Loading...
HomeMy WebLinkAbout2010-071 t Board of County Commissioners 1801 27th Street Vero Beach, Florida 32960 Telephone : (772) 567-8000 FAX : (772) 778-9391 20TH AVENUE SW - 25TH STREET TO 21ST STREET SW AMENDMENT NO . 2 TO THE PROFESSIONAL CIVIL ENGINEERING SERVICES AGREEMENT WITH ARCADIS U . S . , INC . This Amendment No. 2 to the Professional Civil Engineering Services Agreement with Arcadis U . S . , Inc . is in accordance with the existing AGREEMENT dated December 13 , 2005 and the extension thereof, between Arcadis U . S . , Inc . ( ENGINEER) and Indian River County ( COUNTY ) . This Amendment No . 2 amends the agreement as follows : SECTION I — PROJECT LIMITS Consultant services are required for the for modifications to the Falcon Trace Subdivision permit with St . Johns River Water Management District ( SJRWMD ) due to required changes in the construction of 201h Avenue from 25th Street SW to 21St Street SW . SECTION II — SCOPE OF SERVICES The scope of services for this Amendment No . 2 is to perform the following tasks as requested by the County : 1 . Submission of a permit modification to the permit for Falcon Trace Subdivision . 2 . Submission of a drainage easement for the pond . 3 . Submission of drainage calculations for the proposed pond . 4 . Submission of calculations demonstrating no net increase in nutrients will result from the proposed project . 5 . Submission of plans showing the location of erosion control devices . SECTION III - TIME FOR COMPLETION Supplemental tasks shall be completed within 30 business days from the date of execution of this Amendment No . 2 to the Professional Civil Engineering Services Agreement with Arcadis U . S . , Inc . F :\Engineering\Capital Project \0541 20th Ave Widening, 25th St SW to 21st St SW\QCC Agenda Items\Amendment No. 2 Arcadis 03 -08 - 10. doc to PAGE TWO Amendment No . 2 Arcadis U . S . , Inc . For March 23 , 2010 BCC Meeting SECTION V = COMPENSATION The COUNTY agrees to pay , and the ENGINEER agrees to accept , a fee for services rendered according to the " Scope of Services " and further identified in all the Sections of this Amendment No . 1 , a Lump Sum of 2 563 . 36 . All invoicing and payments shall be in accordance with the original Professional Civil Engineering Seryi,ces Agreement with the COUNTY and as stated hereon . Invoices shall include the ` w�,iorkiorder ' and project number, invoice number related to this work order, original cbntra`ct -amount ;:,ruorrent billing amount and retainage amounts . The AYGREEMENT-is hereby emended as specifically set forth herein . All remaining sections of R .. ,. "NY the AGREEMENT sall remainNir' full force and effect, and are incorporated herein . OWNER ��`` BOARD OF COUXIYJ COMMISSIONERS ARCADIS U . S . , INC . INDIAN RIVER COUNTY, FLORIDA (Signature) (Signature) Peter D . O ' Bryan , CHAIRMAN Hank Deibel , P , E . Associate Vice President Approved by BCC March 16 , 2010 Witnes 7by : ATTEST : Jeffrey K . Barton , Clerk of Circuit Court 00 Deputy Clerk (Printed name) Approved as to Form and Legal Sufficiency: Alan S . Polac wich , Sr. , COUNTY Attorney oseph ' rd , COU TY dministrator F:\Engineering\Capital Projects\0541 20th Ave Widening, 25th St SW to 21st St SW\BCC Agenda Items\Amendment No . 2 Arcadis 03 -08 - 10. doc I . -0 f. ARCAD D ADIS Infrastructure, environment, facilities ARCARC Vista Parkway West Palm Beach Florida 33411 Mr. Chris Kafer, P . E . Tel 661 .697.7000Fax 561 .697.7751 Indian River County 1801 27th Street www. arcadis-us ,com Building A Vero Beach , FI 32960-3388 Transportation Subject: 20th Avenue SW 25th Street SW to 21st Street SW Date: March 5 , 2010 Dear Mr. Kafer: Contact: We are pleased to submit this proposal for professional engineering services for the Henry Deibel design of 20th Avenue SW from 25th Street SW to 21 st Street SW. The SJRWMD has issue an RAi requesting additional information relative to the permit modification Phone: for the proposed drainage pond located on the Falcon Trace site. This information (561 ) 697-7075 includes : Email: Hank . deibel@arcadis- us. com 1 . Submission of a permit modification to the permit for Falcon Trace. Our ref: 2 . Submission of a drainage easement for the pond . Florida License Numbers 3 . Submission of drainage calculations for the proposed pond . Engineering EB00007917 4 . Submission of calculations demonstrating no net increase in nutrients will result from the proposed project. Geology GB564 5 . Submission of plans showing the location of erosion control devices. Landscape Architecture LC26000269 a permit application forma and forward it to GL Homes for surveying ARCADIS will prepare p pp L87062 signature . It is our understanding that the County has an easement agreement in affect for the pond site . We will prepare and submit the necessary drainage calculations and plans to the SJRWMD as per their request. Compensation for these services will be a lump sum amount of $2 , 563 . 36 . The attached sheets provide a breakdown of our fees for this work . Imagine the result g" Unr support\admin\marketing\proposalslwpbV2010\20th avenue sw 3-5-10.doc !a ARCA ® IS Mr. Chris Kafer, P . E. March 5 , 2010 Please feel free to contact our office if you have any questions or require any additional information . Sincerely , ARCADIS Henry W. Deibel , Jr. , P . E. Associate Vice President Copies: Page : G:LLNR SippaMOM INUarketra Prop=IslWPBk2OlOUO1h A\erua SW 35-10 doc 2/2 ARCADIS ESTIMATE OF WORK EFFORT FOR ENGINEERING 20TH AVENUE SW 25Th STREET SW TO 21st STREET SW INDIAN RIVER COUNTY Total Contract Cost Computations $ 882.70 Total Activity Salary Costs (a) Overhead Additives: (a1 ) Combined OH Percent 164. 00% (a2) Combined OH Cost $ 1 ,447.63 Subtotal (Salary + Overhead) $ 2, 330.33 (b) Operating Margin Percent 0% (b) Operating Margin Cost $ 10. 010. 003 Subtotal (Salary Related Cost) $ 21563.36 Subtotal (Cost Elements of Basic Activities) $ 2 563 .36 Subcontract items (L.S. ) Subtotal (Basic Services) $ 21563.36 LUMP SUM= 20th Aveneu SW (IRC) 3-5- 10.x1s ARCADIS ESTIMATE OF WORK EFFORT FOR ENGINEERING 20th AVENUE SW 25TH STREET SW TO 21ST STREET SW INDIAN RIVER COUNTY PROJECT MANAGER r PROJECT ENGINEER SR, CADD OPERATOR ACTMTY TOTAL MAN HOURLY MAN HOURLY MAN HOURLY MAN HOURS HOURS `1� DESIGN ANALYSIS 14.0 $ 54.80 3 .0 S 38.50 $ 18.00 17.0 DRAINAGE ANALYSIS $ 54. 80 - $ 38.50 $ 18.00 ROADWAY PLANS $ 54.80 38.50 $ 18.00 UTILITIES $ 54.80 $ 38.50 $ 18.00 PERMI N $ 54.80 - $ 38.50 $ 18.00 SIGNING & PAVEMENT - MARKING PLANS $ 54. 80 $ 38.50 $ 18.00 TOTALS 14.0 3.0 17.0 DESIGN ANALYSIS $ 767. 20 $ 115.50 DRAINAGE ANALYSIS $ $ _ $ ROADWAY PLANS $ $ _ $ UTILITIES $ $ $ PERMITTING $ $ $ MARKING PLANS $ $ _ $ TOTALS $ 767.20 $ 115.50 $ $ 882.70 BY COSTPOR HOURLY ACTIVITY ACTIVITY RATE DESIGN ANALYSIS 17.0 $ 882.70 DRAINAGE ANALYSIS $ ROADWAY PLANS - $ - #DIV/0! UTILITIES $ PERMITTING - SIGNING & PAVEMENT MARKING PLANS $ #DIV/0 ! TOTALS 17.0 $ 882.70 $51.92 Average per hour 20th Aveneu SW (IRC) 3-5-10x15 20th AVENUE SW 25TH STREET SW TO 21 ST STREET SW HIGHWAY PAGE OF HIGHWAY TASK LIST ACTIVITY: A. ROADWAY PLANS PACKAGE SUBACTIVITY: 1 - DESIGN ANALYSIS BASIS OF NO. OF NO. OF TOTAL PROJECT PROJECT TASK ESTIMATE UNITS HOURSIUNIT SHEETS HOURS MANAGER ENGINEER SR. CADD REMARKS Includes forwarding to GL Homes for F2Pond Prepare SJRWMD Permit a lication L. S. 1 4 4 4.0 signatures Flood Routing Calculations L.S. 1 4 4 1 . 0 3.0 rient Loading Calculations L.S. 1 4 4 4 .0 4. Erosion Control Plans L. S. 1 1 1 1 .0 5 Coordination with SJRWMD LS. 1 4 4 4.0 0 0 0 0 0 SUBTOTAL THIS SHEET 17 14 3 0 20th Aveneu SW (IRC) 3-5-10.xls