Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2012-114
I a . = . a- • Board of County Commissioners Administration - Building A 1801 27th Street Vero Beach , Florida 32960 Telephone : ( 772 ) 5674000 FAX : 772 - 778 -9391 Project : Indian River County Sheriff' s Office Crime Scene Building ( Former Sun Sky Roofing Site ) Indian River County Project Crime Scene Unit WORK ORDER NO . 2 FOR PROFESSIONAL SERVICES AGREEMENT FOR Architectural and Engineering Services By Donadio & Associates , Architects , P . A . In accordance with Contract No . 1 This Work Order No . _2_ is in accordance with the existing AGREEMENT dated September 8 , 2009 between Donadio & Associates , Architects , P . A . ( CONSULTANT ) and Indian River County (COUNTY) . This Work Order No . _2_ amends the agreement as follows : SECTION I — PROJECT LIMITS This Work Order No . _2_ is for the CONSULTANT to perform all related architecture and engineering services in connection with the development of the construction documents for the adaptive re - use of the existing structure at the Former Sun Sky Roofing Site adjacent to the Indian River County Sheriff' s Department Office and Jail Complex , SECTION II - SCOPE OF SERVICES As agreed upon between CONSULTANT and COUNTY , the CONSULTANT shall provide Professional Architectural and Engineering services to complete all tasks as outlined in this Work Order No . _2_ ; specifically detailed in the attached proposal Exhibit A . SECTION III — TIME FOR COMPLETION & DE LIVERABLES/WORK PRODUCT 1 . Project shall be completed as follows : a . Time of 100 % " Paper Submittal " review (final review prior to request for final deliverables ) submittal shall be _ 160_ calendar Days from notice to proceed . b . Time of FINAL project completion shall be within _45_ calendar days of receipt of the County ' s review comments . IRC Work Order No . 2 Donadio & Associates IRCSO Crime Scene Unit Page 2 of 3 2 . Deliverables -The CONSULTANT shall provide the COUNTY : a . Consultant Shall : Based upon the approved conceptual design documents , Consultant shall provide standard Architectural /Engineering construction documents necessary for the permitting and construction of the Indian River County Sheriff' s Office Crime Scene Unit b . The CONSULTANT' S work product shall meet or exceed the minimum standards as defined by the master AGREEMENT dated September 8 , 2009 or the COUNTY will not approve the CONSULTANT' S request for payment . SECTION IV — COMPENSATION The COUNTY agrees to pay , and the CONSULTANT agrees to accept , for the above described services rendered as identified in Task One , Two and Three of this Work Order No . _2_, for a total lump sum fee of $208 , 002 . 00 . Any additional services listed hereon shall be authorized individually or together by the COUNTY and / or the County ' s authorized Project Manager . Approved additional services shall be invoiced at the rates disclosed in the approved fee schedule with the CONSULTANT in accordance with the AGREEMENT dated September 9 , 2009 . All invoicing shall include Project Name ( Crime Scene Unit) , Work Order No . _2_ (WO _2_) Payments shall be in accordance with the original Professional Services Agreement , with the COUNTY dated September 9 , 2009 . The AGREEMENT is hereby amended as specifically set forth herein . All remaining sections of the AGREEMENT shall remain in full force and effect , and are incorporated herein . IRC Work Order No , 2 Donadio & Associates IRCSO Crime Scene Unit Page 3 of 3 IN WITNESS WHEREOF the parties hereto have executed these presents this 19th day of June 2012 . Board of County Commissioners Donadio & Associates , Architects , P . A . . Indian River County , Florida (Signature) 4ignature) Gary C . Wheeler, Chairman Anthony J . Donadio , President (Printed name and title) Approved by BCC 06- 19- 12 ,y�OMMI SS/0N•,, NA ATTEST : Jeffrey K . Barton , Clerks') Ci Witnessed by : Cj ACJ ii "( /� `v+• Deputy ClerkN Signature) IVER Cpp�wM' Approved as to Form and Legal Sufficiency : kz ✓fkll if Ian S . Polackwich , Sr. , County Attorney (Printed name) L Josep A . aird , County Ad inistrator V EXHIBIT " A " ATTACHMENT "E" Professional Fee Allocation Sheriffs Office Crime Scene Unit Indian River County , Florida June 8 , 2012 Fee Allocation . The following is the professional fee allocation for the various services defined in Attachments "A " and " C " . 1 . Phase I-A : Spatial Needs Assessment (Programming) : COMPLETED 2 . Phase I -B : Master Planning : COMPLETED 3 . Phase II : Standard Architectural and Engineering Services : The Architectural and Engineering services for the referenced project are based upon an estimated project construction budget of $ 1 , 714 , 225 . This value was established during the previous phases submitted to the County and the standard A/E services reflect this value accordingly : 3 . 1 Basis of Fee : Estimated Construction Value $ 11457 , 225 @ 8 . 62 % . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 1251602 . 00 ' 3 . 2 Civil Engineering Services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 23 , 800 . 00 3 . 3 Reimbursable Expenses Allowance (Not to Exceed) . . . . . . . . . . . . . . . . . . . . . . . . $ 85500 . 00 3 . 4 Subtotal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 157 , 902 . 00 4 . Phase III : Additional Services . Additional Services , consisting of a variety of tasks , are itemized and described in Attachment " C" of this Agreement . The following is a summary of these services and their related professional fee allocation . TOTAL TASK MEN FEE 4 . 1 Interior Design Services : ( 1 . 1 . 1 Attachment " C") $ TBD @ 14 . 0 % . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 $ TBD 4 . 2 Off- Site Civil Engineering . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ TBD 4 . 3 Landscape Architectural Services . . 6 a 0 0 * 0 a 0 0 6 0 a 0 0 # 0 4 0 0 0 a a 0 0 # 0 0 0 95800 . 00 4 . 4 Site and Building Identifications (Not to Exceed) . 0 0 a 6 0 0 0 0 0 a 0 0 * 0 4 6 0 * 0 0 a 0 9 6 0 $ 4 , 200 . 00 4 . 5 Professional Liability Insurance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ N /A 4 . 6 Permitting Coordination Services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 61500 . 00 4 . 7 Sales Tax Exemption Program . . . . . . . . . . eased 90 * 04 00 * 00 98964 * 0 * 08 00 * 60 00 0 seemed * ego * 000 * 0 $ By GC/IRC 4 . 8 Facility Energy Analysis . . . . to 4 . 9 Facility Rendering . . . . . . . . * @ * memo 0 a * some 64 094 0690 * 6 * 00 so * me * 04 00 Soo 80 # 64 0000000 * 60 00 * 06 so 60 60 * 04 $ N /A • Reimbursable Expenses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ N /A 4 . 10 Special Engineering . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ TBD r The 8. 62 % allocation is applied to the total development value less site development costs of $257, 000. ATTACHMENT "E" Professional Fee Allocation Sheriffs Office Crime Scene Unit Indian River County , Florida June 8 , 2012 Page 2 4 . 11 Extended Construction Observation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ TBD 4 . 12 Post Occupancy/Warranty Inspection . . . . . . . . . . . . . . . TBD 4 . 13 Cost Estimating : 4 . 13 . 1 Schematic Design Phase . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ N/A 4 . 13 . 2 Design Development Phase . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 2 ,400 . 00 4 . 13 . 3 75 % Construction Documents Phase . . . . . . 3 , 200 . 00 4 . 13 . 4 95 % Construction Documents Phase . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ TBD 4 . 14 Computer Cable System Design (Not to Exceed) . 0 0 0 a 0 0 0 a a 0 a a 0 * 0 * 00 * 00ses 115200 . 00 4 . 15 Security Consultant (Not to Exceed) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 12 , 800 . 00 4 . 16 Site Surveying . . . . . . . . . . * 000Y * 69sud @ * goose so no * so 90 * 00 0 6 * 04 so 60 * 006 # 0000 * 9690 * 9 * 963 By County 4 . 17 Geotechnical Engineering 7 N/A g g . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ TBD 4 . 18 Grants Application Assistance . . 0 0 6 a 0 0 0 0 # & 0 9 0 0 6 a 0 0 a 6 a * 9 a 6 a * 0 a 0 a * 0 0 0 a 6 0 a 0 0 6 a 0 0 0 0 0 a 0 a 0 4 4 . 19 Additional Construction Observation Services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ TBD/See Below 4 . 20 Record/Conformance Drawings . TBD 4 . 21 Voter Referendum Assistance (if requested) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ N/A 4 . 22 "Basic " Level LEED Design & Certification 9999 . . . . . . . . . . . . . . . . . . . . . . . . . 96 . 0006 $ N/A 4 . 23 Traffic Impact Study (T . I . S . ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ TBD 4 . 25 Communications Consultant . . . 00 * 6 * 90 wo * 6008 * 6 * 08 00 * 00 00 * 00 # 00 60 * 0080 * 06 0660 # 9060 0090 * 64S N/A 4 . 26 Audio -Visual Consultant . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ N/A 4 . 24 Subtotal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 50 , 100 . 00 5 . Additional Construction Observation Services : As noted in Attachment " C" the County has the option of requesting construction observation services that are in addition to those provided under terms of the " standard services" , which consist of on- site meetings twice per month, the following are options for consideration by the County : 5 . 1 Option A • Weekly On - Site Construction Observation Services : 5 . 1 . 1 17 . 5 Ines 0 $ 102 . 00/hr per month . . . . . . $ 1 , 785 . 00 *2 5 . 1 . 2 Reimbursable Expenses . . . . . . . . . . . . . . . . . . . . . $ 150 . 00 5 . 1 . 3 Subtotal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 1 , 935 . 00 5 . 1 . 4 Subtotal : $ 1 , 935 . 00 ,a, TBD months . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ TBD 5 . 2 Option B : " Clerk of the Works " : This represents daily on- site representation and is in addition to standard services provided . If the County elects to utilize this service , the fee shall be negotiated at that time . These are hours in addition to those included under standard services andprovide for a total of four site visits per month. ATTACHMENT "E" Professional Fee Allocation Sheriffs Office Crime Scene Unit Indian River County , Florida June 8 , 2012 Page 3 6 . Summary : The following is a summary of services to be provided as well as related expenses : 6 . 1 Phase I -A : Space Needs Assessment . 0 0 0 & 0 0 0 0 6 4 a 0 a 0 0 0 0 * 0 a 9 0 * 0 0 0 0 * 0 & 0 a * 0 6 9 a * 0 a 6 a 0 0 0 6 * $ Completed 6 . 2 Phase I - B : Master Planning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ Completed 6 . 3 Phase II : Standard Architectural Services & Reimbursables . . . . . . . . . $ 157 , 902 . 00 6 . 4 Phase III : Additional Services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 501100 . 00 6 . 5 Total/Estimated Professional Fees . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 2089002 . 00 EXHIBIT " B " ATTACHMENT " F" Fee Guide Calculator For Architectural and Engineering Services ti ti. State of Florida, Department of Management Services � t Version Posted: March 2012 Project Name: CONSTRUCTION COMPLEXITY GROUP - PERCENTAGE COST FOR BUILDING A 8 C D E F G (Silework Not Included) 1 ,457 ,225 9.01 % 8 .29% 8 .62% 7 . 58% 6 .88% 6. 18% 8 .91 CALCULATED FEE $ 131 , 268 $ 120, 815 $ 125 ,602 $ 110,464 $ 100, 188 $89,999 $1291789 Instructions : Fill in probable construction cast at left and push enter key. GROUP DEFINITIONS: "A" - CONSIDERABLY MORE THAN AVERAGE COMPLEXITY: Complex Laboratories, Medical Hospitals, Emergency Management Centers "B" - MORE THAN AVERAGE COMPLEXITY: Average Laboratories, Mental Hospitals, Simple Medical Hospitals, Clinics, Court Houses, Theatres, Complex University Buildings, Special Purpose Classrooms, Laboratory Classrooms, Libraries, Auditoriums, Museums, Air Terminals, Food Service Facilities, Specialized Detention Areas, Detention-Trealment Areas, Residences "C " - REPAIRS AND RENOVATIONS: Miscellaneous Repairs and Renovations, Alterations to Office Space or Dormitory Space, Fire Code Corrective Work "D" - AVERAGE COMPLEXITY: General Office Space, General Teaching Space, Gymnasiums, General Detention Living Facilities, Factory Buildings "E" - LESS THAN AVERAGE COMPLEXITY: Apartment Buildings, Dormitory Buildings, Service Garages, Stadiums, Repetitive Design Facilities Office Buildings With Undefined Interior Space (open for later partitioning), Specialized Parking Structures "F"- CONSIDERABLY LESS THAN AVERAGE COMPLEXITY: Warehouses , Parking Garages, Storage facilities "G" - BUILDING ENGINEERING SERVICES: Mechanical, Electrical and Structural not exceeding $1 ,000,000 In construction (Not including Site Civil ADDITIONAL SERVICES & EXPENSES: ' The following services are considered Additional to Basic Services and are not included within i the basic fee represented by the fee guides : -Feasibility Studies/ Analysis -LEED Consultation -Facility Programming -Graphlc and Signage Design -Master Planning -Special Code Reviews including ACHA -Soils InvestigationslReports -Detailed Cost Estimates -Surveys -TopographidBoundary -Documents Prepared For: Vegetationllmprovements/Utilities -Alternate Bids Exceeding Contract Scope -Measured Drawings of Existing Facilities -Excessive Change Orders -Existing Facilities Analysis -Multiple Construction Contracts -Toxic Substance Mitigation Surveys and Consultation -Record DocumentslAs Buills -Site Environmental Assessments -Prolonged Construction Contract Administration Services -Site DRI, PUD, Site Pian Review andlor Zoning Modifications -Structural Threshold Inspections -Traffic Analysis and Traffic Signal Warrant Studies -Prgect Representation During -Civil Engineering Design including Construction Beyond Bi-Monthly Administration Pavi nglGrading/Utilibes lDrainagelStormwater ManagementfEnvirormentai & All Site -Additional Construction Contract Permitting Administration Services for Multiple Contracts -Existing Site Utility Infrastructure Improvements -Building Commissioning and Training Services -Site Lighting Design -Post Occupancy Inspections/ Evaluations -Landscape Architectural & Irrigation Design -Rendedngsl Models -Specialty Consultants - Substantive Changes to Scope, Size or Complexity VolcelData Communications; Electronic/Audio *Owner Requested Changes to Approved Documents Visual; Food Service Equipment; Hazardous -Reimbursable Expenses* Material; Hospital/Laboratory; Interior Design; Including, but not limited to, reproduction/ printing costs, Indoor Air Quality; Quality Control; Theater/Acoustical; Security travel expenses and special mail service expenses -Life Cycle Cost (R01) and/or Federal DOE Energy Analysis ' As defined in the Division of Real Estate Development and Management form of Agreement Between Owner and Architect - Engineer. http &, Hfp . state . fl . its/docs/DMSAEFeeGuideCaletilate . asp 6/8/2012