HomeMy WebLinkAbout2012-055 Indian River County 03 / aa / ao iQ
Fire Station # 13 1 !5 - A
Phase II Agreement
TABLE OF ARTICLES
PART 2 AGREEMENT
1 . GENERAL PROVISIONS
2 . OWNER
3 . DESIGN/BUILDER
4. TIME
5 . PAYMENTS
6 . PROTECTION OF PERSONS AND PROPERTY
7 . INSURANCE AND BONDS
8 . CHANGES IN THE WORK
9 . CORRECTION OF WORK
10 . DISPUTE RESOLUTION - MEDIATION AND ARBITRATION
11 . MISCELLANEOUS PROVISIONS
12 . TERMINATION OF THE AGREEMENT
13 . BASIS OF COMPENSATION
14 . OTHER CONDITIONS AND SERVICES
THIS AGREEMENT made as of the 12th day of March in the year of 2012
BETWEEN the Owner :
Indian River County, a political subdivision of the . State of Florida , 4225 43 {d Avenue,
Vero Beach , Florida 32960 and the Design/Builder: Barth Construction , Inc. , 1717
Indian River Blvd . Suite 202A Vero Beach , Florida 32960
For the following Project:
Prase 11 Design Build Expansion and Renovation to the Indian River County
Department of Emergency Services, Fire Station #13 . 4440 4th Street Vero Beach ,
Florida 32968
The architectural services described in Article 3 will be provided by the following person
or entity who is lawfully licensed to practice architecture :
Name and address Registration Relationship to
Number Design/Builder
Paul U . Dritenbas , Edlund Dritenbas AR0009308 Contractual
Binkley Architects & Associates
65 Royal Palm Pointe, Suite D
Vero Beach , FL 32960
Normal structural , mechanical and electrical engineering services will be provided
contractually through the Architect except as indicated below :
Name , address and discipline Registration Relationship to
Number Design/ Builder
The Owner and the Design/Builder agree as set forth below .
TERMS AND CONDITIONS — PART 2 AGREEMENT
ARTICLE 1 GENERAL PROVISIONS
§ 1 . 1 BASIC DEFINITIONS
§ 1 . 1 . 1 The Contract Documents consist of the Part 1 Agreement to the extent not
modified by this Part 2 Agreement , this Part 2 Agreement , the Design/Builder' s Proposal
and written addenda to the Proposal identified in Article 14 , the Construction
Documents approved by the Owner in accordance with Section 3 . 2 . 3 and Modifications
issued after execution of this Part 2 Agreement . A Modification is a Change Order or a
written amendment to this Part 2 Agreement signed by both parties , or a Construction
Change Directive issued by the Owner in accordance with Section 8 . 3 .
§ 1 . 1 . 2 The term "Work" means the construction and services provided by the
Design /Builder to fulfill the Design/Builder' s obligations .
Design/Builder further warrants that upon submittal of an Al , " tion for Payment all
construction for which payments have been received from the Owner shall be free and
clear of liens , claims , security interests or encumbrances in favor of the Design / Builder
or any other person or entity performing construction at the site or furnishing materials
or equipment relating to the construction .
§ Sol o8 At the time of Substantial Completion , the Owner shall pay the Design/Builder
the retainage , if any , less the reasonable cost to correct or complete incorrect or
incomplete Work . Final payment of such withheld sum shall be made upon correction or
completion of such Work .
§ 5 . 2 FINAL PAYMENTS
§ 5 . 2 . 1 Neither final payment nor amounts retained , if any , shall become due until the
Design /Builder submits to the Owner : ( 1 ) an affidavit that payrolls , bills for materials and
equipment , and other indebtedness connected with the Work for which the Owner or
Owner' s property might be responsible or encumbered ( less amounts withheld by the
Owner) have been paid or otherwise satisfied ; ( 2 ) a certificate evidencing that insurance
required by the Contract Documents to remain in force after final payment is currently
in effect and will not be canceled or allowed to expire until at least 30 days ' prior written
notice has been given to the Owner ; ( 3 ) a written statement that the Design /Builder
knows of no substantial reason that the insurance will not be renewable to cover the
period required by the Contract Documents ; (4) consent of surety , if any , to final
payment ; and ( 5 ) if required by the Owner , other data establishing payment or
satisfaction of obligations , such as receipts , releases and waivers of liens , claims ,
security interests or encumbrances arising out of the Contract , to the extent and in such
form as may be designated by the Owner . If a contractor or other person or entity
entitled to assert a lien against the Owner' s property refuses to furnish a release or
waiver required by the Owner, the Design/ Builder may furnish a bond satisfactory to the
Owner to indemnify the Owner against such lien . If such lien remains unsatisfied after
payments are made , the Design/Builder shall indemnify the Owner for all loss and cost ,
including reasonable attorneys ' fees incurred as a result of such lien .
§ 5 . 2 . 2 When the Work has been completed and the contract fully performed , the
Design /Builder shall submit a final application for payment to the Owner , who shall
make final payment in accordance with the Florida Prompt payment Act , FS$ 218 . 70 et
seq . .
§ 5 . 2 . 3 The making of final payment shall constitute a waiver of claims by the Owner
except those arising from .
A liens , claims , security interests or encumbrances arising out of the Contract
and unsettled ,
. 2 failure of the Work to comply with the requirements of the Contract
Documents ; or
. 3 terms of special warranties required by the Contract Documents .
§ 5 . 2 . 4 Acceptance of final payment shall constitute a waiver of all claims by the
Design / Builder except those previously made in writing and identified by the
Design / Builder as unsettled at the time of final Application for Payment .
§ 1 . 2 EXECUTION , CORRELATION AND INTENT
§ 1 . 2 . 1 It is the intent of the Owner and Design /Builder that the Contract Documents
include all items necessary for proper execution and completion of the Work . The
Contract Documents are complementary , and what is required by one shall be as
binding as if required by all ; performance by the Design/Builder shall be required only to
the extent consistent with and reasonably inferable from the Contract Documents as
being necessary to produce the intended results . Words that have well- known technical
or construction industry meanings are used in the Contract Documents in accordance
with such recognized meanings .
§ 1 . 2 . 2 If the Design /Builder believes or is advised by the Architect or by another design
professional retained to provide services on the Project that implementation of any
instruction received from the Owner would cause a violation of any applicable law , the
Design/ Builder shall notify the Owner in writing . Neither the Design/Builder nor the
Architect shall be obligated to perform any act which either believes will violate any
applicable law .
§ 1 . 2 . 3 Nothing contained in this Part 2 Agreement shall create a contractual
relationship between the Owner and any person or entity other than the Design/Builder .
§ 1 . 3 OWNERSHIP AND USE OF DOCUMENTS
§ 1 . 3 . 1 The Owner hopes to use the plans, Drawings , specifications , and other
documents and electronic data furnished by the Design/Builder as a prototype for
construction of other fire stations in the future . are instruments of sery . The
Design/Builder' s Architect and other providers of professional services shall retain all
common law , statutory and other reserved rights , including copyright in those
instruments of service furnished by them , except the owner shall have the right to reuse
the instruments for construction of additional fire stations . d
etheF dOGUrnents and electrenG data are fuFnished for use solely with respeGt to this
Part2Agreement . The Owner shall be permitted to retain copies , including reproducible
copies , of the drawings , specifications , and other documents and electronic data
furnished by the Design/ Builder for information and reference in connection with the
Project except as provided in Sections 1 . 3 . 2 and 1 . 3 . 3 . The Owner intends that the
documents , drawings , plans , specifications and electronic data are intended to be
reused at some future time . Pursuant to FS 287 . 05500 ) . the documents and plans
shall contain notice to the public that the plans are subject to reuse .
§ 1 . 3 . 2 Drawings , specifications , and other documents and electronic data furnished by
the Design/Builder shall not be used by the Owner or others on other projects , for
additions to this Project or for completion of this Project by others , except by agreement
in writing and with appropriate compensation to the Design/Builder, unless the
Design/Builder is adjudged to be in default under this Part 2 Agreement or under any
other subsequently executed agreement .
§ 1 w3 If the Design/ Builder defaults in the Design/Builder's obligations to the Owner ,
the Architect shall grant a license to the Owner to use the drawings , specifications , and
other documents and electronic data furnished by the Architect to the Design/ Builder for
the completion of the Project , conditioned upon the Owner' s execution of an agreement
to cure the Design /Builder' s default in payment to the Architect for services previously
performed and to the extent allowed by law , indemnify the Architect with regard to
claims arising from such reuse without the Architect' s professional involvement .
§ 1 . 3 . 4 Submission or distribution of the Design/Builder' s documents to meet official
regulatory requirements or for similar purposes in connection with the Project is not to
be construed as publication in derogation of the rights reserved in Section 1 . 3 . 1 .
ARTICLE 2 OWNER
§ 2 . 1 The Owner shall designate a representative authorized to act on the Owner' s
behalf with respect to the Project . The Owner or such authorized representative shall
examine documents submitted by the Design/Builder and shall render decisions in a
timely manner and in accordance with the schedule accepted by the Owner . The Owner
may obtain independent review of the Contract Documents by a separate architect ,
engineer , contractor or cost estimator under contract to or employed by the Owner .
Such independent review shall be undertaken at the Owner's expense in a timely
manner and shall not delay the orderly progress of the Work .
§ 2 . 2 The Owner may appoint an on -site project representative to observe the Work and
to have such other responsibilities as the Owner and Design/Builder agree in writing .
§ 2 . 3 The Owner shall cooperate with the Design/Builder in securing building and other
permits , licenses and inspections . The Owner shall not be required to pay the fees for
such permits , licenses and inspections unless the cost of such fees is excluded from the
Design/Builder's Proposal .
§ 2 .4 The Design/ Builder Owner shall furnish services of land surveyors , geotechnical
engineers and other consultants for subsoil , air and water conditions , in addition to
those provided under the Part 1 Agreement , when such services are deemed necessary
by the Design/ Builder to properly carry out the design services required by this Part 2
Agreement .
§ 2 . 5 The Owner shall disclose , to the extent known to the Owner , the results and
reports of prior tests , inspections or investigations conducted for the Project involving :
structural or mechanical systems ; chemical , air and water pollution ; hazardous
materials ; or other environmental and subsurface conditions . The Owner shall disclose
all information known to the Owner regarding the presence of pollutants at the Project' s
site .
§ 2 . 6 The Owner shall furnish all legal , aGGOUnting and insuFanGe GOunseling sePAGes
§ 2 . 7 Those services , information , surveys and reports required by Sections 2 . 4 and 2 . 5
through 2. 6 which are within the Owner' s control shall be furnished at the Owner' s
expense , and the Design/Builder shall be entitled to rely upon the accuracy and
completeness thereof, except to the extent the Owner advises the Design /Builder to the
contrary in writing .
dment , or rider , the OWRer shall pay the
A
§ 2 . 9 If the Owner observes or otherwise becomes aware of a fault or defect in the Work
or nonconformity with the Design/Builder' s Proposal or the Construction Documents , the
Owner shall give prompt written notice thereof to the Design/Builder .
Feasenable evmdenGe that finanGial aFFangements have . . en made te fulfill the Owner' s
obligations under the� v
§ 2 . 11 The Owner shall communicate with persons or entities employed or retained by
the Design/ Builder through the Design/Builder, unless otherwise directed by the
Design/Builder .
ARTICLE 3 DESIGN/BUILDER
§ 3 . 1 SERVICES AND RESPONSIBILITIES
§ 3 . 1 . 1 Design services required by this Part 2 Agreement shall be performed by
qualified architects and other design professionals . The contractual obligations of such
professional persons or entities are undertaken and performed in the interest of the
Design/Builder .
§ 3 . 1 . 2 The agreements between the Design/ Builder and the persons or entities
identified in this Part 2 Agreement , and any subsequent modifications , shall be in
writing . These agreements , including financial arrangements with respect to this Project ,
shall be promptly and fully disclosed to the Owner upon request .
§ 3 . 1 . 3 The Design/ Builder shall be responsible to the Owner for acts and omissions of
the Design/ Builder' s employees , subcontractors and their agents and employees , and
other persons , including the Architect and other design professionals , performing any
portion of the Design /Builder' s obligations under this Part 2 Agreement .
§ 3 . 2 BASIC SERIVICES
§ 3 . 2 . 1 The Design/Builder' s Basic Services are described below and in Article 14 .
§ 3 . 2 . 2 The Design / Builder shall designate a representative authorized to act on the
Design/ Builder' s behalf with respect to the Project .
§ 3 . 2 . 3 The Design/Builder shall submit Construction Documents for review and
approval by the Owner . Construction Documents may include drawings , specifications ,
and other documents and electronic data setting forth in detail the requirements for
construction of the Work , and shall :
A be consistent with the intent of the Design/Builder' s Proposal ;
. 2 provide information for the use of those in the building trades ; and
. 3 include documents customarily required for regulatory agency approvals .
§ 3 . 2 4 The Design/ Builder , with the assistance of the Owner , shall file documents
required to obtain necessary approvals of governmental authorities having jurisdiction
over the Project .
§ 3 . 2 . 5 Unless otherwise provided in the Contract Documents , the Design/Builder shall
provide or cause to be provided and shall pay for design services , labor , materials ,
equipment , tools , construction equipment and machinery , water , heat , utilities ,
transportation and other facilities and services necessary for proper execution and
completion of the Work , whether temporary or permanent and whether or not
incorporated or to be incorporated in the Work .
§ 3 . 2 . 6 The Design/Builder shall be responsible for all construction means , methods ,
techniques , sequences and procedures , and for coordinating all portions of the Work
under this Part 2 Agreement .
§ 3 . 2 . 7 The Design/Builder shall keep the Owner informed of the progress and quality of
the Work .
§ 3 . 2 . 8 The Design/Builder shall be responsible for correcting Work which does not
conform to the Contract Documents .
§ 3 . 2 . 9 The Design/Builder warrants to the Owner that materials and equipment
furnished under the Contract will be of good quality and new unless otherwise required
or permitted by the Contract Documents , that the construction will be free from faults
and defects , and that the construction will conform with the requirements of the Contract
Documents . Construction not conforming to these requirements , including substitutions
not properly approved by the Owner , shall be corrected in accordance with Article 9 .
§ 3 . 2 . 10 The Design/Builder shall pay all sales , consumer , use and similar taxes which
had been legally enacted at the time the Design /Builder's Proposal was first submitted
to the Owner , and shall secure and pay for building and other permits and governmental
fees , licenses and inspections necessary for the proper execution and completion of the
Work which are either customarily secured after execution of a contract for construction
or are legally required at the time the Design/Builder' s Proposal was first submitted to
the Owner .
§ 3 . 2 . 11 The Design /Builder shall comply with and give notices required by laws ,
ordinances , rules , regulations and lawful orders of public authorities relating to the
Project .
§ 3 . 2 . 12 The Design / Builder shall pay royalties and license fees for patented designs ,
processes or products . The Design / Builder shall defend suits or claims for infringement
of patent rights and shall hold the Owner harmless from loss on account thereof, but
shall not be responsible for such defense or loss when a particular design , process or
product of a particular manufacturer is required by the Owner. However , if the
Design/Builder has reason to believe the use of a required design , process or product is
an infringement of a patent , the Design /Builder shall be responsible for such loss unless
such information is promptly furnished to the Owner .
§ 3 . 2 . 13 The Design/Builder shall keep the premises and surrounding area free from
accumulation of waste materials or rubbish caused by operations under this Part 2
Agreement . At the completion of the Work , the Design/Builder shall remove from the
site waste materials , rubbish , the Design/Builder' s tools , construction equipment ,
machinery , and surplus materials .
§ 3 . 2 . 14 The Design/Builder shall notify the Owner when the Design/Builder believes
that the Work or an agreed upon portion thereof is substantially completed . If the
Owner concurs , the Design/ Builder shall issue a Certificate of Substantial Completion
which shall establish the Date of Substantial Completion , shall state the responsibility of
each party for security , maintenance , heat , utilities , damage to the Work and insurance ,
shall include a list of items to be completed or corrected and shall fix the time within
which the Design/Builder shall complete items listed therein . Disputes between the
Owner and Design/Builder regarding the Certificate of Substantial Completion shall be
resolved in accordance with provisions of Article 10 .
§ 3 . 2 . 15 The Design/Builder shall maintain at the site for the Owner one record copy of
the drawings , specifications , product data , samples , shop drawings , Change Orders and
other modifications , in good order and regularly updated to record the completed
construction . These shall be delivered to the Owner upon completion of construction
and prior to final payment .
§ 3 . 3 ADDITIONAL SERVICES
§ 3 . 3 . 1 The services described in this Section 3 . 3 are not included in Basic Services
unless so identified in Article 14 , and they shall be paid for by the Owner as provided in
this Part 2 Agreement , in addition to the compensation for Basic Services . The services
described in this Section 3 . 3 shall be provided only if authorized or confirmed in writing
by the Owner .
§ 3 . 3 . 2 Making revisions in drawings , specifications , and other documents or electronic
data when such revisions are required by the enactment or revision of codes , laws or
regulations subsequent to the preparation of such documents or electronic data .
§ 3 . 3 . 3 Providing consultation concerning replacement of Work damaged by fire or other
cause during construction , and furnishing services required in connection with the
replacement of such Work .
§ 3 . 3 . 4 Providing services in connection with a publ+o hear+Rg , arbitration proceeding or
legal proceeding , except where the Design/Builder is a party thereto .
§ 3 . 3 . 5 Providing coordination of construction performed by the Owner' s own forces or
separate contractors employed by the Owner , and coordination of services required in
connection with construction performed and equipment supplied by the Owner .
§ 3 . 3 . 6 Preparing a set of reproducible record documents or electronic data showing
significant changes in the Work made during construction .
§ 3 . 3 Providing assistance in the utilization of equipment or systems such as
preparation of operation and maintenance manuals , training personnel for operation and
maintenance , and consultation during operation .
ARTICLE 4 TIME
§ 4 . 1 Unless otherwise indicated , the Owner and the Design /Builder shall perform their
respective obligations as expeditiously as is consistent with reasonable skill and care
and t ie orderly progress of the Project .
§ 4 . 2 Time limits stated in the Contract Documents are of the essence . The Work to be
performed under this Part 2 Agreement shall commence upon receipt of a notice to
proceed unless otherwise agreed and , subject to authorized Modifications , Substantial
Completion shall be achieved on or before the date established in Article 14 .
§ 4 . 3 Substantial Completion is the stage in the progress of the Work when the Work or
designated portion thereof is sufficiently complete in accordance with the Contract
Documents so the Owner can occupy or utilize the Work for its intended use .
§ 4 .4 Based on the Design/ Builder' s Proposal , a construction schedule shall be provided
consistent with Section 4 . 2 above .
§ 4 . 5 If the Design/Builder is delayed at any time in the progress of the Work by an act
or neglect of the Owner , Owner' s employees , or separate contractors employed by the
Owner , or by changes ordered in the Work , or by labor disputes , fire , unusual delay in
deliveries , adverse weather conditions not reasonably anticipatable , unavoidable
casualties or other causes beyond the Design/Builder's control , or by delay authorized
by the Owner pending arbitration , or by other causes which the Owner and
Design/ Builder agree may justify delay , then the Contract Time shall be reasonably
extended by Change Order .
ARTICLE 5 PAYMENTS
§ 5 . 1 PROGRESS PAYMENTS
§ 5 . 1 . 1 The Design /Builder shall deliver to the Owner itemized Applications for Payment
in such detail as indicated in Article 14 .
§ 5 . 1 . 2 Upon the Owner' s receipt of a properly submitted and
correct Application for Payment , the Owner shall make payment to the Design /Builder in
accordance with the Florida Prompt payment Act , FS4 218 . 70 et seq .
§ 5 . 1 . 3 The Application for Payment shall constitute a representation by the
Design / Builder to the Owner that the design and construction have progressed to the
point indicated , the quality of the Work covered by the application is in accordance with
the Contract Documents , and the Design /Builder is entitled to payment in the amount
requested .
§ 5 . 1 . 4 Upon receipt of payment from the Owner , the Design/Builder shall promptly pay
the Architect , other design professionals and each contractor the amount to which each
is entitled in accordance with the terms of their respective contracts .
§ 5 . 1 . 5 The Owner shall have no obligation under this Part 2 Agreement to pay or to be
responsible in any way for payment to the Architect , another design professional or a
contractor performing portions of the Work .
§ 5 . 1 . 5 Neither progress payment nor partial or entire use or occupancy of the Project
by the Owner shall constitute an acceptance of Work not in accordance with the
Contract Documents .
§ 501 . 7 The Design /Builder warrants that title to all construction covered by an
Application for Payment will pass to the Owner no later than the time of payment . The
§ 5 . 3 INTEREST PAYMENTS
§ 5 . 3 . 1 Payments due the Design/Builder under this Part 2 Agreement which are not
paid when due shall bear interest in accordance with the Florida Prompt payment Act ,
FS § 218 . 70 et seq . 1 it= nt - the Fate speGmfied in AFtiGle 13 , or in
absence of a GP86fied rate , at the legal Fate prevailing where the PrGjeGt iG lGGated .
ARTICLE 6 PROTECTION OF PERSONS AND PROPERTY
§ 6 . 1 The Design/Builder shall be responsible for initiating , maintaining and providing
supervision of all safety precautions and programs in connection with the performance
of this Part 2 Agreement .
§ 6 . 2 The Design /Builder shall take reasonable precautions for the safety of, and shall
provide reasonable protection to prevent damage , injury or loss to : ( 1 ) employees on
the Work and other persons who may be affected thereby ; ( 2 ) the Work and materials
and equipment to be incorporated therein , whether in storage on or off the site , under
care , custody , or control of the Design/Builder or the Design/Builder' s contractors ; and
( 3) other property at or adjacent thereto , such as trees , shrubs , lawns , walks ,
pavements , roadways , structures and utilities not designated for removal relocation or
replacement in the course of construction .
§ 6 . 3 The Design/Builder shall give notices and comply with applicable laws ,
ordinances , rules , regulations and lawful orders of public authorities bearing on the
safety of persons or property or their protection from damage , injury or loss .
§ 6 . 4 The Design/ Builder shall promptly remedy damage and loss ( other than damage
or loss insured under property insurance provided or required by the Contract
Documents ) to property at the site caused in whole or in part by the Design/Builder , a
contractor of the Design /Builder or anyone directly or indirectly employed by any of
them , or by anyone for whose acts they may be liable .
ARTICLE 7 INSURANCE AND BONDS
§ 7 . 1 DESIGN/BUILDER ' S LIABILITY INSURANCE
§ 7 . 1 . 1 The Design /Builder shall purchase from and maintain , in a company or
companies lawfully authorized to do business in the jurisdiction in which the Project is
located , such insurance as will protect the Design/Builder from claims set forth below
which may arise out of or result from operations under this Part 2 Agreement by the
Design/Builder or by a contractor of the Design/Builder , or by anyone directly or
indirectly employed by any of them , or by anyone for whose acts any of them may be
liable .
A claims under workers ' compensation , disability benefit and other similar
employee benefit laws that are applicable to the Work to be performed ;
. 2 claims for damages because of bodily injury , occupational sickness or
disease , or death of the Design/Builder' s employees ;
. 3 claims for damages because of bodily injury , sickness or disease , or death of
persons other than the Design/Builder' s employees ;
. 4 claims for damages covered by usual personal injury liability coverage which
are sustained ( 1 ) by a person as a result of an offense directly or indirectly
related to employment of such person by the Design/Builder or (2 ) by
another person ;
, n
. 5 claims for damages , other than to the Work itself, because of injury to or
destruction of tangible property , including loss of use resulting therefrom ;
. 6 claims for damages because of bodily injury , death of a person or property
damage arising out of ownership , maintenance or use of a motor vehicle ;
and
. 7 claims involving contractual liability insurance applicable to the
Design/Builder' s obligations under Section 11 . 5 .
§ 7 . 1 . 2 The insurance required by Section 7 . 1 . 1 shall be written for not less than limits
of liability specified in this Part 2 Agreement or required by law , whichever coverage is
greater . Coverages , whether written on an occurrence or claims-made basis , shall be
maintained without interruption from date of commencement of the Work until date of
final payment and termination of any coverage required to be maintained after final
payment .
§ 7 . 1 . 3 Certificates of Insurance acceptable to the Owner shall be delivered to the
Owner immediately after execution of this Part 2 Agreement . These Certificates and the
insurance policies required by this Section 7 . 1 shall contain a provision that coverages
afforded under the policies will not be canceled or allowed to expire until at least 30
days ' prior written notice has been given to the Owner . If any of the foregoing insurance
coverages are required to remain in force after final payment , an additional certificate
evidencing continuation of such coverage shall be submitted with the application for
final payment . Information concerning reduction of coverage shall be furnished by the
Design/ Builder with reasonable promptness in accordance with the Design /Builder' s
information and belief.
§ 7 . 2 OWNER ' S' S 1 IABII ITV INSURANCE
§ 7 . 2 . 1 The Owner shall be FespeRsible for PUFGhasing and maintaining the Ow
usual liability iR661ran ptionally , the Owner may purGhase and maintain ether
Part ) AgreementThe Designiguilder shall not be responsible fGF PLIFGh i nd
maintaining this optional Owner's liability iRsuranGe unless � IrwpeuiviGally required by the
GeRtraGt D6Es ts:-
§ 7 . 3 PROPERTY INSURANCE
§ 7 . 3 . 1 Unless otherwise provided under this Part 2 Agreement , the Owner shall
pUr-lase and maintain ,
jurisdiGtion in whiGh the prinGipal improvements are to be IGGated , property insurance
upon the Work to the full insurable value thereof on a replacement cost basis without
optional dedUGtibles. Such property insurance shall be maintained , unless otherwise
provided in the Contract Documents or otherwise agreed in writing by all persons and
entities who are beneficiaries of such insurance , until final payment has been made or
until no person or entity other than the Owner has an insurable interest in the property
required by this Section 7 . 3 to be insured , whichever is earlier . This insurance shall
include interests of the Owner , the Design/Builder , and their respective contractors and
subcontractors in the Work .
§ 7 . 3 . 2 Property insurance shall be on an all- risk policy form and shall insure against the
perils of fire and extended coverage and physical loss or damage including , without
duplication of coverage , theft , vandalism , malicious mischief , collapse , falsework ,
temporary buildings and debris removal including demolition occasioned by
enforcement of any applicable legal requirements , and shall cover reasonable
compensation for the services and expenses of the Design/ Builder' s Architect and other
professionals required as a result of such insured loss . Coverage for other perils shall
not be required unless otherwise provided in the Contract Documents .
§ 7 . 3 . 3 If the Owner does not intend to purchase such property insurance required by
this Part 2 Agreement and with all of the coverages in the amount described above , the
Owner shall so inform the Design/Builder prior to commencement of the construction .
The Design / Builder may then effect insurance which will protect the interests of the
Design/Builder and the Design/Builder's contractors in the construction , and by
appropriate Change Order the cost thereof shall be charged to the Owner . If the
Design /Builder is damaged by the failure or neglect of the Owner to purchase or
maintain insurance as de-scribed above , then the Owner shall bear all reasonable costs
properly attributable thereto .
. . 4 Unless otherwise provided , the Owner shall PUFGhase and maintain SUGh beile
andFnaGh J ! Ge required. by this PaFt 2 Agreement oF by Ww, whiGh shall
spesif+caNy G` 1nr GUGh insLiFed objeGts during installation and until final aGGeptanGeUwv �
by
the Qwner . Th a-insuFaRGe hall inGlude inteFests of the Owner , the De6ign!Builder , the
Ramerlcd lnsu-red-s
§ 7 . 3 . 5 A loss insured under the Owner's property insurance shall be adjusted by the
Owner as fiduciary and made payable to the Owner as fiduciary for the insureds , as
their interests may appear , subject to requirements of any applicable mortgagee clause
and of Section 7 . 3 . 10 . The Design/ Builder shall pay contractors their shares of
insurance proceeds received by the Design/Builder , and by appropriate agreement ,
written where legally required for validity , shall require contractors to make payments to
their subcontractors in similar manner .
§ 7 . 3 . 6 Before an exposure to loss may occur , the Owner shall file with the
Design /Builder a copy of each policy that includes insurance coverages required by this
Section 7 . 3 . Each policy shall contain all generally applicable conditions , definitions ,
exclusions and endorsements related to this Project . Each policy shall contain a
provision that the policy will not be canceled or allowed to expire until at least 30 days '
prior written notice has been given to the Design/Builder .
. . . . , ,V ,, . iIder requests in ce for risks other than those
/�it�tt., ., . y . .. ._.. ... . . ... � . . .� ..� ... .� .. .... . . . WlttttYt r�v -vc7Tcrrrrurr-rn o ., ..
Mwll . y , i. . ` , f possible , ebtain suGh insuranGe ,
Ghar ged to tke Design/Builder by aP .PFGPriate Change Ord
§ 7 . 3 . 8 The Owner and the Design/Builder waive all rights against each other and the
Architect and other design professionals , contractors , subcontractors , agents and
employees , each of the other , for damages caused by fire or other perils to the extent
covered by property insurance obtained pursuant to this Section 7 . 3 or other property
insurance applicable to the Work , except such rights as they may have to proceeds of
such insurance held by the Owner as trustee . The Owner or Design/ Builder , as
appropriate , shall require from contractors and subcontractors by appropriate
agreements , written where legally required for validity , similar waivers each in favor of
other parties enumerated in this Section 7 . 3 . The policies shall provide such waivers of
subrogation by endorsement or otherwise . A waiver of subrogation shall be effective as
to a person or entity even though that person or entity would otherwise have a duty of
indemnification , contractual or otherwise , did not pay the insurance premium directly or
indirectly , and whether or not the person or entity had an insurable interest in the
property damaged .
§ 7 . 3 . 9 if required in writing by a party in inteFest , the QwneF as trustee shall , upo44
GGGLIrrenGe of an insured less , g .ve bond fGF PFOper peFfeFmanGe of the QwneF' 6 duties .
,
janGe with an arbitration award in whiGh Gase the PFOGedure shall be as
Ode
ide
N ' e" ` " ' 'Y`YaftSUGh made ,no other Vo% ~eement is
FeplaGerneRt-Gf damaged Work shall be Govered by appropriate Ghang,, e QFdeF .
§ 7 . 3 . 10 The Owner as trustee shall have power to adjust and settle a loss with insurers
unless one of the parties in interest shall object in writing , within five ( 5) days after
occurrence of loss to the Owner's exercise of this power ; if such objection be made , the
parties shall enter into dispute resolution under procedures provided in Article 10 . If
distribution of insurance proceeds by arbitration is required , the arbitrators will direct
such distribution .
§ 7 . 3 . 11 Partial occupancy or use prior to Substantial Completion shall not commence
until the insurance company or companies providing property insurance have consented
to such partial occupancy or use by endorsement or otherwise . The Owner and the
Design/ Builder shall take reasonable steps to obtain consent of the insurance company
or companies and shall not , without mutual written consent , take any action with respect
to partial occupancy or use that would cause cancellation , lapse or reduction of
coverage .
LOSS-{ F USE OF INS RANG
. .
Owner' s1 The OWRer , at the
as * nsure-the Owner against less of use of the QwneF'6 pFopeFty d-we to fire or other
hazaFds , h wever-Gaused . The Owner waives 11 rights of aGtien against the
Design /Buil
due to fire er other hazards , haweveF Gau6ec .
ARTICLE 8 CHANGES IN THE WORK
§ 8 . 1 CHANGES
§ 8 . 1 . 1 Changes in the Work may be accomplished after execution of this Part 2
Agreement , without invalidating this Part 2 Agreement , by Change Order , Construction
Change Directive , or order for a minor change in the Work , subject to the limitations
stated in the Contract Documents .
§ 8 . 1 . 2 A Cl; ange Order shall be based upon agreement between the Owner and the
Design/ Builder ; a Construction Change Directive may be issued by the Owner without
the agreement of the Design/Builder ; an order for a minor change in the Work may be
issued by the Design/Builder alone .
§ 801 . 3 Changes in the Work shall be performed under applicable provisions of the
Contract Documents , and the Design/Builder shall proceed promptly , unless otherwise
provided in the Change Order , Construction Change Directive , or order for a minor
change in the Work .
§ 8 . 1 . 4 If unit prices are stated in the Contract Documents or subsequently agreed
upon , and if quantities originally contemplated are so changed in a proposed Change
Order or Construction Change Directive that application of such unit prices to quantities
of Work proposed will cause substantial inequity to the Owner or the Design/ Builder ,
the applicable unit prices shall be equitably adjusted .
§ 8 . 2 CHANGE ORDERS
§ 8 . 2 . 1 A Change Order is a written instrument prepared by the Design/Builder and
signed by the Owner and the Design/Builder , stating their agreement upon all of the
following :
. 1 a change in the Work ;
. 2 the amount of the adjustment , if any , in the Contract Sum ; and
. 3 the extent of the adjustment , if any , in the Contract Time .
§ 8 . 2 . 2 If the Owner requests a proposal for a change in the Work from the
Design/Builder and subsequently elects not to proceed with the change , a Change
Order- shall be issued to reimburse the Design/Builder for any costs incurred for
estimating services , design services or preparation of proposed revisions to the
Contract Documents .
§ 8 . 3 CONSTRUCTION CHANGE DIRECTIVES
§ 8 . 3 . 1 A Construction Change Directive is a written order prepared and signed by the
Owner , directing a change in the Work prior to agreement on adjustment , if any , in the
Contract Surn or Contract Time , or both .
§ 8 . 3 . 2 Except as otherwise agreed by the Owner and the Design/ Builder , the
adjustment to the Contract Sum shall be determined on the basis of reasonable
expenditures and savings of those performing the Work attributable to the change ,
including the expenditures for design services and revisions to the Contract Documents .
In case of an increase in the Contract Sum , the cost shall include a reasonable
allowance for overhead and profit . In such case , the Design/Builder shall keep and
present an itemized accounting together with appropriate supporting data for inclusion
in a Change Order . Unless otherwise provided in the Contract Documents , costs for
these purposes shall be limited to the following :
A costs of labor , including social security , old age and unemployment
insurance , fringe benefits required by agreement or custom , and workers '
compensation insurance ;
. 2 costs of materials , supplies and equipment , including cost of transportation ,
whether incorporated or consumed ;
* 3 rental costs of machinery and equipment exclusive of hand tools , whether
rented from the Design/ Builder or others ,
. 4 costs of premiums for all bonds and insurance permit fees , and sales , use or
similar taxes ,
. 5 additional costs of supervision and field office personnel directly attributable
to the change ; and fees paid to the Architect , engineers and other
professionals .
§ 8 . 3 . 3 Pending final determination of cost to the Owner , amounts not in dispute may be
included in Applications for Payment . The amount of credit to be allowed by the
Design/Builder to the Owner for deletion or change which results in a net decrease in
the Contract Sum will be actual net cost . When both additions and credits covering
related Work or substitutions are involved in a change , the allowance for overhead and
profit shall be figured on the basis of the net increase , if any , with respect to that
change .
§ 8 . 3 .4 When the Owner and the Design/ Builder agree upon the adjustments in the
Contract Suri and Contract Time , such agreement shall be effective immediately and
shall be recorded by preparation and execution of an appropriate Change Order .
§ 8 .4 MINOR CHANGES IN THE WORK
§ 8 .4 . 1 The Design/Builder shall have authority to make minor changes in the
Construction Documents and construction consistent with the intent of the Contract
Documents when such minor changes do not involve adjustment in the Contract Sum or
extension of the Contract Time . The Design/Builder shall promptly inform the Owner , in
writing , of minor changes in the Construction Documents and construction .
§ 8 . 5 CONCEALED CONDITIONS
§ 8 . 5 . 1 If conditions are encountered at the site which are ( 1 ) subsurface or otherwise
concealed pl" ysical conditions which differ materially from those indicated in the
Contract Documents , or (2 ) unknown physical conditions of an unusual nature which
differ materially from those ordinarily found to exist and generally recognized as
inherent in construction activities of the character provided for in the Contract
Documents , then notice by the observing party shall be given to the other party promptly
before conditions are disturbed and in no event later than 21 days after first observance
of the conditions . The Contract Sum shall be equitably adjusted for such concealed or
unknown conditions by Change Order upon claim by either party made within 21 days
after the clai ; rant becomes aware of the conditions .
§ 8 . 6 REGU ATORY CHANGES
§ 8 .6 . 1 The [Design/Builder shall be compensated for changes in the construction
necessitated by the enactment or revisions of codes , laws or regulations subsequent to
the submission of the Design/Builder's Proposal .
ARTICLE 9 CORRECTION OF WORK
§ 9 . 1 The Design / Builder shall promptly correct Work rejected by the Owner or known
by the Design / Builder to be defective or failing to conform to the requirements of the
Contract Documents , whether observed before or after Substantial Completion and
whether or not fabricated , installed or completed . The Design/Builder shall bear costs
of correcting such rejected Work , including additional testing and inspections .
§ 9 . 2 If, within one ( 1 ) year after the date of Substantial Completion of the Work or , after
the date for commencement of warranties established in a written agreement between
the Owner and the Design/Builder , or by terms of an applicable special warranty
required by the Contract Documents , any of the Work is found to be not in accordance
with the requirements of the Contract Documents , the Design." Builder shall correct it
promptly after receipt of a written notice from the Owner to do so unless the Owner has
previously given the Design/ Builder a written acceptance of such condition .
§ 9 . 3 Nothing contained in this Article 9 shall be construed to establish a period of
limitation with respect to other obligations which the Design/ Builder might have under
the Contract Documents . Establishment of the time period of one ( 1 ) year as described
in Section 9 . 2 relates only to the specific obligation of the Design/ Builder to correct the
Work , and has no relationship to the time within which the obligation to comply with the
Contract Documents may be sought to be enforced , nor to the time within which
proceedings may be commenced to establish the Design/ Builder' s liability with respect
to the Design/ Builder' s obligations other than specifically to correct the Work .
§ 9 . 4 If the Design/ Builder fails to correct nonconforming Work as required or fails to
carry out Work in accordance with the Contract Documents , the Owner , by written order
signed personally or by an agent specifically so empowered by the Owner in writing ,
may order the Design/ Builder to stop the Work , or any portion thereof, until the cause
for such order has been eliminated ; however , the Owner' s right to stop the Work shall
not give rise to a duty on the part of the Owner to exercise the right for benefit of the
Design/ Builder or other persons or entities .
§ 9 . 5 If the Design/ Builder defaults or neglects to carry out the Work in accordance with
the Contract Documents and fails within seven ( 7 ) days after receipt of written notice
from the Owner to commence and continue correction of such default or neglect with
diligence and promptness , the Owner may give a second written notice to the
Design / Builder and , seven ( 7 ) days following receipt by the Design/ Builder of that
second written notice and without prejudice to other remedies the Owner may have ,
correct such deficiencies . In such case an appropriate Change Order shall be issued
deducting from payments then or thereafter due the Design/ Builder , the costs of
correcting such deficiencies . If the payments then or thereafter due the Design/ Builder
are not sufficient to cover the amount of the deduction , the Design/ Builder shall pay the
difference to the Owner . Such action by the Owner shall be subject to dispute
resolution procedures as provided in Article 10 ,
ARTICLE 10 DISPUTE RESOLUTION MEDIATION AND ARBITRATI
§ 10 . 1 Claims , disputes or other matters in question between the parties to this Part 2
Agreement arising out of or relating to this Part 2 Agreement or breach thereof shall be
subject to the following procedure .
the dispute shall first be addressed by a meeting between the owner ,
Design/ Builder Architect and Owner' s Representative .
If the dispute is not remedied the parties shall submit the dispute to the County
Administrator or his assign who shall make the final decision on the matter .
The resolution of the dispute shall be reduced to writing and attached to this
agreement . and der-Aded by mediation or arbitration , SUGh mediation or arbitration shall
Rules of the AmeFiGan Arbitration AsSOGiation GUrrently4n-effec-t-,
§ 10 . 2 If the dispute is not settled by the County Administrators , the parties shall
endeavor to settle disputes by mediation . Demand for mediation shall be filed in writing
with the other party to this Part 2 Agreement and with the AmeFiGan Arbitration
ir�
• • • • - • - • W All • W • - M • •
TOM IT OF W 41 OF 11 UP TV IT TV
ow IT W 0
. . . .
M a or or 00 Pm All al W
00 a
a ONA a L MOO W W m3ll1fF.TF".
Mill
• r • . . \ •
• - ate - • al :
•
MOWW At
or W
it 0
SAIL�rJAMENAWl 11@11W
la
0 - � : - . . - . . - - - III : •
MAIN " mo IIIIIIII� Nkkw loss o~01 a
: • - wo a TOOW W All ROMr
♦ • • • • - • • • • - • - • • AL Jim * •
.� • W • - im sleirms • • • • _ • - • - • - • •
D - • i • ' • • • _ • - • • •
2 Agreement . If the Design/ Builder claims that delay or additional cost is involved
because of such action by the Owner, the Design/Builder shall assert such claims as
provided in Section 11 . 4 .
§ 11 012 The Design / Builder shall afford the Owner' s separate contractors reasonable
opportunity for introduction and storage of their materials and equipment and
performance of their activities and shall connect and coordinate the Design/Builder' s
construction and operations with theirs as required by the Contract Documents .
§ 11 . 3 . 3 Costs caused by delays or by improperly timed activities or defective
construction shall be borne by the party responsible therefor .
§ 11 . 4 CLAIMS FOR DAMAGES
§ 11 . 4 . 1 If either party to this Part 2 Agreement suffers injury or damage to person or
property because of an act or omission of the other party , of any of the other party's
employees or agents , or of others for whose acts such party is legally liable , written
notice of such injury or damage , whether or not insured , shall be given to the other party
within a reasonable time not exceeding 21 days after first observance . The notice shall
provide sufficient detail to enable the other party to investigate the matter . If a claim of
additional cost or time related to this claim is to be asserted , it shall be filed in writing .
§ 11 . 5 INDEMNIFICATION
§ 11 . 5 . 1 To the fullest extent permitted by law , the Design/Builder shall indemnify and
hold harmless the Owner , Owner's consultants , and agents and employees of any of
them from a �rd against claims , damages , losses and expenses , including but not limited
to attorneys ' fees , arising out of or resulting from performance of the Work , provided that
such claim , damage , loss or expense is attributable to bodily injury , sickness , disease or
death , or to injury to or destruction of tangible property ( other than the Work itself)
including loss of use resulting therefrom , but only to the extent caused in whole or in
part by negligent acts or omissions of the Design /Builder , anyone directly or indirectly
employed by the Design/Builder or anyone for whose acts the Design / Builder may be
liable , regardless of whether or not such claim , damage , loss or expense is caused in
part by a party indemnified hereunder . Such obligation shall not be construed to negate ,
abridge , or r: :duce other rights or obligations of indemnity which would otherwise exist
as to a party or person described in this Section 11 . 5 .
§ 11 51 In claims against any person or entity indemnified under this Section 11 . 5 by
an employee of the Design /Builder , anyone directly or indirectly employed by the
Design / Builder or anyone for whose acts the Design /Builder may be liable , the
indemnification obligation under this Section 11 . 5 shall not be limited by a limitation on
amount or type of damages , compensation or benefits payable by or for the
Design / Builder under workers' compensation acts , disability benefit acts or other
employee benefit acts .
§ 11 . 5 SUC (7; ESSORS AND ASSIGNS
§ 11 . 6 . 1 ThE Owner and Design /Builder , respectively , bind themselves , their partners ,
successors , assigns and legal representatives to the other party to this Part 2
Agreement and to the partners , successors and assigns of such other party with respect
to all covenants of this Part 2 Agreement . Neither the Owner nor the Design / Builder
shall assign this Part 2 Agreement without the written consent of the other . The Owner
may assign this Part 2 Agreement to any institutional lender providing construction
financing , and the Design/ Builder agrees to execute all consents reasonably required to
facilitate such an assignment . If either party makes such an assignment , that party shall
nevertheless remain legally responsible for all obligations under this Part 2 Agreement ,
unless otherwise agreed by the other party .
§ 11 . 7 TERMINATION OF PROFESSIONAL DESIGN SERVICES
§ 11 . 7 . 1 Prior to termination of the services of the Architect or any other design
professional designated in this Part 2 Agreement , the Design/Builder shall identify to the
Owner in writing another architect or other design professional with respect to whom the
Owner has no reasonable objection , who will provide the services originally to have
been provided by the Architect or other design professional whose services are being
terminated .
§ 11 . 8 EXTENT OF AGREEMENT
§ 11 . 8 . 1 This Part 2 Agreement represents the entire agreement between the Owner
and the Design / Builder and supersedes prior negotiations , representations or
agreements , either written or oral . This Part 2 Agreement may be amended only by
written instrument and signed by both the Owner and the Design/ Builder .
ARTICLE 12 TERMINATION OF THE AGREEMENT
§ 12 . 1 TERMINATION BY THE OWNER
§ 12 . 1 . 1 This Part 2 Agreement may be terminated by the Owner upon 14 days' written
notice to the Design/Builder in the event that the Project is abandoned . If such
termination occurs , the Owner shall pay the Design/Builder for Work completed and for
proven loss sustained upon materials , equipment , tools , and construction equipment
and maclsinery , including reasonable profit and applicable damages .
§ 12 . 1 . 2 If the Design /Builder defaults or persistently fails or neglects to carry out the
Work in accot dance with the Contract Documents or fails to perform the provisions of
this Part 2 Agreement , the Owner may give written notice that the Owner intends to
terminate this Part 2 Agreement . If the Design/ Builder fails to correct the defaults ,
failure or neglect within seven (7 ) days after being given notice , the Owner may then
give a second written notice and , after an additional seven (7 ) days , the Owner may
without prejudice to any other remedy terminate the employment of the Design/Builder
and take possession of the site and of all materials , equipment , tools and construction
equipment arid machinery thereon owned by the Design/Builder and finish the Work by
whatever method the Owner may deem expedient . If the unpaid balance of the
Contract Sum exceeds the expense of finishing the Work and all damages incurred by
the Owner , such excess shall be paid to the Design/Builder . If the expense of
completing the Work and all damages incurred by the Owner exceeds the unpaid
balance , the Design/Builder shall pay the difference to the Owner . This obligation for
payment shall survive termination of this Part 2 Agreement.
§ 12 . 2 `GERMINATION BY THE DESIGN/BUILDER
§ 12 . 2 . 1 If the Owner fails to make payment when due in accordance with the Florida
Prompt Pavalent Act FSS 218 . 70 et seq . , the Design/Builder may give written notice of
the Design/ Builder' s intention to terminate this Part 2 Agreement . If the Design / Builder
fails to receive payment in accordance with the Florida Prompt payment Act , FSS
218 . 70 et sec; . , the
/ (l
Design/ Builder may give a second written notice and , seven (7 ) days after receipt of
such second written notice by the Owner, may terminate this Part 2 Agreement and
recover from the Owner payment for Work executed and for proven losses sustained
upon materials , equipment , tools , and construction equipment and machinery , including
reasonable profit and applicable damages .
ARTICLE 13 BASIS OF COMPENSATION
The Owner shall compensate the Design/Builder in accordance with Article 5 ,
Payments , and the other provisions of this Part 2 Agreement as described below .
§ 13 . 1 COMPENSATION
§ 13 . 1 . 1 For the Design/Builder's performance of the' Work , as described in Section 3 . 2
and including any other services listed in Article 14 as part of Basic Services , the Owner
shall pay the Design/Builder in current funds the Contract Sum as follows :
$498 , 261 . 00
§ 13 . 1 . 2 For Additional Services , as described in Section 3 . 3 and including any other
services listed in Article 14 as Additional Services , compensation shall be as follows :
Per hourly rate attached to master agreement
§ 13 . 2 REIMBURSABLE EXPENSES
§ 13 . 2 . 1 Reimbursable Expenses are in addition to the compensation for Basic and
Additional Services , and include actual expenditures made by the Design/ Builder and
the Design/Builder' s employees and contractors in the interest of the Project , as follows :
All impact and planning fees
§ 1112 FOR REIMBURSAKE EXPENSES , GOmpensation shall be a multiple of
tirries the aFneunts expended .
§ 13 . 3 INTEREST PAYMENT
§ 13 . 3 . 1 The rate of interest for past due payments shall be in accordance with the
Florida Prompt payment Act , FS4 218 . 70 et seciA6 feNews:
One percent { 1 . 00% monthly
IOGal GensunqeF Gf"t laws and other- regulations at Me QwneF 9 and Designl Builder
p4nGoai plaGes of business, at the loGation of the P-rejeGt and elsewhere may-affbGt4he
vak&y of this provision . SpeGifiG legal adviee should b% �
deletion, modifiGation or- other- requirements, suGh as wrift9n diSGIGsures or waiver-s . )
ARTICLE 14 OTHER CONDITIONS AND SERVICES
§ 14 . 1 The Basic Services to be performed shall be commenced on upon notice to
proceed and , subject to authorized adjustments and to delays not caused by the
Design/Builder , Substantial Completion shall be achieved in the Contract Time of 6
months ( 180 ) calendar days .
� n
§ 14 . 2 The Basic Services beyond those described in Article 3 are as follows :
None
§ 14 . 3 Additional Services beyond those described in Article 3 are as follows :
As requested by Owner
§ 14 . 4 The Design/Builder shall submit an Application for Payment on the 25th day of
each month .
§ 14. 5 The Design/ Builder' s Proposal includes the following documents :
(List the documents by specific title and date; include any required performance and
payment bonds. )
Title Date
Attachment "A" 3/9/12
This Agreement entered into as of the day and year first written above .
OWNER : BOARD OF COUNTY DESIGN/BUILDER : BARTH
COMMISSIONERS CONSTRUCTION , INC .
INDIAN RIVER COUNTY, FLORIDA
(Signat ) Aignture)
Gary Wheeler, Chairman Phil Barth , President
(Printed name and title) (Printed name and title)
\� 0 MMISS�O���•••�
BCC Approved : March 20 , 201 d+ j
APPROVED oq . Atlf est : J . K . Barton , Clerk
29 •a
R cooC :• t
Deputy Clerk
ounty ministrator
PROVED A5 TO 6° OK
AND ALS rFl . )E
BY
WILLIAM . DEBRAAi
DEPUTY COUNTY AT'T ORNEY
21
BARTH
Construction , Inc .
General Contractor CGC007847
Attachment " A "
March 9 , 2012
John King
Indian River County Emergency Services
4225 43 rd Avenue
Vero Beach, Florida, 32960
Re : Station # 13 Phase II
Mr. King,
We are pleased to present to you our proposal for Phase II services for Fire Station 413 site . A summary of
the project costs follows ;
Architectural & Engineering Fees
Architectural Fees $ 29 , 500 . 00
Construction, Demolition & General Conditions $ 4165646 . 00
Overhead & Profit $ 435115 .00
Payment & Performance Bond ( 100%) $ 9 , 000 .00
"Total Part Il Design & Construction Costs $4989261 . 00
A complete description of the scope of work and itemized costs is attached.
Thank you
; LL .
Jason Fykes
Barth Construction , Inc .
1717 Indian River Boulevard * Suite 202A * Vero Beach, Florida 32960
Phone : (772 ) 778 -3072 * Fax : (772) 770-3017
&mail : info ® ,barthconstruction . com * Internet : www.bartheonstruction . com
IRC Station 1413 - Phase 2 120 DAYS Sq. Footage 47675
Estimate 17 WEEKS
4 Months
CSTH DESCRIPTION SUBCONTRACTOR TOTAL LMES LABOR MTL SUB TOTAL COST/SF
Code
General Conditions Barth Construction - * - 0 . 00
1010 Equipment Rental * - 0 . 00
1013 Crane Rental * - - 0 . 00
1020 Field Supervision $ 1100/wk 18,700 ' * 18 ,700 - - 18 ,700 4 . 00
Project Management 10hours/week 17,000 * 17,000 17,000 3 . 64
Project Administartor 5 hours/weelc 35825 * 3 ,825 31825 0 . 82
ProjectAccounting5hours/week 5, 100 ` * 5 , 100 - - 55100 1 . 09
1030 Trailer Rental 1 ,000' * 1 ,000 - I ,000 0.21
1031 Temp . Water By Owner - * - 0 . 00
1032 Temp , Power By Owner * - - 0 . 00
1033 Telephone 350 * - 350 350 0 . 07
1034 Temporary Toilet 400 * 400 400 0 . 09
1037 Temp . Road Access * - 0. 00
1038 Project Sin 500 * - 500 500 0 . 11 D
1039 Temporary Fence Not Required * - 0 . 00
1040 Field Office Supp. 150 * 150 - 150 0. 03 f1
1050 Temp . Protection * 0. 00 S
1058 First Aid - * - 0 . 00
1059 Safety * - - - - 0. 00 r+
1060 Printing / Postage 500 * 500 - 500 0. 11 =
D
1061 Moving & Storage * - - 0.00
1070 Photography * - - - 0 . 00
1090 Payroll B&B @ 50% 99350 * 97350 - - 9,350 2 . 00
1100 Civil Engineering. CA Carter 2,860: * 200 21860 0. 61
Architectural Fees 29,500 * - 29, 500 29,500 6 . 31
MEP Engineering In Architectural fees * - - - 0 . 00
Structural Engineering In Architectural fees * - 0. 00
1120 Soil Testing 31500 * - 3 ,500 31500 0 . 75
1125 Concrete Testing 11000 ` * - 15000 - 1 ,000 0.21
1130 Su v vehicle - * - - - 0. 00
1133 Sm . Tools / Supplies 500 * 500 - 500 0. 11
1138 Owned Equipment - * - - - 0 . 00
1140 Housekeeping Labor * - - - 0 . 00
1142 Final Cleaning 700 * - 700 700 0. 15
1158 Solid Waste Impact Fee BY Owner * - - 0 . 00
1200 Surveying 4,000 * 4, 000 - 41000 0 . 86
1205 Layout * - 0 . 00
1250 Common Labor 500 * 500 - 500 0 . 11
1260 Dump Charges 21000 * 21000 2,000 0.43
1273 AS BuiltS
IRC Station 4131111s Phase 2 120 DAYS Sq . Footage 41675
Estimate 17 WEEKS
4 Months
C5I# DESCRIPTION SUBCONTRACTOR TOTALLMES LABOR : MTL f1TOTA1 COST/SF
t Code
1300 Punch-Out Labor - * _ 0 . 00
1320 Builders Risk 200 ' * 2,000 211000 0 .43
1325 Liability Insurance 11500 * 11,500 111500 0 . 32
1500 Building Permit 39000 * 31000 3 ,000 0 . 64
Fire Marshall Permit 31,000 * 31, 000 31000 0 . 64
* - 0 . 00
DIVISION 2 - 0. 00
* - - 0. 00
Site Development T Rose 369000 * - 361,000 36,000 7 . 70
Oil Separator None * - - 0 . 00
Irrigation & Well 8,000 . * 8,000 811000 1 . 71
Landscape 15,000 ' * - 15110000 159000 3 .21
Sod 89500` 81500 81, 500
* - 0 . 00 Y
DIVISION 3 - * - 0 . 00 m
* - - 0.00 3
C . I . P . Concrete J Wilson _85,000 ' * - - 85,000 85 ,000 18 .
18
bug Spray 11200 * - 11,200 1 ,200 0 .26 :3
DIVISION 4 - - - 0.00 '*
* - - 0, 00 y
Block Masonry None - * - 0. 00
* - - 0 . 00
DIVISION 5 - - 0 , 000
* - 0. 00
Structural Steel * - 0 . 00
* - 0. 00
Bollards- 8 each 900' * 900 900 0. 19
anchor bolts 19500 * - 111500 11, 500 0.32
DIVISION 6 * - - - 0 . 00
* - - 0 . 00
Rough Carpentry - * 0 .00
* - 0. 00
Finish Carpentry * - - 0 .00
* - - 0. 00
DIVISION 7 * 0 . 00
* - - 0. 00
* - - 0. 00
Thermal Insulation In Metal Bldg $ - * - 0 . 00
- -
0. 00
IRC Station # 13 - Phase 2 120 DAYS Sq.Footage 49675
Estimate 17 WEEKS
4 Months
CST# DESCRIPTIONt Code SUBCONTRACTOR TOTAL LMES LABOR MTI SUB TOTAL COST/Sr'
Joint Sealants 250 * 250 - 250 0. 05
0. 00
DIVISION 8 - - - 0, 00
Metal Doors & Frames ( 3 ) each Hughes * _ - 0. 00
0.00
0 . 00
0 . 00
OH Doors (2) 16' x 14, ( 1 ) 12' x 12 Hughes 000
* - - 0 . 00
Windows None
_ - - - 0. 00
* - - 0. 00
Louvers/Vents 2,500 . * 2,500 21500 0 . 53
DIVISION 9 * 0, 00
- - 0. 00
Tile None * - 0. 00 D
0. 00 w
* _ 0. 00 A
Acoustical Ceilings None 0. 00 S
* 3
o. 00 m
Painting _ * 3
0. 00
seal floor $ 1 /sf 49600 * - 4, 600 400 0 . 98
_ 0. 00
DIVISION 10 - - - 0 . 00
- - - - 0 . 00
Signs- ADA 500 * - 500 - 500 0011
_ * - 0. 00
Grilles & Screens _
0 .00
* 0. 00
Toilet Accessories None 0 . 00
* - - - 0. 00
Fire Protection Specialties 3 extinguishres 750 ' * 750 750 0. 16
0. 00
* 0 . 00
DIVISION 11
* 0 . 00
Automotive Equipment See attached 279996 * - 27,996 277996 5 . 99
* - - - 0. 00
* - 0 . 00
DIVISION 13 * - - 0 . 00
IRC Station 413 - Phase 2 120 DAYS Sq .Footage 41675
Estimate 17 WEEKS
4 Montbs
CSI# DESCRIPTIONSUBCONTRACTOR TOTAL ` LMES LABOR ' MTL SUB TOTAL COST/SF
Code
Metal Bldg Hughes 64,265 ' 64,265 64,265 13 . 75
add '] supports/engineering for crane 61750 * 67750 6, 750 1 .44
liner panels 31800 * - 3 ,800 3 ,800 0 . 81
DIVISION 15 - 0 . 00
* - 0. 00
HVAC- (2) exh fans 4,000 * 400 4,000 0. 86
* 0 . 00
Plumbing Southem Plumbing 13,700 * - 13 , 700 13 ,700 2 . 93
DIVISION 16 - 0. 00
0. 00
Electrical Complete Electric 35,000 * 3500 35 ,000 7 .49
- - 0. 00
SUB TOTALS 4319146 539975 62,660 314,511 431 ;146 92.22
Sub-Total 431, 146 D
OH & P 439115
ran
- S
Sub Total 474,261
E:771Contingency 159000
r+
Sub-Total 489,261 >
P& P Bond $ 91000 . 00 @ 10D %
Total Bid 4989261 lo6ss
Attachment " A "
BARTH
Construction, Inc .
General Contractor CGCO07847
I . R . C . Fire Station # 13
Phase II Scope of Work
Design, Permitting & Coordination
• All design and engineering for the maintenance building
• All coordination, supervision and project management for the design and
construction of maintenance building
• Site plan design and landscape design are included in phase I
• All construction permitting costs
Site Demolition & Development
• Grading for west retention pond, demo existing paving and concrete slab
• Install drainage — 2 catch basins and pipe ( 136 LF of 18 " RCP , 80 LF of 15 " Rep)
• 6" concrete paving (Phase II Only) signs , stripes
• Import fill (approximately 1 , 800 cu . yd)
• Landscape and irrigation for phase ll development area
Maintenance Building
• Design, permit and construct an 85 ' long x 55 ' wide x 24 ' tall pre -engineered
metal building
• 26 ga. PBR galvalume roof panels
• 26 ga PBR paint wall panels and trim
• 26 ga PBR gutters and downspouts
• 3 " V . R. insulation in roof and walls
• (2) 16 ' x 14 ' ceiling roll -up door — manual
• ( 3 ) 3 degree x 7 degree walk doors and frames
• ( 1 ) 8 ' x 18 ' x 10 ' high walkway roof between new and existing building
• Concrete foundation and slab
• ( 1 ) Emergency eye wash
• (6) Hose bibs
• New 400 amp 208v 3 phase electric service
• ( 24 ) High- Bay light fixtures
• ( 15 ) GFI receptacles
• (2 ) Exhaust fans and (2 ) intake louvers
• ( 3 ) Fire extinguishers
1717 Indian River Boulevard * Suite 202A * Vero Beach , Florida 32960
Phone : (772) 778-3072 * Fax : (772) 770-3017
E-mail : infibruti
;barthconstrucon , coin * Internet : wN��w . harthconstruction . coni
Attachment " A "
Page 2
Excluded ,
All automotive maintenance equipment
Any work shown on Phase III
All concurrency and impact fees
All Phase III site development and fire station construction costs
Any zoning change, land use change or variances
Traffic impact analysis
Environmental investigations to delineate boundaries of wetlands or the presence of
threatened or endangered species .
Atta ; Jlment " All
COASTAL
cAUTOMOTIVE EQUIPMENT
831' 'A TREET
VERO BEACH, FL 32960 DATE ESTIMATE
TEL 800-662 -6547
FAX 772 - 778 -9741 3/8/2012 3795
NAME / ADDRESS
Barth Construction
TERMS DUE DATE REP FOB CONTACT
3 /8/2012
ITEM DESCRIPTION LIST PRICE COST QTY TOTAL
TANK- 275 295 double wall gallon round tank 67 " x 38 "x44 " 1 , 798 . 00 2 3 , 596 . 001'
o . a. h 12ga. UL code # 142
TANK 2" Hinged fill Caps female Thread 32 .00 2 64. 00T
TANK 3 " Galy. Event caps - Female thread Normal 135. 00 2 270 . 00T
vent for UL approval c&b emergency vent
TANK 2 " mushroom vent 78 . 00 2 156 . 00T
TANK to install tanks 250. 00 1 250 . 00T
FREIGHT FREIGHT CHARGES 475 . 00 1 475 . 00T
BAL-3120-040 V Y STRAINER 127. 00 1 127 . 0011
BAL- 1120-015 1 " waste oil pump 750. 00 1 750 . 00T
BAL4520-001 SENSOR TANK LEVEL AUTO SHUT 540. 00 1 540 . 00T
CONTROL
BAL 1 " hose for waste oil 20 . 00 1 20 . 0011
air compressor and lines
CHAMP-HR-5DA 20 DUPLEX-HORIZONTAL 51IP . 170 gal tanks 45695 .00 1 41695 . 00T
twin Shp motors and starters and alternator
C1JAMP -CRN35 AIR DRYER 13450. 00 1 15450 . 00T
champ-po3816a Flex Connector hose 145 . 00 1 145 . 00T
LABOR labor to install compressor and dryer 350 . 00 1 350 . 00T
MISC electric auto drain 155 . 00 1 155 . 00T
GATES 50' air hose 1 /2 0 .45 4 1 . 80T
BAL.3230-003 Ball Valve for shut off air lines 22 . 50 6 135 . 00T
AIR-LINES Install AIR LINE LABOR AND PIAT PER FT 15 .00 350 51250 . 00T
BAI:2120-020 50'x1 /2 air reel 359. 10 2 718 . 2011
BAL 8141 -002 reel hose inlet hose 29 . 00 2 58 . 001'
LABOR - » LABOR to install compressor Ind dry and air 80 . 00 4 320 ,OOT
reels
OLL-LINES INSTALL OIL LINES PLUS PIPE 1 /2 OR 3/4 15 . 00 150 2,25O . 00T
SALES TAX TO BE ADDED (0 . 00
TOTAL
SIGNATURE
Paae 1
r�f4Ldc; riurcrr � n
sCOASTAL AUTOMOTIVE EQUIPMENT
983E 12thNREET
S- T
VERO BEACH , FL 32960 DATE ESTIMATE
TEL 800 - 662 - 6547 3/8/2012 3795
FAX 772- 778 -9741
NAME / ADDRESS
Barth Construction
TERMS DUE DATE REP FOB CONTACT
3 /8/2012
ITEM DESCRIPTIQN LIST PRICE COST QTY TOTAL
bat- 1111 -023 portable pump outfit 13026 . 43 2 25052 . 86T
Balm 131 -005 tiger pump 5 : 1 839 . 84 1 839 . 84'1'
BAI.2120-013 50' x 1 /2 hose reel 450 . 00 1 450 . 001'
BAI :8249-002 REEL INLET HOSE 37 .00 41 11517 ,00T
BAI.3230-002 shut off vale 1 /2" mp 46 . 00 2 92 . 00 '1'
BAL- 3120-033 AIR SOLENOID VALVE 144 . 00 1 144 . 00T
BAL-3270-051 SWIVEL ASSEMBLY 10 .00 I 10. 00T
BAL-3260-051 1 /2 f/r/l w / Auto Water Drain 137. 50 2 275 . 00T
LABOR LABOR RATE PER HOUR oil system pumps 80 . 00 8 640 . 00T
and reels
hardware extra hardware 200 .00 200 . 00T
Lift In Ground
Jason for a Top of the line 60,000 in ground
you are looking at about $ 115 , 000.00 installed
we have another Company out of Canada good
Quality brand you are looking at about $
90, 000 . 00 installed
Above ground Lift Post 60,000 .00
four post with two rolling jacks About $ 75 ,000
installed
give me a call when you get this {banks AL
SALES TAX TO BE ADDED ($qAP
TOTAL $275996 . 70
SIGNATURE
Paoe 2