HomeMy WebLinkAbout2012-057 Board of Count Commissioners
Y
1801 27th Street �Q 1
Vero Beach , Florida 32960
Telephone : ( 772 ) 567 -8000 FAX : ( 772 ) -778-9391
Field and Laboratory Quality Control ( QC )
for
66th Avenue Roadway Improvements, Phase 2
(4th Street to 16th Street )
IRC Project No . 9810B
WORK ORDER NO . 1 ( Engineering Division )
FOR
FOR PROFESSIONAL GEOTECHNICAL SERVICES AGREEMENT
FOR ANNUAL GEOTECHNICAL SERVICES CONTRACT RFQ No . 2010021
WITH
DUNKELBERGER ENGINEERING AND TESTING , INC .
All services performed under this contract shall be supervised and certified by a licensed Professional
Engineer ( PE ) registered with the State of Florida and staff employed directly with your firm .
Scope of Services
All work shall be performed on a unit price basis in accordance with the attached Scope
of Services
( Exhibit A ) dated February 22 , 2012 and shall comply with Standards enumerated in the ANNUAL
GEOTECHNICAL SERVICES CONTRACT RFQ 2010021 WITH DUNKELBERGER ENGINEERING AND TESTING ,
INC . Effective Renewal Date :
March 2 , 2010 .
Minimum Specification Requirements as follows :
Soil Compaction
Concrete Compressive Strength Testing
Asphaltic Roadway Surfacing Testing
Laboratory testing
Engineering reporting
Pile driving inspection and engineering
All work shall also comply with the current Florida Minimum Technical Standards .
C . ADocoments and Settings\craigdALocal SettingsV"Femporary Internet FilesVOLK74\agenda WON I DUNK ELBE RGER 3-22- 12
mm doc
WO # 1
66th Avenue Roadway Improvements, Phase 2
( 4th Street to 16th Street )
IRC Project No . 98108
COMPENSATION .
The COUNTY agrees to pay, and the Geotechnical Professional agrees to accept, a fee for services
rendered according to the " Scope of Services " identified in the attached EXHIBIT " A " Fee Schedule and
Man Hours .
A Not-to - Exceed Amount of: $ 85 , 497 . 00 to be paid on a unit price basis for actual work performed in
accordance with the schedule of services and fees set forth in Exhibit A of RENEWAL OF THE ANNUAL
GEOTECHNICAL SERVICES CONTRACT, RFQ 2010021 WITH DUNKELBERGER ENGINEERING AND TESTING ,
INC . Effective Date : March 3 , 2012
TIME FOR COMPLETION
This Work Order No . 1 shall run concurrently with the construction work for the 66th Avenue Roadway
Improvements , Phase 2 ( 4th Street to 16th Street )
IN WITNESS HEREOF the parties hereto have executed these presents
This rr1_ day of Apr ; 1 , 2012 .
ta,
OWNER DUNKELBERGER ENGINEERING & TESTING ,
BOARD OF COUNTY COMMISSIONERS INC .
iNDIAN RIVER COUNTY, FLORIDA
Gary C. Wh r, Chairrhan Craig . Dunkelberger, P . E . , Principa n ' neer
Approved bty RCC04 - - 03 - 12
Witnessed by:
ATTEST: j
Jeffrey K . Bar , Clerk of irc ourt
��hqc% vt �j
Deput Clerk (Printed name)
Approved as to Form and Legal
Sufficiency :
Alan S. Polackwich, Sr., County
Attorney
rR1 I M
oseph A Baird , County Administrat r
C Documents and SettingsVaig&Local Settings\Temporary Internet Fdes`.OLK74\agenda WO# I DUNKELBERGER 3 -22- 12
mm doc
Estimated Scope and Budget EXHIBIT ,A, Attachment A
Construction Materials Testing Services
Project Name : 66th Avenue Roadway Improvements - Phase 11 Dunkelberger Engineering & Testing , Inc.
Vero Beach (Indian River County), Florida 607 NW Commodity Cove
Client: Indian River County Attn : Michael D. Nixon , PE Port St, Lucie , Florida 34986
Dunkelberger Project No. : PSL-09-3054 ( BG 10.4) (772) 344-9787 FAX (772) 343-9404
Date : February 22 , 2012 Contact: Xiaoyan (Sue) Zheng
Construction Testing Services Contract Amount Previously Completed Completed This Invoice Completed to Date Remaining
on Contract
Itemized Services Qly Unit Price Amount Qty Amount Qty Amount Qty Amount Qty Amount
L Field Observation & Testing
A. Senior Engineering Technician
-Earthwork, Subsoil Excavation Insepction , 90 hour $55 .00 $4 , 950.00 0 $0-00 8 $9.80 0 $9:Go 90 $4,
950 .00
Sampling , and Standby
B- Density Tests
-Embankment 340 test $23. 00 $7 ,820. 00 0 $0-90 0 $"0 9 $0:98 340 $74820 .00
-Storm Drainage 1500 test $23.00 $34 , 500. 00 0 $0.00 8 $00-00 9 $0:98 1500 $34,500 .00
-StablCompacted Subgrade 125 test $23.00 $2 , 875 . 00 0 $&9G 0 $0.88 0 $0-G9 125 $2 ,875.00
-Base Rock 150 test $23.00 $3 ,450 .00 0 $0-80 0 $0.00 0 50 88 150 $3,450.00
-Sidewalk Subgrade 124 test $23.00 $2 ,852.00 0 38:00 0 $8 09 0 $8 W 124 $2,852.00
C . Concrete Testing
-Curbs, Sidewalks, Bridge Substructure, 100 set $85. 00 $ 8,500 .00 0 $0-00 0 $0.00 0 $O:AG 100 $8,
500. 00
Superstructure , and Approach Slabs
Subtotal $649947.00 $0:08 $0:00 $0:80 $64,947.00
ll. Laboratory Testing
Proctors (r-99 and T-180) 20 test $86 .00 $1 ,720 . 00 0 $G:GG 0 $0.00 0 $0-00 20 $
16720 .00
Liquid Limit of Soils (T89) 5 test $45.00 $225. 00 0 $0.00 0 $040 0 $0:80 5 $225 .00
Plastic Limit and Plasticity Index of Soils (T90) 5 test $45 .00 $225 . 00 G $0-OG G 5009 9 $0:80 5
$225 .00
Limerock Bearing Ratio (LBR) 15 test $300.00 $4 ,500 .00 0 $0-00 8 $8:00 0 $0-00 15 $4
,500.00
Subtotal $61670.00 $0-00 $0 00 $000 $6 ,670.00
Ill. Engineering 8 Reporting
Project Engineer' 36rhou, $95 , 001 $3 ,420 . 00 01 0 ¢v&G9 0 $989 36 $3 ,420 . 00
Allowance forsite meetings, trouble-shooting,
and consultation. Test costs include engienering
and reporting
Subtotal $32420.00 $0 00 x0:00 $0;00 $31420.00
IV. Pile Inspection & Engineering
Senior Inspector' 90 HR $55.00 $4, 950 .000 $Gr9G 0 $G AG 0 $000 90 $4 ,950.00
PDA Tests and CAPWAP analysis (by others) 1 LS $4,750.00 $4,750 .OD 0 $&8B 0 $0 00 G $0:00 1 $41750.
00
Project Engineer" 8 HR $95.00 $760 .00 0 $0.80 0 $808 G $"0 8 $760 . 00
Principal Engineer`* 0 HR $ 145.00 $0 .00 8 $G-08 0 50:90 0 $0 G8 0 $0 . 00
" Assume two days of test pile installation and 7 days of production pile installation
`* Perform WEAP analysis and develop recommendations for production pile lenghts and installation criteria . Prepare final report
Subtotal $ 10,460.00 $&08 $030 $0 G0 $10 ,460.00
TOTAL $ 85 ,497 . 00 $8 98 $8 98 $8:90 $ 851497 . 00
3054 (10 .4) . curt est revised on March 1l .xls