WORD ORDER NO . 16 ( Engineering )
Bridge Design Services for 82 " d Avenue Bridge
over the IRFWCD Lateral D Canal
IRC Project No . 0208
FOR
PROFESSIONAL BRIDGE DESIGN SERVICES
WITH
Bridge Design Associates , Inc .
This Work Order No . 16 is in accordance with the existing AGREEMENT dated October 3 ,
2006 between Bridge Design Associates , Inc . (ENGINEER) and Indian River County
( COUNTY) .
This Work Order No . 16 amends the agreement as follows :
SECTION I — PROJECT LIMITS
82nd Avenue Bridge over the Indian River Farms Water Control District Lateral D Canal (4t"
Street)
SECTION II — SCOPE OF SERVICES
This Work Order No . 16 is for providing design , permitting and construction related services
for the above mentioned project .
SECTION III - TIME FOR COMPLETION
Design and permitting services — 240 days for completion . Construction services shall run
concurrently with the construction work for 82nd Avenue Bridge over the I . R . F . W . C . D . Lateral D
Canal .
SECTION IV — COMPENSATION
The COUNTY agrees to pay , and the ENGINEER agrees to accept , a fee for services
rendered according to the " Scope of Services " identified in Section II and III of this Work
Order No . 16 a lump sum cost of $ 81 , 135 . 00 .
S :A2010-JobsTroposals\82nd over lateral D\Con-espondenceABCCBridgeDesignWorkOrderNo . 1604-09- IO . doc
c
PAGE TWO
Work Order No . 16 Bridge Design Associates , Inc .
April 20 , 2010 BCC agenda
The AGREEMENT is hereby amended as specifically set forth herein . All remaining sections
of the AGREEMENT shall remain in full force and effect, and are incorporated herein .
IN WITNESS WHEREOF the parties hereto have executed these presents this
4th__ day of __ May 2010 .
e .°••d "So0M49��s�
BRIDGE DESIGN ASSOCIATES , IN ���' • •
° ,��p; N RIVER COUNTY , FLORIDA
$ eA +D O COUNTY COMIYII SIONERS
BY : Y : a
• e
°
° „may a jyg, • o
Title : BRIAN C . RHEAULT , P . E . ,
PRESIDENT ' ° •'• • • °
approved by the BCC : May 47 2010
Witnessed By : /`' ATTEST :
00 JEFFREY K . BARTON
CLERK OF CIRCUIT COURT
BY : 0�1�
I)rEi<JtY CLERK F COURT
0... "h A
kOSEPHI�BAIRD ADMIN T AT
ALAN POLACKWICH
COUNTY ATTORNEY
Approved as to Form and Legal Sufficiency
S :A2010-JobsTroposals\82nd over lateral D\CorrespondenceABCCBridgeDesignWorkorderNo . 1604-09 - I0 . doc
9
BRIDGEDESIGN ASSOCIATES ,.T ES ' I NCC
GONSULTIN0 F NG1NEERS
BRIAN Co RHEAULT, VE,
President
April 61 2010
Indian River County
180027 4h Street
Vero Beach , Florida 32960
ATTENTION : Chris Kafer, P . E .
REGARDING : 82ND Avenue and 4'h Street Bridge Replacement over Lateral D Canal
Dear Chris :
Pursuant to your request , Bridge Design Associates , Inc. can provide all necessary
structural engineering for the above referenced project.
The proposed bridge will be a three-lane bridge with 10'-0 shoulders and a sidewalk on the
east side of the bridge and utility shelf on both sides . The bridge will be approximately
75'-0 long .
Our design will be based on applicable County and F . D. O . T . Standards amd AASHTO
LRFD Design Standards .
Our services will include design , permitting through Army Corps of Engineers , St, John 's
Water Control District and Indian River Farms Water Control District. Construction Phase
services will also be provided .
Any surveying or property owner research required for permitting is not included in our
scope of services . Permitting fees will be the responsibility of the County.
The attached Exhibits "A" and " B" are manhour breakdowns of tasks with commensurate
fees .
If you have any questions , please give me a call .
Respectfully,
BRIDGE DESIGN ASSOCIATES , INC .
Brian C . Rheault, P . E .
President
BCR: kedS :12010-Jobs\ProposalsX82nd over lateral Morrespondencelproposal 04-06-10 .wpd
11102 Royal Palm Beach 13outevard a Building 200 o Rov)l Palm Beach , Morida 334H
( 561 ) 61361 660 o rah: (561 ) 79]_-7 995
BRIDGE DESIGN ASSOCIATES, INC. a
82ND AVENUE AND 4TH STREET BRIDGE REPLACEMENT OVER LATERAL D CANAL Q
DESIGN PHASE REVISED
April 7, 2010
HOURLY BREAKDOWN OF SERVICES
EXHIBIT "K
CHIEF SENIOR ENGINEER CAD TOTAL LABOR
ENGINEER ENGINEER INTERN TECHNICIAN HOURS COST
ACTIVITY BY BY
ACTIVITY ACTIVITY
$145.00 $115.00 560.00 58000
Coordinate Soils Testing 4.0 4.0 $580.00
Utility Coordination 4.0 8.0 120 $1 ,500.00
Bridge Layout to Site Conditions 4.0 16.0 8.0 28.0 $2060.00
Foundation Design 4.0 16.0 40.0 60.0 $5,620.00
Pile Cap Design & Detailing 4.0 16.0 40.0 60.0 $5,620.00
Slab Design & Detailing 4.0 16,0 40.0 60.0 $6,620.00
Barrier Design & Detailing 4.0 16.0 8.0 280 53,060.00
Design Notes & SpGcifications 4.0 16.0 20.0 $2,420.00
Design Calculations 4.0 24.0 24.0 52.0 $4,780.00
Quantifies 20 30.0 120 44.0 $3,050.00
Cost Estimate & Rebar Details 2.0 8.0 10.0 $1 ,210.00
Permitting 2.0 40.0 42.0 $4,890.00
IRC Reviews 50% 90%, 100% 4.0 16.0 8,0 28.0 $3,060.00
Phasing Details 4.0 16.0 16.0 36.0 $3,700.00
Load Rating Analysis 5.0 16.0 21 .0 51 ,535,00
TOTAL MANHOURS 46.0 201 .0 86.0 1720 505.0
DIRECT LABOR COST $60670.00 323,115.00 $5,160.00 $136760.00 5481705.00
548,705.00
S:\2010Jobs1Prcposals182nd over lateral D1CorrespondencelExhibitA Design 04-07-10
BRIDGE DESIGN ASSOCIATES, INC. ,
82ND AVENUE AND 4TH STREET BRIDGE REPLACEMENT OVER LATERAL D CANAL Q
CONSTRUCTION PHASE
April 7a 2010
HOURLY BREAMOWN OF SERVICES
E) HIBIT 'B'
CHIEF SENi9R ENSINEER CHID TOTAL LABOR
EI MEER B38OMM IUTERN TECHNICIAN HOURS COST
ACTIVITY BY BY
A4:Tnmv AaTnnrY
$145.00 $115.00 :"$Waco $80.00
Pre Construction Moofing 20 20 4.0 $520.00
Shop Drawing Revkrms &0 16.0 24.0 $3,000.00
Pile Casong 20 &0 10.0 $710.00
Pile Driving 16.0 80.0 96.0 $6,640.00
Pilecaps 16.0 64.0 80.0 $5,680.00
Pr"bessed Deft - CwAng &a 162 24.0 $10880.00
Pre-Sbvssed Decks - Plaeemerd 8.0 E.0 $480.00
Closure Pours 8.0 8.0 $480.00
Post Terlsimi 8.0 &0 5820.00
End Closure Pours 8.0 &0 $480.00
Sidewalks 16.0 16.0 $.980.00
Barriers 16.0 16.0 $960.00
A h Stabs 8.0 &o $480.00
Approach Slabs Sidewalk 8.0 &0 $460.00
Approach Slab Barrier 8.0 8.0 $480,00
Final Inspection 4.0 4.0 8.0 $820.00
Final Report & CerOflraHor► 8.0 &0 $11160.00
TOTAL MAN - OURS 22.0 88.0 252.0 0.0 342.0
DIRECT LABOR COST $3,190.00 57,820.00 $15,120.00 $0.00 $26, 130.00
$26, 130.00
PDA TEST (2) $6.300.00
TOTAL $32,430.00