Loading...
HomeMy WebLinkAbout2012-201 11 . 06 . 12 S .N• WORK ORDER NUMBER 2 This Work Order Number 2 is entered into as of this 6th day of November , 2012., pursuant to that certain Continuing Contract Agreement for Professional Services entered into as of November 15 , 2011 , (the "Agreement" ) by and between INDIAN RIVER COUNTY, a political subdivision of the State of Florida ( "COUNTY' ) and BRIDGE DESIGN ASSOCIATES , INC . ( "CONSULTANT" ) . The COUNTY has selected the Consultant to perform the professional services set forth on Exhibit A (Scope of Work) , attached to this Work Order and made part hereof by this reference . The professional services will be performed by the Consultant for the fee schedule set forth in Exhibit A ( Fee Schedule ) , attached to this Work Order and made a part hereof by this reference . Pursuant to paragraph 1 . 4 of the Agreement , nothing contained in any Work Order shall conflict with the terms of the Agreement and the terms - - -- of ,the--Agreement-shall- be -deemed to be-incor-por-ated in-each- individual Work.Orden as-,if— _ fully set forth herein . IN WITNESS WHEREOF , the parties hereto have executed this Work Order as of the date first written above . CONSULTANT : BOARD OF COUNTY COMMISSIONERS BRIDGE DESIGN OF INDIAN RIVER COUNTY Ooissio���Rv„ry4 ASSOCIATES , INC . °,cj, .• s By: By G GJ Brian C . Rheault ry C . Wheeler, Chairman j Title : President ` 41 BCC Approved Date : November 6 , 2012 •``1AgNRNER �°•�C`� .tltl. gq .q Attest: Jeffrey . Smith Cl of Court and ComptrolI Deputy Clerk Approved : oseph Baird , ounty Administrator App oved as to fo d al sufficiency: Alan S . Polackwich , Sr. , County Attorney CADocuments and Seftings\brianr\Local Setfings\Temporary Internet Files\Content.IE5\CEK2V9KE\Bridge_Design WD_No._2_10-16-12[1 ],doe r . --- - - -- -- ------ - - — - BRIDGE DESIGN ASSOCIATES , INC . C O N S U L T I N G E N G I N E E R S BRIAN C. RHEAULT, P.E. President October 10 , 2012 Indian River County 1801 2r Street, Building A Vero Beach , Florida 3296 Attention: Chris Kafer, P . E . Regarding : 6e Avenut' Bridge Replacements / Revised Proposal Project No . : 05-619 Dear Chris: Pursuant to your request, Bridge Design Associates, Inc. has prepared the following proposal for the construction phase services for the project. Bridge Design Associates, Inc. can provide Professional Structural Engineering services for 41 st St. , 45"' St. , and 01 St. Bridges as follows. • Attendance at pre-construction meeting • Review of Shop Drawings • Monitor test pile driving • Analyze the test pile driving results, including a computer analysis to determine the production pile lengths and blow counts required for production piles. • Monitoring pile driving • Inspect and monitor sheet pile casting • Verify filter cloth installation and grouting of the sheet panel joints • Reinforcing steel inspection and casting of the end bents • Reinforcing steel inspection and casting of the superstructure deck units • Superstructure closure pours, reinforcing and casting • Post-tensioning of the deck slabs • Reinforcing steel inspection and casting of the sidewalks • Reinforcing steel inspection of the barrier walls • Reinforcing steel inspection and casting of the approach slabs • As-built drawings and certification package to governing agency (FDOT and County) • Load Rating Certification • PDA Testing 1402 Royal Palm Beach Boulevard • Building 200 • Royal Palm Beach, Florida 33411 (561 ) 686-3660 • Fax: (561 ) 791 -1995 66th Street Bridge Replacements Page 2 In addition , Bridge Design can provide construction services for 331 Street and 37t1 Street bridges as follows : • Attendance at pre-construction meeting • Shop Drawing Reviews • Response to Contractor RFI ' s • Load Rating Certifications 26th Street Headwall as follows : • Attendance at pre-construction meeting • Review Shop Drawings • Monitor pile installation • Monitor reinforcing and casting of new sidewalk and barrier • Final Inspection • Final Report & Certification Concrete and soil testing is not included in the scope of services for this project. Our fee for the construction phase service is $ 102 , 745 . 00 . An approximate breakdown by task is outlined in Exhibits A through E . If you have any questions , please give me a call . Respectfully, /BRIDGESIGN ASSOCIATES , INC . heault, P . E . President BCR: kedSA2005-Jobs\05-619 Vero Bddges\Correspondence\proposal cps 10- 10-12 .wpd F - - - BRIDGE DESIGN ASSOCIATES , INC. 66th Avenue Bridge over 41 st Street September 24, 2012 HOURLY BREAKDOWN OF SERVICES EXHIBIT *A7 CHIEF SENIOR FIELD TOTAL LABOR ENGINEER ENGINEER REP HOURS COST ACTIVITY BY BY ACTIVITY ACTIVITY $150.00 $115.00 $70.00 Pre Construction Meeting1 .0 1 .0 2.0 $265.00 Sho Drawin Reviews 8.0 16.0 24.0 $3,040.00 Pile Castro 2.0 8.0 10.o $790.00 Pile Driving 8.0 40.0 48.0 $3,720.00 Pile Cas 18.0 48.0 66.0 $5,430.00 Reinforcing steel superstructure 8.0 8.0 16.0 $1 ,480.00 D run with concrete screed 8.0 8.0 16.0 $1 ,480.00 Castro of the deck stab B.0 10.0 18.0 $1 ,620.00 Sidewalk 16.0 16.0 $1 , 120.00 Barriers 16.0 16.0 $13120.00 Aoproach Slabs &0 &0 $560.00 Approach Slab Sidewalk 6.0 8.0 $560.00 Approach Slab Barrier 8.0 8.0 $560.00 Final Inspection 4.0 4.0 8.0 $880.00 Final Report & Certification 8.0 8.0 $13200.00 Load Rating I Aswbuitts 4.4 a.4 3.0 15.0 $1 ,730.00 TOTAL MANHOURS 25.0 77.0 - 185.0 287.0 DIRECT LABOR COST $36750.00 $8,855.00 $12,950.00 $251555.00 $25,555.00 PDA TESTING (3) $8.650.00 TOTAL FEES $34,205.00 S:12005-JobsMm619 Vero Bridges%CorrespondenceWxhibit A 09-24-12.xis BRIDGE DESIGN ASSOCIATES, INC . 66th Avenue Bridge over 45th Street September 24, 2012 HOURLY BREAKDOWN OF SERVICES EXHIBIT "B" CHIEF SENIOR FIELD TOTAL LABOR ENGINEER ENGINEER REP HOURS COST ACTIVITY BY BY ACTIVITY ACTIVITY $150.00 $115.00 $70.00 Pre-Construction Meeting 1 .o 1 .o 2.0 $265.00 Shop Drawing Reviews 8.0 16.0 24.0 $3,040.00 Pile Casting 2.0 8.0 10.0 $790.00 Pile Driving 8.0 40.0 48.0 $3,720.00 Pile Caps 8.0 32.0 40.0 $3, 160.00 Pre-stressed decks - casting 8.0 16.0 1 24.0 $2,040.00 Pre-stressed decks - placement 4.0 4.0 $280.00 Closure Pours 8.0 8.0 $560.00 Post Tensioning 8.0 8.0 $920.00 End Closure Pours 8.0 8.0 $560.00 Sidewalks 16.0 16.0 $1120.00 Barriers 16.0 16.0 $1, 120.00 Approach Slabs 8.0 8.0 $560.00 Approach Slab Sidewalk 8.0 8.0 $560.00 Approach Slab Barrier 8.0 8.0 $560.00 Final tns 4.0 4.0 8.0 $880.00 Final Report & Certification ko 8.0 $1200.00 Load Rating / As-builts 4.0 8.0 3.0 15.0 $1 ,730.00 TOTAL MANHOURS 25.0 59.0 179.0 263.0 DIRECT LABOR COST $3,750.00 $61785.00 $12,530.00 $23,065.00 $23,065.00 PDA TESTING (1 ) $2.950.00 TOTAL FEES $26,015.00 8:\2005-Jobs\05.619 Vero Bridges\Correspondence\Fxhibit B 09-24-12.xls BRIDGE DESIGN ASSOCIATES , INC. 66th Avenue Bridge over 49th Street September 24, 2012 HOURLY BREAKDOWN OF SERVICES EXHIBIT "C" CHIEF SENIOR FIELD TOTAL LABOR ENGINEER ENGINEER REP HOURS COST ACTIVITY BY BY ACTIVITY ACTIVITY $150.00 $115.00 $70.00 Pre-Construction Meeting 1 .0 1 .0 2.0 $265.00 Shop Drawing Reviews 8.0 16.0 24.0 $3,040.00 Pile Casting 2.0 8.0 10.0 $790.00 Pile Driving 8.0 40.0 48.0 $3,720.00 Pile Caps 8.0 32.0 40.0 $3, 160.00 Pre-stressed decks - casting 8.0 16.0 24.0 $2,040.00 Pre-stressed decks - placement 4.0 4.0 $280.00 Closure Pours 8.0 8.0 $560.00 Post Tensioning 8.0 8.0 $920.00 End Closure Pours 8.0 8.0 $560.00 Sidewalks 16.0 16.0 $1 , 120.00 Barriers 16.0 16.0 $1 , 120.00 Approach Slabs 6.0 8.0 $560.00 Approach Slab Sidewalk 8.0 8.0 $560.00 Approach Slab Barrier 8.0 8.0 $560.00 Final Inspection 4.0 4.0 8.0 $680.00 Final Report & Certification 8.0 8.0 $1 ,200.00 Load Rating / As-builts 4.0 8.0 3.0 15.0 $19730.00 TOTAL MANHOURS 25.0 59.0 179.0 263.0 DIRECT LABOR COST $35750.00 $6,785.00 $12,530.00 $23,065.00 $23,065.00 PDA TESTING (1 ) $2.950.00 TOTAL FEES $26,015.00 &:12005-Jobs\05-619 Vero Bridgss\Correspondsnce\Exhibit C 09-24-11. is I _ - BRIDGE DESIGN ASSOCIATES, INC. 66th Avenue Bridge over 33rd & 37th Street October 10, 2012 HOURLY BREAKDOWN OF SERVICES EXHIBIT "D' CHIEF SENIOR FIELD TOTAL LABOR ENGINEER ENGINEER REP HOURS COST ACTNITY BY BY ACTIVITY ACTIVITY $150.00 $115.00 $70.00 Pre-Construction Meeting 1 .0 1 .0 2.0 $265.00 Shop Drawing Reviews mmmm, 8.0 16.0 24.0 $3,040.00 Response to Contractor RFI's 8.0 8.0 16.0 $2, 120.00 Load Rating / As-buitts 2 bridges) 8.0 16.0 6.0 30.0 $3,460.00 TOTAL MANHOURS 25.0 41 .0 6.0 72.0 . DIRECT LABOR COST $3,750.00 $41715.00 $420.00 $8,885.00 $8,885.00 S:12005-Jobs\05-619 Vero BridgeslCorrespondence\Exhibit D 1Owl Owl 2.x1s I BRIDGE DESIGN ASSOCIATES, INC. 26th Street Headwall October 10. 2012 HOURLY BREAKDOWN OF SERVICES EXHIBIT "E" CHIEF SENIOR FIELD TOTAL LABOR EINGfREER ENGMEER REP HOURS COST ACTMTY BY BY ACTIVITY ACTIVITY $150.00 $115.00 $70.00 Pre-Construction Meeting 1 .0 1 .0 20 $265.00 Shop Drawing Reviews 8.0 16.0 24.0 $3,040.00 Sidewalks 16.0. 16.0 $1 , 120.00 Barriers 15.0 18.0 $1 , 120.oD Final Inspection 4.0 4.0 8.0 $880.00 Final Report & Certification 8.0 8.0 $1 ,200.00 TOTAL MANHOURS 21 .0 17.0 36.0 74.0 DIRECT LABOR :COST $3, 150.00 $1 ,955.00 $2,520.00 $73625.00 $7,625.00 S:\2005-Jobs105-619 Vero Bridges\Correspondsnes\EKNbit E 1Owl 0AZAs