HomeMy WebLinkAbout2010-071 t
Board of County Commissioners
1801 27th Street
Vero Beach, Florida 32960
Telephone : (772) 567-8000
FAX : (772) 778-9391
20TH AVENUE SW - 25TH STREET TO 21ST STREET SW
AMENDMENT NO . 2
TO THE
PROFESSIONAL CIVIL ENGINEERING SERVICES AGREEMENT
WITH
ARCADIS U . S . , INC .
This Amendment No. 2 to the Professional Civil Engineering Services Agreement with
Arcadis U . S . , Inc . is in accordance with the existing AGREEMENT dated December 13 , 2005
and the extension thereof, between Arcadis U . S . , Inc . ( ENGINEER) and Indian River County
( COUNTY ) .
This Amendment No . 2 amends the agreement as follows :
SECTION I — PROJECT LIMITS
Consultant services are required for the for modifications to the Falcon Trace Subdivision permit
with St . Johns River Water Management District ( SJRWMD ) due to required changes in the
construction of 201h Avenue from 25th Street SW to 21St Street SW .
SECTION II — SCOPE OF SERVICES
The scope of services for this Amendment No . 2 is to perform the following tasks as requested
by the County :
1 . Submission of a permit modification to the permit for Falcon Trace Subdivision .
2 . Submission of a drainage easement for the pond .
3 . Submission of drainage calculations for the proposed pond .
4 . Submission of calculations demonstrating no net increase in nutrients will result from
the proposed project .
5 . Submission of plans showing the location of erosion control devices .
SECTION III - TIME FOR COMPLETION
Supplemental tasks shall be completed within 30 business days from the date of execution
of this Amendment No . 2 to the Professional Civil Engineering Services Agreement with
Arcadis U . S . , Inc .
F :\Engineering\Capital Project \0541 20th Ave Widening, 25th St SW to 21st St SW\QCC Agenda Items\Amendment No. 2 Arcadis 03 -08 -
10. doc
to
PAGE TWO
Amendment No . 2 Arcadis U . S . , Inc .
For March 23 , 2010 BCC Meeting
SECTION V = COMPENSATION
The COUNTY agrees to pay , and the ENGINEER agrees to accept , a fee for services
rendered according to the " Scope of Services " and further identified in all the Sections of
this Amendment No . 1 , a Lump Sum of 2 563 . 36 .
All invoicing and payments shall be in accordance with the original Professional Civil
Engineering Seryi,ces Agreement with the COUNTY and as stated hereon . Invoices shall
include the ` w�,iorkiorder ' and project number, invoice number related to this work order,
original cbntra`ct -amount ;:,ruorrent billing amount and retainage amounts .
The AYGREEMENT-is hereby emended as specifically set forth herein . All remaining sections of
R .. ,. "NY
the AGREEMENT sall remainNir' full force and effect, and are incorporated herein .
OWNER ��``
BOARD OF COUXIYJ COMMISSIONERS ARCADIS U . S . , INC .
INDIAN RIVER COUNTY, FLORIDA
(Signature) (Signature)
Peter D . O ' Bryan , CHAIRMAN Hank Deibel , P , E . Associate Vice
President
Approved by BCC March 16 , 2010
Witnes 7by :
ATTEST :
Jeffrey K . Barton , Clerk of Circuit Court
00
Deputy Clerk (Printed name)
Approved as to Form and Legal Sufficiency:
Alan S . Polac wich , Sr. , COUNTY Attorney oseph ' rd , COU TY
dministrator
F:\Engineering\Capital Projects\0541 20th Ave Widening, 25th St SW to 21st St SW\BCC Agenda Items\Amendment No . 2 Arcadis 03 -08 -
10. doc
I . -0 f.
ARCAD D
ADIS
Infrastructure, environment, facilities ARCARC Vista Parkway
West Palm Beach
Florida 33411
Mr. Chris Kafer, P . E . Tel 661 .697.7000Fax 561 .697.7751
Indian River County
1801 27th Street www. arcadis-us ,com
Building A
Vero Beach , FI 32960-3388
Transportation
Subject:
20th Avenue SW
25th Street SW to 21st Street SW
Date:
March 5 , 2010
Dear Mr. Kafer:
Contact:
We are pleased to submit this proposal for professional engineering services for the Henry Deibel
design of 20th Avenue SW from 25th Street SW to 21 st Street SW. The SJRWMD
has issue an RAi requesting additional information relative to the permit modification Phone:
for the proposed drainage pond located on the Falcon Trace site. This information
(561 ) 697-7075
includes :
Email:
Hank . deibel@arcadis-
us. com
1 . Submission of a permit modification to the permit for Falcon Trace.
Our ref:
2 . Submission of a drainage easement for the pond .
Florida License Numbers
3 . Submission of drainage calculations for the proposed pond .
Engineering
EB00007917
4 . Submission of calculations demonstrating no net increase in nutrients will
result from the proposed project. Geology
GB564
5 . Submission of plans showing the location of erosion control devices. Landscape Architecture
LC26000269
a permit application forma and forward it to GL Homes for surveying
ARCADIS will
prepare p pp L87062
signature . It is our understanding that the County has an easement agreement in
affect for the pond site . We will prepare and submit the necessary drainage
calculations and plans to the SJRWMD as per their request.
Compensation for these services will be a lump sum amount of $2 , 563 . 36 . The
attached sheets provide a breakdown of our fees for this work .
Imagine the result
g" Unr support\admin\marketing\proposalslwpbV2010\20th avenue sw 3-5-10.doc
!a
ARCA ® IS Mr. Chris Kafer, P . E.
March 5 , 2010
Please feel free to contact our office if you have any questions or require any
additional information .
Sincerely ,
ARCADIS
Henry W. Deibel , Jr. , P . E.
Associate Vice President
Copies:
Page :
G:LLNR SippaMOM INUarketra Prop=IslWPBk2OlOUO1h A\erua SW 35-10 doc 2/2
ARCADIS
ESTIMATE OF WORK EFFORT FOR ENGINEERING
20TH AVENUE SW
25Th STREET SW TO 21st STREET SW
INDIAN RIVER COUNTY
Total Contract Cost Computations $ 882.70
Total Activity Salary Costs
(a) Overhead Additives:
(a1 ) Combined OH Percent 164. 00%
(a2) Combined OH Cost $ 1 ,447.63
Subtotal (Salary + Overhead) $ 2, 330.33
(b) Operating Margin Percent 0%
(b) Operating Margin Cost $ 10. 010. 003
Subtotal (Salary Related Cost) $ 21563.36
Subtotal (Cost Elements of Basic Activities) $ 2 563 .36
Subcontract items (L.S. )
Subtotal (Basic Services) $ 21563.36
LUMP SUM=
20th Aveneu SW (IRC) 3-5- 10.x1s
ARCADIS
ESTIMATE OF WORK EFFORT FOR ENGINEERING
20th AVENUE SW
25TH STREET SW TO 21ST STREET SW
INDIAN RIVER COUNTY
PROJECT MANAGER r PROJECT ENGINEER SR, CADD OPERATOR ACTMTY TOTAL
MAN HOURLY MAN HOURLY MAN HOURLY MAN
HOURS HOURS `1�
DESIGN ANALYSIS 14.0 $ 54.80 3 .0 S 38.50 $ 18.00 17.0
DRAINAGE ANALYSIS $ 54. 80 - $ 38.50 $ 18.00
ROADWAY PLANS $ 54.80 38.50 $ 18.00
UTILITIES $ 54.80 $ 38.50 $ 18.00
PERMI N $ 54.80 - $ 38.50 $ 18.00
SIGNING & PAVEMENT -
MARKING PLANS $ 54. 80 $ 38.50 $ 18.00
TOTALS 14.0 3.0 17.0
DESIGN ANALYSIS $ 767. 20 $ 115.50
DRAINAGE ANALYSIS $ $ _ $
ROADWAY PLANS $ $ _ $
UTILITIES $ $
$
PERMITTING $ $ $
MARKING PLANS $ $ _ $
TOTALS $ 767.20 $ 115.50 $ $ 882.70
BY COSTPOR HOURLY
ACTIVITY ACTIVITY RATE
DESIGN ANALYSIS 17.0 $ 882.70
DRAINAGE ANALYSIS $
ROADWAY PLANS - $ - #DIV/0!
UTILITIES $
PERMITTING -
SIGNING & PAVEMENT
MARKING PLANS $ #DIV/0 !
TOTALS 17.0 $ 882.70 $51.92 Average per hour
20th Aveneu SW (IRC) 3-5-10x15
20th AVENUE SW
25TH STREET SW TO 21 ST STREET SW
HIGHWAY PAGE OF
HIGHWAY TASK LIST
ACTIVITY: A. ROADWAY PLANS PACKAGE SUBACTIVITY: 1 - DESIGN ANALYSIS
BASIS OF NO. OF NO. OF TOTAL PROJECT PROJECT
TASK ESTIMATE UNITS HOURSIUNIT SHEETS HOURS MANAGER ENGINEER SR. CADD REMARKS
Includes forwarding to GL Homes for
F2Pond
Prepare SJRWMD Permit a lication L. S. 1 4 4 4.0 signatures
Flood Routing Calculations L.S. 1 4 4 1 . 0 3.0
rient Loading Calculations L.S. 1 4 4 4 .0
4. Erosion Control Plans L. S. 1 1 1 1 .0
5 Coordination with SJRWMD LS. 1 4 4 4.0
0
0
0
0
0
SUBTOTAL THIS SHEET 17 14 3 0
20th Aveneu SW (IRC) 3-5-10.xls