Loading...
HomeMy WebLinkAbout2007-283C � VJIN Board of County Commissioners. 1801 27th Street Vero Beach, Florida 32960 Telephone : (772) 567-8000 FAX: 772-778-9391 WORK ORDER NO . 6 (Engineering) FOR PROFESSIONAL BRIDGE DESIGN SERVICES AGREEMENT FOR ANNUAL BRIDGE DESIGN SERVICES CONTRACT WITH Bridge Design Associates, Inc. Indian River County Project No. 9920-B This Work Order No. 6 is in accordance with the existing AGREEMENT dated October 3 , 2006 between Bridge Design Associates, Inc. (ENGINEER) and Indian River County (COUNTY). This Work Order No . 6 amends the agreement as follows : SECTION I — PROJECT LIMITS 16`h Street Bridge over I .R.F.W. C .D. Range Line Canal (at 74`h Avenue) SECTION II — SCOPE OF SERVICES This Work Order No. 6 is for providing Construction Phase Service (Construction Engineering and Inspection) for the above mentioned project. SECTION III - TIME FOR COMPLETION During Bidding and Construction Phases. SECTION IV — COMPENSATION The COUNTY agrees to pay, and the ENGINEER agrees to accept, a fee for services rendered according to the " Scope of Services" identified in Section 11 and III of this Work Order No . 6, Hourly Not To Exceed $23 , 116 . 80. F:\Engineering\Capital Projects\Bridge Design\BCC Bridge Design Work Order #6 07-30-07.doc PAGE TWO Work Order No. 6 Bridge Design Associates, Inc. July 30, 2007 The AGREEMENT is hereby amended as specifically set forth herein. All remaining sections of the AGREEMENT shall remain in full force and effect, and are incorporated herein. IN WITNESS WHEREOF the parties hereto have executed these presents this 23 day of �sUJ7- 2007. BRIDGE DESIGN ASSOCIATES, INC . INDIAN RIVER COUNTY , FLO1�IDA BOARD OF COUNTY ,C'O/MMIS, lONERS BY : BY : GARY C. ER, CHAIRPERSON Title: PA6l t) C9-F Approved by the BCC : C1 14 '1 C 7 Witnessed By: k' Alt44,eig ATTEST: i.;K. BARTON Jeffrey K. Barton Clerk of Circuit Court BY : �y , DEPUTYCLERKOF COURT WILLIAMAG.RCOLILINS, 11 STR O COUNTY ATTORNEY Approved as to Form and Legal Sufficiency C:\DOCUME—IUKimberly\LOCALS-llTemplTemporary Directory 3 for BCCBridgeDesignWorkOrder#407-30- 07.zip\BCCBridgeDesign WorkOrder#607-30-07.doc BRIDGE DESIGN ASSOCIATES , INC . CONSULTING ENGINEERS BRIAN C. RHEAULT, P.E. President July 23 , 2007 Indian River County 184025 1h Street Vero Beach , Florida 32960 ATTENTION : Chris Kafer, P . E . REGARDING: 16`" Street Bridge over 74"' Avenue Construction Phase Services PROJECT NO. : 05-624 Dear Chris : Pursuant to your request, Bridge Design Associates, Inc. can provide the necessary construction phase services at the above referenced project site. We propose to provide these services on an hourly, not to exceed basis. The attached Exhibit "A" is a manhour breakdown of tasks with commensurate fees. If you have any questions , please give me a call. Respectfully, BRIDGE DESIGN ASSOCIATES , INC . Brian C . Rheault, P . E . President BCR: kedS:t2005-Jobs105-624 16th Ave Bridge at 74thAvenuelCorrespon* jp -07.w JUL 2 62007 (jS� INDIAN RIVER ' N 2035 Vista Parkway, Suite 200 • West Palm Beach, Florida 33411 (561) 686-3660 • Fax: (561) 686-3664 BRIDGE DESIGN ASSOCIATES, INC. 16TH STREET BRIDGE OVER 74TH AVENUE July 25, 2007 HOURLY BREAKDOWN OF SERVICES EXHIBIT "A" PROJECT PROJECT CADD FIELD TOTAL LABOR MANAGER ENGINEER TECH REP/ HOURS COST ACTIVITY E.I. BY BY ACTIVITY ACTIVITY $130.50 $110.20 $89.90 $62.35 Pre-Construction Meeting 2.0 2.0 4. 0 $385.70 Shop Drawing Reviewes / concrete mix, test pile, re-Cast components 2.0 8.0 8.0 18. 0 $1 ,641 .40 Pile Casting / Sheet Piles 50.0 80.0 $4,988.00 Pile Driving 40.0 40.0 $2,494.00 Pile Cas 16.0 16.0 $997.60 Prestressed Placement / Closure Pour 12.0 12.0 $748.20 Post Tensioning 2.0 2.0 12.0 16.0 $1 ,229.60 Sidewalks 8.0 8.0 $498.80 Barriers 16.0 16.0 $997.60 Approach Slab 16.0 16.0 $997.60 Approach Slab sidewalks 16.0 16.0 $997.60 Approach Slab barriers 24.0 24.0 $1 ,496.40 Revetment & misc. pipes 16.0 16.0 $997.60 Final Inspecfion 2.0 2.0 4.0 $385.70 Final Report & Certification 2.o 7.A $zsl .00 TOTAL MANHOURS 10.0 10.0 0.0 268.0 288.0 DIRECT LABOR COST $1 ,305.00 $1 ,102.00 T $0.00 $16,709.80 $ 19, 116.80 ENGINEERING FEES $19, 116.80 PDA Test $4,000.00 05-624 pro cps TOTAL $23, 116.80