Loading...
HomeMy WebLinkAbout2012-105 oc. / Os/) a 8 • �1 . AMENDMENT NO. 16 TO THE PROFESSIONAL a C ENGINEERING SERVICES AGREEMENT 66TH AVENUE PAVING AND DRAINAGE IMPROVEMENTS BETWEEN Orr" STREET AND SIZ60 IRC PROJECT NO , 9810B THIS is an amendJnent to the existing AGREEMENT dated NOVEMBER 17 , 1998 , including AMENDMENTS NUMBER 1 through 15 , between CARTER ASSOCIA'T'ES , INC . (ENGINEER) and INDIAN RIVER COUNTY (COUNTY) . The proposed scope of work includes bridge design revisions , bridge inspection services, electrical plan revisions to meet 2010 Building Code and coordination . All provisions of the original Professional Engineering Services Agreement including Amendment Nos . 1 through 15 shall remain in full force and effect, unless otherwise specifically modified . This amendment addresses changes in " SCOPE OF SERVICES ", and "TIME OF COMPLETION" of the AGREEMENT . SCOPE OF SERVICES See attached letter from Carter Associates , Inc . dated May 16 , 2012 , which specifies changes in the " SCOPE, OF SERVICES " and " COMPENSATION" COMPENSA'T'ION This section of the AGREEMENT entitled SECTION V - COMPENSATI0Vshall be revised in response to the Scope modifications set out herein . The charges associated with this AMENDMENT NO . 16 are as follows : Bridge Design Revisions Lump Sum Total $ 6 , 300 . 00 Bridge Inspection Services Lump Sum Total $ 8 ,3Q0 . 00 Remove Bridge Inspection Services Lump Sum Total ( $ 5 , 800 . 00) From Amendment No . 3 Electrical Code Plan Revisions Lump Sum Total $ 500 . 00 Incidental Coordination Services Lump Sum Total $ 2 , 900 . 00 Total 12 200 . 00 The charges associated with the AGREEMENT (which include changes from Amendments 1 through 15 and these additional services included in proposed Amendment 16) , shall be increased from $ 687 , 315 . 00 to $ 699 , 515 . 00 . FiTublic WorksTNGINEERING DIVISION PROJECTS\98106-66th Ave Ph 2 4th St to 16th St\Admin\agenda itcros\9810 Amendment 16 06-05- 12 , doc I The AGREEMENT is hereby amended as specifically set forth herein. All sections of the AGREEMENT shall remain in full fierce and effect , and are incorporated herein . This Amendment No . 16 to the AGREEMENT , regardless of where executed , shall be governed by and construed by the laws of the State of Florida . TIME OF COMPLETION Carter Associates, Inc . shall have 30 calendar days from their receipt of a written Notice to Proceed to complete the additional design services of this amendment. Inspection services to run concurrently with the bridge construction for the 66th Avenue Roadway Improvements, Phase 2 (4th Street to 16" ' Street) project. In WI"INESS whereof the parties have executed the Amendment this 5th Day of June 2012 CARTER ASSOCIATES , INC . INDIAN RIVER COUNTY , FLORIDA Patrick S . Walther, P . E . Gary C . Zeeler, Chairman Principal/Secretary Board of County Commissioners `s`* Witnessed by : Approved by BCC June 5 2012 -- 4. ybrouciC y , J MP \,2.t Attest : Jeffrey R . Barton, Clerk of Circuit Court /V ��n By . Lv�a Alan S . Polackwich , Sr . , County Attorney Deputy Clerk Approved as to Fonn and Legal Sufficiency n r` C. aoseph . Baird , County Adnunistrator r �r F :1Puhlic Works\RNGINEP,RING DIVISION PROM.'rN\9810B-66dt Ave Ph 2 4th St to 16th St\t%dntim\agenda items\9810 Amendment 16 06-05- 12 .doc 2 CARTER ASSOCIATES , INC . EmXH I B IT A CONSULTING ENGINEERS AND LAND SURVEYORS 1708 21st STREET • `. ' ERO BEACH , FLORIDA 32960-3472 • 772-562 -4191 772 -562 - 7150 ( FAX ) JOHN H . BLUiM . P . E . , PRINCIPAL FRANK S . CUCCURESE. P .S . ; I . DAVID E. LUETHJE , PS . M . , PRINCIPAL CLINTON J . RAHJES . P . E. GEORGE A . SIMONS , P . E . , PRINCIPAL STEVE D . SNOBERGER , P. E . PATRICK S . WALTHER . P. G. , PRINCIPAL BENJAMIN D . SPEED . P . E. MARVIN E . CARTER . P . S . M . , Consultun [ to the Firm DEAN F. LUETHJE . P . E. . 11 L M Consultant to the Firm f1 IRIE ,. _CT ' �t1fl May 16 , 2012 � � q ' ` 'r . J MAY 1 6 � 0Z Mr . Christopher J . Kafer, Jr. , P . E . , County Engineer INDIAN RIVER COUNTY Indian River County Engineering Division ENGINEERING DIVISION 1801 270' Street Vero Beach, FL 32960 C/x Re : 660i Avenue Roadway Improvements (4t" Street to State Road 60 ) Amendment No . 16 — Professional Engineering Services Agreement IRC Project No . 9810 (CAI Job # 98 -23E) Dear Chris : We are pleased to present this proposed amendment for additional professional engineering services for the Phase 2 portion of the 660i Avenue paving and drainage improvements project (40' Street to 16t1i Street) . All provisions of the original Professional Engineering Services Agreement ( dated November 17 , 1998 ) , including Amendment Nos . 1 through 15 , shall remain in full force and effect, unless otherwise specifically modified herein . The following further describes our proposed scope of services and terms of agreement between Carter Associates , Inc . ( CAI) and Indian River County (County) : Additional Services : • Bridge design revisions to meet current Florida Department of Transportation (FDOT) load requirements as requested by the County . The previous bridge design was performed in accordance with the original Professional Engineering Services Agreement which based the bridge design on the 1991 edition of the FDO T Standard Specifications for Road and Bridge Construction and the 1994 edition of the FDOT Design Standards . In order for FDOT to accept the bridge when completed, the current load requirements must be met . (This work will be performed by TRC Worldwide Engineering, Inc . for a lump sum fee of $ 6 , 300 . 00 ; see Exhibit "A") . • Bridge construction inspection services . (Remove bridge inspection services by Jenkins & Charland , Inc . under Amendment 3 for the amount of $ 5 , 800 . 00 and add bridge inspection services by TRC Worldwide Engineering , Inc . for a lump sum amount of $ 8 , 300 . 00) . • Electrical plan revisions to meet 2010 code . The previous work was based on 2007 code . (This work will be performed by KAMM for a lump sum of $ 500 . 00 ) . • Incidental fees for coordinating the above changes , plan modifications to incorporate the above changes , re -permitting through Indian River Farms Water Control District, printing and distribution of revised plans , etc . to be performed by CAI for a lump sum fee of $ 2 , 900 . 00 . A 11r Serving Florida N : \PSw�P\98 -23E�Agreements\Amendmentl6Revproposal . doc Page 1 of 2 —C SIIICC 1911 Compensation : Amendment Now. 16 additional services will be invoiced on percent complete lump sum basis for a total fee of $ 185000 . 00 . Please call me should you have any questions or concerns regarding our proposed scope of work or terms of agreement . Sincerely, Patrick S . Walther, RE Principal/ Secretary/Project Manager Attachment 5('rvh1 :; Flo=fti N : \PSW\P\98 -23E\Agreements\Amendmentl6Revproposal . doc Page 2 of 2 CAV C)1nce 1911 . F TRC Worldwide Engineering, Inc. 12550 Professional Park Drive , Suite 7 Fort Myers , FL 33913 Phone : (239) 939- 1414 F : (239) 278-4289 WORLDWIDE ENGINEERING www .trcww . com C . O .A . No . 27322 May 15 , 2012 Mr . Pat Walther , PE Carter associates , Inc . 1708 21st street Vero Beach , FL 32960 - 3476 RE : Redesign of The Beams For The 66th Avenue Bridge Bridge Construction Inspection Services Dear Mr. Walther: As requested , TRC Worldwide Engineering is pleased to present this proposal for professional structural engineering services , as described below: Scope of Services : We will perform an LRFD beam design for the subject bridge , in accordance with standard AASHTO and FDOT procedures . We will design the AASHTO II beams as simple spans and will include the required additional dead load for the stay-in -place steel forms . We will provide revised sheets B8 and 1310 for your use . We will also provide on site bridge construction inspection . We will observe reinforcing steel placement prior to each concrete pour. It is anticipated this will require ten site visits . In addition we will attend the substantial completion inspection and the final inspection . Services specifically excluded are : Soil investigation , geotechnical engineering , engineering services which are normally provided by Specialty Engineers , applications for permits , actual construction/repairs , mechanical/electrical engineering , site engineering , and architectural design /detailing responsibilities . Fee Structure : The fee for the design services will be a Lump Sum of $ 6 , 300 . 00 . The fee for Bridge Construction Inspection Services will be a Lump Sum of $ 81300 . 00 . Any additional services requested will be charged at our hourly rates . Please note that the attached General Conditions is applicable and form part of our agreement . Thank you for considering TRC Worldwide Engineering , Inc . for this project. If you require any additional information , please feel free to contact us at your convenience . . Sincerely , TRC Worldwide Engineering , Inc . Inc . 941(iL WinP rone , PE Prin opal — Division Manager ( Florida Transportation ) Enclosure : Rate Schedule , General Conditions The terms and conditions of this proposal including the terms on the attached General Conditions are accepted : BY : DATE .- Signature ATE :Signature Printed Name Title S E R V I C E I N N O V A T I O N Q U A L I T Y Y TRC Worldwide Engineering, Inc. Fort M Professional Park Drive , Suite 7 Fort Myers , FL 33913 Phone : (239) 939- 1414 F: (239) 278-4289 WORLDWIDE ENGINEERING www. trcww. com C . O .A . No . 27322 May 23 , 2012 Mr, Pat Walther, PE Carter associates , Inc . 170821 St street Vero Beach , FL 32960-3476 RE : Bridge Construction Inspection Services For The 66th Avenue Bridge Dear Mr. Walther: As requested , here are the specific details of our inspection services proposal : A — Observation of Reinforcing Steel Placement 1 — Abutment No . One - Two site visits 2 — Abutment No . Two - Two site visits 3 — Pier - One site visit 4 — Superstructure - Three site visits 5 — Approach Slab No . One — One site visit 6 — Approach Slab No . Two — One site visit A standard Field Report will be completed for each visit. B — Substantial Completion Observations A letter report will be submitted including a " Punch List' of items that require correction . C - Final Completion Observations A letter report will be submitted certifying that all items on the " Punch " List have been properly addressed . Sincerely , TRC Worldwide Engineering , Inc . Inc . Win Petrone , PE Principal — Division Manager ( Florida Transportation ) S E R V I C E I N N O V A T I O N Q U A L I T Y