HomeMy WebLinkAbout2011-170 aVf� Board of County Commissioners Administration - Building A 1801 27th Street Vero Beach, Florida 32960 Telephone : (772) 567- 8000 FAX : 772-778 -9391 Project : Vertical Network Densification Indian River County Project 1050 WORK ORDER NO . 1 ( Engineering/Surveying ) FOR PROFESSIONAL SERVICES AGREEMENT ANNUAL SURVEYING and MAPPING/GIS SERVICES WITH Creech Engineers , Inc. In accordance with Contract No . 1032 2010-2011 This Work Order No . 1 is in accordance with the existing AGREEMENT dated October 19 , 2010 between Creech Engineers , Inc. , ( SURVEYOR) and Indian River County ( COUNTY) . This Work Order No . 1 amends the agreement as follows : SECTION I — PROJECT LIMITS This Work Order No . 1 is for the SURVEYOR to perform all related field and office Surveying and Mapping services in connection with the Vertical Control Network Densification , consisting of the establishment of twenty-six Benchmarks meeting 2nd Order, Class B Stability . SECTION II - SCOPE OF SERVICES As agreed upon between SURVEYOR and COUNTY, the SURVEYOR shall provide Professional Land Surveying services to complete all tasks as outlined in this Work Order No . 1 ; specifically detailed in the attached proposal Exhibit A . SECTION III — TIME FOR COMPLETION & DELIVERABLESMORK PRODUCT 1 . Project shall be completed as follows : a . The SURVEYOR will complete all field monumentation and measurements within 130 calendar days from receipt of the Notice to Proceed from the COUNTY . b . The SURVEYOR will submit a preliminary submittal to the National Geodetic Survey ( NGS) , within 160 calendar days from receipt of the Notice to Proceed from the COUNTY c . Final Deliverables to the COUNTY are anticipated to be completed within two months after the submittal of the preliminary data as described in Item b above . • The scheduled review and acceptance by the NGS depends heavily on their work load at the time of submittal and may vary greatly. F :\PublicWorks\ENGINEERING DIVISION PROJECTS\1050 2010-2011 IRC Vertical Control Network Densification\Survey\Work Orders\08-03-2011 BCC Consent Agenda\08-03-2011 IRC WO No. 1 - Job No. 1050 .doc IRC Work Order No . 1 Creech Engineers , Inc Vertical Control Network Densification August 3 , 2011 Page 2 of 3 d . The COUNTY will perform a complete review of the Final Deliverables for accordance of contractual items prior to final acceptance by the COUNTY . 2 . Deliverables -The SURVEYOR shall provide the COUNTY : a . All copies of correspondence between the SURVEYOR and the NGS , including copies of all data submittals from project planning to final acceptance . b . FINAL Deliverables , five ( 5 ) paper " hardcopy" signed and sealed Surveyor Reports , photographs of each benchmark recovered or set , copies of NGS recovery sheets for each Benchmark recovered , NGS data sheets for each newly established Benchmark any project related digital files , on AutoCad shall be prepared and delivered in release 2004 through 2009 , PDF formats and an ASCII file for all survey points , all electronic files to be on CD . c . Surveyor Report shall include a cover sheet with location sketch , survey certifications , related title and project number, survey notes , legend and abbreviations and project data sheets . d . Work Product and digital versions are to prepared and submitted so that the COUNTY or other consultants can readily use it for the design and analysis of the area , as defined . It shall contain all information necessary for third - party surveyor to independently recreate and/or utilize the survey work . It is acknowledged all final products become property of Indian River COUNTY and will be available for use by the public at large . e . The SURVEYOR' S work product shall meet or exceed the minimum standards as defined by Sections II , III and IV or the COUNTY will not approve the SURVEYOR' S request for payment . SECTION IV — COMPENSATION The COUNTY agrees to pay, and the SURVEYOR agrees to accept , for the above described services rendered as identified in Sections I , II , and III of this Work Order No . 1 , for a total lump sum fee of $ 118 , 451 . 00 . All and/or any additional services not described hereon shall be pre -approved by the COUNTY . Approved additional services shall be invoiced at the rates disclosed in the approved fee schedule with the SURVEYOR for the contract year(s ) of October 19 , 2010 through October 19 , 2011 . All invoicing shall include Project Number ( 1050 ) , Work Order No . 1 (WO 1 ) , Contract Number ( 1032 ) , itemized man - hours and materials expended to complete the Scope of Services . Payments shall be in accordance with the original Professional Surveying and Mapping/GIS Services Agreement , Contract No . 1032 with the COUNTY and as stated in Section II , III and IV hereon . F:\Public Works\ENGINEERING DIVISION PROJECTS\1050 2010-2011 IRC Vertical Control Network Densification\Survey\Work Orders\08-03- 2011 BCC Consent Agenda\08-03-2011 IRC WO No , 1 - Job No. 1050.doc IRC Work Order No. 1 Creech Engineers , Inc Vertical Control Network Densification August 3 , 2011 Page 3 of 3 The AGREEMENT is hereby amended as specifically set forth herein . All remaining sections of the AGREEMENT shall remain in full force and effect, and are incorporated herein . IN WITNESS WHEREOF the parties hereto have executed these presents this 16th day of August 2011 . OWNER Creech Engineers , Inc . BOARD OF COUNTY COMMISSIONERS INDIAN RIVER COUNTY, FLORIDA Bob Solari , C J . yin ' •. F ,�o (Signature) s • / • TATs&a �j • J t £DS ct of£ . Py - D •� �( i r (Printed name and titlerJ e ::c�a• • qy ; Approved by BCa��� ' 16 , 2011 ATTEST . Jeffrey K. Barton , Clerk VC:1ircui Witnessed by: Deputy Clerk ( ignature) Approved as to Form and Legal Sufficiency: P u yl S 01' 6zeJI r✓ (Printed name) St Ian S . . Polac ich , Sr. , COUNTY Attorney cl oseph air , COUNTY AdMinistrator F :\Public Works\ENGINEERING DIVISION PROJECTS\1050 2010-2011 IRC Vertical Control Network Densification\Survey\Work Orders\08-03- 2011 BCC Consent Agenda\08-03-2011 IRC WO No. 1 - Job No . 1050. doc E CH 4450 W . Eau Gallie Blvd . Suite 232 Melbourne , Florida 32934 A _ Ph : ( 321 ) 255- 5434 , Fax : ( 321 ) 255 -7751 July 25 , 2011 Sent via: PDF PROPOSAL EXHIBIT "A" WORK ORDER NO . 1 ( ENGINEERING/ SURVEY) CONTINUING PROFESSIONAL SURVEYING & MAPPING/ GIS SERVICES CONTRACT 1032, 2010-2011 INDIAN RIVER COUNTY PROJECT No . 1050 INDIAN RIVER COUNTY WORK ORDER No . 1 CREECH ENGINEERS , INC . ( hereinafter referred to as " CONSULTANT" ) is pleased to submit this proposal for professional surveying services to Indian River County ( hereinafter referred to as " COUNTY" ) for the Vertical Densification Project 2011 located in Indian River County, Florida ( hereinafter referred to as " PROJECT" ) . It is the CONSULTANT' S understanding that the COUNTY is adding to , and strengthening the existing published vertical control in Indian River County for FEMA National Flood Insurance Program Community Rating System ( CRS ) credits . To accomplish this task , the COUNTY requested professional surveying and mapping services to level and Blue Book a maximum of twenty-six (26 ) monuments . All Twenty-six ( 26 ) of the monuments will be of aluminum alloy rod construction . Said monuments will be required to meet NGS Class " B" stability. The resulting vertical control network will be Blue Booked and submitted to the National Geodetic Survey ( NGS ) for inclusion into the National Spatial Reference System ( NSRS ) . SCOPE OF SERVICES Task 01 : Planning The CONSULTANT will prepare a map that will show the proposed level routes for all proposed benchmarks . Said level route map will be based upon the " NATIONAL FLOOD INSURANCE PROGRAM -COMMUNITY RATING SYSTEM ; 2011 BENCHMARK INVENTORY SHEET" provided by the COUNTY . Adequate coordination with Sunshine One Call - underground locates will be performed for each location assuring clearance of underground utilities of conflicts prior to any excavations . 10061 00-P P L-072511 .d oc Indian River County VERTICAL DENSIFICATION PROJECT 2011 July 25 , 2011 Page 2 of 6 Reconnaissance The CONSULTANT will recover published control and determine suitable locations for newly established benchmarks to be Blue Booked . The CONSULTANT will prepare field notes and take digital photography of existing stations . Adequate coordination with Call Sunshine - underground locates will be performed for each location assuring clearance of underground utilities of conflicts prior to any excavations . Monumentation The CONSULTANT will establish new monuments of sufficient stability to be Blue Booked in the vertical network . All new benchmarks will be referenced with three ( 3 ) or more witness monuments , and a flexible survey witness post . All Twenty-six (26 ) of the monuments will be of aluminum alloy rod construction . Said monuments will be required to meet NGS Class " B" stability. A maximum of twenty-six (26 ) newly constructed monuments are included in this contract . Task 02 : Vertical Measurements The CONSULTANT will use digital leveling methods to create a closed level network . This network will have sufficient redundancy to achieve the required project accuracy of a minimum of Second order, Class 2 as stated in the FGCS publication Specifications and Procedures to Incorporate Electronic Digital/ Bar-Code Leveling System version 4. 1 5/27/2004. Vertical measurements will be performed using a Trimble Dini 22 Digital Level and two ( 2 ) Invar type rods . Task 03 : Adjustments/ Reports/ Blue Book Submittal The CONSULTANT will perform computations and adjustments necessary for proper Quality Control / Quality Assurance as they relate to the required accuracies . The CONSULTANT will prepare Blue Book digital files , field documentation , and reports necessary for submittal to , and eventual publication by NGS according to the latest NGS Blue Book specifications : Input Formats and Specifications of the National Geodetic Survey Data Base VOL. I, dated 1994 and 1998 . The vertical values will be furnished to the COUNTY in U . S . Survey feet ; relative to the North American Vertical Datum of 1988 ( NAVD88 ) . The CONSULTANT will prepare a Blue Book project report relating the methods used during the survey and will submit survey for review and publication by NGS . EREECH Et`.dC;; iNEERS tlVC . G_: 1VI L .L4Tr_'� N GNr� INEEfrzEL? Indian River County VERTICAL DENSIFICATION PROJECT 2011 July 25 , 2011 Page 3 of 6 Final Drawings and Deliverables The CONSULTANT will prepare a signed and sealed Survey Report relating the methods used during the survey, accuracy achieved , and a list of final coordinates in accordance with the " Minimum Technical Standards" for surveying and mapping in the State of Florida as set forth by the Florida Board of Professional Surveyor's and Mappers in Chapter 5J - 17 , Florida Administrative Code , pursuant to Section 5J - 17 . 052 Geodetic Control Surveys, Florida Statutes . DELIVERABLES : 1 . ) Supply five ( 5 ) signed and sealed Survey Reports . 2 . ) Raw data reports of all observations and adjustments pertinent to final product . 3 . ) Copy of all field notes pertinent to final product in PDF or Word format , provided on CD - ROM . 4 . ) The CONSULTANT shall prepare its Work Product so that it can be readily used by the COUNTY or other consultants for a variety of purposes . It shall contain all information necessary for an independent third - party CONSULTANT or entity to independently locate and utilize the vertical control network . All final products , drawings , files or information related to this project shall become property of Indian River County and remain so for the use of the County and Public at large . SCHEDULE The CONSULTANT shall complete the field Monumentation , vertical measurements and survey report within 130 calendar days of Notice to Proceed from the COUNTY. A preliminary submittal will be made to the National Geodetic Survey within 160 calendar days of Notice to Proceed . ADDITIONAL SERVICES The CONSULTANT will provide , for a fee , additional services that require analyses beyond those described in the above task( s ) . These additional services may include , but not limited to : A . Additional surveying services . B . Additional data formatting and submittal to agencies other than specifically stated herein . C . Access to restricted areas , or remote areas requiring special access and/or security clearance . [: REEFH ENC37CNEERS CNC _ C.'.% IVI LI ✓1Tt _� IV EIV (SIN EF_ RE-- [:' Indian River County VERTICAL DENSIFICATION PROJECT 2011 July 25 , 2011 Page 4 of 6 INFORMATION AND /OR SERVICES PROVIDED BY THE COUNTY The following information and/or services have been previously provided per GIS to the CONSULTANT by the COUNTY or their representative : A. Map of proposed benchmark monuments to be Blue Booked . B . Map of recently recovered published control by the COUNTY. FEES AND BILLING This proposal , as well as the attached General Contract Provisions , represents the entire understanding between the COUNTY and the CONSULTANT concerning the PROJECT . Billing will be invoiced on a monthly based percentage complete for Lump Sum Tasks and for services actually provided for Time and Material ( hourly) Tasks . Invoices are payable as per the original Professional Surveying and Mapping contractual agreement between the COUNTY and the CONSULTANT. All remittance should be sent to Creech Engineers , Inc . , P . O . Box 327 , Stuart , Florida 34995-0327 . TASK ' FEE TYPE FEE al a Task 01 — Planning Reconnaissance Monumentation LS $22 , 550 . 00 Task 02 — Leveling LS $811925 . 00 Task 03 — Adjustments Final Reports Deliverables _ Submittal to NGS _ LS I $ 11 , 220 . 00 Task 99 — Direct Expenses Materials — Aluminum Alloy Rod @ $ 8 . 48 per 4' section ( estimate +/- 50 ' of rod per monument X 26 monuments = 1 , 300 ' LS $2 , 756 . 00 Total• $ 1181451 . 00 LS : Lump Sum T&E : Time & Materials TNE : Time & Materials - Not-To-Exceed Note . Cost breakdown per newly established benchmark (26 total ) _ $4, 555 . 81 Cost Breakdown per mile of level circuit ( 100 miles ) _ $ 1 , 184 . 51 CRECCH CIVI Lt2.,1T1G'> IV ENr�-: INGEREL=? Indian River County VERTICAL DENSIFICATION PROJECT 2011 July 25 , 2011 Page 5 of 6 Hourly Breakdown PROFF SURVEY SURVEYOR 3 PERSON i . 2 PERSON SURVEYOI I RIII .I I `PROJECT IN FIELDI I. F . I FIELD TASK ( DIRECTOR) MANAGER) ' TRAINING ) ;'r. CREW CREW ; ._ . $ 140 fi . $ 10.5 hr $ 8I. 5 hr $ 145hr. IF i $ 110 hn ` FEE -- __€ I � _..� --_ �.__. Task 01 15 50 85 i 40 $22 , 550 . 00 Task 02 65 150 430 ! $ 81 , 925 . 00_ Task 03 8 80 20 _ $ 11 , 220 . 00 SUM OF HOURS 8 160 220 515 40 FEE PER ! Sub-Total POSITION $ 11120 . 00 $ 169800 . 00 $ 189700 . 00 $741675 . 00 ; $49400 . 00 $ 115, 695 . 00 Materials i $29756 . 00 Total : $ 118 , 451 . 00 Cancellation of any individual lump sum task by COUNTY prior to completion shall be subject to payment for time and expenses incurred up to point of cancellation . SUMMARY AND AUTHORIZATION The CONSULTANT strives to provide superior , personalized , professional service to our clients . We appreciate this opportunity to present our proposal to the COUNTY. General Contractual Provisions are as per the " Professional Surveying Services Agreement for Annual Surveying and Mapping Services" dated October 7 , 2010 , IRC Contract No . 1031 , 2010- 2011 . CREECH ENGINEERS , INC . (" CONSULTANT" ) By: Print Name : Patrick B . Meeds , P . S . M . Title : Director of Surveys Date : July 25 , 2011 CREECH ' C1V11_12.' TIC?tV C-. 1L: IN GF Rpt? Indian River County VERTICAL DENSIFICATION PROJECT 2011 July 25 , 2011 Page 6 of 6 Professional Land Surveying and Mapping / GIS Services RFQ 2011009 FEE SCHEDULE HOURLY RATES BY EMPLOYEE CLASSIFICATION : CLASSIFICATION RATE Professional Surveyor ( Director) $ 140 . 00 Survey Project Manager ( P . S . M . ) $ 105 . 00 Surveyor In Training $ 85 . 00 Survey CAD Operator/Technician $ 75 . 00 Three- Person Field Crew $ 145 . 00 Two- Person Field Crew $ 110 . 00 Three- Person GPS Field Crew $ 150 . 00 Two- Person GPS Field Crew $ 115 . 00 Two Person Leica Scanner Crew $ 150 . 00 GIS Senior Analyst $ 110 . 00 Clerical $ 40 . 00 Authorized Reimbursable Expenses Blueprints (24" X 36 " ) $ 5 . 00/Sheet s � j Consultants Signature and Position Patrick B . Meeds , P . S . M . / V . P . Director of Surveys October 7 , 2010 Date 0QEEFH EMC. INEEIRS tNC _ C: I VII_I.��hTIC?N ENC'31N C- F_ RL= L