HomeMy WebLinkAbout2007-256a 00 7
WORK ORDER NUMBER 09
This Work Order Number 09 is entered into as of this _ day of . 2007 pursuant
to that certain Continuing Contract Agreement for Professional Services entered into as of 10
August, 2004 ("Agreement'), by and between Indian River County Solid Waste Disposal
District, a dependent special district of Indian River County, Florida, whose address is c/o
Indian River County Utilities Department, 1840 25th Street, Vero Beach, Florida 32960
("DISTRICT') and Geosvntec Consultants. Inc. ("CONSULTANT').
The DISTRICT has selected the Consultant to perform the professional services set
forth on Attachment 1, attached to this Work Order and made part hereof by this reference.
The professional services will be performed by the Consultant for the fee schedule set forth in
Attachment 2, attached to this Work Order and made a part hereof by this reference. The
Consultant will perform the professional services within the timeframe more particularly set
forth in Attachment 3, attached to this Work Order and made a part hereof by this reference
all in accordance with the terms and provisions set forth in the Agreement. Pursuant to
paragraph 1.4 of the Agreement, nothing contained in any Work Order shall conflict with the
terms of the Agreement and the terms of the Agreement shall be deemed to be incorporated
in each individual Work Order as if fully set forth herein.
IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the
date first written above.
CONSULTANT
GEOSYNTEC CONSULTANTS, INC. INDIAN RIVER COUNTY
SOLID WASTE DISPOSAL DISTRICT
By: By: rh%
Thomas A. Peel, Ph.D., Vice President Gary C. Wegler;.Chairman
Attest: J.K. Barton, Clerk of Court
By: G
Dep y Clerk
Approved: `
N - `!-a Ltiv 1 `1
seph A. Baird, County Administrator
as to form and legal sufficiency:
E. Fell, Assistant County Attorney
ATTACHMENT I
PROFESSIONAL SERVICES
Geosyntec
consultants
29 June 2007
Mr. Himanshu Mehta, P.E.
Assistant Managing Director
Solid Waste Disposal District
Indian River County
1325 74th Avenue SW
Vero Beach, Florida 32968
Subject: Proposal for Engineering Services
Borrow Area Permitting
Indian River County Landfill Facility
Vero Beach, Indian River County, Florida
Dear Mr. Mehta:
2258 Riverside Avenue
Jacksonville. FL 32204
904-388-8821
904-388-8163
Geosyntec Consultants (Geosyntec) is pleased to submit this proposal to the Indian River County
(IRC) Solid Waste Disposal District (SWDD) for the provision of engineering services related to
permitting of a borrow area at the IRC Landfill (IRCL) facility located in Vero Beach, Indian
River County, Florida. The proposal presents the scope of work, budget estimate, and schedule
for permitting the borrow area. The proposal was prepared in response to a verbal request from
Mr. Himanshu Mehta, P.E. of SWDD and subsequent meetings between SWDD and Geosyntec
at the IRCL site . Geosyntec has prepared this proposal as Attachment I under Work Order No.
09 for the Continuing Contract Agreement for Professional Services between IRC SWDD and
Geosyntec, dated 10 August 2004.
The remainder of this proposal presents: (i) project background; (ii) proposed scope of work;
(iii) budget estimate; and (iv) schedule.
PROJECT BACKGROUND
The IRCL facility is located in southern Indian River County, east of Interstate 95, south of Oslo
Road, and west of Rangeline Road in Vero Beach, Florida. The SWDD operates both the Class I
landfill and Construction and Demolition (C&D) disposal facility at the IRCL facility. The
overall IRCL site occupies 276 acres, with 63 acres used for Class 1 disposal and 22 acres used
for C&D disposal. Waste materials accepted for the Class I landfill disposal include residential,
commercial, agricultural, and industrial wastes. The landfill serves the unincorporated Indian
XL07170/JL70 146.doc
engineers I i I innovators
Mr. Himanshu Mehta, P.E.
29 June 2007
Page 2
River County and municipalities of Vero Beach, Orchid, Fellsmere, Sebastian, Indian River
Shores, and Wabasso, Florida.
SWDD has recently permitted a C&D expansion (Cell 2) and intends to permit and construct a
new Class I landfill expansion (Segment 3) within the 276 -acre permitted facility. Construction
of the Class I landfill Segment 3 as well as construction of the Class I landfill vertical expansion
(permitted in 2006) would require fill material from either on-site or off-site borrow sources.
SWDD intends to permit the approximately 200 -acre property north of the IRCL facility as a
borrow area for future cell constructions at the facility. It is anticipated that this permitting will
have to be obtained through St. Johns River Water Management District (SJRWMD), and may
be the Indian River Farms Water Control District (IRFWCD). It is also anticipated that a
stormwater management and tree removal permit will have to be obtained from the IRC Planning
Department. This proposal presents the scope of work for permitting the northern 200 -acre
facility as a borrow area.
PROPOSED SCOPE OF WORK
This project includes professional engineering services that will be performed for permitting the
200 -acre parcel of land as a borrow area for the IRCL facility. For budgeting purposes, the scope
of work will be performed in five tasks, as presented below.
Task 1: General Consulting/Meeting Support/Project Management;
Task 2: Environmental Resource Permit (ERP) Application;
Task 3: Consumptive Use Permit (CUP) Modification;
Task 4: Stormwater Management and Tree Removal Application; and
Task 5: Miscellaneous Permit Applications for the Borrow Area.
Each of these tasks is briefly described below.
Task 1: General Consulting/Meeting Support/Project Management
Task 1 consists of three components: general consulting, meeting support, and project
management. Geosyntec will provide SWDD with consulting services necessary to initiate the
project and attend pre -application meetings with SJRWMD, IRFWCD, and IRC Planning
XL07170/1L70146.doc
i ;:neer. I � I inuovaina
Mr. Himanshu Mehta, P.E.
29 June 2007
Page 3
Department. Geosyntec will prepare presentation graphics, engineering drawings, and other
documents required to support the meetings and project coordination activities.
A kickoff meeting with SWDD is proposed before the start of project activities so that the
specific project requirements can be discussed. If required by SWDD, Geosyntec will prepare for
and attend a meeting with the SWDD Board to explain the project scope and budget
requirements. Geosyntec will also schedule and attend, with SWDD staff, three separate pre -
application meetings with SJRWMD, IRFWCD and IRC Planning Department to discuss specific
permitting issues. Following each meeting, Geosyntec will prepare meeting minutes that
document decisions reached in the meetings.
Project management activities will
include: budget
and schedule tracking, invoice
review, and
project communications, including
the preparation
of a monthly progress report.
The project
report will include a description
of the activities
completed during the month and planned
activities for the following month.
In addition, the
progress report will identify any
technical or
administrative issues that require SWDD's attention and the current status of the
budget and
schedule.
For the purpose of this budget estimate, Geosyntec has included six meetings: (i) one kickoff
meeting with SWDD; (ii) two (pre -application and review) meetings with SJRWMD and SWDD
staff; (iii) one pre -application meeting with IRFWCD and SWDD staff; and two (pre-app)ication
and review) meetings with IRC Planning Department and SWDD staff.
Task 2: Environmental Resource Permit (ERP) Application
A Standard General Environmental Resource Permit is required from the St. Johns River Water
Management District (SJRWMD). Specific project conditions correspond with the general
restrictions noted within the permit guidelines and include; impoundment volume at the final
development stage is less than 120 acre-feet, alteration of less than one acre of wetlands, the
project size is less than 100 acres. Preparation of the ERP application will require the
completion of Sections A, C, and E of the SJRWMD application form (40C-4.900(1).
As noted in the SJRWMD regulatory guidelines, the ERP program/application process is
required to ensure water resource protection from impacts to surface waters, floodplains, and
wetlands. The ERP application will require significant efforts to specifically address the
concerns of the SJRWMD and will include the following information;
• Site information;
xL07 1 Ton L7o 14e.doo
Mr. Himanshu Mehta, P.E.
29 June 2007
Page 4
• Environmental considerations;
• Conceptual construction plans;
• Specific construction schedules and techniques;
• Drainage information;
• Operation and maintenance; and
• Water use.
Appropriate sections of the ERP will be completed including the results of specific calculations
packages are required.
Task 3: Consumptive Use Permit (CUP) Modification
It is very likely that a minor modification to the existing Consumptive Use Permit (CUP) will be
required. As noted in the existing CUP (SJRWMD ID - 2185), the overall footprint of the
proposed borrow area will likely change since the previous submittal indicated a combined total
36.05 acres. Current conceptual plans yield approximately the same footprint however, the edge
of the proposed pit has been altered to eliminate potential impacts to existing surface water
drainage patterns and two isolated wetland systems within the central portion of the subject
property. Geosyntec will ascertain the need fro a CUP minor modification at the pre -application
meeting with SJRWMD.
Task 4: Stormwater Management and Tree Removal Permit Application
A stormwater management and tree removal permit for the borrow area will be needed from the
IRC Planning Department. Geosyntec will schedule a pre -application review meeting with the
IRC Planning Department, prepare and submit the necessary permit application forms and
documents, and attend a final review meeting.
Task 5: Miscellaneous Permit Applications for the Borrow Area
The borrow pit operation will also require an emergency outfall for release of stormwater runoff
during events of intense rain. The outfall will most likely discharge to either the C-5 or the C-4
canals, or both, of the iRFWCD. Geosyntec will meet with representatives of the IRFWCD to
agree on the location, configuration and design criteria of the outfall. We will also prepare the
x L07I Ton L70146. dac
Mr. Himanshu Mehta, P.E.
29 June 2007
Page 5
permit application for the outfall in accordance with 1RFWCD requirements and respond to
requests for additional information (RAI).
The emergency outfall will also require an NPDES permit, or an approved alternative, from
FDEP. The SWDD presently operates its outfall that discharges to the C-6 canal under the Multi -
Sector General Permit (MSGP). Geosyntec recommends modifying the existing permit to
provide coverage to the new outfall. We will modify the Stormwater Pollution Prevention Plan
(SWPPP) of the site to include the area and facilities of the borrow pit operation. We will also
assist SWDD to prepare the permit application.
BUDGET ESTIMATE
A budget estimate for the scope of work outlined in Tasks 1 through 5 of this proposal is
summarized in the following table, and a detailed budget estimate is provided as Attachment 2.
The budget estimate does not include permit fees that will be required at the time the ERP
application is submitted to SJRWMD.
Task 1 —
General Consulting/Meeting Support/Project Management
$
18,519
Task 2 —
ERP Application
$
54 006
Task 3 —
GCCS Design
$
7,458
Task 4—
Stormwater & Tree Removal Permit Application
$
9,522
Task 5 —
Miscellaneous Permit Application
$
10044
TOTAL
(estimated)
$
99 649
Geosyntec will not exceed the cost estimate without prior approval and written authorization
from SWDD.
SCHEDULE
Geosyntec has prepared a schedule for preparing the required permit applications, which is
included as Attachment 3. The schedule, as presented, assumes a start date of 23 July 2007, and
projects an ERP Application submittal to SJRWMD on 29 October 2007. The other permit
applications will be submitted concurrently with the ERP Application. Geosyntec has assumed
that the required permit will be obtained within two to three months of submission. Response to
SJRWMD comments will be performed during this two- to three-month period. Therefore, it is
anticipated that the ERP, CUP, tree removal and other permits permit for the borrow area will be
issued by 31 January 2008 if not sooner.
xL07170/JL70I46-dog
,...triI I I i. I I innovators
Mr. Himanshu Mehta, P.E.
29 June 2007
Page 6
Geosyntec will work with SWDD to refine the project schedule and set the milestones necessary
to meet the needs of the project. Throughout the duration of the project, Geosyntec will work
diligently to meet those milestones and the schedule developed for the project.
CLOSURE
Geosyntec appreciates this opportunity to offer our services. If this proposal is acceptable, please
indicate your agreement by signing the attached work authorization, which references this
proposal. Please return one signed work authorization to Dr. Badu-Tweneboah's attention.
Please call the undersigned with questions you may have as you review this proposal.
Sincerely,
Ate+ r`
r 1 on Thompso , P.G.
"�" Senior Hydrologist
6
Kwasi Badu-Tweneboah, Ph.D., P.E.
Associate
Attachments
XL07170/JL70146.doc
I I inrararors
ATTACHMENT 2
FEE SCHEDULE
Table 1
BUDGET ESTIMATE
PROFESSIONAL SERVICES FOR BORROW AREA PERMITTING
INDIAN RIVER COUNTY LANDFILL FACILITY
TASK 1, PHASE 1: Project Management and Meetines
XL07170/JL70146/Budget.xls Geosyntec Consultants
ITEM
BASIS
RATE
QUANTITY
ESTIMATED
BUDGET
a. Principal
hr
$185
0
x
„1.
$0
b. Associate
hr
$160
48
$7,680
c. Senior Professional
hr
$142
30
$4,250
d. Project Professional
hr
$109
30
531262
e. Professional
hr
$89
0
$0
f. Senior Staff Engineer
hr
$82
0
SO
g. Staff Engineer
hr
$68
0
SO
Subtotal Professional Services
$15,192
* x
a. CADD Designer
hr
$95
0
$0
b. Senior CADD Operator
hr
$91
0
$0
c. Drafter/CADD Operator
hr
$54
16
$864
d. Technical/Administrative Assistant
hr
$70
4
$281
e. Technical Word Processor
hr
S66
0
$0
f. Clerical
hr
$42
18
$760
Subtotal Technical/Administrative Services
$1,905
a. Lodging
day
$100
0
SO
b. Per Diem
day
$21
0
$0
c. Communications Fee
3% labor
0.03
17,097
$513
d. CADD Computer System
hr
$15
16
$240
e. Vehicle Rental
day
$100
6
$600
f 8.5'x1]" Photocopies
each
50.12
200
S24
g. CADD Drawings
each
$3
15
$45
Subtotal Reimbursables
$1,422
na`,.d;`4��I"AIES �'tlII,BUDGFIT
:x$18,$19,.....,:.
XL07170/JL70146/Budget.xls Geosyntec Consultants
Table 2
BUDGET ESTIMATE
PROFESSIONAL SERVICES FOR BORROW AREA PERMITTING
INDIAN RIVER COUNTY LANDFILL FACILITY
I A;511 L, rfIA3E 1: EKr Application
ITEM
BASIS
RATE
QUANTITY
ESTIMATED
BUDGET
a. Principal
hr
$185
2
$370
b. Associate
hr
$160
24
$3.840
c. Senior Professional
hr
$142
90
$129751
d. Project Professional
hr
$109
100
$10,872
e. Professional
hr
$89
0
$0
f. Senior Staff Professional
hr
$82
120
$93788
g. Staff Professional
hr
$68
160
$10,957
Subtotal Professional Services
$48,578
lieu �'
a. CADD Designer
hr
$95
0
$0
b. Senior CADD Operator
hr
$91
20
$1,819
c. Drafter,/CADD Operator
hr
S54
20
$1,080
d. Technical,'Administrative Assistant
hr
S70
0
$0
e. Technical Word Processor
hr
$66
0
$0
f. Clerical
hr
$42
4
$169
Subtotal Technical/Administrative Services
$3,068
0i Retmttrsables _
a. Lodging
day
S100
0
$0
b. Per Diem
day
$21
0
$0
c. Communications Fee
3% labor
0.03
$51,647
511549
d. CADD Computer System
hr
$15
40
S600
e. Vehicle Rental
day
S75
0
$0
f. Laboratory Analysis
LS
$5,000
0
$0
g. 8.5'x11" Photocopies
each
$0.12
500
$60
h. CADD Drawings
each
$3
50
$150
Subtotal Reimbursables
$2,359
r1OTAL S1ITrIz1T D BUDGET - TA3If.2,PII 1SE 11'
$54,006
XL071701J L70146/Budgel.xis Geosyntec Consultants
Table 3
BUDGET ESTIMATE
PROFESSIONAL SERVICES FOR BORROW AREA PERMITTING
INDIAN RIVER COUNTY LANDFILL FACILITY
TASK 3, PHASE 1:CONSUMPTIVE USE PERMIT MODIFICATION
XL07170/JL70146Budget. As Geosyntec Consultants
ITEM
BASIS
RATE
QUANTITY
ESTIMATED
BUDGET
a. Principal
hr
$185
0
$0
b. Associate
hr
$160
4
$640
c. Senior Professional
hr
$142
20
52,834
d. Project Professional
hr
$109
24
$2,609
e. Professional
hr
$89
0
SO
f. Senior Staff Professional
hr
$82
0
$0
g. Staff Professional
hr
$68
0
$0
Subtotal Professional Services
$6,083
a. Site Manager/Construction Manager
hr
.$81
0
$0
b. Senior Engineering Technician
hr
$60
0
$0
c. Engineering Technician
hr
$47
0
$0
d. Senior CADD Operator
hr
$91
0
$0
e. Drafter/CADD Operator
hr
$54
12
$648
f Technical/Administrative Assistant
hr
$70
0
$0
g. Technical Word Processor
hr
$66
0
$0
h. Clerical
hr
$42
6
$253
Subtotal Technical/Administrative Services
$902
1 11,7777777
a. Lodging
day
$100
0
$0
b. Per Diem
day
$21
0
SO
c. Communications Fee
3% labor
0.03
$6.984
$210
d. CADD Computer System
hr
$15
12
$180
e. Vehicle Rental
day
$75
0
$0
f. 8.5'x11" Photocopies
each
$0.12
200
S24
g. CADD Photocopies
each
$3
20
$60
Subtotal Reimbursables
$474
3_.. fir, fir.W.S'11�1E tj
$7,458`
XL07170/JL70146Budget. As Geosyntec Consultants
Table 4
BUDGET ESTIMATE
PROFESSIONAL SERVICES FOR BORROW AREA PERMITTING
INDIAN RIVER COUNTY LANDFILL FACILITY
TASK 4, PHASE I:STORMWATER MANAGEMENT AND TRF.F. RF?V10VA1. ervl ICAF
XL071701JL70146/B udget. xls Geosyntec Consultants
ITEM
BASIS
RATE
QUANTITY
ESTIMATED
BUDGET
tea. Principal
hr
$185
0
50
b. Associate
hr
$160
8
$13280
c. Senior Professional
hr
$142
8
$1,133
d. Project Professional
hr
$109
16
$1,740
e. Professional
hr
$89
0
$0
f. Senior Staff Professional
hr
$82
30
$2.447
g. Staff Professional
hr
$68
0
$0
Subtotal Professional Services
$6,600
I
v
a. Site Manager/Construction Manager
hr
$81
0
$0
b. Senior Engineering Technician
hr
$60
0
SO
c. Engineering Technician
hr
$47
0
$0
d. Senior CADD Operator
hr
$91
0
$0
e. Drafter/CADD Operator
hr
$54
26
$1,404
f. Technical/Administrative Assistant
hr
$70
0
$0
g. Technical Word Processor
hr
$66
8
5527
h. Clerical
hr
$42
6
$253
Subtotal Technical/Administrative Services
$23185
a. Lodging .
day
$100
0
$0.
b. Per Diem
day
$21
0
SO
c. Communications Fee
3% labor
0.03
$8,785
$264
d. CADD Computer System
hr
$15
26
$390
e. Vehicle Rental
day
$75
0
$0
f. 8.5'x11" Photocopies
each
$0.12
200
$24
g. CADD Photocopies
each
$3
20
$60
Subtotal Reimbursables$738
t e _ . IIt • r`i . A ''
' ' <$9s52z,
XL071701JL70146/B udget. xls Geosyntec Consultants
Table 5
BUDGET ESTIMATE
PROFESSIONAL SERVICES FOR BORROW AREA PERMITTING
INDIAN RIVER COUNTY LANDFILL FACILITY
TASK 5, PHASE 1:MISCELLANEOUS PERMIT APPLICATIONS
XL07170/JL70146/Budget.xls Geosyntec Consultants
ITEM
BASIS
RATE
QUANTITY
ESTIMATED
BUDGET
t ej�r� - r )-
a. Principal
a
hr
a
. `K t`xF�h` r }
$185
Src >�; :. �
0
`A� } �a"roNpc'b
$0
b. Associate
hr
$160
10
$1,600
c. Senior Professional
hr
$142
0
$0
d. Project Professional
hr
$109
24
$2,609
e. Professional
hr
$89
0
$0
f. Senior Staff Professional
hr
$82
36
$2.937
g. Staff Professional
hr
$68
0
$0
Subtotal Professional Services
$79146
a -:
aers ,.sk
LL� ,
a. Site Manager/Construction Manager
hr
$81
0
$0
b. Senior Engineering Technician
hr
$60
0
$0
c. Engineering Technician
hr
$47
0
$0
d. Senior CADD Operator
hr
S91
0
$0
e. Drafter/CADD Operator
hr
$54
30
$1,620
f. Technical/Administrative Assistant
hr
$70
0
$0
g. Technical Word Processor
hr
$66
6
$395
h. Clerical
Ehr
$42
4
5169
Subtotal Technical/Administrative Services
$2,184
G Rerm6ucsables x t .,.'k,
a
s, -
a. Lodging
day
$100
0
$0
b. Per Diem
day
$21
0
$0
c. Communications Fee
3% labor
0.03
$95330
5280
d. CADD Computer System
hr
$15
30
$450
e. Vehicle Rental
day
$75
0
$0
f. 8.5"x11" Photocopies
each
$O.t2
200
S24
g. CADD Photocopies
each
S3
20
$60
Subtotal Reimbursablesl
$814
TTALSTIM 11 L$`TUpGE>t 1ASI� S'PHASE 1
$10,144,
XL07170/JL70146/Budget.xls Geosyntec Consultants
ATTACHMENT 3
PROJECT SCHEDULE