HomeMy WebLinkAbout2013-1247-z 13
CIO 13400 1 d,
AMENDMENT NUMBER 2 WORK ORDER NUMBER 1
This Amendment 2 to Work Order Number 1 is entered into as of this 2nd day
of T„t� 2013 pursuant to that certain Continuing Contract Agreement for
Professional Services, entered into as of November 15, 2011 (the "Agreement"), by and
between INDIAN RIVER COUNTY, a political subdivision of the State of Florida ("COUNTY") and
ATKINS NORTH AMERICA, INC., ("Consultant"),
1. The COUNTY has selected the Consultant to perform the professional. services set
forth in existing Work Order Number 1 , Effective Date Feb 7. 20120
2. The COUNTY and the Consultant desire to amend this Work Order as set forth on
Exhibit 1 (Scope of Work) attached to this Amendment and made part hereof by this reference.
The professional services will be performed by the Consultant for the fee schedule set forth in
Exhibit 1 (Fee Schedule), and within the timeframe more particularly set forth in Exhibit 1 (Time
Schedule), all in accordance with the terms and provisions set forth in the Agreement.
3. From and after the Effective Date of this Amendment, the above -referenced Work
Order is amended as set forth in this Amendment. Pursuant to paragraph 1.4 of the Agreement,
nothing contained in any Work Order shall conflict with the terms of the Agreement and the
terms of the Agreement shall be deemed to be incorporated in each individual Work Order as if
fully set forth herein.
IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the date
first written above.
CONSULTANT:
ATKINS NORTH AMERICA, INC.
By:
BOARD OF COUNTY COMMISSIONERS
OF INDIAN RIVER COUNTY
Title: �,�,ea v�n�lt�
BCC Approved Date,
Attest: Jeffrey R. Smith, Clerk of
Comptrolle,�
Approved:
.n { Joseph
Approved as to form and legal sufficiency:
Alan S.
Counf'�Administrator
ch, ., County Attorney
EXHIBIT
June 18, 2013
Mike Hotchkiss
Capital Projects Manager
Indian River County
1801 27th Street.
Vero Beach, F132960
Aticins North Amenca, Inc.
482 South Keller Road
Orlando, Florida 3281 M1 01
Telephone: +1.407.647.7275
.lel ll L l
RE: West Regional WWTP
Anaerobic Tanks Odor Control System
Amendment for Clarifiers No. land 2 Rehab and Walkway Replacement
Dear Mike,
Based on our field visit and clarifiers inspection requested by you, it was determined the existing
clarifiers #1 and #2 are in dire need of mechanisms and walkway rehabilitation. During the site
visit, the corrosion expert and our structural engineer determined while the walkways over the
clarifiers and the mechanisms can be salvaged; by painting and cleaning, the walkway between
the clarifiers is beyond repair and need replacement. Following is a summary of the
repair/replacement scope:
• Rehabilitate the clarifier mechanisms for clarifiers # 1 and #2.
• Rehabilitate the clarifier walkways for clarifiers # 1 and #2.
• Replace the sludge squeegees on the clarifier
mechanisms
Jr this task after the mechanism rehab.
• Replace walkway between clarifiers #I and #2.
• Paint clarifiers #1 and #2 exterior
• Paint existing chlorine building and fascia board.
(County maintenance_ can
Engineering services related to this scope were not anticipated or included in the original scope.
Scope of these additional services will include the following:
• Conduct site visit
• Prepare a condition assessment and rehab recommendation report
• Review Report with County and prepare drawings/sketches for Walkway between
clarifiers #1 and #2.
• Prepare and issue change order.
EXHIBIT
• Review walkway and paint shop drawing and respond to request for information (RFIs)
We request an additional compensation of $11,600.00 for this scope. Work Order budget
summary is as follows.
Original Work Order No 1 amount: $109,980.00
Amendment #1 Amount $8,600.00
Amendment #2 Budget $11,600.00
Revised Budget Total = $130,180.00
If you have any questions or need additional information, please feel free to contact us at 800-
284-5182.
Sincerely,
Atkins,
Raj Singh, P.E.
Senior Design Manager