Loading...
HomeMy WebLinkAbout2012-056 03 / zA0 / ► a , s . g . a . MEMORANDUM OF UNDERSTANDING ao ► a BETWEEN THE CITY OF VERO BEACH , FLORIDA AND INDIAN RIVER COUNTY, FLORIDA, This Memorandum of Understanding (hereinafter "MOU ") is hereby made and entered into by and between the City of Vero Beach, Florida, a Florida municipal corporation, whose mailing address is P . O . Box 1389 , Vero Beach, FL 329614389 (hereinafter "City") and the Board of County Commissioners of Indian River County , Florida, a political subdivision of the State of Florida, whose hailing address is 1801 27t11 Street, Vero Beach, FL 32960 (hereinafter "County") , WITNESSETH WHEREAS , between 1960 and 1977 , the County operated a facility commonly known as the Gifford Road Landfill (herein after " Landfill ") located on the south side of 41st Street, west of 43rd Avenue, encompassing approximately 115 acres , of which approximately 60 acres lies within the City on land specifically held as Airport land for the Vero Beach Municipal Airport (hereinafter "Airport") ; and WHEREAS , on or about September 18 , 1974 , during a public hearing, this Landfill was found to be "not in compliance " with State regulations and on December 11 , 1974, the County filed a permit application with the Florida Department of Pollution Control to operate the Landfill as a Solid Waste Resource Recovery and Management Facility ; and WHEREAS , on February 10 , 1976 a Temporary Operating Permit was issued pursuant to the application with an expiration date of July 1 , 1977, allowing the continued operation until the Landfill could be either improved to meet minimum standards or closed down; and WHEREAS , the Florida Department of Environmental Regulation, by letter dated February 10 , 1976 , recognized the proximity of the Landfill to the Airport being in conflict with Chapter 17 - 7 , Florida Administrative Code , and in keeping with FAA comments submitted by letter dated March 3 , 1975 , the Permit was issued as a Temporary Operating Permit to facilitate the closure of this Landfill , and further attached several conditions which began the ongoing and expanding requirements for testing and monitoring groundwater flows found to contain certain contaminants ; and WHEREAS , during 1978 said Landfill was closed , capped with soil , and various monitoring wells installed ; and Page 1 of 7 N :1CityAmy1ST11Client Docs\City Manager\Agreements\MOU County City well monitoring 3 8 . 2012 _ doc WHEREAS, recently the Florida Department of Environmental Protection (FDEP) has directed the County, through its environmental engineering consultants , Geosyntec , to further expand the monitoring well program by the installation of three new monitoring wells as depicted on the aerial attached hereto as Attachment "A", with the intent to define direction and extent of movement of the plume of contamination ; and WHEREAS , the southern 60 acres of the Landfill lying within the Airport boundary, together with all of the locations of existing monitoring wells identified on Attachment "A" and "B " are in undeveloped woodlands northwest of the airfield, and there are currently no plans to initiate any development of the affected areas ; and WHEREAS , the County, City, and FAA have had knowledge of the existence of the Landfill since before 1975 ; and WHEREAS , the installation of additional monitoring wells west of 43rd Avenue will have very little effect upon the continued operation or development of the Airport for the foreseeable future ; and WHEREAS , that allowing the County and/or their authorized environmental consultants access to the Airport for continued monitoring required by the State of Florida is in the best interest of the public , NOW THEREFORE , in consideration of the mutual covenants contained herein and other good and valuable consideration , the parties agree as follows : Section 1 . Recitations . The above recitals are true and correct and are incorporated by reference herein . Section 2 . Purpose and Scone. The purpose of this MOU is to allow the County and/or its authorized environmental consultants , pursuant to FDEP requirements , to continue to test , monitor, and report findings directly related to longstanding and continuing groundwater contamination emanating from the closed County Landfill lying on and adjacent to the Airport . The testing , monitoring, and reporting of findings per this MOU shall be conducted on that certain real property as more particularly described in Attachment "A " and Attachment "B " attached hereto and incorporated herein (cumulatively " Well Monitoring Premises") , Section 3 . City Responsibilities. The City agrees to : 1 . Allow County environmental staff and environmental consultants access to periodically test existing monitoring wells identified on Attachment "A" and Attachment "B , " as such attachments may be amended from time to time pursuant to Section 5 , below . Page 2 of 7 N :ACityAtny\STI\Client Docs\City ManagerAAgreements\MOU County City well monitoring 3 8 .2012 . . doc 2 . Allow County ' s environmental consultant and its authorized sub-contractors access to bring in equipment necessary to enable installation, maintenance, on- going monitoring, and/or plugging and abandonment of existing monitoring wells as directed by the Florida Department of Environmental Protection . 3 . Be the primary contact between County and the FAA regarding this ongoing testing and monitoring program . 4 . Cooperate with County in connection with any permits , applications , and other requests , as necessary or required in connection with the County ' s testing and monitoring program on the Well Monitoring Premises . Section 4. County Responsibilities . The County agrees to : L Install , secure , and maintain all groundwater monitoring wells and related well monitoring equipment, and the maintenance of the grounds surrounding the wells and well monitoring equipment, in compliance with all pertinent laws , rules , ordinances and regulations , and with the requirements of the City of Vero Beach Code, the Florida Department of Environmental Protection, the Monitoring Well Design and Construction Guidance Manual , and any other prudent engineering practices in the best interest of the public , the City , and the Airport. Violation of any law , rule , ordinance or regulation by County may result in immediate termination of this MOU . 2 . Provide to the City and Airport two (2 ) copies of all monitoring data and reports assembled and published by the County and/or their environmental consultants to FDEP pursuant to the ongoing plan . 3 . Provide horizontal GPS coordinates and details of types of well casings, depth of wells , and other pertinent site specific details of all monitoring well installations on the Well Monitoring Premises . 4 . Remove , relocate , or adjust any affected monitoring well when or if the location is needed for Airport use or Airport commercial/industrial development upon 180 - day written notice from the City . 5 . Provide the City/Airport Director written notice of any new requests to install additional monitoring wells or other related monitoring equipment. 6 . Ensure that this agreement and any activities in furtherance of the contamination monitoring or Landfill cleanup activities be subject to approval of the City with concurrence of the FAA . Page 3 of 7 NACityAtny\S 'rl\Client Docs\City Manager\Agreements\MOU County City well monitoring 3 8 . 2012 . .doe T Preserve and ensure the City/Airport Director' s right to enter and inspect the Well Monitoring Premises at all reasonable hours to insure the Well Monitoring Premises are being property maintained and kept in good condition . Section 5 . Terms of MOU. This MOU may only be modified in writing by mutual agreement of both parties and concurrence from FAA . Subject to all of the terms of this MOU , upon agreement of the County Administrator and City Manager, and concurrence from FAA, Attachment "B" may be revised to add or delete well installations without further action of the Board of County Commissioners or Vero Beach City Council . Section 6. Hold Harmless. 'To the extent allowed by law, the County agrees to hold harmless and indemnify City from any liability which may arise from the County ' s occupancy or use of the Well Monitoring Premises and access thereto . Section 7. Insurance. 1 . Property Insurance . During the term of this MOU , at County ' s sole cost and expense, County shall place the Well Monitoring Premises, all wells and related well monitoring equipment on its lists of lands and property covered under its policies of self insurance and excess insurance and shall furnish City a certificate of said coverage. 2 . Commercial General Liability Insurance During the term of this MOU , County ' s Environmental Consultant shall procure, maintain and pay for commercial general liability insurance providing all risks coverage which protects County, County ' s elected officials , employees , officers , and agents , and City, City ' s elected officials , employees , officers , and agents, from any and all claims and liabilities for bodily injury and property damage arising from operations , premises , fire, and other related issues . Such insurance coverage shall have a combined single limit of not less than $ 1 , 000 , 000 . 00 . A copy of the additional insured endorsement must be attached and contain language no less restrictive than ISO Form CG 20 10 07 04 or ISO Form CG20 33 07 04 . County ' s Environmental Consultant ' s insurance shall be primary and any other insurance that may be maintained by the City shall be in excess of and shall not contribute with County ' s insurance . 3 . Damage by Fire or Other Causes . In the event that any improvements on the Well Monitoring Premises are destroyed or so damaged by fire or other casualty as to be unfit for occupancy or use , County shall have the option to rebuild or repair the damaged improvements , including but not limited to all wells and related well monitoring equipment , or County may choose to terminate this MOU and the MOU shall thereby be ended . City shall not be liable to rebuild , replace or repair said premises for the benefit of County . Page 4 of 7 N :\CityAtny\STI\Client Docs\City Manager\Agreements\MOU County City well monitoring 3 8 .2012 . . doe Section 8 . Attorney ' s Fees and Costs . In the event there arises any dispute or litigation over the terns and conditions of this MOU or County ' s occupancy or use of the Well Monitoring Premises, each party shall be responsible for its own attorney ' s fees , costs and suit money expended to resolved that dispute . Section 9. Termination of MOU This MOU may only be terminated by either party by providing 180 - days written notice to the other party at the appropriate address below : If to the City : City of Vero Beach 1053 20th Place Post Office Box 1389 Vero Beach, Florida 32961 . 1389 Attention : City Manager cc : Airport Director If to the County : Indian River County Solid Waste Disposal District 132574 1h Avenue Southwest Vero Beach, Florida 32968 Attention : County Administrator cc : Managing Director, Solid Waste Disposal District Section 10. Effective Date. This MOU shall be effective upon the date last entered below. Except as terminated pursuant to Section 6 , above, this MOU shall have no express termination date, the intention of the parties being that the purpose of the MOU shall be achieved over an extended period of time . ( The remainder of this page is left blank intentionally.) Page 5 of 7 N :ACityAtnyM' l\Client Docs\City Manager\Agreemenls\M0LJ County City well monitoring 3 8 . 20 L2 . .doe INDIAN RIVER COUNTY, FLORIDA ATTEST , BOARD OF COUNTY COMMISSIONERS J . K . CLERK CIRCUIT CCUR i , Gar Wheeler Deputy Clerk =oJ • o*F Ch an of ., * ; Date: March 20 , 2012 (SEAL) °q2 • c��s 9R COUt : #0� NYNNN •M 11 � Approved as to form and legal sufficiency : Approved . Alan S . Polackwich, Sr. seph A . aird County Attorney unty Administrator Approved as to technical requirements : Himanshu H . Mehta, Managing Director of the Solid Waste Disposal District Page 6 of 7 NACityAtny\ST1\Client Docs\City Manager\Agreements\MOU County City well monitoring 3 8 .2012. .doc CITY OF VERO BEACH, FLORIDA ATTEST , yER6�B H CITY COUNCIL By: Gam'✓ -" Tammy K. oc Tar E . Turner City Clerk Mayor Date : _ 3 ' a k 161 [ SEAL] Approved as to forin and legal sufficiency : Approved as conforming to municipal PitveZsZR. Wayhe R. omnonnor Acting City Attorney ity anager Approved as to technical requirements : Ericson W. Menger Airport Director Page 7 of 7 NACityAtny\STRClient Docs\City Manager\AgreementsW0LJ County City well monitoring 3 8 . 2012. . . doc a Ilk e Non u old oN do, do LL ISmy No. doodo No 'J - do U N tNod ;oo n c: s .' ti No. oolm, do Noof Idol I.) d" ody r � r Ili 0 'p �S y ?'Too '� .. T No p r p _ aC, ( CL 3 a Noon too Sa q. Co do AN NI e O 2 <_ cu Noddy A Illy I Nod > � r u noNO w +—� oloy U 4 `: sno ddo. „ In .. a : .- Jr. - V Q bno n . , a r � .� r . 11 only I NdV Von T p�, aI; old IVY Q 41 1 F a4 3qf AF1C M1 � y&mw{IVVo# 8 �.+FRf i }tIrldo 8 d v , S / ragEr �brVIIII, 1 yondPi gq > , d 1w Ii a t f Ig `,d Afa.A14EdYd�Cl � a�e# +d�, } i, aq ,� IV do fi ¢ ryo,/ _ YK *fit ! 'G X5) ont 'd Illy Idyl, I VV I do ryry� �; n5Y. d 44 IVd1z NV I F on do V IV "Nou: 11 1 IV r x wI VA fV � . 11 Vy d j on I do do I IV Vo I Von I /on Nlk PIN, a do I ol Ion 11 A In r � . � on' 'e In 4 Id I xdo � . 40 ABY Al Ix to dd� (p{[ k Wind Well Construetion Details and Coordinates for the Southen Portion ofthe Monitoring Well Netc>, ork Scxlth Giffi,id Road T .andtiII - Indian RivcrCmnri. . Florida Installatirat Screened Screen Latitude Longitude Latitude Longitude Casing Ground Well ID � Northing Eastin Date Interval Length (duimal (decimal (degrees, (degrees, ( NAD g :2447 eraHon Elevation (ft, 13I,S) (ft) degmcav) degrees) minutes, millute's, (NAD 1983) 1983 ) , IN (ft, nC.VD seconds) seconds) 1988) 1988) (iR MW.3A A r 95 2 to 12 10 27.(1(12 -80 . 4.34 27`' 39' 44 . 85 " 80" 2(i ' 1 S5" ` 12104115 839453 . 3 . CTR-MW03B A -95 30 to 35 5 27.662 - 80 . 434 27" 39' 44 , 8Z " 80 26' 1 .67" 12104U8.0 83)442. 5 24.43 21 9 22 CO) GR-MtNO3C A -95 (i2 to 72 10 27 .6(i2 80 .431 27" 39' 14 . 79 " 80 26' 1 .80" 1210105 .2 839430.9 24 . 3 t}I2 MWU3ll Ckt -02 15 l0 55 IU 27 .(1(12 -80 .431 27" 3 )' 4a .G0 ' 80 =' 2(i' 1 _(i9" 1 . 22 .0 ` 1210386 .3 839441 . 1 22.96 CR-MW04A Apr-95 5 to 15 10 27 .(1(11 -80 .43(1 2T' 39' 38 . 0(1 " 80' 2(i 10 .31 " 2 0 .2 CUR-MW0413 1209723 . 5 838669.() 26. 68 24 .2 A -95 3U 1035 5 27.661 80 .436 27" 39' 38 , 19 " 8. 2Ci 10 .33 " 1209735 .0 838666.6 27.02 2-15 GR-M[k04C A r- 95 59 to 64 5 27. (1(11 -80 43(1 P27' 3 )' 38 . 30 " 80 2Ci 103(1 " ` 1209746.4 838(163 . 7 26 .69 (3R MV�'U4ll Oct -02 45 l0 55 lU 27.(1(11 -80, 43(1 39' 37 . 92 " SW 2(i 10 .3.3 " 1209707 . 7 838666. 7E24 , 57 35 24 .2 GR-MW0<T3 Se -X, 20 t0 3U 10 27.661 -80 . 431 3)' 41 . 12 " 8." 25, 52 .04" 1210.4.. 5 840313 .484 22 .4 Cat-M14'U6C Sc , 46 (i(i to 71 5 27. (1(11 - 80 . 431 27° 3 )' 41 .01 " 901:125. 52.00 " 12100302 840313 . 7 21 . 5 GR-MW06T) Sr -9C, SU to 6. 10 / • . j1 2L5 27.661 80 . 431 27" 39 40 . 88 " 80" 25 , 5L99 " 1210014. 7 840314494 CUR-MW0713 Se >-95 2U to 3U lU 27.664 80 .431 27 39' 4) . 76 " 8U" 25, 52 .55 " 1210910.6 840260. 1 214 GR-MW07C Sc -)5 (i8 to 73 5 27 .(1 (14 - 80 . 431 2T 39' 49 . 74 " RO° 25, 52 .13 " 1210908. 7 810271 .3 24.49 - (�R MWU7ll Clct-02 4J l0 55 1. 27_(1(14 80 . 431 27 ' 3 )' 49 .(19 " RO° 25. 52 .45 - c 22 .5 ` 12109()3 . 5 84U269. 1 25 . 10 UR-MW 1213 Aures 97 24. 5 to 29 . 5 5 27.664 -80 .430 27" 39' 49 . 86 " 8U" 25 , 48 .38 " 1210933 . 1 840650.3 2(1. 52 22 .3 GR-M[>; 12C Oct- 02 (i0 to 70 10 27 .664 -80 . 430 27-i& 49. $(i " R0`' 25, 48 . 38" 1210 )22. (1 810(135 . 5 t 24 . 5 OR-mw 12ll Oct- 02 40 to 50 10 27 .66=3 - 80 .430 27 39' 49 . 86 " 80" 25 , 48 ,37" 1210922. 8 840635 . 6 2 3 89 22.4 C; R-MW I ST3 Opt-02 25 to 35 lU 27 .(1(13 -80 .430 27= 39' 45 .27 ' R0`' 25. 48 .61 " 1210459 .2 94061 ( . 7 1 22.4 Gilt-M1�' 15C Clct- U2 55 to 65 10 27.663 - 80 .430 27 39' 45 .27 " 80" 254 48 .61 " 1210459 .4 840616 . 5 21 .85 21 . 8 GR-MW 15T) Oct-02 40 to 50 lU 27. (1(13 80 .4.30 27° 39' 45 .21 " 80`-' 25- 48(13 " 1210452 . 9 8400149 21 . 7 ) 21 . 8 GR- MWl (iA <)�t-02 5 to 15 10 27.664 80 .434 27 39' SU .4> " 9(Y' 26' 1 . )3 " 21 , 9 r ` 121097(1 . 5 83941 Fi . 3 24.48 CUR-MW IC,l3 Ckt-02 25035 lU 27.(1(1 1 80 .4.3a 2T' 39' 50 .4(1 " 80':' 2(i' 1 . 99" , • 21 -6 GR-MW I (iC Opt-02 (i0 to 70 10 27.664 -80 .434 27" 39' 50,46 " 80" 26' 1, 99' 12109777 8394113 214 2432 21 .8 GR-MW 16ll LILt-U2 40 l0 5. 10 27.(1(14 80 .434 27`' 39' 50 .45 " 80'=' 2(i' 1 . 92 ' , , 21 8 CR-MW17A Oct-02 5 to 15 121 .976 .4 831177 6 24 .32 21 .6 10 27.660 -80 .434 27" 39' 37 . 75' 80 26' 2 . 76 ' 1209(194. 0 839348 .0 25 .01 9 25 ,04 CTR-MW 1713 Cka -U2 30 to 40 10 27. (1(10 -80 .434 27`' 39' 37 . 75 " 80`' 2(i' 2_(14 " r 22 . 2 GR-MW 17C Oct-02 6U t0 7U 10 27.660 -80 .431 27" 39' 37 .75 " 80" 26' 2.64 ' 1209693 , 5 839358 .9 25 . 05 22 .2 GR-MW17D Oct -02 45 l0 55 10 27.(1(10 -80 .4.34 27`' .39' .37 . 75 " 80`' Approximate NE Comer o2(i' 2.7(1' 120)693 .7 83'9348 . 1 24. 98 22 .2 f FormerL,tndfill 7.668 -80 .433 27" 40' 42 1 80 25' 58 .34 " 1212368 . 1 839733 .2 Approximate NW Corner - -- of Former L:mdriill _ - 27.(1(18 -80 .4.39 271:p 40' 4.40" R0° 26' 18 . 8.3 " 1212378 . 9 837990.4 Approvinate SF Corner of - -' ForrnerL.andfill 11 27_(1(11 -80 . 434 27 .39" 37 . 82 " 80'=' 26' 2. 23" 1209701 . 5 839395 . 2 Approximate SW Comer - -- ofFornierLandtill 27.661 -80 .440 27 39' 38 . 08 " 80 26 24 .67 " 120971811 837377 . 8 1 . It BLS indicates teat, below land suriai�e. 2. N( M ) indicates National Qcixictic Vertical Datum. x NAD indicates Kurth Atnerir.an Lkatunt. 4. - indicates that mibnnatiun not available or nut apPliaiblu. IRU7(,( ; i1fOid_WellColisttucbon 1 or 1 � eosvntec t'ousuli<wrs