HomeMy WebLinkAbout2006-378 WORK ORDER NUMBER 7
acro
This Work Order Number 7 is entered into as of this 24th day of October, 2006
pursuant to that certain Continuing Contract Agreement for Professional Services entered into
as of March 2, 2004 ("Agreement"), by and between Indian River County, a political subdivision
of the State of Florida ("COUNTY") and Camp Dresser & McKee Inc. ("Consultant").
The COUNTY has selected the Consultant to perform the professional services set forth
on Attachment A, attached to this Work Order and made part hereof by this reference. The
professional services will be performed by the Consultant for the fee schedule set forth in
Attachment B, attached to this Work Order and made a part hereof by this reference. The
Consultant will perform the professional services within the timeframe more particularly set
forth in Attachment C, attached to this Work Order and made a part hereof by this reference all
in accordance with the terms and provisions set forth in the Agreement. Pursuant to paragraph
1 .4 of the Agreement, nothing contained in any Work Order shall conflict with the terms of the
Agreement and the terms of the Agreement shall be deemed to be incorporated in each
individual Work Order as if fully set forth herein.
IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the
date first written above.
CONSULTANT BOARD OF COUNTY COMMIS§10NERS
Camp Dresser & McKee Inc. OF INDIAN RIVER COU�T pcC,
r /
By. 13 0;41
Eric J. Uotke, P.E., BCEE Arthur R. Neu ger,
Principal Engineer
Attest: J. K. Barton, pClerk of Court
By:
Deputy Clerk
Approved:
J seph . Baird, County Administrator
proved as to form and legal sufficiency:
i E. Fell, At7ststait County Attorney
r
1 mn 5K.eac
ATTACHMENT A
SCOPE OF WORK
INDIAN RIVER COUNTY
ALTERNATIVE WATER SUPPLY MASTER PLAN
BACKGROUND
The Indian River County (County) Department of Utility Services has recently been approached
by Soil and Water Conservation District (SWCD), the Agricultural Advisory Committee (AAC)
and the Indian River Citrus League with concerns surrounding the pending North County
Water Treatment Plant (WTP) expansion project. The concerns focus on the neighboring land
owners, including several functioning citrus groves to the west (upstream) of the WTP, and
several smaller residential sites. Many of these properties continue to utilize the artesian flow
wells for both irrigation and potable use that were installed by the original citrus farmers.
The County has been working diligently with these groups to ensure that no adverse impacts
are experienced by the neighboring well owners as a result of the expansion project. Currently,
the North County WTP consists of 2 reverse osmosis (RO) treatment skids and 3 production
wells. The expansion is planned to include the addition of three RO treatment skids. To provide
raw water for the new skids, an additional three production wells are needed. The County has
submitted a Consumptive Use Permit (CUP) modification request to the St. Johns River Water
Management District (SJRWMD) requesting the three wells as well as a temporary CUP (TCUP)
that will allow for construction of the new wells prior to issuance of the final CUP permit. In
the future, an additional expansion will be required to accommodate growth within the County.
The future expansion would involve installing an additional three RO treatment skids and the
corresponding three production wells (for a total of eight skids and nine wells at buildout) .
The SWCD has requested that once the TCUP and subsequent CUP are issued (as is anticipated)
for the first three wells, the County explore alternative water supply sources to eliminate the
need for the final three wells. As such, the County has requested assistance from CDM to
identify possible alternatives to using Upper Floridan Aquifer (UFA) wells/ water, develop a
comparative budget-level cost analysis for each including the resulting impact on the current
rate structure (on a cost per 1,000 gallon basis), determine the feasibility of implementing each
option, the schedule that would be required to implement each option, and identify the pros
and cons of each option .
Services to be provided under this authorization are provided below.
SCOPE OF SERVICES
CDM will perform the following task services .
TASK 1.0 IDENTIFICATION OF POTENTIAL ALTERNATIVE WATER SUPPLIES
CDM will work with County staff and SWCD board members to identify up to five alternative
water supplies within the County that would potentially be suitable for potable use. CDM will
A-1 mh2582 Alt kdoc
hold a kick-off meeting with both parties to determine the options to be considered . CDM will
coordinate with SJRWMD and South Florida Water Management District (SFWMD) to have
representatives attend the kick-off meeting and provide input into the feasibility of various
options. These options may include but are not limited to a pipeline from the Upper St. Johns
Basin reservoir in the western portion of the County, surface water treatment, desalination of
ocean water, and/ or expanding the County' s wellfield to include a larger footprint in an effort
to minimize local impacts. The options identified in this task will be the basis for the remaining
tasks in this Work Order.
TASK 2.0 CONCEPTUAL ANALYSIS
CDM will perform a conceptual analysis for each alternative identified in Task 1 .0 . The analysis
will include identifying the pros and cons of each identified alternative, ease of permitting,
distance of proposed alternative from existing treatment infrastructure, transmission/
conveyance corridors for pipeline routing, efficiency of treatment process, and the ability to
convert existing treatment infrastructure to accommodate new source water. CDM will conduct
up to two meetings with SJRWMD and FDEP staff to obtain conceptual considerations and
permitting needs on each of the alternatives. CDM will also conduct one meeting with County
staff and SWCD board members to discuss the draft analysis and receive comments .
TASK 3. 0 COST IMPACTS
CDM will establish a planning-level comparison of the costs to implement each alternative
identified in Task 1 .0. These cost estimates will include treatment costs, process modifications
needed to treat each source if RO is not plausible, piping to/ from the water plant from each
alternative source, and estimated operations and maintenance costs. Costs associated with
expansion of the existing plants into the UFA will be presented for comparison purposes. This
analysis will serve as a basis of comparison for determining which option (s) could be
considered further as an alternative to constructing additional UFA production wells.
TASK 4. 0 SCHEDULE OF IMPLEMENTATION
Once options are identified and cost estimates are established CDM will estimate the time frame
necessary to implement each option. Development of implementation schedules will consider
the construction time associated with pipelines and other infrastructure needed to tap into the
source, including WTP construction/ modifications, in-line booster pump stations (if needed)
and/ or storage tanks. Permitting issues will also be factored in to the implementation schedule.
Certain options, such as desalination, may have a significantly longer construction time, while
tapping the St. Johns upper basin project may require more lead time in the permitting process .
TASK 5.0 RANKING OF OPTIONS
CDM will summarize the findings/ results of Tasks 1 .0 through 4 .0 and compile a ranking of the
alternatives based on various parameters (cost, implementation schedule, etc.), as well as how
each schedule relates to the projected demands of the water system. The County has developed
projected demands through 2025 based on population projections. The final three wells that
would be pursued after the TCUP is issued would be required by the year 2011 to stay ahead of
demand. Any alternative considered would have to have an implementation schedule to meet
that demand as well .
A-2 mh2582 Att A.doc
Task 6.0 DRAFT REPORT
CDM will compile the findings of Tasks 1 .0 through 5.0 into a summary report. CDM will
provide five copies of the draft report to the County for review and comment, and distribute the
draft report electronically to SWCD board members for comment also. Once comments are
received, CDM will incorporate applicable comments.
TASK 7.0 REVIEW WORKSHOP
At the request of the SWCD Board members, CDM will hold a public workshop with the Indian
River County Board of County Commissioners (BOCC), representatives from SJRWMD and
SFWMD, County staff, SWCD board members and interested parties to discuss the results and
conclusions of the Alternative Water Supply Plan. CDM will coordinate the attendance of
representatives from SFWMD and SJRWMD. CDM will provide a meeting facilitator to
optimize the productivity of the workshop. Additional comments will be discussed and
received for inclusion into the final report prior to finalizing the report and making the formal
presentation to the BOCC.
TASK 8.0 FINAL REPORT AND PRESENTATION TO THE BOCC
CDM will incorporate final comments resulting from the Workshop outlined in Task 7.0 and
finalize the report, provide five copies of the final report to the County, and distribute the final
report electronically to SWCD board members. CDM will then prepare a PowerPoint
presentation to be given to the BOCC at an official BOCC meeting. CDM will attend the BOCC
meeting and deliver the presentation to board members, or assist County staff in delivering the
presentation.
OTHER SERVICES NOT INCLUDED IN THIS SCOPE OF SERVICES
This authorization does not include:
■ Detailed construction cost estimates (budget-level only)
■ Design services related to any of the identified alternatives
COUNTY RESPONSIBILITIES
The County will provide all reasonable data requested by CDM to perform the evaluation. The
County will also provide a timely review of all work products.
A-3 mnssez An A.doc
ATTACHMENT B
PROJECT BUDGET
ENGINEERING SERVICES FOR
ALTERNATIVE WATER SUPPLY MASTER PLAN
PROJECT
DESCRIPTION: Alternative Water Supply Master Plan
Category Hours Rate Cost
Officer 76 $155 $11,780
Principal/ Associate 72 $140 $10,080
Senior Professional 30 $120 $300
Professional II 172 $100 $17,200
Senior Support Services 16 $75 $1,200
Staff Support Services 12 $65 $780
Project Administration 60 $65 $1290-
TOTAL HOURS 438
SALARY $48,540
OTHER DIRECT COSTS $3,300
OUTSIDE PROFESSIONAL SERVICES (H. DEAN) $6,500
TOTAL ESTIMATED COSTS - UPPER LIMIT $58,340
TOTAL ESTIMATED ENGINEERING FEE (UPPER LIMIT) SA340
B-1 mh2M2 da
ATTACHMENT C
SCHEDULE
ENGINEERING SERVICES FOR
ALTERNATIVE WATER SUPPLY MASTER PLAN
SCHEDULE
The following schedule is anticipated assuming authorization of the Work Order by the Board
of County Commissioners on October 24, 2006.
Draft Master Plan January 24, 2007
Public Workshop February 26, 2007
Final Master Plan March 26, 2007
G1 mh2582 Att C doc