Loading...
HomeMy WebLinkAbout2007-373 116 7 rJ J 73 Board of County Commissioners. 1801 27th Street Vero Beach, Florida 32960 Telephone : (772) 567-8000 FAX : 772-778-9391 WORK ORDER NO. 7 (Engineering) FOR PROFESSIONAL BRIDGE DESIGN SERVICES AGREEMENT FOR ANNUAL BRIDGE DESIGN SERVICES CONTRACT WITH Bridge Design Associates , Inc. Indian River County Project No. 0702 This Work Order No . 7 is in accordance with the existing AGREEMENT dated October 3 , 2006 between Bridge Design Associates , Inc. (ENGINEER) and Indian River County (COUNTY) . This Work Order No. 7 amends the agreement as follows : SECTION I — PROJECT LIMITS Oslo Road Bridge over 43`d Avenue Canal SECTION II — SCOPE OF SERVICES This Work Order No. 7 is for providing modification design of the existing south bridge barrier for the above mentioned project as well as pedestrian access for the shopping center on the southeast quadrant of the intersection. SECTION III - TIME FOR COMPLETION 90 Calendar days from notice to proceed to 90 % submittal . 30 Calendar days from date of written comments to 90 % submittal to 100 % submittal . SECTION IV — COMPENSATION The COUNTY agrees to pay, and the ENGINEER agrees to accept, a fee for services rendered according to the " Scope of Services " identified in Section 11 and III of this Work Order No. 7 , Lump Sum $ 10,912.00 . S TERSONNELAKim\2007AOctober 2007ABCCBridgeDesignWorkOrdcr#710- 16-07-doc PAGE TWO Work Order No. 7 Bridge Design Associates, Inc . October 16, 2007 The AGREEMENT is hereby amended as specifically set forth herein . All remaining sections of the AGREEMENT shall remain in full force and effect, and are incorporated herein. IN WITNESS WHEREOF the parties hereto have executed these presents this l� dayof 6a'W'Xi. 2007 . BRIDGE DESIGN ASSOCIATES , INC . INDIAN RIVER COUNTY/;, FLORIDA BOARD OF CGUNTY MV4, IISSIONERS BY : f . GARY-C, EL1 R, CHAIRMAN Title: ,n� �SIDEti � Approvedby the BCC : Witnessed By : K ,L �LG� ATTEST : T) C . u ` Jeffrey K . Barton Clerk of Circuit Court BY : DEPUTY CLERK OF COURT - h CLJ SEPH AIRD OUNTY ADMI IST L AM G . COLLINS , II COUNTY ATTORNEY Approved as to Form and Legal Sufficiency S:TERS0NNELAKim\2007A0ctober 2007ABCCBridgeDesignWorkOrdcr#710- 16-07.doc BRIDGE DESIGN ASSOCIATES , INC . CONSULTING ENGINEERS BRIAN C. RHEAULT, P.E. President July 13, 2007 Arcadis � 2081 Vista Parkway West Palm Beach, Florida 33411 per 1 r ?OOI ATTENTION: Hank Deibel, P . E . REGARDING: Oslo Road & 43r° Avenue Intersection PROJECT NO. : 03-539 Dear Hank: Pursuant to your request, we have reviewed the preliminary information regarding the modification of the existing south bridge barrierto provide a 50' radius between Oslo Road and 43'" Avenue. In addition, it is our understanding the County would like to provide pedestrian access into the shopping center on the southeast quadrant of the intersection. We believe a new sidewalk could be incorporated into the existing bridge to the south of the intersection or by utilizing a separate pedestrian bridge between the bridges into the shopping center on Oslo Road . The attached Exhibit "A" is a breakdown of approximate manhours and tasks to complete the project. If you have any questions, please give me a call. Respectfully, BRIDGE DESIGN ASSOCIATES, INC. Brian C. Rheault, P. E. President BCR:kedS_12003-Jobs103-539 43rd Avenue at South Relief Canal\Correspondencelpro arcadis 43rd & oslo.wpd 1402 Royal Palm Beach Boulevard • Building 200 • Royal Palm Beach, Florida 33411 (561 ) 686-3660 • Fax: (561 ) 791 - 1995 BRIDGE DESIGN ASSOCIATES, INC. l0 ROAD & 43RD AVENUE INTERSECTION October 8, 2007 HOURLY BREAKDOWN OF SERVICES EXHIBIT "N' PROJECT PROJECT =$58.00 LABOR MANAGER ENGINEERCOST ACTIVlT' BY TOTAL ACTIVITY $128.00 $104.00 50' RADIUS BARRIER DESIGN Foundation Design & detailing 2.0 4.0 2.0 8.0 $812.00 Walt Design & Detailing 1 .0 4.0 2.0 7.0 $664.00 Slab 2.0 4.0 2.0 &0 $812.00 Demolition Detailing 20 2.0 4.0 $396.00 Quantities 3.0 8.0 11 .0 $674. 00 Mqt!!q2 & Coordination 1.0 1.0 $126.00 Subtotal Radius Bartter Design ao 12.0 11.0 6.0 39.0 $3, 506.00 SIDEWALK Pian I.a out 2.0 5.0 7.0 14.0 $1 ,266.00 Superstructure Design 2.0 5.0 7.0 14.0 $1 ,266.00 Miscellaneous Detalis 2.0 3.0 7.0 12.0 $1 ,058.00 Specifications 1 .0 3.0 4.0 $440.00 Quantities 4.0 8.0 12.0 $744,00 Perm 1.0 7.0 8.0 16.0 $1,320.00 Meeting & Corodmation 20 2.0 $256.00 PerrnR litatton & Responses 2.0 5.0 4.0 11 .0 $1 ,056.00 Subtotal Sidewalk 92.0 28.0 29.0 16.0 85.0 $7,406.00 TOTAL MANHOURS 20.0 40.0 40.0 24.0 124.0 DIRECT LABOR COST $2,560.00 $4,160.00 $2,800.00 $1 ,3920D $10,912.00 Pm osfo mad 43rd 100807 ENGINEERING FEES $10,912.00