Professional Services
for
OSLO ROAD IMPROVEMENTS , PHASE II , BETWEEN 43RD AVENUE AND 27TH AVENUE
CUMBERLAND FARMS
AMENDMENT NO . 1
to
WORK ORDER NO . 27 ( Engineering Division )
FOR
Continuing Contract Agreement for Professional Services
WITH
Geosyntec Consultants , Inc .
This Amendment No . 1 to Work Order No . 27 is entered into pursuant to the Continuing
Contract Agreement for Professional Services entered into August 10 , 2004 and amended July
24 , 2007 ( as so amended , the " Agreement" ) , by and between Indian River County Board of
County Commissioners ( " COUNTY" ) on the same terms as the existing Agreement , as
extended , between the Indian River County Solid Waste Disposal District , a dependent special
district of Indian River County , Florida , ( " DISTRICT" ) AND Geosyntec Consultants , Inc . , a
Florida Corporation ( " CONSULTANT" ) .
The COUNTY has selected the CONSULTANT to perform the professional services set forth on
Attachment A , attached to this Amendment No . 1 to Work Order No . 27 and made part hereof
by this reference . The professional services will be performed by the CONSULTANT for the fee
schedule set forth in Attachment B , attached to this Amendment No . 1 to Work Order No . 27
and made a part hereof by this reference . The CONSULTANT will perform the professional
services within the Schedule more particularly set forth in Attachment A , attached to this
Amendment No . 1 to Work Order No . 27 and made a part hereof by this reference all
in
accordance with the terms and provisions set forth in the Agreement . Pursuant to paragraph
1 . 4 of the Agreement , nothing contained in any Work Order or Amendment to Work Order shall
conflict with the terms of the Agreement and terms of the Agreement shall be deemed to be
incorporated in each individual Work Order or Amendment to Work Order as if fully set forth
herein .
COMPENSATION .
The COUNTY agrees to pay , and the CONSULTANT agrees to accept , a fee for services
rendered according to the " Scope of Services " identified in Attachment B - Fee Schedule and
Man Hours .
C :ADocuments and Settings\ilangenbach\ Local Settings\Temporary Internet Files\Content.Outlook\8GDL7Z7G\Work Order 27 -Amend No I 1I -
22-
IO . doc
ti
Page 2
AMENDMENT NO , 1 TO WO #27 — Geosyntec Consultants , Inc .
Oslo Road Phase II — 43 `d Ave to 27th Ave
A Not-to - Exceed Amount of: $ 180 , 645 . 32 to be paid on a unit price basis for actual work
performed in accordance with the schedule of services and fees set forth in Attachment B .
IN WITNESS HEREOF the parties hereto have executed these presents
Pa 0
This 7th day of December-,r 2010 . +t•, .00 M „SS •...
i
t� t ��/t�=„
i
OWNER GEOSYNTEC CONSULTANTS , INC .
BOARD OF COUNTY COMMISSIONERS �' e
INDIAN RIVER COUNTY, FLORIDA
. a
� a4
a ,_y
C !� •. • a
6
/ 0. . .p{. • �)br^av ap
4 �Q •� �� bbOb� l VO� {V • " O '"ddb
- aa4a44aanb4p
(Signature) (Signature)
Bob Solari , Chairman Thomas A. Peel , Ph . D . , Vice President
Approved by BCC 12 / 7 / 10 Witnessed by :
ATTEST :
Jeffrey K . Barton , Clerk of Circuit Court
3�L�' 0�a�
Deputy Clerk (Printed name)
Approved as to Form nd Legal Sufficiency :
Alan S . Polackwich , Sr. , County Attorney
6 eph A . trd , Courfty A ministrator
C :ADocuments and Settings\jlangenbach\ Local Settings\Temporary Intemet Files\Content . OUClook\8GDL7Z7G\Work Order 27 -Amend No I 1I -
22 -
IO . doc
t.
GeosMtec6770 South Washington Avenue, Suite 3
Titusville, Florida 32780
13I-1 321 . 269. 5880
consultants FAX 321 . 269 . 5813
ATTACHMENT
� TTACH � A wwmNv . geosyntec. co
1 l � j 22 November 2010
Mr . Michael Nixon
Roadway Production Manager
Engineering Division
Indian River County
1801 27th Street (Bldg A)
Vero Beach , Florida 32960 - 3388
Subject : Amendment # 1 to Work Order 427
Proposal for UST Closure , Petroleum Contaminated Soil and Groundwater Source
Removal , UST Closure/Source Removal Report
Cumberland Farms # 0955
2614 Oslo Road , Vero Beach , Florida
FDEP Facility ID No , 318520246
Geosyntec Consultants ( Geosyntec) is pleased to submit this Work Order Amendment to Indian
River County (IRC) for underground storage tank (UST) closure , petroleum-impacted soil and
groundwater source removal activities and reporting services to be completed at the Cumberland
Farms #0955 ( Site) , located at 2614 Oslo Road , Vero Beach , Florida . This Amendment 91 to
Work Order #27 has been prepared in accordance with the Professional Services Agreement
(PSA) between Geosyntec and Indian River County Solid Waste Disposal District . An overview
of the proposed project scope of activities follows .
PROJECT OVERVIEW
Geosyntec completed petroleum-related assessment activities at the Site on behalf of IRC in May
2010 . Field investigations identified the presence of low-level petroleum constituents in the soil
and groundwater in two limited areas of the Site at concentrations above Florida Department of
Environmental Protection (FDEP) soil and groundwater cleanup target levels . IRC purchased
the Site in 2009 for the intended purpose of widening Oslo Road . As a component of the
planned future use of the Site, the existing UST system requires closure in accordance with
FDEP requirements and identified petroleum impacts to soil and groundwater warrant
remediation . Addressing the identified petroleum contamination at the time of the UST closure
XR 10109/CCR 10080 . DOC
engineers I scientists I innovators
Mr . Michael Nixon Geosyntecc
22 November 2010 coll .t , o ., nl ,
Page 2
work (while the contamination is accessible) offers a high potential for mitigating the need for
future monitoring wells and/or groundwater remediation in the Oslo Road right- of-way in the
future .
Based upon the findings of supplemental assessment activities performed by Geosyntec in May
2010 , and discussions with IRC Engineering Division staff and the Brevard County Natural
Resources Management Office (responsible for petroleum cleanup program in IRC ) , the
following general work scope was developed :
• properly close the three existing 8 , 000 gallon USTs , including the product piping
distribution system , in accordance with FDEP requirements with the associated
demolition and disposal of the overhead canopy structure ;
• dewater the petroleum- impacted area associated with the existing USTs and a former
UST area and perform petroleum source removal activities during the time of UST
closure work to remediate identified soil and groundwater impacts ;
• provide treatment of petroleum-impacted dewatering fluids , with discharge of the treated
fluids to the existing storm water basin on the eastern side of the Site ;
• dispose of the USTs , piping , canopy, concrete footers and excavated non-hazardous
petroleum -impacted soils at the IRC Class I landfill ;
• backfill the excavation areas with clean compacted backfill in 6 -inch lifts to provide a
stable soil sub -base for the planned road widening activities ;
• perform all required soil and groundwater sampling and environmental oversight during
the performance of the UST removal and impacted - soil excavation activities ; and ,
• complete the FDEP -required storage tank system closure report , which will also include
a description of the source removal activities .
The proposed scope of work for the services described above has been broken dawn into three
separate Tasks as described below.
XR 10109/CCR 10080 .DOC
engineers I scientists I innovators
Mr . Michael Nixon Geosyntec °
22 November 2010 ( 11„11 ) u ' " ”
Page 3
Task 1 — Preliminary Activities and Proiect Mannement
Task 1 includes project management for the entire project and activities required to implement
the proposed work . Specific activities include ; project planning and management responsibilities
such as correspondence with IRC and IRC Department of Health, Brevard County Natural
Resources , meetings with IRC personnel , subcontracting , invoice review, project coordination ,
review of subcontractor required deliverables and project administration . The project
management phase also includes budget for revisions to the OSHA-required Site- Specific Health
and Safety Plan to reflect the proposed excavation work to be conducted at the Site .
Geosyntec prepared bid specifications (which were reviewed by IRC) , drawings , and a schedule
of prices suitable for subcontractor bidding of the petroleum related work. Geosyntec received
price quotes from three subcontractors qualified to perform the scope of services related to the
project scope . A review of the bids revealed a bid of $ 150 ,200 by PR&D , a bid of $ 145 ,497 by
Florida Environmental Compliance Corporation (FECC) , and a bid of $ 89 , 950 by HCC
Environmental Services (HCC) . Based upon follow-up telephone communications with HCC ,
regarding the price and schedule , HCC confirmed that they can complete the specific services
outlined in the scope of work for the proposed price . Geosyntec recommends that the low
bidder, HCC , be selected for the project as the petroleum contractor . Bid pricing information
and a copy of the bidding package is included as Attachment C . A detailed breakdown of
estimated project costs is included as Attachment B .
Task 2 — UST Closure/Source Removal Activities
Task 2 includes project activities associated with implementing the UST closure and source
removal activities , including the following :
e install and operate a dewatering system with the objective of lowering the water table to
a minimum of 10 ft below land surface within the proposed excavation areas ;
o set-up and operate dewatering fluids treatment equipment, which will include an air
stripper with treated effluent discharge to the stormwater area in the eastern portion of
the Site ;
XR 10109/CCR 10080 . DOC
engineers I scientists I innovators
Mr . Michael Nixon Geosyntec °
22 November 2010 " ' "S` II "' " "
Page 4
• provide a mobile laboratory (one day) at the time of start-up of the dewatering fluids
treatment equipment to document that the dewatering treatment system meets discharge
standards ;
• perform activities associated with the proper closure and off- site disposal of the three ,
8 , 000- gallon USTs , including required soil and groundwater sampling ;
• excavate petroleum contaminated soil from two areas , with soil sampling and off.- site
disposal of soil to the IRC Class I landfill (NOTE : Costs for the transport of the
excavated soils to the IRC Class I landfill are included in this proposal ; however,
this proposal assumes costs for the disposal of the excavated soils [ tipping fee (s) ]
will be handled internally by IRC) ;
• provide and place clean backfill (in compacted 6 -inch lifts) , perform soil density testing ;
and ,
• perform the required sampling of two temporary groundwater monitoring wells in the
excavation areas and remove wells upon completion of sampling activities .
Geosyntec will subcontract UST closure/source removal services to HCC , perform oversight of
the subcontractor during field activities , conduct required soil and groundwater sampling
activities and flame ionization detector (FID ) monitoring in accordance with FDEP
requirements . Geosyntec will document construction progress and ensure that activities are
completed in accordance with the plans and specifications and perform all soil density testing
activities during backfilling . Due to the uncertainties associated with the source removal
activities , a 20 percent contingency has been added to the Task 2 costs . The contingency is in
place to cover items such as increased excavation volumes (based upon the discovery of
additional petroleum- contaminated soil during excavation) , increases in project duration due to
weather , etc . Geosyntec will notify IRC of any field conditions that may require accessibility of
contingency fees . Geosyntec ' s proposal assumes 20 days of project related field work/oversight
activities associated with the UST closure/source removal activities . A detailed breakdown of
estimated project costs is included as Attachment B .
XR 10109/CCR 10080 . DOC
engineers I scientists I innovators
Mr. Michael Nixon Geosyntec °
22 November 2010
Page 5
Task 3 — Reporting
Geosyntec will prepare a Tank Closure/ Source Removal Report in accordance with Chapter 62 -
761 , Florida Administrative Code (FAC) and FDEP Storage Tank System Closure Requirements .
The report will include photographs documenting the UST closure work and petroleum source
removal activities , laboratory analytical results for collected soil and groundwater samples in
tables and figures , and a detailed summary of the field activities completed at the site . It is
anticipated that the report will include a recommendation for No Further Action (assuming
sampling results do not exceed any cleanup target levels) . The final reports ( four hard copies
and one electronic copy to be provided to IRC) will be signed and sealed by the Florida- licensed
professional engineer in responsible charge of the project . A detailed breakdown of estimated
project costs is included as Attachment B .
ASSUMPTIONS
The following assumptions were made in developing this fee proposal :
• Excavated soil Will be transported to the IRC Class I landfill for disposal as non
-
hazardous waste . Costs for soil disposal at the IRC Landfill are the responsibility of IRC .
• IRC staff will sign/execute all waste/soil disposal manifests .
• All site work can be performed in Level D personal protective equipment .
® Project work can be performed beginning in January 2011 .
• Geosyntec and our subcontractors will be able to work unimpeded seven days per week
between from 7 am - 7 pm .
SCHEDULE
Upon receipt of a signed Work Order for Amendment # 1 from IRC , Geosyntec will immediately
initiate field activities scheduling . Geosyntec anticipates initiating project field work in the
beginning of January 2011 and completing the field activities by the end of January . It is
anticipated that UST Closure and Source Removal Report will be submitted to IRC personnel by
XR 10109/CCR 10080 .DOC
engineers I scientists I innovators
Mr . Michael Nixon Geosyntec °
22 November 2010
Page 6
the end of February 2011 . IRC will be notified immediately of potential project delays which
could impact schedule .
CLOSURE
Geosyntec appreciates the opportunity to submit to IRC the attached fee proposal (Attachment
B ) for services at the Site . If this proposal is acceptable to you, please indicate your agreement
by signing Amendment # 1 to Work Order 927 which references this proposal . Please return one
signed authorization to Mr . Langenbachs ' attention . Please call either of the undersigned with
questions you may have as you review this letter or the fee proposal .
Sincerely ,
James J . Langenbach , P . E .
Associate
Thomas A . Peel , Ph . D .
Florida/Gulf Coast Operations
Managing Principal
Attachments
xR 1 a 1 o9iccR 1 ooso .Doc
engineers I scientists i innovators
ATTACHMENT B
Table 1
Summary of Estimated Costs
Indian River County
Oslo Road Cumberland Farms , UST Closure/Source Removal and Reporting
Proposal No. XR10109
Labor Direct External
Task Task Description Hours Labor Expenses Expenses Total Cost
1 Preliminary Activities 42 $45856 . 78 $244 . 70 $ 53101 . 48
2 UST Closure/Source Removal Activities 272 $281461 . 40 $ 6 , 770 . 84 $ 100 , 380 . 98 $ 135 , 613 . 22
3 Reporting 88 $ 9 , 363 . 66 $459 . 41 $ 95823 . 07
Subtotal 402 $42 ,681 . 84 $794.74 . 95 $ 100 ,380 .98 $ 1509537 . 77
Contingency on Task 2 (20 % ) 5301107 . 55
TOTAL WITH 20 % CONTINGENCY ON TASK 2 $ 180964 .32
Notes:
1 . Direct expenses includes 3 % Communications Fee .
2 . External expenses include 7 % subcontractor markup .
3 . Contingency budget amount will not be utilized withour prior written approval from IRC personnel .
Page 1 of 1 Geosyntec Consultants
ATTACHMENT C
SUB - CONTRACTOR BIDS
FECC , INC . d / b / a Florida Environmental Compliance Corporation
C 3652 Old Winter Garden Road , Orlando , Florida 32805
Telcphone 407 /296 -9995 Facsimile 407 /296- 9125
October 28 , 2010
Mr . .11m Langenbach
Geosyntec Consultants , Inc .
6770 S . Washington Avenue , Suite 3
Titusville , FL 32780
Phone 321 /269 - 5880 ; FAX 321 /269 - 5813 ; Cellular 321 /403 - 3784 ;
E -Mail : jlangenbach@geosyntec . coni
R E : Scope of Work and Cost Proposal
Indian River County ( [RC) - Three 8 , 000- Gallon UST Closures , and
Site Excavation / Restoration Activities for Oslo Road Widening Project
Site : Cumberland Farms #f0955 , 2614 Oslo Road , Vero Beach , FL
FECC Proposal 4 100 10 17010
Dear Mr . Langenbach :
I' ECC , INC . (FECC ) is pleased to submit for consideration the included proposal . The
proposed scope of work and cost proposal for the above referenced project is based upon our
discussion with you regarding the project , our visit to the site, applicable environmental
regulations and our experience with projects of this nature . All work will be performed in a
timely manner using professional workmanship , and in accordance to federal , state and local
regulations . All personnel are OSFIA 40 - 1-101. 11- certified . At the end of the project a copy of
I p ►-open documentation will be provided .
FECC is licensed and fully insurecl with $ 5 million of coverage for general liability,
pollution liability and professional liability . We have been in business since 1989 and have
successfully excavated , transported and /or disposed of over one billion pounds of hazardous ,
TSCA , peU-oleum and industrial waste . FECC has also removed over 300 USTs and has
installed numerous ASTs and USTs . FECC is a Qualified Small Business by the Small
Business Administration . FECC is a Certified Pollutant Storage Systems Contractor
( PCC049520) , a Building Contractor ( CBC 1250388 ) , and is an FDEP - Qualified PetroleLIIII
Cleanup Contractor .
Thank you for the opportunity to be of service to you . If you have any questions or wish to
schedule the project, please contact me at 407/296 - 9995 x 201 , or on my cellular phone at
407 / 832 - 6811 .
Sincerely ,
rECC , INC .
(1,11oAtien a. xkf &,ul / Lanz Avaywe Q. gCiTf Mnd / Win
Gordon A . Kirkland Dwayne A . Kirkland
President Viee President
GAK / DAKA (Im
Pagc 2
Geosyntec Consultants , Inc .
FECC Proposal # 1001017010
October 28 , 2010
SCOPE OF WORD AND COST PROPOSAL
for
Indian River County ( IRC) - Three 8 , 000 - Gallon UST Closures , and
Site Excavation / Restoration Activities for Oslo Road Widening Projcct
Site : Cumberland Farms 40955 , 2614 Oslo Road , Vero Beach , FL
1 . INDIAN RIVER COUNTY ( IRC ) - TI--IREI? 8 , 000- GALLON UST CLOSURES
Furnish labor, equipment , and materials required to complete the scope ol' work per the
Request for Bid specifications c - mailed to FECC on October 21 , 2010 . In addition ,
FECC received both sets of Questions and Answers dated October 25 , 2010 .
l4or Item 2 . 7 , dewatering will be performed using wellpoinls , airs 11) 1) ci and carbon
vessels .
FECC will comply with the applicable trench safety standards .
See the attached . pdf f ile ( 1 page ) for FECC ' s signed Schedule of Prices , containing a cost
breakdown for Bid Items # 1 . 1 to # 2 . 12 .
TOTAL ESTIMATED COST . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 145 ,1497 * 00
11 . ASSUMPTIONS
• Priccs are valid for ( 60 ) sixty days and are subject to change without notice . Prices arc
based on current fuel prices .
• The final invoice alllollllt Will include any change orders and/or additional work . Balance
is due upon completion of the project .
Ifyou wish to schedule the project , please sign the acceptance below and FAX back to me at
407/296 - 9125 .
ACCEPTANCE
The scope of the services defined in the above agreement is accepted and FECC , INC . is hereby
authorized to proceed with the work . All invoices are due upon receipt . Finance charges of
1 . 5 °/, per month ( 18 °/, per annual ) will be added to any account not paid in 30 days . Any cost of
collection for non - payment including attorney' s fees and court costs shall be additional charges to
this proposal . Any legal action taken for collection of past due accounts or any other legal action
will be brought to the appropriate court in Orange County, Florida .
Approval by Geosyntee Consultants , Inc . :
By :
J -
TitIc :
Date :
SCHEDULE OF PRICES - CUMBERLAND FARMS # 0955 , 2614 Oslo Rd , Vero Beach , Florida
Bid Item
Extended
N Item Description Unit Unit lily Cost _
t General
Provision of 40 Hr OSHA Training Certificates for Site Workers and Documentation of PSSC
1 . 1 licenseLS � �: � 5, Sti ^ " - S 250 . 00
tEsr � «
250 . 00
1 . 2 Preparation and provision of Ea thwork Work Plan and Project ect Schedule LSITT
- - - -
1 . 3 Mobilization to Site ' � q 4i5ro '
--- -- - - LS 71500 . 00
---- "„� ;��.�idwt5, � . _ . ; $
1 . 4 Demobilization I STa ° af $ 1 , 500 . 00
$ --
IT
+Tr -
1 . 5 Provision of required pose c xcavaI ion documentation 1_ S _ 500000
IT
2 Site Work
2 . t Installation of tem orar G ft chain link security fence (as outlined on drawings) LS
}
temporary - Y - ,i. . $ 3 , 000 . 00
Y
2 . 2 Installation of silt fence Ls------ - ----------
IT
;._ °r $ 600 . 00
Remove and dispose ( includes 1 & D) of overhead canopy structure , pump islands and looters
$ 8r
2 . 3 ( including electrical disconnects LS
-- - --- - -- - -- ------ -- -- - ---- - .. ..,�, � , 0 00 . 00
zip r.
_ --- �] - _
' r ,
Remove and dispose ( includes T& D) of on -site signage and associated footers ( including
2 . 4 electrical disconnects r #,
Pf
# F
WT
IT
VAC truck and/or equivalent services associated with cleaning of the three USTs prior to rf
removal , including proper oft-site disposal of rinseale and/or petroleum contact fluids and any
jrjz
LS j 3 , 500 . 00
2 . 5 stud e from three USTs �
Remove and dispose ( includes T & D) of three , 8 , 000 gallon USTs , piping system , and ' � z `
2 . 6 asphalt/concrete debris LS lkk
,
---- ----- � , tart ..r_ 1 $ 16 500 . 00
__ ____.-__-_-____.---- __-__-- _- iMT
Over - excavation of UST area and lormer UST area to 10 It bis with associated sol stockpilin
ov
( including dewatering/treatment and/or saturated zone excavation with aeration and follow- up �� $ rtt
excavation draining ) . DESCRIBE IN DETAIL IN A COVER LETTER THE SELECTED
� ' ''
2 .7 IMPLEMENTATION APPROACH LS I�� .: y11 � v ;y4 ' $ 54 , 021 . 00
Off -site TRANSPORT of excavated soils ( soil disposal in IRC Class I landfill - tipping fee covered
2 . 8 infernally by IRC) - - BCY $ 4 . 82 1800 $ 8 , 676 . 00
Purchase , delivery and backfilling ( in dry dewalered condition ) with clean fill and associatedpaBCY $ 20 . 00 1800 $ 361000000
2 . 9 compaction in accordance with Section 02200 Earthwork
IT
;v0) g. rj .¢ ITT
2 . 10 Installation and removal of 2 temporary 12 It pre - pack monilorincclwells - -- I_S _ , sx r �n 'a � `; $
400 • 00
s`Iryy111-r
R�2YRarf ----.--
Final grading and site cleanup (includes removal of chain link fence and removal and disposal ofTIT I
2 . 11
2 . t t silt fence_ _- - _ _ L_S yy �y 1y � r, 2r800000
Additional Excavation Beyond Defined Area ( includes any additional costs for stockpiling ,
2 . 12 pavement/concrete removal and disposal and restoration ) BCY $ 26 - 00
Rr+�n`PSc`3". , .�,y ' �t u t �: k 5
IT
IT
Js+. .' I y
TOTAL $ 145 497 . 0
Notes :
1 . LS Items to be reimbursed following completion of specific tasks in accordance with the specifications .
2 . BCY - Bank cubic yards .
3 . Any volume to tonnage based calculations/conversions shall be based upon an assumption of 1 . 4 Ions/cy
4 Unit rate items to be reimbursed in accordance with the actual units completed (e . g . it 1650 BCY are excavated 2 . 310) tons
) , only 1 , 650 BCY shall be
charged ) . Additional excavation volurrmes , transport , and disposal ( items 2 . 12 ) will not be reimbursed unless PRIOR WRITTEN APPROVAL
is provided by
Geosynlec .
5 . The SUBCONTRACTOR bid shall include written assurance that SUBCONTRACTOR will comply with the applicable trench safety standards .
SUBCONTRACT R : `F C , INC . , 36 2 OLD WIN�rER GARDEN ROAD , ORLAN _ 32805
�-' - '
SIGNATURE :
DATE
DWAYNE KIRKLrAND , VICE PRESIDENT = 10 / 28 / 10
�ti. .
PETROLEUM RESOURCES & DEVELOPMENT , INC .
2460 N Courtenay Pkwy , Suite 112
Merritt Island , FI . 32953
TEL: ( 321 ) 986-6026 FAX : ( 321 ) 986-6036
10 -28 - 10
Jim Langenbach
6770 S Washington Ave , Suite 3
Titusville, F1 32780
Jim :
Please find the completed quote that you requested .
PR&D , Inc . is taking the approach of installing well points 5 ' on center around each of the
excavations , leaving one end semi open for entry & exit . We will be stepping the dewatering
points & header away from the planned excavation to incorporate sloping of the excavation for
backfilling, compacting & density test .
We will operate the dewatering system prior to excavation so we will excavate dry soil &
backfill into a dry excavation .
The treated water will be directed through an air stripper with either a holding tank or bag filters .
The effluent will be pumped through a carbon vessel for polishing .
All excavation activities shall be performed in accordance with OSHA Regulations, 29 CFR
1926 , Subpart P and the Florida Trench Safety Act, Florida Statutes Chapter 553 , Part VI .
PR&D , Inc . will comply with the applicable trench safety standards .
PR&D . Inc . is estimating 17 days to complete the project .
If you have any questions re, please feel free to call me at ( 321 ) 288 -2767 .
Sincerely :
Kenneth P . Richard
Vice President
www.prdincorporated. com
at + r7CUl1LC Ur rml% iCJ ' VUMCCKI.HIVU rAKRK) ffW100 , Zq '1 .4 41SI0 Ka , veru t3eaacn , t- lortaa
Bid Item Extended
# Item Description Unit I Unit Rate I Quantity Cost
1 General
Provision of 40 Hr OSHA Training Certificates for Site Workers and Documentation of PSSC 10 0 • 0
1 . 1 license LS $
$ 250 . 0
1 . 2 Preparation and provision of Earthwork Work Plan and Project Schedule LS
1 .3 Mobilization to Site LS 3 2 500 . 0
1 . 4 Demobilization LS — $ r 5
1 . 5 Provision of required post-excavation documentation _ LS $ 2 0 0 ' 0
_ 2 Site Work —
2. 1 Installation of temporary 6 ft chain link security fence (as outlined on drawings) LS $ 1 , 900003
2. 2 Installation of silt fence LS $ 5 0 0 0
Remove and dispose (includes T& D) of overhead canopy structure, pump islands , and footers
2. 3 (including electrical disconnects) LS s 1 2 , 0 0 0 . 0
Remove and dispose (includes T&D) of on-site signage and associated footers (including LS s 41 5 0 0 . 0
2.4 electrical disconnects)
VAC truck and/or equivalent services associated with cleaning of the three USTs prior to
removal, including proper off-site disposal of rinseate and/or petroleum contact fluids and any
2. 5 sludge from three USTs LS $ 2 , 200a00
Remove and dispose (includes T&D) of three, 8 ,000 gallon USTs, piping system , andLS $ 1 5 , 000 . 00
2. 6 asphall1concrete debris
Over-excavation of UST area and former UST area to 10 ft bls with associated soil stockpiling
(including dewatering/treatment and/or saturated zone excavation with aeration and follow-up
excavation draining). DESCRIBE IN DETAIL IN A COVER LETTER THE SELECTED
2. 7 IMPLEMENTATION APPROACH _ LS s52 , 600 . 00
Off-site TRANSPORT of excavated soils (soil disposal in lRC Class I landfill - tipping fee covered
2. 8 internally by IRC) BCY s8 - 00 1800 s 1 4 4 0 0 . 0
Purchase, delivery and backfilling (in dry dewatered condition) with clean fill and associated 4 0 5 0 0 . 0
2 .9 compaction in accordance with Section 02200 - Earthwork BCY s22 . 50 1800 $
2. 10 Installation and removal of 2 temporary 12 ft pre-pack monitoring wells LS $ 500000
Final grading and site cleanup (includes removal of chain link fence and removal and disposal of 5 0 0 . 0
2. 11 silt fence) LS $
Additional Excavation Beyond Defined Area (includes any additional costs for stockpiling ,
2. 12 pavement/concrete removal and disposal and restoration) BCY $ 3 0 0 0
TOTAL x150 , 200 ' 0
Notes: PR & D Quote # 1837 - 10
1 . LS Items to be reimbursed following completion of specific tasks in accordance with the specifications.
2. BCY - Bank cubic yards.
3. Any volume to tonnage based calculations/conversions shall be based upon an assumption of 1 .4 tons/cy
4. Unit rate items to be reimbursed in accordance with the actual units completed (e.g. if 1650 BCY are excavated 2, 310 tons], only 1 ,650 BCY shall
be
charged). Additional excavation volumes, transport, and disposal (items 2. 12) will not be reimbursed unless PRIOR WRITTEN APPROVAL is provided by
Geosyntec.
5. The SUBCONTRACTOR bid shall include written assurance that SUBCONTRACTOR will comply with the applicable trench safety standards.
SUBCONTRACTOR: Petroleum Resources & Development , Inc . DATE:10 - 28 - 10
SIGNATURE: 14.A
Oct 28 1, 0 05 : 43p Hcc Environment Svc 352 # 473 # 9841 p . l
Groundwater Remediation Construction Services
340 S .W. Jasmine Avenue ( 352 ) 473- 9801
Keystone Heights , FL 32656 Fax (352) 473 -9841
October 28 , 2010
Geosyntec Consultants
6770 S . Washington Avenue, Suite 3
Titusville, FL 32780
Facsimile : 321 -269- 5813
ATTN : Jim Langenbach
RE : Cumberland Farms #0955
2614 Oslo road
Vero Beach , FL
HCC Bid #10-36
Dear Jim :
HCC thanks you for the opportunity to bid this job on your enclosed bid sheet according to your
plans and specifications described in the bid package. I would like to make the following
clarifications :
1 . Estimated construction time will be approximately thirteen ( 13 ) working days and one
( 1 ) day each for mobe and demobe.
2 . Dewatering method : Due to the compaction requirements of a dry hole I do not think
it will be feasible to dig the excavation wet and then try to dewater later. I am proposing a
traditional well point system or a horizontal dewatering sock connected to a 6 " vacuum pump
and treated with a portable air stripper before discharging into the adjacent pond . Although this
method may be more costly it is the best way to insure a dry hole for compaction purposes .
3 . Clean backfill that meets the specification requirements will come from the Stewart
Mine which passes MOT road specifications and we have a recent analytical of the soil to
satisfy your requirements.
4 . Temporary pre-pack wells will be installed by us and supplied by others .
We look forward to the successful completion of this project in the near future. If you have any
questions or I can be of further assistance, please feel free to contact me at my office.
Sincerely
L
EARL M HATCH, , President
L
Oct 28 10 05e44p Hcc Environment Svc 352 # 473 # 9841 p • 2
,
SCHEDULE OF PRICES - CUMBERLAND FARMS #0955 , 2814 Oslo Rd , Vero Beach , Florida
Extended
FidItem
Item Description Unit Unit Rate G�uanti Cost
General
Provision of 40 Hr OSHA Training Certificates for SRe Workers and Documentation of PSSC LS $ �.
1 . 1 license �j
1 .2 preparation and provision of Earthwork Work Plan and Project Schedule LS C t5o
1 ,3 Mobilization to Site LS $
1 .4 Demobilization
LS $
1 .5 Provision of required post-excavation documentation LS
2 Site Work
2. 1 Installation of tom ora 6 ftchaln link securityfence as outlined on dmwin s LS $
2.2 installation of silt fence LS _
Remove and dispose (includes T&D) of overhead canopy structure , pump Islands , and footors LS $
2.3 (including electrical disconnects
Remove and dispose pncludes T&D) of on-site signage and associated footers (including LS $
2.4 electrical disconnects
VAC ck and/or equivalent services associated with cleaning of the three USTs prior to
remo 1, including proper off-site disposal of rinseate and/or potroleum contact fluids and any LS $ o
2.5 sludge from three USTs
Remove and dispose (indudes T&D) of three , 8,000 gallon USTs, piping system , and LS $ � —
2 . 6 asphatt/ooncrete debris
Over-excavation of LIST area and former UST area to 10 ft bls with associated soil stockpiling
(including dewatering/treatment and/or saturated zone excavation with aeration and follow-up
excavation dralning) . DESCRIBE IN DETAIL IN A COVER LETTER THE SELECTED LS $ ' v
2.7 IMPLEMENTATION APPROACH
Off-site TRANSPORT of excavated soils (soil disposal in IRC Class I landfill - tipping fee covered BCY $ 1800 $
2. 8 internals IRC
Purchase, delivery and backfilling (in dry dewaterod condition) with clean fill and associated BCY $ 1800 $
2.9 compaction in accordance with Section 02200 - Earthwork
2. 10 Installation and removal of 2 tem ora 12 ft pro-packmonkoring wells LS $
Final grading and site cleanup (Includes removal of chain link fence and removal and disposal of LS $
2. 11 silt fence) /
Additional Excavation Beyond Defined Area (includes any additional costs for stockpiling,
2, 12 vement/concrato removal and disposal and restoration) BCY $ (•p 0
L
S
TOTAL
Notes:
1 . LS Items to be reimbursed following completion of specific tasks In accordance with the specifications.
2. BCY - Bank cubic yards.
3. Any volume to tonnage based calculations/conversions shall be based upon an assumption of 1 .4tonslcy
4. Unit rate Items to be reimbursed in accordance with the actual units completed (e .g . if 1650 BCY are excavated 2,310 tons) , only 1 ,650
BCY shall be
charged). Additional excavation volumes, transport, and disposal (items 2.12) will not be reimbursed unless PRIOR WRITTEN APPROVAL is provided by
Geosyntec.
5. The SUBCONTRACTOR bid shall include written assurance that SUBCONTRACTOR will comply with the applicable trench safety standards.
HCC ENVIRONMENTAL SVS , INC .
340 SW JASMINE AVE.
KEYSTONE HEIGHTS, FL B2W DATE: l6
SUBCONTRACTOR:
4
SIGNATURE: . . .
i
Oct 28 10 05 : 44p Hcc Environment Svc 352 # 47349841 pw3
Petroleum Recovery Systems , Inc .
100 S . Jackson Ave
Jacksonville, Florida 32220
Phone (904) 786 -8495 Fax (904) 783 -2166
Email bbrinson@petroleumrecoverysystems _ cora
.o
_r
•x,.w-:'_ter-^,.-.—w.^_y , o. .:. .
1 •
.� �J, l '•1 MBIA• _ _ .�. .. _
T w : w
... _r. : . <. . . . .: .. .. . _
r
y..^"'" ::^:Y'_`r • ' . :. . .... . . r: .0 -: . :. . r. ...:,. . uii „-'1< , ..... . . ” 5°: f,l :-'rP{` �•. "•lra"•..,
:Y�'!-!�.
,erw• �itltc � -.. _ : ..y... . . -�`�'r�:`;�i .iiF�.: tP
. . lust,:
C1♦\rICML• T • .jy r- �� �� �� ..�� ((�� ..
. . A : '.� .�-..{.v.rtw���•r:i`� {'YA.. 4 �S � �Y• ' [ i F 1.ti:• r ...
..A�.A..t..�. ., 4 _ :,d�.. ':�,4:A..2 ti ,•,�j'.+iJy�'t � A Y.'i:.=<< . . �C"rii�'JK:..i. r.:::.. .. _
Portable Hydrocarbon Spargers are true portable units . it takes only 15 minutes set up
and break down time. Our system has its own diesel powered generator, which supplies
electric power to our units; also , four independent 3 -horsepower electric motors . Our
electric motors power four independent forced air blowers . Each blower produces 250
cubic feet of air, totaling 1 ,000 cubic feet per minute. Our hydrocarbon Sparger has an
oil-water separator unit.
Common constituents removed to clean-up standards include BTEX, Naphthalene ' s ,
MTBE, and solvents such as PCE, TCE, and vinvl chloride.