WORK ORDER NUMBER 3 o 13
131h Street S . W . Bridge Over IRFWCD Sub- Lateral B=8 Canal
This Work Order Number 3 is entered into as of this _ n day of December , 2013
pursuant to that certain Continuing Contract Agreement for Professional Services entered into as
of November 15 , 2011 ( the "Agreement" ), by and between INDIAN RIVER COUNTY, a political
subdivision of the State of Florida ( " COUNTY" ) and Bridge Design and Associates, Inc .
( " Consultant" ) .
The COUNTY has selected the Consultant to perform the professional services set forth on
Exhibit A ( Scope of Work ) , attached to this Work Order and made part hereof by this reference .
The professional services will be performed by the Consultant for the fee schedule set forth in
Exhibit A ( Fee Schedule ), attached to this Work Order and made a part hereof by this reference .
The Consultant will perform the professional services within the timeframe more particularly set
forth in Exhibit A (Time Schedule ) , attached to this Work Order and made a part hereof by this
reference all in accordance with the terms and provisions set forth in the Agreement . Pursuant to
paragraph 1 . 4 of the Agreement, nothing contained in any Work Order shall conflict with the
terms of the Agreement and the terms of the Agreement shall be deemed to be incorporated in
each individual Work Order as if fully set forth herein .
IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the date
first written above .
CONSULTANT: BOARD OF COUNTY COMMISSIONERS •.- cohl4fs'�.�
Bridge Design a Associates, Inc . OF INDIAN RIVER COUNTY f•�°� ,"` •F�•:
ML+
S � # S
By ; By :
Peter D . O' Bryan , Chairman
Title : Brian C. Rheault P . E .
%% O
COUN� �
President
BCC Approved Date . December 10 , 2013
Attest : Jeffrey R . Smith, Cl k A Cou Comptroller
By .
Deputy Clerk
Approved :
seph A air , County Administrator
� t
Approved as to form and legal sufficiency : &ZLZ � 4cjv�
Dylan T . Reingold , County Attorney
F :\Public Works\ENGINEERING DIVISION PROJECTS\0530- 13th St SW East of 58th Ave\Admim\agenda items\Bridge Design Work Order No . 3 .doc
BRIDGE DESIGN ASSOCIATES , INC "
CONSULTING ENGINEERS
BRIAN C. RHEAULT, P.E.
November 20, 2013 President
Indian River county
1800 27' Street
Vero Beach , Florida 32960
Attention . Chris Kafer, P. E.
Regarding : 13"' Street S .W. over Sub lateral 13-8 Canal
Project No. : 06-624
Dear Chris:
Pursuant to your request, Bridge Design Associates , Inc. can provide all necessary structural
engineering for the above referenced project.
The proposed bridge will be a three-lane bridge with an 8'.0 and 64" shoulders and a sidewalk on the
north side of the bridge and utility shelf on both sides . The bridge will be approximately 37'-0 long .
Our design will be based on applicable County and F. D . O . T. Standards and AASHTO LRFD Design
Standards.
Our services will include design , permitting through Army Corps of Engineers, St. John's Water Control
District and Indian River Farms Water Control District. Construction Phase services will also be
provided .
Design Phase services and permitting will be complete within 180 days following notice to proceed .
Construction Phase Services will be performed contiguous with construction .
Any surveying or property owner research required for permitting is not included in our scope of
services . Permitting fees will be the responsibility of the County.
The attached Exhibits "A" and " B" are manhour breakdowns of tasks with commensurate fees .
If you have any questions, please give me a call .
Respectfully,
Wresident
ESIGN ASSOCIATES , INC.
heault, P. E . , #38797
BCR: kedS:\2006-Jobs\0662413th St SW over 58th Ave Bridge\01 Admin\Proposals\proposal 11 -20A3.wpd
1402 Royal Palm Beach Boulevard * Building 200 • Royal Palm Beach , Florida 33411
(561 ) 686 -3660 9 Fax : (561 ) 791 - 1995
BRIDGE DESIGN ASSOCIATES, INC.
13TH STREET AND 58TH AVENUE BRIDGE REPLACEMENT
November 20, 2013
HOURLY BREAKDOWN OF SERVICES
EXHIBIT W
PROJECT PROJECT FIELD CAD 118y
LABOR
MANAGER ENGINEER REP TECH COST
ACTIVITY SHE EJ. BY
* AACTIVITY
$150.00 $115.00 $70.00 $90.00
COORDINATION Nil
Utility Coodination WA 4.0 a.o e.o $1 ,oeo.00
Pennit Meetings / IRFWCD / SJRWMD I ACOE / DE N/A 4.0 4.0 5600.00
DESIGN
General Notes/ Construction Notes / Specifications N/A 2.5 8.0 10.5 $1 ,295.00
Design Sheet pile wall system for end bent WA e.o 8.0 $690.00
Design end bent pille cap NIA 6.0 6.0 $690.00
Design su ersbWure deck slab WA 2.0 12.0 14.0 $1 ,e80.00
Design closure pours NIA 3.0 3.0 $345.00
Design post tension system WA 4.0 4.0 $450.00
Design barrier system & guardrail WA 2.0 4.0 8.0 $780.00
Design slope n NIA 2.0 4.0 e.o $750.00
PLANS PREPARATION
Index of Sheets / Location Ma I Summ of Q B1 6.0 a.o $540.00
Bridge Cross section existing & prop 02 4.0 4.0 $360.00
General Notes / Design Criteria / Constr. Notes B3 2.0 20 $180.00
Bridge Plan Sheet B4 12.0 12.0 $19080.00
Bridge Elevation B5 3.0 3.0 $270.00
Substructure Plan B6 e.o 6.0 $540.00
Pile Data Table i Soil Borings B7 e.0 6.0 $640.00
Finish Grade Plan B8 12.o 12.0 $10080.00
End Bent Plan & Elevation B9 e.o 6.0 $540.00
End Bent details B10 q4oO24,0
12.0 $11080.00
Su tructlue typical cross section B11 $380.00
Precast slab la ut Ian & t tension B12 0 $360.00
Precast slab lan elevation 813 0 $720.00
Precast slab details, bar bendin d B14 .0 $1 ,520.00
Sheet pile wall details, notes etc. 815 8.0 B.o $720.00
Approach slab la out sheet B16 a.0 6.0 $540.00
Index sheets (6001601 ,614,700-1 ,7004, 810 617-
8201 - 8204) B24 9.o 9.0 $810.00
Load Ratio Analysis WA 5.0 18.0 21 .0 $1 ,895.00
MISCELLANEOUS
Quantities & Estimates NIA 1 .0 2.0 120 15.0 $1 ,220.00
Permit Application & Responses WA 4.0 8.0 5.0 17.0 $1 ,970.00
TOTALMANHOURS 21 .5 68.0 28.0 131 .0 248.5
DIRECT LABOR COST $3,225.00 $7,590.00 $11950.00 $11 ,790.00 $24,585.00
ENGINEERING FEES $24,555.00
S;120054obsW6-52413th St SW over 581h Ave BrWoeWl AdmjnW apwalsWAW A Dssipn 11404 36"bit A Deaipn 1140.13
BRIDGE DESIGN ASSOCIATES , INC.
13TH STREET OVER SUB LATERAL B-8 CANAL
CONSTRUCTION PHASE
November 20, 2013
HOURLY BREAKDOWN OF SERVICES
EXHIBIT "B"
PROJECT PROJECT FIELD REP CAD TOTAL LABOR
MANAGER ENGINEER EJ. TECHNICIAN HOURS COST
ACTIVITY BY BY
ACTIVITY ACTIVITY
$ 150.00 $115.00 $70.00 $90.00
Pre Construction Meeting 2.0 2.0 4.0 $530.00
Shop Drawing Reviews 8.0 16.0 24.0 $3040.00
Pile Casting 2.0 8.0 1 10.0 $790.00
Pile Ddvi 16.0 40.0 56.0 54,640.00
Pile Cas 8.0 32.0 40.0 53160.00
Prestressed Decks - Casting 8.0 16.0 24.0 $2,040.00
PreSMessed Decks - Placement 8.0 8.0 $560.00
Closure Pours 8.0 8.0 $560.00
Post Tensioning 8.0 8.0 $920.00
End Closure Pours 8.0 8.0 $560.00
Sidewalks 16.0 16.0 $1 .120.00
Barriers 16.0 16.0 1 $1 ,120.00
Approach Slabs 8.0 8.0 $560.00
Approach Slabs Sidewalk 8.0 8.0 $560.00
Approach Slab Barrier &0 8.0 $560.00
Final Inspection 4.0 4.0 8.0 $880.00
Final Report & Certification 8.0 8.0 51,200.00
TOTAL MANHOURS 22.0 60.0 180.0 0.0 262.0
DIRECT LABOR COST $3.300.00 $6.900.00 51200.00 $0.00 $22,800.00
$22,800.00
PDA TEST (2) 56.300.00
TOTAL $29,100.00