AMENDMENT NO. 16 TO THE PROFESSIONAL a C
ENGINEERING SERVICES AGREEMENT
66TH AVENUE PAVING AND DRAINAGE IMPROVEMENTS
BETWEEN Orr" STREET AND SIZ60
IRC PROJECT NO , 9810B
THIS is an amendJnent to the existing AGREEMENT dated NOVEMBER 17 , 1998 , including
AMENDMENTS NUMBER 1 through 15 , between CARTER ASSOCIA'T'ES , INC . (ENGINEER) and
INDIAN RIVER COUNTY (COUNTY) . The proposed scope of work includes bridge design revisions ,
bridge inspection services, electrical plan revisions to meet 2010 Building Code and coordination . All
provisions of the original Professional Engineering Services Agreement including Amendment Nos . 1
through 15 shall remain in full force and effect, unless otherwise specifically modified . This amendment
addresses changes in " SCOPE OF SERVICES ",
and "TIME OF COMPLETION" of
the AGREEMENT .
SCOPE OF SERVICES
See attached letter from Carter Associates , Inc . dated May 16 , 2012 , which specifies changes in the
" SCOPE, OF SERVICES " and " COMPENSATION"
COMPENSA'T'ION
This section of the AGREEMENT entitled SECTION V - COMPENSATI0Vshall be revised in
response to the Scope modifications set out herein . The charges associated with this AMENDMENT NO . 16
are as follows :
Bridge Design Revisions Lump Sum Total $ 6 , 300 . 00
Bridge Inspection Services Lump Sum Total $ 8 ,3Q0 . 00
Remove Bridge Inspection Services Lump Sum Total ( $ 5 , 800 . 00)
From Amendment No . 3
Electrical Code Plan Revisions Lump Sum Total $ 500 . 00
Incidental Coordination Services Lump Sum Total $ 2 , 900 . 00
Total 12 200 . 00
The charges associated with the AGREEMENT (which include changes from Amendments 1 through 15 and
these additional services included in proposed Amendment 16) , shall be increased from $ 687 , 315 . 00 to
$ 699 , 515 . 00 .
FiTublic WorksTNGINEERING DIVISION PROJECTS\98106-66th Ave Ph 2 4th St to 16th St\Admin\agenda itcros\9810 Amendment 16 06-05- 12 , doc I
The AGREEMENT is hereby amended as specifically set forth herein. All sections of the
AGREEMENT shall remain in full fierce and effect , and are incorporated herein . This Amendment No . 16 to
the AGREEMENT , regardless of where executed , shall be governed by and construed by the laws of the
State of Florida .
TIME OF COMPLETION
Carter Associates, Inc . shall have 30 calendar days from their receipt of a written Notice to Proceed to
complete the additional design services of this amendment. Inspection services to run concurrently with the
bridge construction for the 66th Avenue Roadway Improvements, Phase 2 (4th Street to 16" ' Street) project.
In WI"INESS whereof the parties have executed the Amendment this 5th Day of
June 2012
CARTER ASSOCIATES , INC . INDIAN RIVER COUNTY , FLORIDA
Patrick S . Walther, P . E . Gary C . Zeeler, Chairman
Principal/Secretary Board of County Commissioners `s`*
Witnessed by : Approved by BCC June 5 2012
-- 4. ybrouciC
y , J MP
\,2.t
Attest :
Jeffrey R . Barton, Clerk of Circuit Court
/V
��n
By . Lv�a
Alan S . Polackwich , Sr . , County Attorney Deputy Clerk
Approved as to Fonn and Legal Sufficiency n
r` C.
aoseph . Baird , County Adnunistrator
r �r
F :1Puhlic Works\RNGINEP,RING DIVISION PROM.'rN\9810B-66dt Ave Ph 2 4th St to 16th St\t%dntim\agenda items\9810 Amendment 16 06-05- 12 .doc 2
CARTER ASSOCIATES , INC . EmXH I B IT A
CONSULTING ENGINEERS AND LAND SURVEYORS
1708 21st STREET • `. ' ERO BEACH , FLORIDA 32960-3472 • 772-562 -4191 772 -562 - 7150 ( FAX )
JOHN H . BLUiM . P . E . , PRINCIPAL FRANK S . CUCCURESE. P .S . ; I .
DAVID E. LUETHJE , PS . M . , PRINCIPAL CLINTON J . RAHJES . P . E.
GEORGE A . SIMONS , P . E . , PRINCIPAL STEVE D . SNOBERGER , P. E .
PATRICK S . WALTHER . P. G. , PRINCIPAL BENJAMIN D . SPEED . P . E.
MARVIN E . CARTER . P . S . M . , Consultun [ to the Firm
DEAN F. LUETHJE . P . E. . 11 L M Consultant to the Firm f1
IRIE ,. _CT
' �t1fl
May 16 , 2012 � � q ' ` 'r . J
MAY 1 6 � 0Z
Mr . Christopher J . Kafer, Jr. , P . E . , County Engineer INDIAN RIVER COUNTY
Indian River County Engineering Division ENGINEERING DIVISION
1801 270' Street
Vero Beach, FL 32960
C/x
Re : 660i Avenue Roadway Improvements (4t" Street to State Road 60 )
Amendment No . 16 — Professional Engineering Services Agreement
IRC Project No . 9810 (CAI Job # 98 -23E)
Dear Chris :
We are pleased to present this proposed amendment for additional professional engineering services for the
Phase 2 portion of the 660i Avenue paving and drainage improvements project (40' Street to 16t1i Street) . All
provisions of the original Professional Engineering Services Agreement ( dated November 17 , 1998 ) ,
including Amendment Nos . 1 through 15 , shall remain in full force and effect, unless otherwise specifically
modified herein . The following further describes our proposed scope of services and terms of agreement
between Carter Associates , Inc . ( CAI) and Indian River County (County) :
Additional Services :
• Bridge design revisions to meet current Florida Department of Transportation (FDOT) load
requirements as requested by the County . The previous bridge design was performed in accordance
with the original Professional Engineering Services Agreement which based the bridge design on the
1991 edition of the FDO T Standard Specifications for Road and Bridge Construction and the 1994
edition of the FDOT Design Standards . In order for FDOT to accept the bridge when completed, the
current load requirements must be met . (This work will be performed by TRC Worldwide
Engineering, Inc . for a lump sum fee of $ 6 , 300 . 00 ; see Exhibit "A") .
• Bridge construction inspection services . (Remove bridge inspection services by Jenkins & Charland ,
Inc . under Amendment 3 for the amount of $ 5 , 800 . 00 and add bridge inspection services by TRC
Worldwide Engineering , Inc . for a lump sum amount of $ 8 , 300 . 00) .
• Electrical plan revisions to meet 2010 code . The previous work was based on 2007 code . (This work
will be performed by KAMM for a lump sum of $ 500 . 00 ) .
• Incidental fees for coordinating the above changes , plan modifications to incorporate the above
changes , re -permitting through Indian River Farms Water Control District, printing and distribution
of revised plans , etc . to be performed by CAI for a lump sum fee of $ 2 , 900 . 00 .
A 11r Serving Florida
N : \PSw�P\98 -23E�Agreements\Amendmentl6Revproposal . doc Page 1 of 2 —C SIIICC 1911
Compensation :
Amendment Now. 16 additional services will be invoiced on percent complete lump sum basis for a total fee of
$ 185000 . 00 .
Please call me should you have any questions or concerns regarding our proposed scope of work or terms of
agreement .
Sincerely,
Patrick S . Walther, RE
Principal/ Secretary/Project Manager
Attachment
5('rvh1 :; Flo=fti
N : \PSW\P\98 -23E\Agreements\Amendmentl6Revproposal . doc Page 2 of 2 CAV C)1nce 1911
.
F
TRC Worldwide Engineering, Inc.
12550 Professional Park Drive , Suite 7
Fort Myers , FL 33913
Phone : (239) 939- 1414 F : (239) 278-4289 WORLDWIDE ENGINEERING
www .trcww . com C . O .A . No . 27322
May 15 , 2012
Mr . Pat Walther , PE
Carter associates , Inc .
1708 21st street
Vero Beach , FL 32960 - 3476
RE : Redesign of The Beams For The 66th Avenue Bridge
Bridge Construction Inspection Services
Dear Mr. Walther:
As requested , TRC Worldwide Engineering is pleased to present this proposal for professional structural
engineering services , as described below:
Scope of Services : We will perform an LRFD beam design for the subject bridge , in accordance with
standard AASHTO and FDOT procedures . We will design the AASHTO II beams as simple spans and will
include the required additional dead load for the stay-in -place steel forms . We will provide revised sheets B8
and 1310 for your use .
We will also provide on site bridge construction inspection . We will observe reinforcing steel placement prior
to each concrete pour. It is anticipated this will require ten site visits . In addition we will attend the
substantial
completion inspection and the final inspection .
Services specifically excluded are : Soil investigation , geotechnical engineering , engineering services which
are normally provided by Specialty Engineers , applications for permits , actual construction/repairs ,
mechanical/electrical engineering , site engineering , and architectural design /detailing responsibilities .
Fee Structure : The fee for the design services will be a Lump Sum of $ 6 , 300 . 00 .
The fee for Bridge Construction Inspection Services will be a Lump Sum of $ 81300 . 00 .
Any additional services requested will be charged at our hourly rates .
Please note that the attached General Conditions is applicable and form part of our agreement .
Thank you for considering TRC Worldwide Engineering , Inc . for this project. If you require any additional
information , please feel free to contact us at your convenience . .
Sincerely ,
TRC Worldwide Engineering , Inc . Inc .
941(iL
WinP rone , PE
Prin opal — Division Manager ( Florida Transportation )
Enclosure : Rate Schedule , General Conditions
The terms and conditions of this proposal including the terms on the attached General Conditions are
accepted :
BY : DATE .-
Signature
ATE :Signature
Printed Name Title
S E R V I C E I N N O V A T I O N Q U A L I
T Y
Y
TRC Worldwide Engineering, Inc.
Fort M Professional Park Drive , Suite 7
Fort Myers , FL 33913
Phone : (239) 939- 1414 F: (239) 278-4289 WORLDWIDE ENGINEERING
www. trcww. com C . O .A . No . 27322
May 23 , 2012
Mr, Pat Walther, PE
Carter associates , Inc .
170821 St street
Vero Beach , FL 32960-3476
RE : Bridge Construction Inspection Services For The 66th Avenue Bridge
Dear Mr. Walther:
As requested , here are the specific details of our inspection services proposal :
A — Observation of Reinforcing Steel Placement
1 — Abutment No . One - Two site visits
2 — Abutment No . Two - Two site visits
3 — Pier - One site visit
4 — Superstructure - Three site visits
5 — Approach Slab No . One — One site visit
6 — Approach Slab No . Two — One site visit
A standard Field Report will be completed for each visit.
B — Substantial Completion Observations
A letter report will be submitted including a " Punch List' of items that require correction .
C - Final Completion Observations
A letter report will be submitted certifying that all items on the " Punch " List have been properly
addressed .
Sincerely ,
TRC Worldwide Engineering , Inc . Inc .
Win Petrone , PE
Principal — Division Manager ( Florida Transportation )