BRIDGE REPLACEMENTS AND WIDENING OF 66TH AVENUE
FROM SOUTH OF SR 60 TO NORTH OF 57TH STREET
IRC PROJECT NUMBER 0545
1
PROFESSIONAL CIVIL ENGINEERING, GEOTECHNICAL ENGINEERING
AND LAND SURVEYING SERVICES
AMENDMENT NO* 13 TO THE PROFESSIONAL ENGINEERING/LAND SURVEYING
SERVICES AGREEMENT BETWEEN ARCADIS US, Inc. AND INDIAN RIVER
COUNTY, FLORIDA.
This is an amendment to the existing Engneering/Land Surveying Services Agreement
(AGREEMENT) dated September 6, 2005 between ARCADIS US, Inc. (ENGINEER) and
Indian River .County (COUNTY). This amendment addresses changes in " Section I — Project
Limits and Description" and " Section V - Compensation" .
Amendment Description
This Amendment includes the following.
" SECTION I - PROJECT LIMITS AND DESCRIPTION" is being modified to mncorporate
the following.
Plans have been prepared for the construction of 6e Avenue from south of SR 60 to north of
57u' Street. Included in theproject is the construction of a 12 inch diameter water main on 33. d
Street. Also included . is the construction of water main and reuse water main crossings at 33'
Street, 37`x' Street, 45th Street, and 49th Street, and the relocation of an existing force main at 33rd
Street. The COUNTY has requested that the. ENGINEER revise the plans to extend the water
main construction on 33' d Street an additional 500 feet to the 'west,-and provide a final
certification_for these facilities to FDEP upon completion of the construction.
In order to provide the construction completion certification, the ENGINEER will perform
periodic inspections of the progress of the work. it is our understanding that the COUNTY will
perform daily inspections of the contractor' s operations to confirm that the utility lines are
constructed in accordance with COUNTY standards. The ENGINEER will perform site
inspections on a weekly basis during the installation of the utility lines to observe the contractors
operations and confirm that the utility improvements are constructed in accordance with the
project plans. In addition, the ENGINEER will attend construction progress meetings as
requested by the COUNTY, and will provide engineering services Ion an as requested basis
during construction to address questions and requests for additional information and to address
unforeseen construction issues that may arise. The estimated hourly not to exceed fee included in
this supplement is based on providing professional engineering services for six hours per week
(two site visits per week) during a 16 week construction time period ( 16 hours Project
Engineering Manager & 96 , hours Sr. Field Coordinator). Additional time is included for the
Page l of'4
G:\INR Support\ADMIN\Marketing\Proposals\WPB\2013\66 th Ave Amendment No 13 5-3043 .doc
preparation of the final certifications, addressing contractor' s request for information, and other
miscellaneous duties.
"SECTION ,IV — TIME FOR COMPLETION" is being modified to incorporate the
following.
The time for -completion of Amendment Number 13 shall run concurrently with the construction
of this project.
"SECTION V - COMPENSATION" is being modified to incorporate the following.
The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered
pursuant to this Agreement fees in accordance with the following.
A. Professional Services Fee
1 . The basic compensation mutually agreed upon by the ENGINEER and the
COUNTY follows:
The following is a summary of costs:
Charge Associated with
Change in Project Scope New Total
And Pro ect Limits_ Compensation
Geotechnical Services (Tierra)(Lump Sum) ...NN........�MM....M.1Nf. $139,460.;00
Engineering (ARCADIS) (Lump Sum) ...................:.....:....«.....»... $0.00 $9533, 975.50
Signal Plans (AR CADIS) ................................................................ $0. 00 $84, 726. 66
Design Survey (66te Avenue) (ARCADIS)....................................... $0. 00 $1692500. 00
Design Survey (Sidestrees) (ARCADIS). .................. .... ... ..... ...... $0. 00 $71,428.00
Right-of- Way Survey and Map (66`" Avenue)................................. $0. 00 $117,821.00
Right-of-way Survey (Sidestreets) .................................................... $0. 00 $61,963.00
Structural Design for 4 bridges
(Bridge Design Associates, Inc.) ...................................................... $0. 00 $ZOT,222. 00
Landscape & Irrgatson ..............................................................:......
$0 00 $ 77,160: 00
(Thomas Lucido & Associates) (Lump Sum) ,
Pond--.Surveys .r..y►•.M. ..}M}..fIM..H�#..f►.*..RNI,MNN.}.1f}..N.Al..#.Y.#II.aM....#•••• $0.:00. $25, 790.00 -
Page 2 of 4
G:\LNR Support\ADMIN\Marketing\Proposals\WPB\2013\66 thAve Amendment No 13. 5-3043 .doe '
Water Main Plans (ARCADIS) ... ................ ...... ... .. ....................... $0. 00 $86,145.00
(Lump Sum)
Corridor Study (ARCADIS).......:......0.000....,..,..,.,.............»;.......,.... $0. 00 $15,58Z00
Cultural Resource Assessment ........ ....... ... 0000.:;:....,«,. . ..:.....«..: $0. 00 $8, 925. 93
I IF
TOTAL PROFESSIONAL SERVICES,...,,,,».............. ................. $0. 00. $2,019, 69809
HOURLY RATE ALLOWANCES'
Allowance for Sketch and Legal
Descriptions and staking of parcels (3.75. 00/each) ................ NTE MOO $51,000. 00
Allowance for miscellaneous roadway design
I
due to right of way negotiations ............................... NTE $0. 00 $20200000
Allowance for Survey Crew and Soft Dig
Machine for Horizontal and Vertical
Utility Locations at Potential Conflicts
(Survey $112/Hr) ............................................... ....................... NTE $000 $209000. 00
Allowance for Survey and Design
Of a transition to match the existing pavement
At the north end of the project0.00..0.0.000.0.0.000.0.000...00000...0,0,...0... NTE $0. 00 $27,000.00
Construction Engineering Services - Public Works .... NTE $209000900 $77987712
Construction. Engineering Services-Utility Dept ......... NTE $10,44624 $10,44624
TOTAL HOURLY RATE ALLOWANCES.,0.0.00.........0. NTE $30,44624 $2060323:36'
Compensation for the hourly rate allowances will be made on an hourly basis at the
hourly rates listed below:
Project Engineer Manager..00...0.0.00..0. 0....0...0„.0.000.0..000000 $I46 64
Project Engineer ............................................................... $109. 70 '
IF
Senior CADD Operator .........000..0000.00.........,00.................. .. $85984
CaddDraftsman....... 0....... 0«0..... 000..........0 .00.....0.000..000.. $5689
Survey ProjectManages.:...... .:......:. . 0 ........,................ $106*40
Professional ,Surveyor. «0..»«..01 .....:,,..0......... «....... .....0«. $9830
.
Survey CADD Tech ...........................»,.........,....««,..........».,, $68. 17
3 Man Field Crew....... .......... ......:...«.......«1 :.,..0. .......: $12684
2 Man Field Crew,....«......»..............00.......«, ...,.«.0 ,.«.,..00, $114014
Sr. Field Coordinator ... .................................................. $ 75000
Page 3 of 4
G:\LNR Support\ADMIN\Marketing\Proposals\WPB\20I3\66 th. Ave Amendment No ' 3 5-3043 .doc
The AGREEMENT is hereby amended as specifically set forth here in. All other sections of the
AGREEMENT shall remain in full force and effect and are incorporated herein.
This Amendment No . 13 to the AGREEMENT regardless of where executed, shall be governed
by and constructed by the laws of the State of Florida.
In witness whereof the parties have executed this Amendment this 18th day of
Timp 520138
ARCADIS , IN INDIAN RIVER COUNTY, FLORIDA
2081 Vis ay Suite 200
West P Be h 33411
pppppp•aggqq
By: 00
By •°°,f�, *41*
ye
Ro Lawson, P . E . Jose, escher, airman °� :•• • 'FAN'00 ,
ice President Board of County Commissioners.! * !
� q
q • a
' a
00 %04zr
rioU�� 'e
°aaapoaaoo°
0
WITNESSED BY : Approved by BCC 06- 18-13
Attest.
Jeffrey R. Smith, Clerk of Court
and Comptroller
s County Attorney Deputy Cl
Approved as to Form and Legal Sufficiency
seph A. Baird,
ounty Administrator
Page 4 of 4