Loading...
HomeMy WebLinkAbout2007-283B Board of County Commissioners. 1801 27th Street Vero Beach, Florida 32%0 Telephone: (772) 567-8000 FAX: 772-778-9391 WORK ORDER NO. 5 (Engineering) FOR PROFESSIONAL BRIDGE DESIGN SERVICES AGREEMENT FOR ANNUAL BRIDGE DESIGN SERVICES CONTRACT WITH Bridge Design Associates, Inc. Indian River County Project No. 0107-B This Work Order No. 5 is in accordance with the existing AGREEMENT dated October 3 , 2006 between Bridge Design Associates, Inc. (ENGINEER) and Indian River County (COUNTY). This Work Order No. 5 amends the agreement as follows: SECTION I - PROJECT LIMITS 53'd Street Bridge over I.R.F.W.C .D. Lateral H Canal SECTION H - SCOPE OF SERVICES This Work Order No. 5 is for providing Construction Phase Service (Construction Engineering and Inspection) for the above mentioned project. SECTION III - TIME FOR COMPLETION During Bidding and Construction Phases. SECTION IV - COMPENSATION The COUNTY agrees to pay, and the ENGINEER agrees to accept, a fee for services rendered according to the "Scope of Services" identified in Section II and III of this Work Order No. 5, Hourly Not To Exceed $30,883 .00. C:\DOCUME-1 \Kimberly\LOCALS-1\Temp\Temporary Directory 2 for BCCBridgeDesignWorkOrder1W07-30- 07.zip\BCCBridgeDesign WorkOrder#507-30-07.doc PAGE TWO Work Order No. 5 Bridge Design Associates, Inc. July 30, 2007 The AGREEMENT is hereby amended as specifically set forth herein. All remaining sections of the AGREEMENT shall remain in full force and effect, and are incorporated herein. IN WITNESS WHEREOF the parties hereto have executed these presents this 2 day of u sT 2007. BRIDGE DESIGN ASSOCIATES, INC . INDIAN RIVER COUNTY, FLORIDA BOARD OF COUNTY COMMISSIONERS BY : �� BY: l� Title: PRES ! DEIs'7- GARY C. WHEYLER, CHAIRPERSON ( Approved by the BCC : q l4 I0 -7 Witnessed By: � "� ATTEST: 4 . K. BARTON Jeffrey K. Barton � Clerk of Circuit Court BY: Yet u o �ir kyr D UE UTY CLERK OF CO RT SEPH B IRD C UNTY AD IS WILLIAM G . COLLINS, II COUNTY ATTORNEY Approved as to Form and Legal Sufficiency C:\DOCUME-1 \Kimberly\LOCALS-I\Temp\Temporary Directory 2 for BCCBridgeDesignWorkOrder#407-30- 07.zip\BCCBridgeDesign WorkOrder#507-30-07.doc BRIDGE DESIGN ASSOCIATES , INC . CONSULTING ENGINEERS BRIAN C. RHEAULT, P.E. President July 23, 2007 Indian River County 1840 25'" Street Vero Beach, Florida 32960 ATTENTION: Chris Kafer, P. E . REGARDING: 53`' Street Bridge over Lateral "H" Canal Construction Phase Services PROJECT NO. : 05-623 Dear Chris: Pursuant to your request, Bridge Design Associates, Inc. can provide the necessary construction phase services at the above referenced project site. We propose to provide these services on an hourly, not to exceed basis_ The attached Exhibit "A" is a manhour breakdown of tasks with commensurate fees . If you have any questions, please give me a call. Respectfully, BRID E DESIGN ASSOCIATES, INC. Brian C. Rheault, P. E. President BCR:kedS:V005-Jobs105.623 53rd Street at Lateral HICorrespondencelpro cps 07-23-07.wpd , ft&v � <5 D JUS ENG/H FR CCQ�TIo' Y N 2035 Vista Parkway, Suite 200 • West Palm Beach, Florida 33411 (561) 686-3660 • Fax: (561) 686-3664 BRIDGE DESIGN ASSOCIATES, INC. 53RD STREET OVER LATERAL "H" CANAL July 25, 2007 HOURLY BREAKDOWN OF SERVICES EXHIBIT "A" PROJECT PROJECT CADD FIELD TOTAL LABOR MANAGER ENGINEER TECH REP/ HOURS COST ACTIVITY E.I. BY BY ACTIVITY ACTIVITY $130.50 $110.20 $89.90 $62.35 Pre-Construction Meeting 2.0 2.0 4.0 $385.70 Shop Drawing Reviewes / concrete mbc test pile, re-cast components 2.0 16.0 8.0 26.0 $2,523.00 Pile Casting / Sheet Pile 112.0 192.0 $6,983.20 Pile Driving 56.0 56.0 $3,491 .60 Pile Caps 16.0 16.0 $997.60 Prestressed Beams *48.048.0 $2,992.80 CIP Slab 8.0 $2,378.00 Median $498.80 Sidewalks $997.60 Banters $997.60 A roach Slab $997.60 Approach Slab sidewalks $997.60 Approach Slab barriers 16.0 16.0 $997.60 Slope Protection 16.0 16.0 $997.60 Final Ins ectton 2.0 2.0 4.0 $385. 70 Final Report & Certification 2.0 2.0 $261 . 00 TOTAL MANHOURS 8.0 24.0 0.0 372.0 404.0 DIRECT LABOR COST $1 ,044.00 $2,644.80 $0.00 $23, 194.20 =$26,883.00 ENGINEERING FEES $26,883.00 PDA Test $4,000.00 05-623 pro cps TOTAL FEES $30,883.00