Loading...
HomeMy WebLinkAbout2011-113 Board of County Commissioners Administration - Building A ( South) 5d7 -17 - I ' 180127th Street Vero Beach , Florida 32960 ' Telephone : (772 ) 567 - 8000 FAX : 772 - 778 -9391 Project : Oslo Boat Ramp — IRC Project No . 0381 AMENDMENT NO . 2 to WORK ORDER NO . 1 ( Engineering ) FOR PROFESSIONAL SERVICES AGREEMENT WITH G . K . ENVIRONMENTAL , INC . This AMENDMENT NO . 2 TO Work Order No . 1 ( Engineering ) is in accordance with the existing original AGREEMENT dated March 15 , 2005 and amended on March 4 , 2008 and September 21 , 2010 , between G . K . Environmental , Inc . ( CONSULTANT) and Indian River County ( COUNTY) . Due to continued interventions from local objectors and subsequent requests for plan revisions and additional information from State Federal permitting agencies and their commenting agencies, additional environmental work / assistance to the County will be required. This AMENDMENT NO . 2 TO Work Order No . 1 amends the agreement as follows : PROJECT LIMITS This AMENDMENT NO . 2 TO Work Order No . 1 is for the CONSULTANT to perform environmental services as required in Scope of Services for State and Federal Environmental Resource and individual permits . SCOPE OF SERVICES As agreed upon between G . K . Environmental , Inc . and Indian River County , the CONSULTANT shall provide environmental services to complete all tasks as outlined in this AMENDMENT NO . 2 TO Work Order No . 1 and described as follows : TASK I — Permit Application Re -Submittal Assistance / Meetings ( $ 2 , 420 . 00 ) PHASE I : CONSULTANT to assist COUNTY staff and COUNTY ' S engineer and surveyor to complete required field work / meet / review work with COUNTY , review drawings , and permit application , revisions as required by commenting and regulatory agencies . GKE will meet with County staff and State and Federal staff to provide assistance with the project . F : \Public Works\ENGINEERING DIVISION PROJECTS\0381 B-OSLO BOAT RAMP Phase Il \Admim\Contracts\GK Environmental\OBR Amendment No 2 to Work Order No 1 4-9- 11 . doc GK Environmental , Inc. Oslo Road Boat Ramp Amendment No . 2 to Work Order No . 1 May 17 , 2011 BCC Agenda Page 2 of 4 TASK IV — Revised Mitigation Plan (revised for retention pond relocation and new compliance ACOE regulations) ( $ 29640 . 00 ) PHASE IV : CONSULTANT will meet with COUNTY and permit agency staff to finalize mitigation plan and inspect mitigation sites for compatibility and prepare a revised draft mitigation plan , based upon the ecological values of wetland impacts . This revised plan will be based on recent reduction in wetland impacts and field/office meetings with the ACOE / SJRWMD . Boat trip to mitigation sites for ACOE / SJRWMD will be provided to inspect site . TASK V — Revise Uniform Mitigation Assessment Method ( UMAM ) ( $ 440 . 00 ) PHASE V : CONSULTANT will conduct a Uniform Mitigation Assessment Method ( UMAM ) and/or a Wetland Rapid Assessment Procedure (WRAP ) of the wetlands located within the boundaries of the project site . UMAM/WRAP determines a numerical value for the ecological functions and ecological values of the existing wetlands and mitigation site . The UMAMANRAP score can be used to determine what type / amount of mitigation will be required for the project site . The UMAM/WRAP score is based on vegetation , wildlife usage , hydrology , soils , water quality , success factor, and adjacent property . These scores will be reviewed with both the ACOE and SJRWMD . TASK VII — Revised Vegetation Survey ( FLUCCS ) — ACOE Requirement with new plan ( $ 440 . 00 ) PHASE VII : CONSULTANT will conduct a systematic survey of vegetation using the Florida Land Use, Cover and Classification System (FLUCCS), A Technical Report. FLUCCS was developed by the State of Florida , Department of Administration , Division of State Planning , Bureau of Comprehensive Planning , April 1976 . CONSULTANT ecologist will base the vegetative community descriptions upon field survey observations , SCS soil maps , aerial photograph interpretation , and site inspections . TASK IX — Response to Agency Requests for Additional Information ( RAI ) ( $ 29640 . 00 ) PHASE IX : Following agency permit application review of additional information and revised drawings , CONSULTANT will meet with County and Agency Staff, and respond to all environmentally related questions outlined in agency letters requesting additional information ( RAI letters) . The above estimated cost is to cover one additional round of SJRWMD RAI responses and ACOE RAI responses . F : \Public Works\ENGINEERING DIVISION PROJECTS\0381 B-OSLO BOAT RAMP Phase II\Admim\Contracts\GK Environmental\OBR Amendment No 2 to Work Order No 1 4-9- 11 . doc GK Environmental , Inc. Oslo Road Boat Ramp Amendment No . 2 to Work Order No . 1 May 17 , 2011 BCC Agenda Page 3 of 4 TOTAL AMENDMENT NO. 2 COST $ 8 , 580 . 00 NOTE 1 : The above costs include additional GKE staff, boat , fuel , and equipment . NOTE 2 : If required , following permit application submittal and agency review , GKE will complete any required additional environmental work / meetings . A separate amendment will be provided if necessary for any additional environmental permitting assistance costs and post construction assistance and monitoring . Services Not Included The following services / fees are not included ( if required ) in this agreement , but will be coordinated and reviewed by CONSULTANT : 1 ) Surveying / engineering 2 ) Legal work 3 ) Engineered permit drawings 4) Water quality " laboratory" analysis ( HBOI ) COMPENSATION This section of the AGREEMENT entitled CONSULTANT FEES / COMPENSATION shall be revised in response to the Scope modifications set out herein . The charges associated with this AMENDED AGREEMENT are as follow : Fees for Environmental Services : Work on TASKS I through XV AS AMENDED ABOVE NOT -TO - EXCEED $ 8 , 580 . 00 F :\Public Works\ENGINEERING DIVISION PROJECTS\0381B-OSLO BOAT RAMP Phase Il \Admim\Contracts\GK Environmental\OBR Amendment No 2 to Work Order No 1 4-9- 11 . doc GK Environmental , Inc. Oslo Road Boat Ramp Amendment No . 2 to Work Order No . 1 May 17 , 2011 BCC Agenda Page 4 of 4 The AGREEMENT is hereby amended as specifically set forth herein . All remaining sections of the AGREEMENT shall remain in full force and effect , and are incorporated herein . IN WITNESS WHEREOF the parties hereto have executed these presents this 17 day of May , 2011 . OWNER G . K . ENVIRONMENTAL , INC . BOARD OF COUNTY COMMISSIONERS INDIAN RIVER COUNTY, FLORIDA 017 ee • e0 e0e 0000 ®�a eee /O ^^ Cr Al Bob Solari , Chairman o" •':� , orge ftYc7zy i resi t 0 ; ,. , , .` , . Environmental, Inc . e h e o a � e n to �Ia O e909 • e , • bfR. -(j(jV5$•{yfY�Y elV�0i�p0-�..y�' J Approved by BCC May 17 , 2011 ATTEST • Witnessed by: Jeff r K . arto CI r of Circuit Court eputy CI (Si ature ) Approved as to Form and Legal Sufficiency : laj % a L J/ ! / 14ttt) , �r � � 01 , Alan S . Polackwich , Sr. , COUNTY Attorney (Printed name)0 J-osepFA . Bdird ,�C60qfV Administrator F : \Public Works\ENGINEERING DIVISION PROJECTS\0381 B-OSLO BOAT RAMP Phase II \Admim\Contracts\GK Environmental\OBR Amendment No 2 to Work Order No 1 4-9- 11 . doc