Loading...
HomeMy WebLinkAbout2010-130 v i � - J • i dvf � � 13o TASK ORDER NO . 1 INDIAN RIVER COUNTY AND CAROLLO ENGINEERS , A Professional Corporation This Task Order is issued by the OWNER and accepted by ENGINEER pursuant to the mutual promises , covenants and conditions contained in the Agreement between the above named parties dated the 1 st day of May 2007 , in connection with the Continuing Contract Agreement for Professional Services . PURPOSE The purpose of this Task Order is to describe the Scope of Services for the Evaluation Related to Scaling and Corrosion Considerations at the OWNER 7s Reverse Osmosis ( RO ) treatment plant. The overall goal of the study is to perform evaluations and develop suitable recommendations for the treatment process/operations to address scaling and corrosion considerations . These evaluations will be achieved through specific data analysis , chemistry modeling , and sampling . ENGINEER ' S SERVICES ENGINEER ' s services include the following two tasks to complete this assignment . These tasks are discussed in detail below. • Task 1 — Reviews and Evaluation • Task 2 — Report TASK 1 . REVIEWS AND EVALUATION The data reviews and evaluation will focus on specific evaluations of water quality related to scaling/corrosion , chemistry modeling using RTW model , and specific sampling and analysis for water quality related to scaling/corrosion . In case a coupon study is one of the recommendations based on the results from these evaluations , its scope will be separately and subsequently developed in another task order. An interim letter memorandum will be prepared and submitted at the end of Subtask 1 . 2 , summarizing the results of the chemistry modeling , and including initial recommendations on changes to treatment process/operations . These initial results and recommendations will be enhanced and finalized in the project report that will be developed in Task 2 , after completion of the sampling and analysis in Task 1 . 3 . The associated subtasks are listed below . Subtask 1 . 1 Water Quality Related to Scaling/Corrosion a . Obtain/compile pertinent data (for last 1 -2 years ) on water quality related to scaling /corrosion b . Analyze water quality data related to scaling for last 1 -2 years c . Analyze water quality data related to corrosion for last 1 -2 years HAClienAIndian River County\ContracAIRC 2010-T01 _Fn1 .doc 1 . p Subtask 1 . 2 Chemistry Modeling a . Evaluate scaling/corrosion indices under current operation b . Determine conditions for recommended operation c . Draft letter memorandum summarizing modeling results d . Final letter memorandum summarizing modeling results Subtask 1 . 3 Sampling and Analysis a . Sampling protocol b . Sampling and coordination c . Sample Analysis d . Deposits/scale sampling and coordination e . Deposits/scale analysis Task 1 Deliverables : Draft Letter Memorandum ( electronic copy PDF format ) Final Letter Memorandum ( electronic copy PDF format ) TASK 2 . REPORT Subtask 2 . 1 . Draft Report At the completion of the data reviews and evaluation (Task 1 ) , ENGINEER will produce a Draft Report summarizing and documenting the results of the evaluations and including suitable recommendations , and distribute the draft report to the OWNER for review and approval . Subtask 2 .2 . Meeting to discuss draft report ( Prep/Attend/ Distribute Minutes ) After the submission of the draft report, ENGINEER will meet with OWNER to discuss the results and recommendations included in the draft report . OWNER' s comments will be received , and incorporated in the finalization of the report . Subtask 2 . 3. Final Report The ENGINEER will revise the Draft Report as appropriate based on the OWNER ' s comments received , and submit a Final Report . Task 2 Deliverables : Draft Report ( 4 copies ) Final Report ( 4 copies ) TIME OF PERFORMANCE Completion of the services outlined above will be provided as needed during the project . The overall schedule for the preparation of the Report is estimated to be fourteen ( 14) weeks after . receipt of the Notice to Proceed ( NTP ) . The estimated timeline is described below . • Task 1 . 1 and 1 . 2 of the study will delivered to the OWNER within seven weeks of receipt of the NTP . • Task 1 . 3 and Task 2 of the study will be delivered to the OWNER within fourteen weeks of receipt of the NTP . H :1Clientllndian River County\ContracAIRC 2010-T01 _Fn1 .doc 2 1 PAYMENT OWNER shall pay ENGINEER for ENGINEER 's Services , as delineated above , rendered under a lump sum fee of $ 39 , 545 , plus approved expenses . Reimbursable Expenses . OWNER shall pay ENGINEER the actual costs of all approved Reimbursable Expenses incurred in connection with all ENGINEER's Services , as delineated above , including those of independent associates and consultants employed by ENGINEER. EFFECTIVE DATE This Task Order No . 1 is effective as of the "day of April , 2010 . IN WITNESS WHEREOF , duly authorized representatives of the OWNER and of the ENGINEER have executed this Task Order No . 1 evidencing its issuance by OWNER and acceptance by ENGINEER . CAROLLO ENGINEERS , BOARD OF COUNTY COMMISSIONERS OF A Professional Corporation INDIAN RIVER COUNTY Accepted this 18 day of May 2010 Rob S . Cushing , PhD , PE , DEE Peter D . O ' Bryan ,c• ° ° ° °�'.?*:�iFI Partner Chairman 0 : •' . • 5p o e , 8 e � a By : �/�� Attest : J . K . Barton , Clerk of Court ':•:, c Partner .#too Off'• By : - R �OUNTY; ��• Deputy rk proved : May 18 , 2010 J ' ephA . B ird , County Administra proved as to form and legal sufficiency: r .-� Alan S . Polackwic , County Attorney HACIientUndian River County\Contract\ IRC 2010-T01 _Fnl .doc 3 4/28/2010 Indian River County Carollo Engineers , P .C . Evaluation Related to Scaling and Corrosion Considerations Engineering Fee Estimate TOTAL TOTAL SUB SUB/ TOTAL TOTAL ` LABOR LABOR MARKUP - DIRECT PECE : ODC'S COST ITEM DESCRIPTION HOURS COSTS Extemal ON SUBS COSTS ON + `Laboratory DL His PECE (HRS) ($$$) ($$$) ($$$) ($$$) . 10 % $9 . 00 Task 1 - Reviews and Evaluations 1 . 1 Water Quality Related to Scaling/Corrosion a. Obtain and compile pertinent data ( last 1 -2 years) 2 $310 $0 $0 $0 $ 18 $ 18 $328 b. Analyze water quality data related to scaling (last 1 -2 years) 20 $22750 $0 $0 $0 $ 180 $ 180 $2, 930 c. Analyze water quality data related to corrosion (last 1 -2 years) 8 $ 11100 $0 $0 $0 $ 72 $72 $ 1 , 172 1 .2 Chemistry Modeling a. Evaluate scaling/corrosion indices under current operation 15 $29360 $0 $0 $0 $ 135 $ 135 $2,495 b. Determine conditions for recommended operation 15 $2 , 360 $0 $ 0 $0 $ 135 $ 135 $2,495 c. Draft letter memo summarizing modeling results 19 $ 2 , 680 $0 $0 $0 $ 171 $ 171 $2;851 d. Final letter memo summarizing modeling results 10 $ 12350 $0 $ 0 $0 $ 90 $90 - $.11440 1 .3 Sampling and Analysis a. Sampling protocol 10 $ 1 ,460 $0 $0 $0 $ 90 $90 $ 1 ,550 b. Sampling and coordination* 4 $630 $ 1 , 200 $ 120 $ 150 $ 36 $ 1 , 506 $2, 136 c. Sample analysis 15 $2 , 250 $0 $0 $0 $ 135 $ 135 - $2, 385 d. Deposits/scale sampling and coordination* 6 $880 $ 1 , 000 $ 100 $ 150 $ 54 $ 1 , 304 $2, 184 e. Deposits/scale analysis 12 $ 12760 $0 $0 $0 $ 108 $ 108 $1 ,868 136 $ 199890 $2,200 $220 $300 $ 17224 $3,944 $231834 SUBTOTAL Task 2 - Report 2. 1 Draft report 57 $7 , 580 $0 $ 0 $0 $ 513 $ 513 581093 2.2 Meeting to discuss draft report ( Prep/Attend/Distribute Minutes) 28 $ 5 , 240 $0 $0 $0 $252 $252 $5,492 2.3 Final report 14 $2 , 000 $0 $ 0 $0 $ 126 $ 126 $2„126 99 $ 14,820 $0 $0 $0 $891 $891 $ 15,711 SUBTOTAL - Total Engineering Services 235 $34,710 $21200 $220 $300 $2 , 115 $4,835 $397545 PECE = Project Equipment and Communication Expenses * Overall sampling direction , oversight, and coordination by Carollo ; field sample collection to be performed by County operations staff