Loading...
HomeMy WebLinkAbout2006-052 WORK ORDER NUMBER 3 This Work Order Number 3 is entered into as of this day of 2005 pursuant to that certain Continuing Contract Agreement for Professional Services entered into as of March 16 , 2004 ("Agreement') , by and between Indian River County, a political subdivision of the State of Florida ("COUNTY') and Brown and Caldwell ("CONSULTANT" ) . The COUNTY has selected the Consultant to perform the professional services set forth on Attachment 1 , attached to this Work Order and made part hereof by this reference . The professional services will be performed by the Consultant for the fee schedule set forth in Attachment 2 , attached to this Work Order and made a part hereof by this reference . The Consultant will perform the professional services within the timeframe more particularly set forth in Attachment 3 , attached to this Work Order and made a part hereof by this reference all in accordance with the terms and provisions set forth in the Agreement. Pursuant to paragraph 1 .4 of the Agreement, nothing contained in any Work Order shall conflict with the terms of the Agreement and the terms of the Agreement shall be deemed to be incorporated in each individual Work Order as if fully set forth herein . IN WITNESS WHEREOF , the parties hereto have executed this Work Order as of the date first written above . BOARD OF COUNTY COMMISSIONERS BROWN AND CALDWELL OF INDIAN RIVER COUNTY BY Yli.14B Harold E . Schmid Jr. , P . E . / ; rtiiur Nau :, r 5r , Ctic.i n Title : Vice President BCC Approved ., I, F, laru'a.ry 14 , 2006 c Attest: J K�Barto6QCle�k-6POourt BY 9r .Nt "tq Deputy Cr6rkf r 4�' Approved : J eph A. Baird , County Administrator r d as to for legal suf iency: )/eian E . Fell , As istant County Attorne Y ATTACHMENT SCOPE OF SERVICES RECLAIMED WATER SYSTEM IMPLEMENTATION PLAN DEPARTMENT OF UTILITY SERVICES INDIAN RIVER COUNTY, FLORIDA This Scope of Services describes work to be performed by Brown and Caldwell (BC) for the Indian River County Department of Utility Services related to development of a countywide Reclaimed Water System Implementation Plan . BACKGROUND Indian River County currently operates four regional wastewater treatment facilities (WWTFs) located throughout the County' s designated utility service area. The plants are designated as the North, Central, South and West Regional WWTFs . Treated effluent from the four plants is conveyed through a looped transmission system to a number of effluent sites, primarily golf courses, located throughout the County. The West Regional and South Regional WWTFs also have permitted surface water discharges to constructed wetlands that ultimately discharge to the Indian River. Because of a continued high rate of growth in Indian River County, WWTF capacity is being increased to keep pace with anticipated increases in wastewater flows . An expansion of the Central Regional WWTF is nearing completion and expansions of the North and West Regional WWTFs will soon be underway. As treatment capacity increases, however, the existing disposal sites will no longer be able to accommodate the quantity of treated effluent required. This will eventually limit the amount of additional treatment capacity that can be constructed unless alternative means of effluent disposal are developed . To date, Indian River County has not made reclaimed water available to individual residences, businesses, parks and greenspace areas for irrigation purposes . However, developers who are now planning future residential and commercial developments are requesting reclaimed water service from the County. This offers Indian River County the opportunity to dispose of additional wastewater effluent while reducing peak water supply demand . Accordingly, the County is interested in exploring the feasibility of developing reclaimed water transmission and distribution system that would make public access quality reclaimed water available to individual residents and businesses either via a low pressure main, a pressurized main or a combination of both . Presently, each of the County' s effluent disposal sites is identified individually in one or more of the WWTF operating permits. If the County wants to add another site or user to the system, a permit modification is required. To facilitate the process of developing a S :A041077.003VIRC Reclaimed Water System Implementation Plan\Attachment I .doc October I , 2005 countywide reclaimed water transmission and distribution system , it would be preferable to have the entire County Urban Service Area designated as Reuse Service Area by FDEP . This would allow the County to provide reclaimed water service to individual residents in identified developments and other land uses without having to go through a permit modification process each time. To have the entire limits of the County designated as Reuse Service Area, however, it is necessary to prepare a Reclaimed Water Master Plan, identifying how the area in question will be provided with public access reclaimed water service and who the major reclaimed water users in the area are expected to be. PROJECT OBJECTIVE The overall objectives of this project are to perform the reclaimed water system master planning necessary for FDEP to designate one or more Reuse Service Areas in Indian River County and to establish an implementation strategy for providing reclaimed water service to individual homes and businesses in the County' s Urban Service Area. More specifically, project objectives include the following : • Develop a wastewater reuse strategy that is responsive to the County' s overall water resources needs, while addressing short-term requirements for effluent disposal capacity. • Identify the current and projected future availability and demand for reclaimed water, as well as the location of potential customers in relation to production facilities . • Identify feasible reuse alternatives, considering current and potential future markets for reclaimed water. • Develop a County-wide Reuse Service Areas in Indian River County so that a Permit for Reclaimed Water can be obtained for the entire area, from any of the County's four WWTFs. • Develop conceptual layouts and planning level cost estimates for low pressure, pressurized and hybrid reclaimed water delivery systems in each proposed Reuse Service Area • Identify a preferred approach for funding capital improvements required for reclaimed water system implementation. • Develop mechanisms for coordinating the technical and economic requirements of the reclaimed water system with the County' s ordinances and Comprehensive Plan . The following describes the work to be performed by BC in preparing the Indian River County Reclaimed Water System Implementation Plan. S:\041077 .003\IRC Reclaimed Water System Implementation PlamAttachment I .doe October I , 2005 SCOPE OF SERVICES BC ' s proposed Scope of Services consists of eight primary work elements or tasks . A brief description of the work to be performed in each task is presented in the following paragraphs. Task 1 — Project Management Project management includes contract administration and project review meetings with Indian River County staff. Subtask 1 . 1 — Contract Administration . Prepare a Project Management Plan and negotiate subconsultant agreements. Monitor the progress of work by all members of the BC Team on a regular basis to assure compliance with the established schedule and budget. Review and process subconsultant invoices and documentation of services completed. Prepare monthly status reports that summarize the work completed to accompany BC invoices to Indian River County for periodic payment. Subtask 1 .2 — Project Review Meetings. Prepare for and attend periodic project status meetings with Indian River County staff to review the progress of work on the project. The first meeting will be a project kick-off meeting and will be held prior to the initiation of work to review and reach a consensus on project scope and direction. Subsequent meetings will be held at approximately monthly intervals thereafter. The meetings will be attended by the BC project manager, as well as other members of the BC Team as may be appropriate for the issues to be discussed. A total of six project review meetings have been assumed for budgeting purposes. All project review meetings will be conducted at the Indian River County Administration Building unless otherwise directed by Indian River County staff. BC will prepare meeting summaries following each meeting and distribute them to all attendees . Task 2 — Data and Information Review The purpose of this task is to compile and review all available data and information with relevance to the development of a low pressure and/or pressurized reclaimed water transmission and distribution system in Indian River County. The work will involve a comprehensive review of existing documents and records and discussions with County staff and other project stakeholders, as applicable. It is anticipated that most of the available data will be in Geographical Information System (GIS) coverages from Indian River County or other sources . Accordingly, all graphic representations and model input data sets will be formulated in a format that is compatible with Indian River County' s GIS database. S:A041077 .003VIRC Reclaimed Water System Implementation PlanA.4ttachment Ldoc October 1 , 2005 Subtask 2. 1 — Existing Effluent Transmission and Disposal System. Review reports, maps, hydraulic models, design documents, permits and permit applications, operating data and other available information related to the location, type and capacity of pumping facilities, pipelines and disposal sites comprising the County ' s existing effluent transmission and disposal system . Meet with County staff and golf course managers to document the wet weather storage capacity available at each disposal site, the quantity of irrigation water used, and the terms of the agreements between the County and the golf courses for delivery of treated effluent. Review operating data available from Indian River County regarding the quantity of treated effluent disposed of at each disposal site over the past five years . Subtask 2 . 2 — Land Use Projections and Planned Future Developments . Compile and review future land use and zoning information available from the Indian River County Planning Department to identify those areas where either a low pressure or pressurized reclaimed water transmission and distribution system would most likely be successful initially. Identify the location of residential and commercial developments already in the planning process that could be potential initial customers for a low pressure, pressurized and/or hybrid reclaimed water transmission and distribution system . Subtask 2 .3 — Population and Wastewater Flow Projections. Review and confirm the population and wastewater flow projections contained in the most recent update of the County ' s Wastewater Treatment and Effluent Disposal Master Plan. If necessary, revise those projections to reflect current planning data available from the County. Subtask 2 .4 — Existing Institutional and Regulatory Environment. Review the provisions of the County' s existing Comprehensive Plan, ordinances , and land development regulations (LDRs) to define policies and procedures that affect the County' s ability to distribute reclaimed water throughout its Urban Service Area. A review of the permitting requirements will be conducted, particularly as it relates to obtaining a General Permit for expanding the reclaimed water system, and how this type of permit can be coordinated with the County' s Comprehensive Plan. Finally, identify regulatory mandates that must be appropriately addressed in the planning phase to gain project approval and eligibility for financial assistance. Subtask 2.5 — Utility Finances and Rates. Review the financial position of the County' s water and wastewater utility system and its current rate structure. Meet with County staff and the County' s financial advisor, if so directed, to identify potential options available for funding of reclaimed water system improvements . Task 3 — Reclaimed Water Needs Assessment Using data compiled in Task 2, make an assessment of the reclaimed water needs of Indian River County to satisfy future customer demand for water and wastewater service in the Urban Service Area. The needs assessment will be made by comparing existing consumptive use permits and existing effluent disposal capacity with future projections of water supply demand and wastewater flow rates . Shortfalls in projected water supply S :\041077.003\IRC Reclaimed Water System Implementation Plan\Attachment Ldoc October I , 2005 and effluent disposal capacity can be made up with reclaimed water utilization, increases in consumptive use permits, and/or development of additional effluent disposal sites . The reclaimed water needs assessment will also consider seasonal variations in supply and demand and will take into account wet and dry weather flow conditions . Reclaimed water utilization rates necessary to satisfy the County' s projected shortfall in long-range water supply and effluent disposal capacity will be prepared, assuming various scenarios for increases in consumptive use permits and the development of additional effluent disposal sites . These scenarios will be associated with high, moderate and low utilization rates for reclaimed water in the County' s Urban Service Area. Knowing approximately how much reclaimed water may need to be produced and delivered in the future will assist in the identification and evaluation of alternative reclaimed water system implementation strategies in Task 4 . Task 4 — Reclaimed Water System Implementation Strategies The objective of this task is to identify and evaluate alternative approaches to implementation of either a low pressure, a pressured or combination reclaimed water system with respect to their applicability for meeting the goals and objectives of Indian River County. Following this initial evaluation, a workshop will be conducted with County staff to reach consensus on a preferred approach for more detailed planning in Tasks 5 and 6 . Subtask 4. 1 — Case Studies of Similar Systems. Develop case studies of up to three other Florida utilities that have developed successful reclaimed water systems similar to that being proposed in Indian River County. Examples of potential case studies include Hillsborough County, the City of Altamonte Springs, and the City of St. Petersburg. Each case study will identify how the reclaimed water distribution system was implemented, including public involvement, revisions to ordinances and development regulations, construction of improvements, methods of financing, and system operation. If possible, the case studies will reflect different approaches to implementation of reclaimed water systems and any regulatory or institutional challenges that were overcome . Subtask 4.2 - Alternative Approaches to Satisfying System Needs . Future water demand and wastewater flow projections will be compared to the projected water supply and wastewater treatment capacity available in each of the service areas in 5 -year increments through 2025 . This evaluation will be used to determine the most limited resource which is now or will act in the future as the economic driver for reclaimed water system expansion . The economic driver may shift over time based on the success of the wastewater reuse program. Determination of the economic. driver will define why the reclaimed water system needs to be expanded and will help to identify who the expanded system will most directly benefit (e. g. water vs . wastewater customers) . This is turn will assist in determining how project costs can be most fairly distributed among System users . The strength of the economic driver will also influence to what extent the use of reclaimed water should be made voluntary or mandatory both now and in the future . S:\041077.003\1RC Reclaimed Water System Implementation PlanWttachment Ldoe October 1 , 2005 The following provides a brief explanation of how the economic driver for reuse system expansion will influence the implementation strategy and regulatory structure presented in the Reuse Master Plan : (1 ) Water Supply as driver — if water supply is the limited resource that is driving the need for reuse expansion, land uses that use large quantities of irrigation water (farming, low density golf course communities, large industrial water users, etc) may be required to use reclaimed water to meet their consumptive use demands and thus will be required to install reuse infrastructure to connect to a backbone system developed by the County and financed through the water/wastewater/reuse rate structure. Pressures on water supply from urban and rural users will be identified to determine the balance between demands on the limited water supply, benefits provided by the various densities of development by using reuse for irrigation ; and costs of providing the infrastructure to realize those benefits . (2) Wastewater Treatment Capacity as driver — if wastewater treatment capacity is the limited resource that is driving the need for reuse system expansion, higher density developments that generate a greater demand for wastewater treatment capacity but a relatively low demand for reuse water due to limited green spaces may need to subsidize large reuse water users or the purchase of additional effluent disposal sites through their wastewater rates and/or provide reuse infrastructure on-site to help generate some of the additional wastewater treatment capacity necessary to serve their developments . Regardless of the economic driver, the goal of the Reclaimed Water System Implementation Plan will be an equitable reuse program that mitigates future water and wastewater system supply shortages and the growth and/or use restrictions that could result from those shortages. Subtask 4.3 — Alternative Approaches to Satisfying Institutional and Regulatory Requirements. The case studies in Subtask 4 . 1 will include an evaluation of the changes made to the Comprehensive Plans, LDRs and Reuse Ordinances in the Case Study jurisdictions to implement the proposed expansion of the reuse system . The degree to which new development approvals will be conditioned on the installation of reuse infrastructure in Indian River County will be addressed in this task. An evaluation will be made to determine if the Comprehensive Plan should be amended to include a Reuse Element or if the Water and Wastewater Sub-elements will need to be amended to reflect the necessity of expanded reuse to provide necessary reductions in consumptive water use and/or increases in wastewater disposal capacity to meet growth projections. The Future Land Use element may need to be amended to include the Reuse Service Areas as a land use overlay, and objectives and policies may need to be added to determine which land use categories will require reuse infrastructure to be provided as a condition of development approval . The Capital Improvements Element will eventually need to be amended to reflect the first 5 -year increment in the Reuse System Capital S:A041077.003VIRC Reclaimed Water System Implementation PlanAAttachment l .doc October 1 , 2005 Improvements Program and how that program will be financed (rates, impact fees, utility revenue reserves, etc . ). The County' s LDRs may need to be amended to reflect the zoning categories which may require the installation of reuse infrastructure as a condition of development approval . Once again, the economic driver and timing associated with the need for reuse expansion will help direct and define the changes that are necessary in the County ' s LDRs. The County' s reuse ordinance will also need to be revised to reflect the proposed Reuse Service Areas and the proposed reuse rate structure which may also influence the ordinances establishing the water and wastewater rate structures . Subtask 4.4 — Financing Strategies and Rate Structure Alternatives. Meet with County staff, and the County' s financial advisor, if directed, to identify potential options for funding of reclaimed water system improvements. Strategies to be considered include, but are not necessarily limited to, the following : • Bonding/debt — Because it is most feasible to serve new customers with water reuse rather than retrofit the existing developed areas, a debt strategy which is based on the principle that the infrastructure will serve future customers and so the payments should be made by future customers has merit. The utility' s debt capacity must be determined to ensure that a debtibonding strategy will not hamper the utility' s ability to continue to conduct their business and effectively serve their customer base. Types of debt instruments and their feasibility for use will be analyzed in this task. • Pay-As-You-Go A cash strategy utilizes cash reserved and cash flow generated by existing utility customers. It can be theorized that the existing customers have received the benefit of using the limited supply of potable water and wastewater treatment capacity and the cost of using that limited resource will be used to expand the capacity of the system to continue to serve others entering the system . Once new customers are being served, they too will begin to pay into the cash reserves to be used to further expand the system. This type of strategy will likely result in the slower implementation of a master reuse system, however, the needs analysis will determine if this is acceptable. • Cash and Debt Combination — A financing strategy that combines debt and cash could be a feasible approach to implementing the master reuse system expansion plan. This type of strategy will be investigated as one of the possible financing alternatives . Each of the financing strategies identified will be evaluated with respect to applicability for reclaimed water infrastructure projects in Indian River County. The advantages and disadvantages of each strategy will be presented in the Technical Memorandum in Subtask 4 . 5 and discussed at the workshop meeting in Subtask 4. 6. S:A041077.003VIRC Reclaimed Water System Implementation PlanAAttachment I .doc October I , 2005 6 The limited resource, or economic driver, identified in Task 3 , be it primarily effluent disposal (wastewater treatment capacity) or water supply, will influence the distribution of costs in the eventual reclaimed rate structure. The analysis in this section will compare the rate structures in the Case Study jurisdictions and how the costs were distributed between water, wastewater and reclaimed water customers. Alternatives for designing a reclaimed water rate structure in Indian River County' s will also be presented and discussed. Subtask 4.5 — Technical Memorandum. Prepare an interim deliverable in Technical Memorandum format that summarizes the results of the work performed in Tasks 2 through 4 for review by Indian River County staff. The Technical Memorandum will provide the reference material for the discussions to be conducted at the workshop meeting in Subtask 4 . 6 . Subtask 4.6 — Workshop Meeting on Implementation Strategy. BC will prepare for and lead a workshop style meeting with County staff. BC Team members will present the results of work preformed in Tasks 2 and 3 , as well as the findings of the case studies and the preliminary evaluations in Subtasks 4 . 1 through 4.4. The purpose of the workshop meeting will be to gain consensus on an implementation strategy to be used as the basis for more detailed planning in subsequent tasks. Task 5 — Reclaimed Water System Conceptual Design This task includes the planning and conceptual design of an expanded reclaimed water distribution system in Indian River County to serve residential and commercial developments as well as existing users such as gold courses . Subtask 5. 1 — Define Geographical Reuse Service Areas. Based on the land use and planning information compiled and reviewed in Task 2 , define the geographical limits of the proposed Reuse Service Area within the County. While the goal of this program is to have the primary Reuse Service Area defined as the County Urban Service Area, from a planning perspective it is important to evaluate the capabilities of each WWTF, and define sub areas, so that the County can properly management of the reclaimed water produced at each WWTF . However, other options will also be considered, taking into account the demand for reclaimed water in the WWTF service areas and the location of potential customers within those service areas . Describe the background information on the physical, environmental, and demographic characteristics of each of the areas served by the County's four W WTFs. This task will focus on the factors that affect planning, design, and operation of a low pressure, a pressurized and a combination reclaimed water transmission and distribution system . Topics will include vicinity mapping, soils, climate, population and land use zoning. Information from the County's Comprehensive Plan and the County's Planning Department will be reviewed and summarized to document the proposed development in the County's four WWTF service areas. S :\041077.003\IRC Reclaimed Water System Implementation Plan\Attachment I .doc October I , 2005 The study area boundaries will be as defined and presented in a GIS format. Key political jurisdictions will be defined including public and private utilities service areas . Subtask 5.2 — Identify Major Reclaimed Water Users . Within each proposed Reuse Service Area, identify all major users of reclaimed water, typically defined as customers using an average of 100, 000 gallons or more of reclaimed water per day will be identified and located on a map of the System. Also identify the location of any planned residential or commercial developments to be served initially by the reclaimed water system. Subtask 5.3 — Forecast Initial and Future Reclaimed Water Demand Projections. Prepare reclaimed water demand projections for each proposed Reuse Service Area in 5 - year increments over the next 20 years . Relate the number of potential reclaimed water customers and the potential reclaimed water demand to wastewater treatment capacity and the quantity of reclaimed water that will be available in each Reuse Service Area over that period. Subtask 5.4 — Develop Conceptual Design of Reclaimed Water System. For each Reuse Service Area, develop recommendations for wastewater reuse and develop a conceptual layout for a reclaimed water storage, transmission and distribution system. Depending on operational requirements and the locations of planned developments, the conceptual layouts may or may not include the existing transmission loop that supplies effluent disposal sites . The initial phases of reclaimed water system development will likely focus on the areas between the source (WWTF) and one or two major users in the Reuse Service Area. The conceptual designs will include planning level definition of the following: • Developments or geographical areas to be served initially with reclaimed water; • Availability of reclaimed water customers, reclaimed water demand, and potential revenues from the sale of reclaimed water; • Improvements at reclaimed water production facilities (WWTFs) that are required to produce a reliable supply of reclaimed water; • Approximate locations and sizes of reclaimed water storage tanks, pumping stations, and transmission mains required initially in each Reuse Service Area; • A planning level opinion of probable construction cost; and • A plan for phased construction over the next 10 years, taking into account developers ' timelines for having new reclaimed water customers connected to the County' s System. Simplified hydraulic models will be used to develop a conceptual layout and the approximate sizing of reclaimed water system components required for each Reuse Service Area. The models will be developed using GIS data available from Indian River S:\041077.003\IRC Reclaimed Water System Implementation PlanWttachment I .doc October 1 , 2005 County, as well as data from the County' s model of the existing effluent transmission main loop. Definition of actual pipeline alignments and the siting of storage tanks, booster pumping stations and other system components, however, are beyond the scope of this task. These activities will be completed in subsequent phases of work that will include detailed modeling and design of required improvements . Task 6 — Implementation Plan The objective of this task is to provide additional planning for the implementation of the recommended reclaimed water distribution system in Indian River County, taking into account the various technical, institutional and financial considerations involved and the implementation strategy reached at the workshop meeting in Subtask 4 . 5 . Subtask 6. 1 — Document Implementation Strategy. Document the proposed strategy for satisfying the County' s goals objectives in implementing the recommended reclaimed water delivery system . The implementation strategy will consider the reclaimed water demand and effluent disposal needs of the County' s System, the County' s financial resources, and any institutional changes that would be required. Subtask 6.2 — Modifications to Comprehensive Plan, Ordinances and Development Regulations. Meet with County Planning Department staff and make recommendations for modifications to the County' s Comprehensive Plan; water, wastewater and reclaimed water ordinances ; and LDRs, consistent with the County ' s strategy for implementing the expanded reclaimed water distribution system. BC will prepare suggested text changes for consideration by County staff. Preparation of applications for Comprehensive Plan amendments and adoption proceedings for local ordinances and regulations will be the responsibility of County staff. Subtask 6.3 — Implementation Plan. Prepare a comprehensive plan documenting the specific work activities required to implement the various elements of the recommended reclaimed water transmission and distribution system. The implementation plan will include planning level schedules and cost estimates for capital improvements, a Plan of Finance including specific recommendations for follow-on evaluations of required user charges and fees, and the identification of any additional institutional and regulatory requirements that must be satisfied. Task 7 — Report Preparation Prepare a Reclaimed Water Implementation Plan Report documenting the work performed in Tasks 2 through 6 above and summarizing the County' s plan for developing an expanded reclaimed water transmission system. Subtask 7. 1 — Draft Report. Prepare five (5) copies of a Draft Reclaimed Water System Implementation Plan Report and submit to Indian River County for review. SA041077.003\IRC Reclaimed Water System Implementation Plan\Wttachment l .doc October 1 , 2005 Subtask 7.2 — Final Report. Meet with County staff to discuss review comments on the draft report. Make appropriate revisions to the draft report and prepare a Final Reclaimed Water System Implementation Plan Report. Submit ten (10) bound copies of the final report to Indian River County. Electronic copies of all graphics, databases, models and other supporting documentation will also be provided with submittal of the final report. Task 8 — FDEP Permit Modifications This task includes work required to have the entire utility service area of unincorporated Indian River County included in one or more Reuse Service Areas, consistent with the recommended implementation plan developed in Task 6 above. Subtask 8. 1 — Coordination with FDEP during Plan Development. BC will coordinate with FDEP Central District staff during work on the Reclaimed Water System Implementation Plan to assure that all regulatory requirements are being considered and that the work is being focused on providing the information necessary for FDEP to approve geographical Reuse Service Areas. Included in this effort will be two pre- application meetings with FDEP staff in Orlando, one at the initiation of work to communicate the County' s goals and objectives for the project, and the second later in the project to communicate the County' s proposed plan. Subtask 8.2 — Applications for Permit Modifications. Prepare applications for WWTF permit modifications to recognize the proposed Reuse Service Areas. For budgeting purposes, it has been assumed that FDEP operations permit for one of the four existing W WTFs will be modified to incorporate the overall service area for the County' s four WWTFs, which will result in a major permit modification. It is anticipated that the Reclaimed Water System Implementation Plan Report will include all of the supporting documentation that FDEP will need to issue the minor permit modifications and that no Requests for Additional Information (RAIs) will be made. Task 9 — Meetings and Presentations In this task, BC will assist County staff in making presentations to the Utility Advisory Committee (UAC) and the Board of County Commissioners (BoCC) regarding the Reclaimed Water System Implementation Plan. Subtask 9. 1 — UAC Meetings. BC will assist County staff in making two presentations to the UAC . The first presentation will be made at the conclusion of Task 4 to present the preferred strategy for implementing the expanded reclaimed water system. The second presentation will be made following the completion of Task 6, but prior to submittal of the Draft Report, to discuss specific recommendations and follow-on work activities for expanding the reclaimed water system. Subtask 9.2 — BoCC Meeting. Following submittal of the Draft Report, BC will assist County staff in presenting the recommendations of the countywide Reclaimed Water System Implementation Plan at a regularly scheduled meeting of the BoCC . BC will prepare a PowerPoint presentation (or equivalent graphics) that summarizes the primary elements and recommendations of the Plan. S :\041077.003\IRC Reclaimed Water System Implementation Plan\Attachment l .doc October 1 , 2005 ATTACHMENT 2 PROJECT BUDGET RECLAIMED WATER SYSTEM IMPLEMENTATION PLAN DEPARTMENT OF UTILITY SERVICES INDIAN RIVER COUNTY, FLORIDA Brown and Caldwell proposes to perform the services described in Section 1 for the lump sum amount of $ 194, 500, which includes all BC labor charges, subconsultant charges and direct expenses associated with performance of the work. A breakdown of labor hours, by task, and a summary of anticipated direct expenses and subconsultant fees are presented on the following pages. S :\041077.003\IRC Reclaimed Water System Implementation Plan\Attachment 2 .doc October I , 2005 COST ESTIMATE RECLAIMED WATER SYSTEM IMPLEMENTATION PLAN INDIAN RIVER COUNTY, FLORIDA BROWN AND CALDWELL - OTHER DIRECT COSTS NO. OF UNIT TOTAL UNIT UNITS COST COST 1 .0 AIRFARE TRIP 0 500 $0 2.0 MILEAGE Ml . 2,640 0.38 $990 Tot 3 .0 LODGING AND MEALS DAY 0 120.00 $0 4.0 CAR RENTAL DAY 10 50.00 $500 5.0 B/W COPYING AND PRINTING WORK EFFORT PAGE 0 0. 10 $0 DRAFT REPORTS PAGE 0 0. 10 $0 FINAL REPORTS PAGE 0 0. 10 $0 11 x 17 COPIES (TOTAL) PAGE 0 0.20 $0 BNV COPYING SUBTOTAL $0 6.0 COLORCOPYING DRAFT REPORTS PAGE 0 1 .00 S0 FINAL REPORTS PAGE 0 1 .00 $0 COLOR COPYING SUBTOTAL $0 6.0 COMMUNICATIONS TELEPHONE LS 0 500.00 $0 POSTAGE LS 0 50.00 $0 FEDERALEXPRESS UNIT 10 25.00 $250 FAX PAGE 0 2.00 $0 COMMUNICATIONS SUBTOTAL $250 7.0 COMPUTER CADD/GIS HOUR 0 20.00 $0 ENGINEERING HOUR 0 15.00 $0 WORD PROCESSING HOUR 0 10.00 $0 COMPUTER SUBTOTAL $0 8.0 SUBCONSULTANTS JPR Planning Services, Inc. LS 1 36000.00 $36,000 $0 SUBCONSULTANTS SUBTOTAL $36,000 OTHER DIRECT COSTS SUBTOTAL $37,740 MARKUP ON ODCs 0.0% $0 TOTAL OTHER DIRECT COSTS $37,740 , PROJECT COST SUMMARY __ . TOTAL BILLING LABOR COST $ 156, 760 TOTAL OTHER DIRECT COSTS - $ 37,740 TOTAL PROJECT COST $ 194,500 S:\041077.003\IRC Reclaimed Water System Imp Plan\Cost Estimate_rev2.xls ATTACHMENT PROJECT SCHEDULE RECLAIMED WATER SYSTEM IMPLEMENTATION PLAN DEPARTMENT OF UTILITY SERVICES INDIAN RIVER COUNTY, FLORIDA Brown and Caldwell estimates that the work associated with development of the Reclaimed Water System Implementation Plan will take approximately seven (7) months to complete. Assuming a Notice to Proceed is issued by January 10, 2006, submittal of the draft report would occur by the end of July 2006 . Submittal of the final report and applications for FDEP permit modifications would be made subsequent to a final presentation to the Board of County Commissioners. Project Milestone Estimated Completion Date Notice to Proceed February 7, 2006 Data Review (Task 2) March 10, 2006 Reclaimed Water Needs Assessment (Task 3) March 24, 2006 Reclaimed Water Implementation Strategies (Task 4) Technical Memorandum April 7, 2006 Workshop Meeting for Consensus Building April 21 , 2006 Presentation to UAC May 4, 2006 Reclaimed Water System Conceptual Design (Task 5) June 2 , 2006 Reclaimed Water System Implementation Plan (Task 6) June 2 , 2006 Presentation to UAC July 6, 2006 Draft Report Submittal July 31 , 2006 Presentation to BOCC August 15 , 2006 Final Report Submittal August 31 , 2006 FDEP Permit Applications Submitted February 10, 2006 It should be noted that the proposed Project Schedule is subject to change at the direction of County staff based on project requirements and scheduling of presentations to the Utility Advisory Committee and the Board of County Commissioners . S :A041077.003VIRC Reclaimed Water System Implementation PlanAAttachment 3 .doc Febmary3, 2005 ATTACHMENT 4 f ' Wastewater Capacity and Estimated Flow - West Regional W WTF Figure 1 8.00 Treatment Capacity �— Demand with Concurrency Demand less Conolrrency 6.00 1 1 1 E 1 4.00 0 LL 1 1 1 1 2.00 0.00 2000 2005 2010 2015 2020 2025 2030 You" Wastewater Capacity and Estimated Flow - South Regional WWTF Figure 2 4.0 Treatment Cepadly Oe 5a with Concurrency Demand less Concurrency m E 0 2.0 LL Oe 2000 2005 2010 2015 2020 2025 2030 Years ISS 5 IRC WWTF Expansion May 2005 / / ATTACHMENT 5 Wastewater Capacity and Estimated Flow - North Regional WWTF Fipure 4 6.0 Treatment Capacity - Demand with Concurrency Demand lass Cencumency 4.0 I 9 1 E 1 0 1 EL I 1 2.0 1 1 1 I 0.0 2000 2005 2010 2015 2020 2025 2030 years Wastewater Capacity and Estimated Flow - Central Regional W WTF Fipure 5 6.0 Treatment Capacity Demand with Concurrency Demand less Concurrency 4.0 wi 0 9 E 1 a 1 woo a 1 I 20 0.0 2000 2005 2010 2015 2020 2025 2030 years Mv 8 IRC WWTF Expansion May 2005 ATTACHMENT 6 DEPARTMF:N'I OF UTILITY SERVICES - AA;ATEA & WASTEWATER PLANT INFORIMATION Owner of System: Indian River County Department of Utility Scn� ices UPDA'1' HD AS OI'.Address: 1940 25di Sncct 1/5 /2006 City, County, State, ZIP: Ccm Reach, Indian lover County, RL 12960 G IfQ� \ � 1` Telephone / Fax 777 567 5000 Extension 1835 / 772-774-5143 Engineering Services. Title: Phone Extension: email. Michael C I-lotchkt s, P. E. Capital Projects M nager 1821 1II1Iotdlk1Sl@d1rCrov-com I hinan.hu IL Alchta, RE- Environmental Engineer 1822 1a�t1ranii1cgnv.com \\ // Gordon L- Sparks, P. E. Gnvironmrntal ljnydncer 1823 Gs arks i c nv-cnm Larry 13Brown,LOAN ' c r g P. G- hnvlronmental Ana neer 1827 Ibatwn " ncgov.con Joseph Tombro Plans Reviewer 1826jtombcogeugg0v.com WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION Nano of Treatment Plan[ Serving Project Central WWTF North \Cn\TCP South \CRYrTF West WWTP County Indian Ricer Indian (liver Indian Nicer Indian Rn er City Vero Beach Vero Beach Veto Beach Vero Beach DEP Permit Number FLA 010431 EI,A 104388 FLA 1110435 PLA 041637 Expiration Date 4/22/2008 12/6/2009 2/26/2007 03/27/2010 Flow routed m Central Status Acme WW'IP Active Acme Maximum monthly average daily Bow over tire last 12 monthiod 1 .916 AIGD flow Inured to Centel pen VAVI'1 L635 MCI7 1 , 132 MC3D Month(s) Used December-04 to November-05 Maximum three-month averse daily Bow over the last 12 month period 1 .739 MGD Plow muted to Cenral g Y P W\V/rl: 1 .491 bIGD 1 .074 MGD Months(s) Used December-04 to Noveuber-05 Current Permitted Capacity, MADE 2.000 MGD 0.850 MGD 2.000 A1GI7 2.000 MGD Future Expansion, MADE To 4.00 MGD Current Outstanding Flow Commitments (a) 2.500 MGD 1 .8721\IGD (a) 1 ,263 bIGD (a) O Current Oursrandin, Floor Commurromrs = Afa.rimum Afmuhly ADF + Plant Capacity Associated ev}h FRU'.. Sold to Reserve Fmurc Cloc ci� . (a) - South If FTF & t est IhIVTFruc in a common ulniceanori PUBLIC WATER SYSTEM (PWS) INFORMATION PWS Name: North County & South County RO Water Plants PWS Identification No.: 3314052 PWS Type: Coninuuity �- Total Permitted Maximum Day Operating Capacity of Plant(s): 12, 100,000 GPU Total Maximum Day Flow at Plant(s) as Recorded on Monthly Operating Reports During Past 12 Months: 9,640,000 GPD 1`Alinlk'eA111111 S - UNG 1 N 1 NL 'CAt y6ievd. x ll nAGbmrv . IS IIS ....... uulnnla - tiw wmR9l e6 "r' Ele.n¢migJa