HomeMy WebLinkAbout2012-190 CX CIO lei 1Qa Change Order Form No . 1 DATE OF ISSUANCE : 9- 17- 12 EFFECTIVE DATE : OWNER : Indian River County CONTRACTOR A . M . Construction Group Inc. Contract : Bid No . : 2012042 Project : South Regional Wastewater Treatment Facility Headworks Rehabiliation OWNER's Contract No . ENGINEER's Contract No . ENGINEER You are directed to make the following changes in the Contract Documents : Description : Replace 5 (five) Pipe support Pedestals , Replace 2 (two) 16 inch Diameter Knife Valves , Repair Headworks Odor Control Tower and Blower Base , and Extend Chlorine Fill Lines Reason for Change Order: Facility Inspection revealed several components that were noted to be in dilapidated condition and need repair Attachments : ( List documents supporting change) Attachment # 1 (A . M . Construction Group Proposal) Attachment # 2 (Pictures of Pipe Pedestals , Knife Valves , and Headworks Odor Control Tower and Blower Base CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES Description Amount Description Time Original Contract Price $89, 177 . 43 Original Contract Time: (days or dates) Substantial Completion : 90 Final Completion : 105 Net Increase ( Decrease) from previous $0 Net change from previous Change Change Orders No . 0 to 0 : Orders No. 0 to 0 : (days) Substantial Completion : 90 Final Completion : 105 Contract Price prior to this Change $89 . 177 . 43 I Contract Time prior to this Change Order: Order: (days or dates) Substantial Completion : 90 Final Completion : 105 Net increase (decrease) of this Change $27. 200 . 00 Net increase (decrease) this Order: Change Order: (days or dates) Substantial Completwrr:� ' �� Finalm ,ICtwhY ' � Contract Price with all approved $ 116 . 377 .43 Contract Time with all JVehf �a TM. a Change Orders : Change Orders : �, � rlaya dgtes) SubstaomQlon : s0 F m le , : ..% il ACCEPTED : RECOMMENDED : �QVE. •rm mikee <" Abel Mendez Aaron Bowles � 0 k - By : y: Bv : �. CONTRACTOR (Signature) ENGINEER (Signature) OWNER: ateirti) Gary C . c f eefer , Chairman Date : 9- 17- 12 Date : 9- 17- 12 Date : r)riwpher 16 , 2.pj Agenda - Change Order No 1 South WWTF Headworks Change Order with AM Construction Group Inc October 2012 Form 00942 - 1 CADocuments and Settings\acosner\Local Settings\Temporary Internet Files\OLI(71 Wgenda - Change Order No 1 South W WTF Headworks Change Order with AM Construction Group Inc October 2012 Fono.doc Rev. 05/01 t 12689 — 164h Court North Jupiter, FL 33478 Fax : (561 ) 748-9203 Office (561 ) 262-7874 S Cell : 561 262-7833 �' lOri Group., Inc . Email : amconstructiongbellsouth.net DATE : September 17, 2012 LICENSED & INSURED : REVISED General & Plumbing Contractor AM Construction Group, Inc . CGC 1504453 QB21671 CFC 1425723 AME / ADDRESS , Terry Southard Indian River County Utilities Operations Complex 350 41St Street Vero Beach, FL 32967 Vero Beach Headworks C.O. Proposal SCOPE OF WORK. 1).Replacement of additional viae pedestals 1 . Demo 5 existing pipe supports . 2 . Supply & install 5 additional galvanized dipped pipe" supports that need replacing. 3 . All 316 S . S . hardware, grout & epoxy. 4 . Equipment, tools & labor. 5 . All insurances. TOTAL PRICE . Two thousand, five hundred dollars and no cents. 2$ ,500.00 2).Replacement of (2) - 16" Knife valves 1 . Demo 2 existing 16" knife valves & DIP couplings . 2 . Install 2 - 16" FNW S . S . lined knife gate valves & couplings . 3 . Materials & labor. 4 . All insurances . TOTAL PRICE . Fifteen thousand, nine hundred and fifty dollars and no cents. 15$ ,950.00 Deduct: To use Dezurik Knife valves (Additional 4 week lead time more than quoted FNW- S . S. lined knife valves) . $ 1 ,400.00 1 - I 3).Headworks Odor control tower repairs : 1 . Clean & prep odor control tower. 2 . Cut out, re-fiberglass or re-wet damaged fiberglass matting with vinylester resin . 3 . Gel-coat odor control tower. 4 . Remove blower, motor and frame . 5 . Repair existing frame base with S . S . angle . 6 . Repair/patch existing concrete pump pad. 7 . Install blower with S . S . anchors . 8 . Materials & labor. 9 . All insurances . TOTAL PRICE : Nine thousand, seven hundred dollars and no cents $9.700.00 4).Extend chlorine fill lines. 1 . Extend 2 — 2" chlorine fill lines to corner of slab to accommodate fill truck. 2 . 40 ' of 2" sch. 80 PVC pipe, S . S . uni-strut, S . S . anchors, S. S . pipe support. 3 . All materials & labor. 4 . All insurances. TOTAL PRICE . Four hundred fifty dollars and no cents $450.00 EXCLUDED : Electrical & anything not in scope of work. If this proposal is acceptable to you, please sign below and return to AM Construction Group, Inc., and keep the attached copy for your records. Customer Signature & Printed Name 2