HomeMy WebLinkAbout2012-201 11 . 06 . 12
S .N•
WORK ORDER NUMBER 2
This Work Order Number 2 is entered into as of this 6th day of November ,
2012., pursuant to that certain Continuing Contract Agreement for Professional Services
entered into as of November 15 , 2011 , (the "Agreement" ) by and between INDIAN RIVER
COUNTY, a political subdivision of the State of Florida ( "COUNTY' ) and BRIDGE DESIGN
ASSOCIATES , INC . ( "CONSULTANT" ) .
The COUNTY has selected the Consultant to perform the professional services set
forth on Exhibit A (Scope of Work) , attached to this Work Order and made part hereof by
this reference . The professional services will be performed by the Consultant for the fee
schedule set forth in Exhibit A ( Fee Schedule ) , attached to this Work Order and made a
part hereof by this reference . Pursuant to paragraph 1 . 4 of the Agreement , nothing
contained in any Work Order shall conflict with the terms of the Agreement and the terms
- - -- of ,the--Agreement-shall- be -deemed to be-incor-por-ated in-each- individual Work.Orden as-,if— _
fully set forth herein .
IN WITNESS WHEREOF , the parties hereto have executed this Work Order as of
the date first written above .
CONSULTANT : BOARD OF COUNTY COMMISSIONERS
BRIDGE DESIGN OF INDIAN RIVER COUNTY Ooissio���Rv„ry4
ASSOCIATES , INC . °,cj, .• s
By: By G GJ
Brian C . Rheault ry C . Wheeler, Chairman
j
Title : President ` 41
BCC Approved Date : November 6 , 2012 •``1AgNRNER �°•�C`�
.tltl. gq .q
Attest: Jeffrey . Smith Cl of Court and
ComptrolI
Deputy Clerk
Approved :
oseph Baird , ounty Administrator
App oved as to fo d al sufficiency:
Alan S . Polackwich , Sr. , County Attorney
CADocuments and Seftings\brianr\Local Setfings\Temporary Internet Files\Content.IE5\CEK2V9KE\Bridge_Design WD_No._2_10-16-12[1 ],doe
r . --- - - -- -- ------
- - — -
BRIDGE DESIGN ASSOCIATES , INC .
C O N S U L T I N G E N G I N E E R S
BRIAN C. RHEAULT, P.E.
President
October 10 , 2012
Indian River County
1801 2r Street, Building A
Vero Beach , Florida 3296
Attention: Chris Kafer, P . E .
Regarding : 6e Avenut' Bridge Replacements / Revised Proposal
Project No . : 05-619
Dear Chris:
Pursuant to your request, Bridge Design Associates, Inc. has prepared the following
proposal for the construction phase services for the project.
Bridge Design Associates, Inc. can provide Professional Structural Engineering services
for 41 st St. , 45"' St. , and 01 St. Bridges as follows.
• Attendance at pre-construction meeting
• Review of Shop Drawings
• Monitor test pile driving
• Analyze the test pile driving results, including a computer analysis to
determine the production pile lengths and blow counts required for
production piles.
• Monitoring pile driving
• Inspect and monitor sheet pile casting
• Verify filter cloth installation and grouting of the sheet panel joints
• Reinforcing steel inspection and casting of the end bents
• Reinforcing steel inspection and casting of the superstructure deck units
• Superstructure closure pours, reinforcing and casting
• Post-tensioning of the deck slabs
• Reinforcing steel inspection and casting of the sidewalks
• Reinforcing steel inspection of the barrier walls
• Reinforcing steel inspection and casting of the approach slabs
• As-built drawings and certification package to governing agency (FDOT and
County)
• Load Rating Certification
• PDA Testing
1402 Royal Palm Beach Boulevard • Building 200 • Royal Palm Beach, Florida 33411
(561 ) 686-3660 • Fax: (561 ) 791 -1995
66th Street Bridge Replacements
Page 2
In addition , Bridge Design can provide construction services for 331 Street and 37t1 Street
bridges as follows :
• Attendance at pre-construction meeting
• Shop Drawing Reviews
• Response to Contractor RFI ' s
• Load Rating Certifications
26th Street Headwall as follows :
• Attendance at pre-construction meeting
• Review Shop Drawings
• Monitor pile installation
• Monitor reinforcing and casting of new sidewalk and barrier
• Final Inspection
• Final Report & Certification
Concrete and soil testing is not included in the scope of services for this project.
Our fee for the construction phase service is $ 102 , 745 . 00 . An approximate breakdown by
task is outlined in Exhibits A through E .
If you have any questions , please give me a call .
Respectfully,
/BRIDGESIGN ASSOCIATES , INC .
heault, P . E .
President
BCR: kedSA2005-Jobs\05-619 Vero Bddges\Correspondence\proposal cps 10- 10-12 .wpd
F - - -
BRIDGE DESIGN ASSOCIATES , INC.
66th Avenue Bridge over 41 st Street
September 24, 2012
HOURLY BREAKDOWN OF SERVICES
EXHIBIT *A7
CHIEF SENIOR FIELD TOTAL LABOR
ENGINEER ENGINEER REP HOURS COST
ACTIVITY BY BY
ACTIVITY ACTIVITY
$150.00 $115.00 $70.00
Pre Construction Meeting1 .0 1 .0 2.0 $265.00
Sho Drawin Reviews 8.0 16.0 24.0 $3,040.00
Pile Castro 2.0 8.0 10.o $790.00
Pile Driving 8.0 40.0 48.0 $3,720.00
Pile Cas 18.0 48.0 66.0 $5,430.00
Reinforcing steel superstructure 8.0 8.0 16.0 $1 ,480.00
D run with concrete screed 8.0 8.0 16.0 $1 ,480.00
Castro of the deck stab B.0 10.0 18.0 $1 ,620.00
Sidewalk 16.0 16.0 $1 , 120.00
Barriers 16.0 16.0 $13120.00
Aoproach Slabs &0 &0 $560.00
Approach Slab Sidewalk 6.0 8.0 $560.00
Approach Slab Barrier 8.0 8.0 $560.00
Final Inspection 4.0 4.0 8.0 $880.00
Final Report & Certification 8.0 8.0 $13200.00
Load Rating I Aswbuitts 4.4 a.4 3.0 15.0 $1 ,730.00
TOTAL MANHOURS 25.0 77.0 - 185.0 287.0
DIRECT LABOR COST $36750.00 $8,855.00 $12,950.00 $251555.00
$25,555.00
PDA TESTING (3) $8.650.00
TOTAL FEES $34,205.00
S:12005-JobsMm619 Vero Bridges%CorrespondenceWxhibit A 09-24-12.xis
BRIDGE DESIGN ASSOCIATES, INC .
66th Avenue Bridge over 45th Street
September 24, 2012
HOURLY BREAKDOWN OF SERVICES
EXHIBIT "B"
CHIEF SENIOR FIELD TOTAL LABOR
ENGINEER ENGINEER REP HOURS COST
ACTIVITY BY BY
ACTIVITY ACTIVITY
$150.00 $115.00 $70.00
Pre-Construction Meeting 1 .o 1 .o 2.0 $265.00
Shop Drawing Reviews 8.0 16.0 24.0 $3,040.00
Pile Casting 2.0 8.0 10.0 $790.00
Pile Driving 8.0 40.0 48.0 $3,720.00
Pile Caps 8.0 32.0 40.0 $3, 160.00
Pre-stressed decks - casting 8.0 16.0 1 24.0 $2,040.00
Pre-stressed decks - placement 4.0 4.0 $280.00
Closure Pours 8.0 8.0 $560.00
Post Tensioning 8.0 8.0 $920.00
End Closure Pours 8.0 8.0 $560.00
Sidewalks 16.0 16.0 $1120.00
Barriers 16.0 16.0 $1, 120.00
Approach Slabs 8.0 8.0 $560.00
Approach Slab Sidewalk 8.0 8.0 $560.00
Approach Slab Barrier 8.0 8.0 $560.00
Final tns 4.0 4.0 8.0 $880.00
Final Report & Certification ko 8.0 $1200.00
Load Rating / As-builts 4.0 8.0 3.0 15.0 $1 ,730.00
TOTAL MANHOURS 25.0 59.0 179.0 263.0
DIRECT LABOR COST $3,750.00 $61785.00 $12,530.00 $23,065.00
$23,065.00
PDA TESTING (1 ) $2.950.00
TOTAL FEES $26,015.00
8:\2005-Jobs\05.619 Vero Bridges\Correspondence\Fxhibit B 09-24-12.xls
BRIDGE DESIGN ASSOCIATES , INC.
66th Avenue Bridge over 49th Street
September 24, 2012
HOURLY BREAKDOWN OF SERVICES
EXHIBIT "C"
CHIEF SENIOR FIELD TOTAL LABOR
ENGINEER ENGINEER REP HOURS COST
ACTIVITY BY BY
ACTIVITY ACTIVITY
$150.00 $115.00 $70.00
Pre-Construction Meeting 1 .0 1 .0 2.0 $265.00
Shop Drawing Reviews 8.0 16.0 24.0 $3,040.00
Pile Casting 2.0 8.0 10.0 $790.00
Pile Driving 8.0 40.0 48.0 $3,720.00
Pile Caps 8.0 32.0 40.0 $3, 160.00
Pre-stressed decks - casting 8.0 16.0 24.0 $2,040.00
Pre-stressed decks - placement 4.0 4.0 $280.00
Closure Pours 8.0 8.0 $560.00
Post Tensioning 8.0 8.0 $920.00
End Closure Pours 8.0 8.0 $560.00
Sidewalks 16.0 16.0 $1 , 120.00
Barriers 16.0 16.0 $1 , 120.00
Approach Slabs 6.0 8.0 $560.00
Approach Slab Sidewalk 8.0 8.0 $560.00
Approach Slab Barrier 8.0 8.0 $560.00
Final Inspection 4.0 4.0 8.0 $680.00
Final Report & Certification 8.0 8.0 $1 ,200.00
Load Rating / As-builts 4.0 8.0 3.0 15.0 $19730.00
TOTAL MANHOURS 25.0 59.0 179.0 263.0
DIRECT LABOR COST $35750.00 $6,785.00 $12,530.00 $23,065.00
$23,065.00
PDA TESTING (1 ) $2.950.00
TOTAL FEES $26,015.00
&:12005-Jobs\05-619 Vero Bridgss\Correspondsnce\Exhibit C 09-24-11. is
I _ -
BRIDGE DESIGN ASSOCIATES, INC.
66th Avenue Bridge over 33rd & 37th Street
October 10, 2012
HOURLY BREAKDOWN OF SERVICES
EXHIBIT "D'
CHIEF SENIOR FIELD TOTAL LABOR
ENGINEER ENGINEER REP HOURS COST
ACTNITY BY BY
ACTIVITY ACTIVITY
$150.00 $115.00 $70.00
Pre-Construction Meeting 1 .0 1 .0 2.0 $265.00
Shop Drawing Reviews mmmm, 8.0 16.0 24.0 $3,040.00
Response to Contractor RFI's 8.0 8.0 16.0 $2, 120.00
Load Rating / As-buitts 2 bridges) 8.0 16.0 6.0 30.0 $3,460.00
TOTAL MANHOURS 25.0 41 .0 6.0 72.0 .
DIRECT LABOR COST $3,750.00 $41715.00 $420.00 $8,885.00
$8,885.00
S:12005-Jobs\05-619 Vero BridgeslCorrespondence\Exhibit D 1Owl Owl 2.x1s
I
BRIDGE DESIGN ASSOCIATES, INC.
26th Street Headwall
October 10. 2012
HOURLY BREAKDOWN OF SERVICES
EXHIBIT "E"
CHIEF SENIOR FIELD TOTAL LABOR
EINGfREER ENGMEER REP HOURS COST
ACTMTY BY BY
ACTIVITY ACTIVITY
$150.00 $115.00 $70.00
Pre-Construction Meeting 1 .0 1 .0 20 $265.00
Shop Drawing Reviews 8.0 16.0 24.0 $3,040.00
Sidewalks 16.0. 16.0 $1 , 120.00
Barriers 15.0 18.0 $1 , 120.oD
Final Inspection 4.0 4.0 8.0 $880.00
Final Report & Certification 8.0 8.0 $1 ,200.00
TOTAL MANHOURS 21 .0 17.0 36.0 74.0
DIRECT LABOR :COST $3, 150.00 $1 ,955.00 $2,520.00 $73625.00
$7,625.00
S:\2005-Jobs105-619 Vero Bridges\Correspondsnes\EKNbit E 1Owl 0AZAs