Loading...
HomeMy WebLinkAbout2007-283A Board of County Commissioners 1801 27'" street Vero Beach, Florida 32960 Telephone: (772) 567-8000 FAX: 772-778-9391 WORK ORDER NO. 4 (Engineering) FOR PROFESSIONAL BRIDGE DESIGN SERVICES AGREEMENT FOR ANNUAL BRIDGE DESIGN SERVICES CONTRACT WITH Bridge Design Associates, Inc. Indian River County Project No. 0611 -B This Work Order No. 4 is in accordance with the existing AGREEMENT dated October 3 , 2006 between Bridge Design Associates, Inc. (ENGINEER) and Indian River County (COUNTY). This Work Order No. 4 amends the agreement as follows: SECTION I — PROJECT LIMITS 56'hPlace Bridge over I.R.F.W.C.D. North Relief Canal SECTION II — SCOPE OF SERVICES This Work Order No . 4 is for providing Construction Phase Service (Construction Engineering and Inspection) for the above mentioned project. SECTION III - TIME FOR COMPLETION During Bidding and Construction Phases. SECTION IV — COMPENSATION The COUNTY agrees to pay, and the ENGINEER agrees to accept, a fee for services rendered according to the " Scope of Services" identified in Section II and III of this Work Order No . 4, Hourly Not To Exceed $30.201 .20 . C:\DOCUME-1 \Kimberly\LOCALS- 1 \Temp\Temporary Directory 1 for BCCBridgeDesignWorkOrder#407-30- 07.zip\BCCBridgeDesignWorkOrder#407-30-07.doc PAGE TWO Work Order No. 4 Bridge Design Associates, Inc. July 30, 2007 The AGREEMENT is hereby amended as specifically set forth herein. All remaining sections of the AGREEMENT shall remain in full force and effect, and are incorporated herein. IN WITNESS WHEREOF the parties hereto have executed these presents this 2, day of drT 2007. ry BRIDGE DESIGN ASSOCIATES, INC . INDIAN RIVER COUNTY , FhOkiDA BOARD OF COUNTY COMMIS-WNERS BY: BY : G PREs l �GIf T GARY C. EJ.ER, CAMM-ftRSON Title: Approved by the BCC : q J k4 Witnessed By: d ATTEST: ! _K. 6ARTOM Jeffrey K. Barton Clerk of Circuit Court BY: c tiv, l DEPUTY CLERK OF COURT OSEPH I OUNTY ADMINIST OR � WILLIAM G� COLLINS, II COUNTY ATTORNEY Approved as to Form and Legal Sufficiency C :IDOCUME-1\Kimberly\LCCALS- 1 \Temp\Temporary Directory I for BCCBridgeDesignWorkOrder#407-30- 07.zip\B CCBridgeDesign W orkOrd er#407-30-07.doc BRIDGE DESIGN ASSOCIATES , INC . CONSULTING ENGINEERS BRIAN C. RHEAULT, P.E. President July 23, 2007 Indian River County 1840 25"' Street Vero Beach, Florida 32960 ATTENTION : Chris Kafer, P . E . REGARDING: 56TH Place over North Relief Canal Construction Phase Services PROJECT NO. : 06-525 Dear Chris: Pursuant to your request, Bridge Design Associates, Inc. can provide the necessary construction phase services at the above referenced project site. We propose to provide these services on an hourly, not to exceed basis. The attached Exhibits "A" is a manhour breakdown of tasks with commensurate fees. If you have any questions, please give me a call. Respectfully, BRIDGE DESIGN ASSOCIATES, INC. Brian C. Rheault, P. E. President BCR: kedS:%2006-Jobs106-625 56th PL N over 53rd St Bridge%Correspondencelpro cps 07-23-07.wpd 2035 Vista Parkway, Suite 200 • West Palm Beach, Florida 33411 (561) 686-3660 • Fax : (561) 686-3664 BRIDGE DESIGN ASSOCIATES, INC. 56TH PLACE OVER NORTH RELIEF CANAL July 25, 2007 HOURLY BREAKDOWN OF SERVICES EXHIBIT "A ' PROJECT PROJECT CADD FIELD TOTAL LABOR MANAGER ENGINEER TECH REP/ HOURS COST ACTIVITY E.I. BY BY ACTIVITY ACTIVITY $130.50 $110.20 $89.90 $62.35 Pre-Construction Meeting 2.0 2.0 4.0 $385.70 Shop Drawing Reviewes / concrete mix, test pile, re-cast components 2.0 8.0 8.0 18.0 $1 ,641 .40 Pile Casting / Sheet Piles 48.0 48.0 $2,992.80 Pile Driving 80.0 80.0 $4,988.00 Pile Caps 32.0 32.0 $1 ,995.20 Prestressed Placement / Closure Pour 24.0 24.0 $1 ,496.40 Post Tensioning 2.0 2.0 48.0 52.0 $3,474.20 Sidewalks 24.0 24.0 $1 ,496.40 Barriers 24.0 24.0 $1 ,496.40 Approach Slab 16.0 16.0 $997.60 Approach Slab sidewalks 16.0 16.0 $997.60 Approach Slab barriers 32.0 32.0 $1 ,995.20 Revetment I Slope Protection 16A 16.0 $997.60 Final Inspection 2.0 2.0 4.0 $385.70 Final Rep2d & Certfication 2.0 1 2.0 $261 .00 TOTAL MANHOURS 10.0 10.0 0.0 372.0 392.0 DIRECT LABOR COST $1 ,305.00 $1 ,102.00 $0.00 $23, 194.20 $25,601 .20 ENGINEERING FEES $25,601 .20 PDA TEST $4,600.00 06-625 pro cps TOTAL $30,201 .20