Project :
Vertical Network Densification
Indian River County Project 1050
WORK ORDER NO . 1 ( Engineering/Surveying )
FOR
PROFESSIONAL SERVICES AGREEMENT
ANNUAL SURVEYING and MAPPING/GIS SERVICES
WITH
Creech Engineers , Inc.
In accordance with Contract No . 1032 2010-2011
This Work Order No . 1 is in accordance with the existing AGREEMENT dated October 19 , 2010
between Creech Engineers , Inc. , ( SURVEYOR) and Indian River County ( COUNTY) . This Work
Order No . 1 amends the agreement as follows :
SECTION I — PROJECT LIMITS
This Work Order No . 1 is for the SURVEYOR to perform all related field and office Surveying
and Mapping services in connection with the Vertical Control Network Densification , consisting
of the establishment of twenty-six Benchmarks meeting 2nd Order, Class B Stability .
SECTION II - SCOPE OF SERVICES
As agreed upon between SURVEYOR and COUNTY, the SURVEYOR shall provide
Professional Land Surveying services to complete all tasks as outlined in this Work Order No . 1 ;
specifically detailed in the attached proposal Exhibit A .
SECTION III — TIME FOR COMPLETION & DELIVERABLESMORK PRODUCT
1 . Project shall be completed as follows :
a . The SURVEYOR will complete all field monumentation and measurements within
130 calendar days from receipt of the Notice to Proceed from the COUNTY .
b . The SURVEYOR will submit a preliminary submittal to the National Geodetic
Survey ( NGS) , within 160 calendar days from receipt of the Notice to Proceed from
the COUNTY
c . Final Deliverables to the COUNTY are anticipated to be completed within two
months after the submittal of the preliminary data as described in Item b above .
• The scheduled review and acceptance by the NGS depends heavily on their
work load at the time of submittal and may vary greatly.
F :\PublicWorks\ENGINEERING DIVISION PROJECTS\1050 2010-2011 IRC Vertical Control Network Densification\Survey\Work
Orders\08-03-2011 BCC Consent Agenda\08-03-2011 IRC WO No. 1 - Job No. 1050 .doc
IRC Work Order No . 1
Creech Engineers , Inc
Vertical Control Network Densification
August 3 , 2011
Page 2 of 3
d . The COUNTY will perform a complete review of the Final Deliverables for
accordance of contractual items prior to final acceptance by the COUNTY .
2 . Deliverables -The SURVEYOR shall provide the COUNTY :
a . All copies of correspondence between the SURVEYOR and the NGS , including
copies of all data submittals from project planning to final acceptance .
b . FINAL Deliverables , five ( 5 ) paper " hardcopy" signed and sealed Surveyor Reports ,
photographs of each benchmark recovered or set , copies of NGS recovery sheets for
each Benchmark recovered , NGS data sheets for each newly established
Benchmark any project related digital files , on AutoCad shall be prepared and
delivered in release 2004 through 2009 , PDF formats and an ASCII file for all survey
points , all electronic files to be on CD .
c . Surveyor Report shall include a cover sheet with location sketch , survey
certifications , related title and project number, survey notes , legend and
abbreviations and project data sheets .
d . Work Product and digital versions are to prepared and submitted so that the
COUNTY or other consultants can readily use it for the design and analysis of the
area , as defined . It shall contain all information necessary for third - party surveyor to
independently recreate and/or utilize the survey work . It is acknowledged all final
products become property of Indian River COUNTY and will be available for use by
the public at large .
e . The SURVEYOR' S work product shall meet or exceed the minimum standards as
defined by Sections II , III and IV or the COUNTY will not approve the SURVEYOR' S
request for payment .
SECTION IV — COMPENSATION
The COUNTY agrees to pay, and the SURVEYOR agrees to accept , for the above described
services rendered as identified in Sections I , II , and III of this Work Order No . 1 , for a
total lump
sum fee of $ 118 , 451 . 00 .
All and/or any additional services not described hereon shall be pre -approved by the
COUNTY . Approved additional services shall be invoiced at the rates disclosed in the
approved fee schedule with the SURVEYOR for the contract year(s ) of October 19 , 2010
through October 19 , 2011 .
All invoicing shall include Project Number ( 1050 ) , Work Order No . 1 (WO 1 ) , Contract Number
( 1032 ) , itemized man - hours and materials expended to complete the Scope of Services .
Payments shall be in accordance with the original Professional Surveying and Mapping/GIS
Services Agreement , Contract No . 1032 with the COUNTY and as stated in Section II , III and IV
hereon .
F:\Public Works\ENGINEERING DIVISION PROJECTS\1050 2010-2011 IRC Vertical Control Network Densification\Survey\Work Orders\08-03-
2011 BCC Consent Agenda\08-03-2011 IRC WO No , 1 - Job No. 1050.doc
IRC Work Order No. 1
Creech Engineers , Inc
Vertical Control Network Densification
August 3 , 2011
Page 3 of 3
The AGREEMENT is hereby amended as specifically set forth herein . All remaining sections of
the AGREEMENT shall remain in full force and effect, and are incorporated herein .
IN WITNESS WHEREOF the parties hereto have executed these presents this 16th day
of August 2011 .
OWNER Creech Engineers , Inc .
BOARD OF COUNTY COMMISSIONERS
INDIAN RIVER COUNTY, FLORIDA
Bob Solari , C J . yin ' •. F ,�o (Signature)
s • /
•
TATs&a �j • J t £DS ct of£ . Py - D •�
�(
i r (Printed name and titlerJ
e ::c�a•
• qy ;
Approved by BCa��� ' 16 , 2011
ATTEST .
Jeffrey K. Barton , Clerk VC:1ircui Witnessed by:
Deputy Clerk ( ignature)
Approved as to Form and Legal Sufficiency: P u yl S 01' 6zeJI r✓
(Printed name)
St Ian S . . Polac ich , Sr. , COUNTY Attorney
cl
oseph air , COUNTY AdMinistrator
F :\Public Works\ENGINEERING DIVISION PROJECTS\1050 2010-2011 IRC Vertical Control Network Densification\Survey\Work Orders\08-03-
2011 BCC Consent Agenda\08-03-2011 IRC WO No. 1 - Job No . 1050. doc
E CH 4450 W . Eau Gallie Blvd . Suite 232
Melbourne , Florida 32934
A _ Ph : ( 321 ) 255- 5434 , Fax : ( 321 ) 255 -7751
July 25 , 2011 Sent via: PDF
PROPOSAL
EXHIBIT "A"
WORK ORDER NO . 1
( ENGINEERING/ SURVEY) CONTINUING PROFESSIONAL SURVEYING & MAPPING/ GIS SERVICES
CONTRACT 1032, 2010-2011
INDIAN RIVER COUNTY PROJECT No . 1050
INDIAN RIVER COUNTY WORK ORDER No . 1
CREECH ENGINEERS , INC . ( hereinafter referred to as " CONSULTANT" ) is pleased to submit
this proposal for professional surveying services to Indian River County ( hereinafter referred to
as " COUNTY" ) for the Vertical Densification Project 2011 located in Indian River County,
Florida ( hereinafter referred to as " PROJECT" ) .
It is the CONSULTANT' S understanding that the COUNTY is adding to , and strengthening the
existing published vertical control in Indian River County for FEMA National Flood Insurance
Program Community Rating System ( CRS ) credits . To accomplish this task , the COUNTY
requested professional surveying and mapping services to level and Blue Book a maximum of
twenty-six (26 ) monuments . All Twenty-six ( 26 ) of the monuments will be of aluminum alloy rod
construction . Said monuments will be required to meet NGS Class " B" stability. The resulting
vertical control network will be Blue Booked and submitted to the National Geodetic Survey
( NGS ) for inclusion into the National Spatial Reference System ( NSRS ) .
SCOPE OF SERVICES
Task 01 :
Planning
The CONSULTANT will prepare a map that will show the proposed level routes for all proposed
benchmarks . Said level route map will be based upon the " NATIONAL FLOOD INSURANCE
PROGRAM -COMMUNITY RATING SYSTEM ; 2011 BENCHMARK INVENTORY SHEET"
provided by the COUNTY . Adequate coordination with Sunshine One Call - underground
locates will be performed for each location assuring clearance of underground utilities of
conflicts prior to any excavations .
10061 00-P P L-072511 .d oc
Indian River County
VERTICAL DENSIFICATION PROJECT 2011
July 25 , 2011
Page 2 of 6
Reconnaissance
The CONSULTANT will recover published control and determine suitable locations for newly
established benchmarks to be Blue Booked . The CONSULTANT will prepare field notes and
take digital photography of existing stations . Adequate coordination with Call Sunshine -
underground locates will be performed for each location assuring clearance of underground
utilities of conflicts prior to any excavations .
Monumentation
The CONSULTANT will establish new monuments of sufficient stability to be Blue Booked in
the vertical network . All new benchmarks will be referenced with three ( 3 ) or more witness
monuments , and a flexible survey witness post . All Twenty-six (26 ) of the monuments will be of
aluminum alloy rod construction . Said monuments will be required to meet NGS Class " B"
stability.
A maximum of twenty-six (26 ) newly constructed monuments are included in this contract .
Task 02 :
Vertical Measurements
The CONSULTANT will use digital leveling methods to create a closed level network . This
network will have sufficient redundancy to achieve the required project accuracy of a minimum
of Second order, Class 2 as stated in the FGCS publication Specifications and Procedures to
Incorporate Electronic Digital/ Bar-Code Leveling System version 4. 1 5/27/2004. Vertical
measurements will be performed using a Trimble Dini 22 Digital Level and two ( 2 ) Invar type
rods .
Task 03 :
Adjustments/ Reports/ Blue Book Submittal
The CONSULTANT will perform computations and adjustments necessary for proper Quality
Control / Quality Assurance as they relate to the required accuracies . The CONSULTANT will
prepare Blue Book digital files , field documentation , and reports necessary for submittal to , and
eventual publication by NGS according to the latest NGS Blue Book specifications : Input
Formats and Specifications of the National Geodetic Survey Data Base VOL. I, dated 1994 and
1998 . The vertical values will be furnished to the COUNTY in U . S . Survey feet ; relative to the
North American Vertical Datum of 1988 ( NAVD88 ) . The CONSULTANT will prepare a Blue
Book project report relating the methods used during the survey and will submit survey for
review and publication by NGS .
EREECH
Et`.dC;; iNEERS tlVC .
G_: 1VI L .L4Tr_'� N GNr� INEEfrzEL?
Indian River County
VERTICAL DENSIFICATION PROJECT 2011
July 25 , 2011
Page 3 of 6
Final Drawings and Deliverables
The CONSULTANT will prepare a signed and sealed Survey Report relating the methods used
during the survey, accuracy achieved , and a list of final coordinates in accordance with the
" Minimum Technical Standards" for surveying and mapping in the State of Florida as set forth
by the Florida Board of Professional Surveyor's and Mappers in Chapter 5J - 17 , Florida
Administrative Code , pursuant to Section 5J - 17 . 052 Geodetic Control Surveys, Florida Statutes .
DELIVERABLES :
1 . ) Supply five ( 5 ) signed and sealed Survey Reports .
2 . ) Raw data reports of all observations and adjustments pertinent to final product .
3 . ) Copy of all field notes pertinent to final product in PDF or Word format , provided on
CD - ROM .
4 . ) The CONSULTANT shall prepare its Work Product so that it can be readily used by
the COUNTY or other consultants for a variety of purposes . It shall contain all
information necessary for an independent third - party CONSULTANT or entity to
independently locate and utilize the vertical control network . All final products ,
drawings , files or information related to this project shall become property of Indian
River County and remain so for the use of the County and Public at large .
SCHEDULE
The CONSULTANT shall complete the field Monumentation , vertical measurements and survey
report within 130 calendar days of Notice to Proceed from the COUNTY. A preliminary
submittal will be made to the National Geodetic Survey within 160 calendar days of Notice to
Proceed .
ADDITIONAL SERVICES
The CONSULTANT will provide , for a fee , additional services that require analyses beyond
those described in the above task( s ) . These additional services may include , but not limited to :
A . Additional surveying services .
B . Additional data formatting and submittal to agencies other than specifically stated
herein .
C . Access to restricted areas , or remote areas requiring special access and/or security
clearance .
[: REEFH
ENC37CNEERS CNC _
C.'.% IVI LI ✓1Tt _� IV EIV (SIN EF_ RE-- [:'
Indian River County
VERTICAL DENSIFICATION PROJECT 2011
July 25 , 2011
Page 4 of 6
INFORMATION AND /OR SERVICES PROVIDED BY THE COUNTY
The following information and/or services have been previously provided per GIS to the
CONSULTANT by the COUNTY or their representative :
A. Map of proposed benchmark monuments to be Blue Booked .
B . Map of recently recovered published control by the COUNTY.
FEES AND BILLING
This proposal , as well as the attached General Contract Provisions , represents the entire
understanding between the COUNTY and the CONSULTANT concerning the PROJECT . Billing
will be invoiced on a monthly based percentage complete for Lump Sum Tasks and for services
actually provided for Time and Material ( hourly) Tasks . Invoices are payable as per the original
Professional Surveying and Mapping contractual agreement between the COUNTY and the
CONSULTANT. All remittance should be sent to Creech Engineers , Inc . , P . O . Box 327 , Stuart ,
Florida 34995-0327 .
TASK ' FEE TYPE FEE
al a
Task 01 — Planning
Reconnaissance
Monumentation LS $22 , 550 . 00
Task 02 — Leveling LS $811925 . 00
Task 03 — Adjustments
Final Reports
Deliverables
_ Submittal to NGS _ LS I $ 11 , 220 . 00
Task 99 — Direct Expenses
Materials — Aluminum Alloy Rod @ $ 8 . 48 per 4'
section
( estimate +/- 50 ' of rod per monument
X 26 monuments = 1 , 300 ' LS $2 , 756 . 00
Total• $ 1181451 . 00
LS : Lump Sum T&E : Time & Materials TNE : Time & Materials - Not-To-Exceed
Note .
Cost breakdown per newly established benchmark (26 total ) _ $4, 555 . 81
Cost Breakdown per mile of level circuit ( 100 miles ) _ $ 1 , 184 . 51
CRECCH
CIVI Lt2.,1T1G'> IV ENr�-: INGEREL=?
Indian River County
VERTICAL DENSIFICATION PROJECT 2011
July 25 , 2011
Page 5 of 6
Hourly Breakdown
PROFF SURVEY SURVEYOR 3 PERSON i . 2 PERSON
SURVEYOI I RIII .I I `PROJECT IN FIELDI I. F . I FIELD
TASK ( DIRECTOR) MANAGER) ' TRAINING ) ;'r. CREW CREW ;
._
. $ 140 fi . $ 10.5 hr $ 8I. 5 hr $ 145hr. IF
i $ 110 hn ` FEE
-- __€ I � _..� --_ �.__.
Task 01 15 50 85 i 40 $22 , 550 . 00
Task 02 65 150 430 ! $ 81 , 925 . 00_
Task 03 8 80 20 _ $ 11 , 220 . 00
SUM OF
HOURS 8 160 220 515 40
FEE PER ! Sub-Total
POSITION $ 11120 . 00 $ 169800 . 00 $ 189700 . 00 $741675 . 00 ; $49400 . 00 $ 115, 695 . 00
Materials
i $29756 . 00
Total :
$ 118 , 451 . 00
Cancellation of any individual lump sum task by COUNTY prior to completion shall be subject to
payment for time and expenses incurred up to point of cancellation .
SUMMARY AND AUTHORIZATION
The CONSULTANT strives to provide superior , personalized , professional service to our clients .
We appreciate this opportunity to present our proposal to the COUNTY.
General Contractual Provisions are as per the " Professional Surveying Services Agreement for
Annual Surveying and Mapping Services" dated October 7 , 2010 , IRC Contract No . 1031 , 2010-
2011 .
CREECH ENGINEERS , INC .
(" CONSULTANT" )
By:
Print Name : Patrick B . Meeds , P . S . M .
Title : Director of Surveys
Date : July 25 , 2011
CREECH
' C1V11_12.' TIC?tV C-. 1L: IN GF Rpt?
Indian River County
VERTICAL DENSIFICATION PROJECT 2011
July 25 , 2011
Page 6 of 6
Professional Land Surveying and Mapping / GIS Services
RFQ 2011009
FEE SCHEDULE
HOURLY RATES BY EMPLOYEE CLASSIFICATION :
CLASSIFICATION RATE
Professional Surveyor ( Director) $ 140 . 00
Survey Project Manager ( P . S . M . ) $ 105 . 00
Surveyor In Training $ 85 . 00
Survey CAD Operator/Technician $ 75 . 00
Three- Person Field Crew $ 145 . 00
Two- Person Field Crew $ 110 . 00
Three- Person GPS Field Crew $ 150 . 00
Two- Person GPS Field Crew $ 115 . 00
Two Person Leica Scanner Crew $ 150 . 00
GIS Senior Analyst $ 110 . 00
Clerical $ 40 . 00
Authorized Reimbursable Expenses
Blueprints (24" X 36 " ) $ 5 . 00/Sheet
s � j
Consultants Signature and Position
Patrick B . Meeds , P . S . M . / V . P .
Director of Surveys
October 7 , 2010
Date