Loading...
HomeMy WebLinkAbout2007-052 Page ] of 2 - / 3 , 0 h Board of County Commissioners l/ 1810 25th Street e.. M - CSS Vero Beach, Florida 32960 Telephone: (772) 567-8000 FAX: (772)-778-9391 APPROVED BY TESTING FEB 1 3 2007 for Fellsmere Sidewalk Phase II BOARD COUNTY IRC Project No. 0382 COMMISSION WORK ORDER NO. 2 ( Engineering Division ) FOR FOR PROFESSIONAL GEOTECHNICAL SERVICES AGREEMENT FOR ANNUAL GEOTECHNICAL SERVICES CONTRACT NO . 0534 WITH CTI - CONSTRUCTION TESTING & INSPECTION , INC . All services performed under this contract shall be supervised and certified by a licensed Professional Engineer ( PE) registered with the State of Florida and staff employed directly with your firm . Scope of Services All work shall be performed on a unit price basis in accordance with the attached Scope of Services dated January 2 , 2007 and shall comply with Standards enumerated in the RENEWAL OF THE ANNUAL GEOTECHNICAL SERVICES CONTRACT, IRC PROJECT NO. 0534 WITH CTI , INC . Effective Date : October 1 , 2006 . Minimum Specification Requirements as follows: • In-place moisture density testing of embankment fill , pipe backfill , stabilized sub grade , base course, and curb pads by Nuclear Method (AASHTO-T238). • Laboratory testing of soils and aggregates including Proctors , Limerock Bearing Ratio (LBR) , soil classification , carbonate content (base) , and other such specified QC Tests . • Standard laboratory testing of concrete sidewalk and endwalls. • Preparation and issuance of engineering reports presenting the test results and their compliance with the project specifications. All work shall also comply with the current Florida Minimum Technical Standards. F:\Engineering\Capital Projects\0382 Fellsmere Bike Path-Sidewalk\0382 BCC Agenda WON 02 CTI-02-02-07.doc Page 2 of 2 Work Order #2 Fellsmere Sidewalk Phase II COMPENSATION . The COUNTY agrees to pay, and the Geotechnical Professional agrees to accept , a fee for services rendered according to the "Scope of Services" identified in the attached EXHIBIT "A" Fee Schedule and Man Hours . A Not-to-Exceed Amount of: $2 , 662. 29 to be paid on a unit price basis for actual work performed in accordance with the schedule of services and fees set forth in Exhibit A of RENEWAL OF THE ANNUAL GEOTECHNICAL SERVICES CONTRACT, IRC PROJECT NO . 0534 WITH CTI , INC . Effective Date: October 1 , 2006 . TIME FOR COMPLETION This Work Order No. 2 shall run concurrently with the construction work for the Fellsmere Sidewalk Phase II IRC Bid No. 2006087 IRC Project No. 0382 IN WITNESS HEREOF the parties hereto have executed these presents This 13th day of February , 2007 . OWNER CTI - CONSTRUCTION, TESTING & BOARD OF COUNTY COMMSIONERS INSPECTION, INC. INDIAN RIVERCOUNTY, FLORIDA 1 (Signatzn ' (Signature) — — Kei&Sfo r7 3rancl lyfatlagec (Printid ngmg and title) (Printed name and title) Appr0�ed.pyBCC . .02 / 13 /07 ATTEST: Jeffrey K. Barton, Clerk of Circuit Court Witnessed by : iii V kV,, Deputy Clerk (Printed name) Ap ro ed as to Form ryd Le all ufficiency: � WilliamC un Attorney A ; � ty y eph A. aird, County Administrator F:Tngineering\Capital Projects\0382 Fellsmere Bike Path-Sidewalk\0382 BCC Agenda WO# 02 CTI-02-02-07.doc SCOPE OF SERVICES EXHIBIT "A " 01/02/07 Materials Sampling And Testing Cost Estimate Fellsmere Sidewalk Phase 2 County Project # 0382 From Myrtle Street to Cypress Street I- EARTHWORK IL �I. , R 17 . E �InS 'I��A1'x. r Ips' S6 ra. II" u� ;a iT rC r �� i^ l . astl 19� "e ; • . lit Yost . r 120-6 Embankment 1 per soil type 3 AASHTO T-180 $95.42 15 $39.50 $286.26 $592.50 3 AASHTO M-145 $234.00 $702.00 3 AASHTO T-87 $26.06 $78.18 Total Estimated Cost - $1 ,066.44 i $592.50 ` Working Hours Per Day - 8.00 hrs./day II- ASPHALT MIN IN, e . ,. y, " OO �$�dl�le Ilia ' S tl q.i,llL j b ` ti 465 � 5� IIh �3g . 1i le TOO TBild COskil ililo 1 per 1000 Tons T 308 $ 105.47 $50.50 FM 1 -T 209 $90.00 Total Estimated Cost - ` Working Hours Per Day - 8.00 hrs./day EXHIBIT "A " A SCOPE OF SERVICES 01/02/07 Materials Sampling And Testing Cost Estimate Fellsmere Sidewalk Phase 2 County Project # 0382 From Myrtle Street to Cypress Street II- CONCRETE 522-2 Concrete Sidewalk354 SY 1 per 100 CY per 5 ASTM C-39 $14.00 20 $39.50 $70.00 $790.00 day per mix ASTM C-173 $14.00 $28.67 5 $143.35 3 test min. on soil densities Total Estimated Cost - $ 143.35 1 $70.00 1 $790.00 CTI - Construction Testing & Inspection, Inc. 3 Conc. Cylinders each test SUMMARY: Earthwork - $1 ,658.94 Concrete field test include slump , air, & Temp. Asphalt - Working Hours Per Day - 8.00 hrs./day Concrete - $ 1 ,003.35 Hours are estimated, actual site hours will be billed from field reports. Estimated Contract Cost- $2,662.29