HomeMy WebLinkAbout2012-008 CHANGE ORDER Distribution to : AIA DOCUMENT G701 OWNER ARCHITECT CONTRACTOR FIELD OTHER PROJECT : Indian River County Transit Facility CHANGE ORDER NUMBER : ONE 438543 d Avenue Vero Beach , Fl 32960 INITIATION DATE : December 30 , 2011 TO : Barth Construction , Inc . CONTRACT DATE : June 21 , 201 1 1717 Indian River Blvd . Suite 202A Vero Beach , FL 32960 You are directed to make the following changes in this Contract : Chance Order Proposal # Description Amount 1 Use millings in lieu of coquina base <$ 273 . 00> 2 Delete air compressor equipment <$ 3 , 726 . 00> 3 Additional furring & blocking $ 3 , 631 . 00 4 Revised foundations for Maintenance Building $ 25019 . 00 5 Drainage & utility conflict $ 141401 . 00 7 Pass through window & counter $ 1 , 247 . 00 Total Change Order Amount $ 179299.00 Not valid until signed by both the Architect and Owner. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract 'rime The Original ( Contract Sum ) ( Gtoed Maximum ` est) was . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 1 , 617 , 691 , 00 Net change by previously authorized Change Orders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ The (Contract Sum ) ( ) prior to this Change Order was . . . . . . . . . . . . $ 1 , 671 , 691 . 00 The ( Contract Sum ) ( ) will be ( increased ) ( decreased ) (unchanged ) bythis Change Order . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 175299 . 00 The new (Contract Sum) (Guaranteed Maximum Cost) including this Change Order will be $ The Contract Time will be ( increased) (deereased) (tmehanged) by ( 12 ) Days The Date of Substantial Completion as of the date of this Change Order therefore is March 26 , 2012 Ny NN NNNNNi • •• ,4 C 0 MAI/s ,,,,,, ENGINEER CONTRACTOR OWNER �.:oJ�. • i0` , . oo Schulke Bittle & Stoddard Barth Construction Gary C Wheeler, Chaiff* ; 1717 Indian River Blvd 1717 Indian River Blvd . Indian River County BIX!C ' '♦ ' Suite 201 Suite 202A 1801 27°i Street goo 1A 00 Vero Beach , FL 32960 Vero Beach , FI 32960 Vero Beach , F1 32960 ;� ••, a� • •, ; ». �N seeNM BY • BY : BY * G / DATE : 05'�!� DATE . _�2. 3D . I ! DATE : AIA DOCUMENT G701 * CHANGE ORDER * APRIL 1978 EDITION * AIA * 1978 "THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE . , N . W . , WASHINGTON , D . C . 20006 BARTH Construction, Inca General Contractor CGCO07847 November 18 , 2011 Revised 11 . 28. 11 Joe Schulke Schulke Bittle & Stoddard 1717 Indian River Blvd Vero Beach , FI 32960 Re : Indian River County Transit Facility Change Order Proposal #1 - Use Milling in lieu of coquina base John , We are presenting the costs for Change Order Proposal # 1 Using millings in lieu of coquina base in the amount of, a credit , ($ 273 .00) and a time extension of 5 days . 1 ) This proposal is for the costs associated with the use of asphalt millings in lieu of coquina base per the specification provided by IRC Engineering . 2 ) This proposal is based on the work being performed during normal business hours . 3 ) The cost are further described and detailed in the attached spreadsheet. Should you require any additional information , please feel free to contact me . Sincerely , Jason ykes Barth Construction Inc . Approved by : Date ' Cc : Lynn Williams , IRC Ken Lebron , CAG 1717 Indian River Boulevard * Suite 202A * Vero Beach , Florida 32960 Phone : (561 ) 778 =3072 * Fax: (561 ) 770-3017 E-mail : (ail : igfc�.arthconstructioil X0m * Internet: www .barthconstruction .com GAProjects\ IRC Transit Facility\Change Order Proposals\COP # 1 - use millings in lieu of coquina.doc FF 0 DAYS Sq.Footage C.O P. #1 - Use Millings in lieu of coquina base 0 WEEKS 0 Months afq DESCRIPTION mroNTRACrOR TOTAL. LMES - - LABOR - MTL SUB TOTAL .COSTISF Cost Code - ♦ - _ - IF0.00 IF IF 0.00 IF 0.00 02000 Tim Rose Contractin 4545 Sq yds - 3.301 ` ' 43,301 43,301 0.00 10" Millings , (45,450) (45,450) 0.00 credit 8" Coquina 4545 sq yds 4Z27 0.00 IF 960 sq yds " r - - 61827 89827 0.00 8" Millim s , (7,200) (71200) 000 credit 6" coquina 960 sq yds (70 ) _ 0.00 IF IF IF Additional testin KS M 250 • 250 250 0.00 EO1IF IF 0.00 y 0.00 i 0.00 IF 0.00 IF IF IF 0.00 IF rIF 0.00 0.00 « IF 0.00 « 0.00 « 0.00 r « IF 0.00 _ « _ 0.00 FFFFFI 0.00 IF 0.00 IF 0.00 + IF 0.00 : _ . . . _ . . . . _ IFIF0.00 IFFFIFIFFFI IF 0.00 IF SUB TOTALS (173) • (273) (273 0.00 LABOR BURDEN Sub-Total213 Overhead I 01020 PreCon Fee Sub Total " 273) �� Sub-Total (273) P&P Bond @ . 7% Total Bid Page 1 of 2 Jason Fykes From , Joseph W. Schulke , P . E . Uschulke@sbsengineers . com] Sent : Monday , October 17 , 2011 12 : 56 PM To . Jason Fykes Subject: FW: SRA Transit facilty Jason ? i-Jovv do you feel about C.: ont; iik,lering that IRC. created the specification and has u. >ed =, i� ublil. road f� ,. c;jr- cts ( E , ' � Vit . } , this may offer you ( arid me ) some reelief as to lia . i lityA li' ior , l� z ilii E? ei - ' yCi :' �1C. I' £ y iiI17; 'iile depth of these ! ly 2 " over" the t: OCIUIIk � . , . . C:C) ri"t' (='l" � :' From : Chris Kafer [mailto : ckafer@ircgov .com] Sent : Monday, October 17, 2011 12 : 08 PM To : Joseph W . Schulke, P . E . Cc: Geoffrey Barkett; 'Jason Fykes' ; Lynn Williams; Chris Mora , Daniel Wittenberg , David Hays; Jack Jolly; 'Terry Cook' Subject : RE : SRA Transit facilty Joe -- I discussed the lklSl' of r`l .splaalt millings in lieu of cemented coquina shell material -for base: with Chrk JViora ankrl Ti= rry Cook ( Road and Bridge Superintendent ) . We all agreed that the use of Wsp ;lait lkrtiliil*tl, 5 +; alalci he acceptable, with the following conditions : :t . n& halt rTaiiiings idiill be 9" thicl< Ind place in 2 lifts for the Regular Duty Asphalt section , ami VfY t. lIi k and played ill 2 lifts for the Heavy Duty Asphalt section _ `i ) on � ity i =! sts shall be performed on each lift of the asphalt millings and obtain rior to fr.l � 'rt +: r construction . the density requirements shall be the sane as fort 7ria � i?t2il ccxJuiwi shell hasel Prime coat shall be E? 1r sed on niiliings prior to asphalt placement . rl � pla l ' �: r; tilli l � s shall bo free of foreign material , such as soil . :; . Asphalt nailfiilf, s slit-Ill be crushed to provide a gradation where .j. 00IX; of material " sieve . Stabili <Nd SLJOPi_gide and asphalt shall he per original pavement design , PIC i..Clf1ir t:1 nle it yoil have any questions Olk if I call be of further a � 5i5 . (1n {: e . . . C. ilr15 From % Joseph W . Schulke, P . E . [mailto :jschulke@sbsengineers .com] Sent : Monday, October 17, 2011 8 : 36 AM To : Chris Kafer Cc : Geoffrey Barkett; Jason Fykes; Lynn williams; Chris Mora Subject: RE : SRA Transit facilty ih . { lopw Voili Ylrtd ci (,.ireaa weekend . ! have n0t. heard bacl< rrorn you on the below ernail . . . Look forward to hearing from? you , 11 /28/2011 Page 2 of .) From : Joseph W . Schulke, P . E . Sent : Tuesday, October 11, 20113 : 32 PM To : Chris Kafer Cc : Geoffrey Barkett; 'Jason Fykes ' ; ' Lynn williams' ; Chris Mora Subject : SRA Transit facilty Chris, We are considering alternative recyclable materials for the transit facility, in order to obtain the FGBC / LEED rating . The contractor has proposed using asphalt millings in lieu of coquina for a base course in the parking areas . I can not find much information on the subject . However, I was told by Geoff Barkett — that he had an informal discussion several months ago with you , and that you indicated that IRC is using millings in numerous applications on public roads . Further, the IRC PM for this project, Lynn Williams, indicated that he had inquired with Chris Mora about this, and Chris had indicated that this may be acceptable . Do you have any information on this use, specifications, construction techniques, testing, or anything like this ? ? I would appreciate your response and any knowledge you can share on this topic . Thanks Joseph W . Schulke , P . E . Schulke , Bittle & Stoddard, LLC 1717 Indian River Blvd . , Ste . 201 Vero Beach, Florida 32960 Phone : ( 772 ) 770-9622 Fax : ( 772 ) 770-9496 www . sbsengirieers . com- 11 /28/2011 KSM KELLER , SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING , INC . . MARTIN (772) 337 =7755 PO . BOX 78-1377, SEBASTIAN , FL 32978-'I 377 SEBASTIAN (772) 589-0712 PALM BEACH (561 ) 845-7445 www,ksmengineedng.net MELBOURNE (321 ) 768-8488 FAX (561 ) 845-8876 E-Mail : KSMQKSMENGINEERING.NET ST. LUCIE (772) 229-9093 C .A .: 5693 FAX (772) 589 =6469 November 17 , 2011 Mr. Jason Fykes Barth Construction , Inc. 1717 Indian River Blvd Suite #202A Vero Beach , FL 32960 Re : Indian River County Transit Facility 4385 43rd Avenue Iridian River County, Florida Permit # : KSM Project #: 110949 -Asphalt Dear Jason : We have reviewed the specifications for testing requirements for the asphalt millings to be used as the base material for the above referenced project. We have the ability to test the base material accurately as described by the specifications listed by Indian River County for this project . Should you have any questions , please feel free to contact us . llltll { ! ! II ? ?11/!/ Respectf � A ! E . li,1%e J , P . E . e ► ta Sr,gTEOpz [� Fax to : 77fl�` 7 >1f oo% ' . a. • moo` Cr , :S ` � JEK : km Ronald G . Keller, P.E .: 37293 / SI Lic . No. : 860 / Julie E. Keller, P. E.: 68366 Page 1 of 1 Jason Fykes From . Julie [Julie@ksmengineering . net] Sent: Friday , November 18 , 2011 10 : 48 AM To . Jason Fykes Subject: Letter Attachments : Document ( 3 ) . pdf Jason - See attached letter. Let me know if it is sufficient. The price difference is going to be $250 . jithe `I�'e ((er, (CSE KSM Engineering & Testing President P . O . Box 78 - 1377 Sebastian , FL 32978 Phone : 772 - 589 - 0712 Fax : 772 - 589 - 6469 Cell 772 - 370- 3545 11 /28/2011 BARTH Construction, Inc. General Contractor CGCO07847 November 18 , 2011 Joe Schulke Schulke Bittle & Stoddard 1717 Indian River Blvd Vero Beach , FI 32960 Re : Indian River County Transit Facility Change Order Proposal #2-Delete Air Compressor Equipment John , We are presenting the costs for Change Order Proposal #2 Deleting Air Compressor Equipment in the amount of, a credit, ( $3 ,726 . 00 ) and a time extension of 0 days . 1 ) This proposal is for the costs associated with the deleting the material cost only for the air compressor unit from the contract. 2 ) This proposal is based on the work being performed during normal business hours . 3) The cost are further described and detailed in the attached spreadsheet. Should you require any additional information , please feel free to contact me . Sincerely , Jason Fykes Barth Construction Inc , Approved by : Date : Cc : Lynn Williams, IRC Ken Lebron, CAG 1717 Indian River Boulevard * Suite 202A * Vero Beach, Florida 32960 Phone : (561 ) 778-3072 * Fax: (561 ) 770-3017 E-mail : inPoi/c%baiihconstructioii , com * Internet : www .barthconstruction .com G :\Projects\IRC Transit Facility\Change Order Proposals\COP #2 delete air compresor unit. doc 0 DAYS Sq.Footage C. O. P. #2 - Delete Air Compressor Equipment 0 WEEKS 0 Months CSIN DESCRIPTION - - SUBCONTRACTOR TOTAL LMES LABOR - MTL - SUB , TOTAL COSTISF _ - Cost Code ` 0.00 r 0.00 15400 Delete Air Compressor E ui ment " 0. 00 R9709 - - (3 ,700) (3,700) 0.00 0,00 + 0.00 r 0.00 ♦ 0.00 r 0.00 0.00 0.00 + 0.00 0.00 + 0-00 0.00 000 000 0.00 0.00 r _ _ _ + 000 0.00 0. 00 « 0.00 0.00 + 0.00 + 0.00 0.00 SUB TOTALS (31700) ' - (3 ,700) (3,700) o.00 LABOR BURDEN Sub-Total .r': : : 397 Overhead 01020 Profit Sub Total Sub-Total r ., ;(39700) P&P Bond $ 25. 90 @ . 7% Total Bid (3,726 #REF! BARTH Construction , Inc. General Contractor CGCO07847 November 29 , 2011 Joe Schulke Schulke Bittle & Stoddard 1717 Indian River Blvd Vero Beach , FI 32960 Re : Indian River County Transit Facility Change Order Proposal #3 Additional Furring & Blocking John , We are presenting the costs for Change Order Proposal #6 Restroom tile Changes in the amount of (3 ,631 .00) and a time extension of 0 days . 1 ) This proposal is for the costs associated with the additional furring and blocking required per Architectural Clarification #004 . Also included are the costs for the chase wall required for the kitchen sink . 2 ) This proposal is based on the work being performed during normal business hours . 3 ) The cost are further described and detailed in the attached spreadsheet. Should you require any additional information , please feel free to contact me . Sincerely , aason Fykes Barth Construction Inc . Approved by : Date ' Cc : Lynn Williams Ken Lebron , CAG 1717 Indian River Boulevard * Suite 202A * Vero Beach, Florida 32960 Phone : (561 ) 778-3072 * Fax : (561 ) 770-3017 E-mail : infoicr, bgnstructiirn . com * Internet : www .barthconstruction.com G :\Projects\IRC Transit Facility\Change Order Proposals\COP 93 Additional Furring & Blocking. doc 0 DAYS Sq. Footage C .O. P. #3 Additional Furring & Blocking 0 WEEKS 0 Mouths CS1R DESCRIPTION SUBCONTRACTOR TOTAL � .LMES LABOR MTL SUB - TOTAL COMSF Cost Code 0.00 Add'I Fuff ing per Clarification 9004 2,685 22585 2,585 000 « 0. 00 11 L Add'I blocking for cabinets in Kitchen 325 325 325 0. 00 0.00 Chase Wall at Kitchen sink 295 * 295 295 0.00 0.00 0,00 + 0.00 0.00 + 0.00 0, 001 _ « 0.00 _ 0.00 « 0,00 « 000 _ 0,00 0.00 + 0.00 0,00 0.00 0. 00 « 0.00 « 0.00 0.00 0.00 000 + 0,00 + 0.00 SUB TOTALS 3,205 - 3 ,205 3,205 0.00 LABOR BURDEN Sub-Total 39205 01020 Overhead - $40 @7. 5% Profit 160 @ 5% Sub Total < 3;606 CoBtiaancy Sub-Total 31666 P& P Bond $ 25.24 @. 7% Total Bid 3,631 NREF ! BARTH Construction, Inc. General Contractor CGCO07847 November 29 , 2011 Joe Schulke Schulke Bittle & Stoddard 1717 Indian River Blvd Vero Beach , FI 32960 Re : Indian River County Transit Facility Change Order Proposal #4 Revised Foundations on Maintenance Bldg John , We are presenting the costs for Change Order Proposal #4 Revised Foundations on Maintenance Bldg in the amount of ($2 ,019 .00 ) and a time extension of 0 days. 1 ) This proposal is for the costs associated with the revised foundations on the Maintenance Building per revised drawings S4 . 013 , S4 . 1 B and S4 . 2B 2 ) This proposal is based on the work being performed during normal business hours . 3 ) The cost are further described and detailed in the attached spreadsheet. Should you require any additional information , please feel free to contact me . Sincerely , ,1�rb�1 Jason Fykes Barth Construction Inc. Approved by : Date . Cc : Lynn Williams Ken Lebron, CAG 1717 Indian River Boulevard * Suite 202A * Vero Beach , Florida 32960 Phone : (561 ) 778-3072 * Fax : (561 ) 770=3017 E-mail : info. ii^b arthcpnstrucfpii . com * Internet : www .barthconstruction .com G :\Projects\IRC Transit Facility\Change Order Proposals\COP #4 Revised Foundations on Maint Bldg. doc 0 DAYS Sq.Footage C.O. P. #4-Revised Foundations on Maintenance Bldg 0 WEEKS 0 Months (SIN - DESCRIPTION SUBCONTBACTOA TOTAL LMIS LABOR MTL SUB TOTAL COST/SF COSI Code + 0.00 + 0.00 03000 Additional rebar - - " ` > _- ; 315 + - - 315 315 0.00 additional concrete - -950 - - 950 950 0.00 Additional Labor : 125 " 525 525 0.00 + 0.00 + 0.00 0.00 + 0.00 + 0.00 + 0.00 0.00 « 0,00 + 0.00 0.00 0.00 + 0,00 + 0001 + 0.00 + 000 0,00 000 + 0.0o . . . . . . . . .. . « 0.00 + 000 0.00 + 0.00 + 000 « 0.00 Z L SUBTOTALS 1,790 + 1 ,790 1 ,790 0.00 LABOR BURDEN Sub•Total 11790 otozo Overhead I I L 11125 @7.5% Profit 90 @5% Sub Total " 2,005 cou3f#gfccy : 0 Sub-Total 5,005 P&P Bond $ 14. 03 @0. 7% Total Bid 2,019 #REF ! 111BARTH construction , Inca General Contractor CGC007847 November 29 , 2011 Revised 12. 5. 11 Revised 12. 8. 11 Joe Schulke Schulke Bittle & Stoddard 1717 Indian River Blvd Vero Beach , FI 32960 Re : Indian River County Transit Facility Change Order Proposal #5 Drainage & Utility Conflict Resolution Joe , We are presenting the costs for Change Order Proposal #5 Drainage & Utility Conflict Resolution in the amount of ( $ 14 ,401 .00 ) and a time extension of 7 days . 1 ) This proposal is for the costs to lower the 24" ADS drainage outfall pipe to avoid the FPL secondary pipe to the Supervisors of Elections Building and the additional rip-rap at the outfall . 2 ) This proposal is based on the work being performed during normal business hours . 3 ) The cost are further described and detailed in the attached spreadsheet. Should you require any additional information , please feel free to contact me . Sincerely , J Jason Fykes Barth Construction Inc . Approved by : Date : �111 Will Cc : Lynn Williams Ken Lebron , CAG 1717 Indian River Boulevard * Suite 202A * Vero Beach , Florida 32960 Phone : (561 ) 778-3072 * Fax : (561 ) 770 =3017 E-mail : inlb ' bartljconstructi_on . com * Internet: www .barthconshuction.com rder Proposals\COP # 5 Drainage and utility conflict .doc G :\Projects\ IRC Transit Facility\Change 0 7 DAYS Sq.Footage C. O. P. #5 Drainage Utility Conflict 1 WEEKS 0 Months CS19 DESCRIPTION SUBCONTRACTOR. TOTAL LM ES ' - ' LABOR MTL SUB TOTAL COSTISF Cost Code 000 Additional Supervision & Coordination 358 • 350 350 ono 0.00 0.00 0.00 Saw Cut Manhole alio + 800 800 0.00 Add 2" riser to D 03 - 687 . ' - 687 687 0.00 Add 3' riser to D 02 7J3' 735 735 0.00 Lower 514' of 24 " ADS ( Labor & E ui ment) -- : 6,900 ' - - 8,900 8,900 0.00 000 10 ' Add'I Rip Rap rr 1.210 + 17240 %240 0.00 0.00 _ . __. r 0.00 0.00 • 0.00 0.00 0.00 ♦ 0,00 ♦ O.00 • 0.00 0.00 r 0.00 • 0.00 000 ♦ 0.00 0.00 0. 00 SUBTOTALS t29712 • _ 12,712 121712 r 0.00 LABOR BURDEN Sub-Total 12 712' o, ozo Overhead 953, C� 7. 5% Profit 636 @5% Sub Total 14,301 Cgntingepoy _b Sub-TotalL , 14j301 . P&P Bond $ 100, 11 @ , 7% Total Bid 1!4.401 #RFP BARTH Construction, Inca General Contractor CGCO07847 December 12 , 2011 Joe Schulke Schulke Bittle & Stoddard 1717 Indian River Blvd Vero Beach , FI 32960 Re : Indian River County Transit Facility Change Order Proposal #7 Transaction Counter & Window Joe , We are presenting the costs for Change Order Proposal #7 Transaction Counter & Window in the amount of ($ 1 ,247 .00 ) and a time extension of 0 days . 1 ) This proposal is for the costs to install a transaction counter & sliding window at room # 125 per the attached sketch . 2 ) This proposal is based on the work being performed during normal business hours . 3) The cost are further described and detailed in the attached spreadsheet. Should you require any additional information , please feel free to contact me . Sincerely , Jason Fykes Barth Construction Inc . Approved by: Date* Cc : Lynn Williams Ken Lebron, CAG 1717 Indian River Boulevard * Suite 202A * Vero Beach, Florida 32960 Phone : (561 ) 778-3072 * Fax : (561 ) 770-3017 E-mail : info(c% barthconstructii>n . com * Internet: www .bartheonstruction .com ls\COP #6 Restroom the changes . doc G :\Projects\IRC Transit Facility\Change Order Proposa 0 DAYS Sq .Footage C . O. P. #7 Transaction Counter 0 WEEKS 0 Months COSI Code CSId DESCRIPTION SUBCONTRACTORS TOTAL LUES LABOR MiT. SU13 - TOTAL - COST/SF " 0.00 Framing & Drywall , - 350' " - 250 250 0.00 - - 0.00 Sliding Door/window 701 lot 701 o.oa 0.00 0.00 Lam inateTo -I50 150 150 0.00 0.00 0.00 • 0.00 _ o.00 0.00 Li • 0.00 • 0.00 o.00 0.00 SUBTOTALS L1,101' • 1 , 101 1, 101 0.00 LABOR BURDEN Sub-Total 01020 Overhead `:83 @7. 5% Profit SS @ 5% Sub Total 19239 , CbhtipgeccY 0 Sub-Total 19239 , aL P&P Bond $ 8.67 @0. 7% Total Bid 1,247 #REF! �. o 1 > 24224 r r i I E � I ro�:. Wot*lEN 15 TOILET f;P� O _\ rJ 'j -1 OFFICE MANAG . } 114 _ 125 M to r- I: i ' I I t I PW It € I } 3 � I i i n a 4 :�i1 .e , -- �, I 4z 30 o 0 61 Iwo Fro 'A k� Ell1 j IST m COPYRIGHT — All reports, plans, specifications, computer files, field data, notes and other documents are instruments of service prepared by The Ceribefio Architectural Group, as instruments of service they remain the property of C.A.G. C.A.G. shall retain all common law, statuatory and other reserved rights, including the copyright thereto. Any use or reproduction of this document without written permission from C.A.G. is a violation of Federal copyright laws. PRONM C' ' A . G • PROJECT NAME - NUMBER 09-056 SHEET e; ;;t t ; , r, f, INDIAN RIVER TRANSIT FACILITY PARTIAL lrehitecft.IritA DATE 12-02- 11 µ ; INDIAN RIVER COUNTY FLORIDA it I LO ro 1.IDACE � ,CERTIFICATE A101 a y 1MWLA0ERA%i1WE EAAReet1B19 SHEET TITLE SC&E ,E W. "WA. 1 . N .T. S . • w R, E _ OFFICE MGR , TRANSACTION CNTR. RPOP � WOOD TRISEES A00P.4 COMM S/e' WYW' TO doom" OF OELK AT ORAFSTOPPMS LOGATIa e - see PLOOR PLAW A-IOIP POR LO ATOMS I _ . . HOOD TRAW5 ABODE \ I BRACE TO � STR chum Wm a BA 3 WOO ITL. STV 9tAGNLs • • oz. AnAsW PARMION FR % N 9/D' P \ I IPM T V 5UD561ee LATERAL BRAOEb WEN PART"WR F%AHW NOT AMALN TO POOF 5rRLcTLW' b•N M 5A 6ALv. \ \ WIL SILOS I or-& . FASIEWD TO N54IEAG81 \ s1EA. T. OAS. AV STRGT. ABOVE \ II l JLLL i I II 5U5P, :G0:U5 F, GLNO, I II F 6TP, ee. PA FPAOgt AT D'-O• AFP IS ON T® OW SRWT AJOJo - sUDIN6 EUY W IL10Y5 WTH LG:K 3/1• PLTYI TOP N/ P nG V IE - IA VOE GOEOR WLS"RT R-] bld b0 MTB7 ISN R I 21. I I 5/D` 6J3E. WWHW. I I I MAL SILOS M HVL TeMa 60 OL. p I TO ur esm OP cowronm I I ry I I I I I � EN'E As 5G6UIID I PLNR FMS« As sc"Ictv I I (a)OFFICE MGR. TRANSACTION COUNTER SCALE: N T.S. © COPYRIGHT — All reports, plans, specifications, computer files, field data, notes and other documents are instruments of service prepared by The Coribeno Architectural Group, as instruments of service they remain the property of C .A.G. C.A.G. shall retain all common law, statuotory and other reserved rights, including the copyright thereto. Any use or reproduction of this document without written permission from C.A.G. is a violation of Federal copyright laws. PROJECT NMIE . _ NIJ11 R 09-056 s,tE`r IN f T:i <i INDIAN RIVER TRANSIT FACILITY Archil t:x:ztzr,Ti DATE PARTIAL INDIAN RIVER COUNTY FLORIDA 2-02" � _ rLORioA CEnnFtcnrB MR oolTeis sNeeT TITLE A501 aSCAE N .T. S . OFFICE MGR. TRANSACTION CNTR. SECTION Y QO xuj m 0 ION,t = I w - C_3 K — nam LO ° ate (. d _ '.........'T_._._.� It NN, IN INN a, T 2 Y - tot GtN O /,I IN IN IN p + + o - F '� Q ti Q F D x _ IN IN IN Nk 77= Ne } 'r. `o u I a y 2 CC It Ni � [L UJ It �WY [B 1 � (n } m ON O O v; t,55 it NI it IN hx �' •yarr ' ' !� IN I IN IN IN" Na L S t S 4 it � # ` a� IN S 1 i'� r . j ✓ l d iD t� 4 4 J V7 E �. ry t n . ,.-N10 INC S O 15 ,tot IN I NiNiii IN No T` W , NI - V ♦ © tJ} tG iIn w.l ✓ ; 5. / I - I ... ... Ott rS L W wCA ' c IN C:) IN- _ �- IN r� r , W4rI it ItNNAN �. �cc _ J OD O k 1 , Roo _ G C r3 ro CL CJU ;: r � rV � c� '•� Q ~cs -� ccEm rr 0 y v C .� a? •�—� y � C �" � • ^.I ct Ott toot ct �y cG y cc3 a wo C74 y �fj r— v� ^fi cc G cct O x n +, +, �;/ + om"f CCS -+ J •�