HomeMy WebLinkAbout2013-228 Ao 13
16 5 - S'
A013 -- aa9
WORK ORDER NUMBER 8
This Work Order Number 8 is entered into as of this NO 12 _ day of November 2013
pursuant to that certain Continuing Contract Agreement for Professional Services entered into as
of November 15, 2011 (the "Agreement" ), by and between INDIAN RIVER COUNTY, a political
subdivision of the State of Florida ( "COUNTY" ) and Geosyntec Consultants, Inc . ( "Consultant" ) .
The COUNTY has selected the Consultant to perform the professional services set forth on
Exhibit 1 (Scope of Work), attached to this Work Order and made part hereof by this reference .
The professional services will be performed by the Consultant for the fee schedule set forth in
Exhibit 1 ( Fee Schedule ), attached to this Work Order and made a part hereof by this reference .
The Consultant will perform the professional services within the timeframe more particularly set
forth in Exhibit 1 (Time Schedule ), attached to this Work Order and made a part hereof by
this
reference all in accordance with the terms and provisions set forth in the Agreement . Pursuant to
paragraph 1 .4 of the Agreement, nothing contained in any Work Order shall conflict with the
terms of the Agreement and the terms of the Agreement shall be deemed to be incorporated in
each individual Work Order as if fully set forth herein .
IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the date
first written above .
CONSULTANT. BOARD OF COUNTY COMMISSIONERS
Geosyntec Consultants, Inc . OF INDIAN RIVER COUNTY
By: h�t� By:
J e E . Flescher , Chairman
Title : Senior Vice- President
BCC Approved Date . _ November 12 , 2013
, • yivOMh'iiS�
Attest: Jeffrey R . Smith, Clerk of Court and Comptroller
* By: Y
' Deputy Clerk
t ANA
„Ri�F"b " 111 tit R COUNT Approvedtoseph
Cl tJ�
. Baird, County Administrator
Approved as to form and legal sufficiency:
Dylan Reingold, County Attorney
EXHIBIT 1
PROFESSIONAL SERVICES
Geosyntec ' 1507 20th Street, Suite 201
Vero Beach, Florida 32960
PH 772.564 .8717
consultants FAx 772.564 .8719
www.geosyntec.com
Mr. Himanshu Mehta, P .E . 17 October 2013
Managing Director
Solid Waste Disposal District
Indian River County
1325 74th Avenue SW
Vero Beach, Florida 32968
Subject: Proposal to Provide Construction Quality Assurance Services
Class I Landfill — Indian River County Landfill Facility
Vero Beach, Indian River County, Florida
Dear Mr. Mehta :
Geosyntec Consultants (Geosyntec) is pleased to submit this proposal to the Indian River County
(IRC) Solid Waste Disposal District (SWDD) to provide Construction Quality Assurance (CQA)
services for the Class I Landfill at the IRC Landfill (IRCL) facility located in Vero Beach, Indian
River County , Florida. The proposal presents the scope of work, schedule, and budget estimate
to provide CQA services at the Class I Landfill . The proposal was prepared in response to a
request from Mr. Himanshu Mehta P .E . , Managing Director of SWDD , to Dr. Kwasi Badu-
Tweneboah, P .E . of Geosyntec in an email dated 19 September 2013 . Geosyntec has prepared
this proposal as Exhibit 1 of Work Order No . 8 for the Continuing Contract Agreement for
Professional Services between IRC SWDD and Geosyntec, dated 15 November 2011 .
The remainder of this proposal presents : (i) project background ; (ii) proposed scope of work ;
(iii) schedule ; and (iv) budget estimate .
PROJECT BACKGROUND
The Phase 2 construction of Cell 1 of Segment 3 Expansion (Phase 2 project) began on May 21 ,
2012 and was substantially completed on February 6, 2013 . The Phase 2 project was approved
for waste acceptance by the Florida Department of Environmental Protection (FDEP) on April 5 ,
2013 . Geosyntec provided CQA activities for the Phase 2 project.
As a part of the Phase 2 project, an east-west temporary diversion berm and a rain flap were
constructed to divide Cell 1 into approximately two halves in order to separate the landfilling and
leachate in the northern half of the cell from stormwater in the southern half of the cell . A pump
was installed at the low point in the southern half to pump out the collected stormwater to the
perimeter drainage channel .
JL130791JL13079_Proposal for CQA Services
engineers I scientists I innovators
Mr. Himanshu Mehta, P . E.
17 October 2013
Page 2
Since inception of waste acceptance within Cell 1 , Republic Services Inc . (RSI) , the Class I
landfill operator, has been placing waste within the northern half of Cell 1 . Geosyntec
understands that with the current on-site waste operations, RSI would like to utilize the southern
half of Cell 1 for waste placement. In order to utilize the southern half of the cell, the east-west
temporary rain flap needs to be removed, and the leachate collection system (LCS) for Cell 1
including the primary geocomposite drainage layer, leachate collection pipe and leachate
collection corridor (aggregate) need to be connected to collect and transmit leachate to the
leachate sump at the northern half of the cell .
In view of the above, SWDD decided to obtain bids for Cell 1 East-West Rain Flap Removal
(Project) through RSI under their operations contract. SWDD requested Geosyntec to prepare bid
documents for the Project. Geosyntec subsequently completed the preparation of the bid
documents including a bid form and construction drawings for obtaining bids for the Project. On
September 19, 2013 , SWDD requested Geosyntec to provide a proposal for provision of CQA
monitoring services during the Project. This proposal addresses the proposed CQA services for
the Project.
PROPOSED SCOPE OF WORK
Geosyntec will provide CQA monitoring services during the removal of the temporary diversion
berm and rain flap and connection of the primary geocomposite drainage layer, leachate
collection pipe and aggregate gravel within the leachate collection corridor as described in the
bid form and depicted on the construction drawings .
Geosyntec will provide a CQA senior engineering technician (SET) who will be on-site during
Contractor' s work (estimated to be 3 days total) to monitor the field activities and prepare daily
field reports, including photographic documentation . Based on the bid documents, Geosyntec
has assumed a 3 -day construction schedule for the Project. The CQA SET will be on site for a
total of three (3 ) 10-hr days . If the Contractor anticipates the work to extend beyond three (3 )
days, Geosyntec will coordinate with the Contractor and RSI to provide monitoring services for
the critical components of the project.
Following completion of field work, Geosyntec will provide SWDD with a brief summary
memorandum of the field work (with the daily reports as attachment) for recordkeeping or
submittal to FDEP if necessary . However, Geosyntec does not anticipate the need to submit this
to FDEP for review and approval .
JL 13079\JL13079_Proposal for CQA Services
engineers I Scientists i innovators
Mr. Himanshu Mehta, P . E.
17 October 2013
Page 3
SCHEDULE
Geosyntec scope of work for provision of CQA services is based on a three (3 ) day construction
schedule as noted on the bid form issued to the Contractors . The CQA SET will mobilize to the
site upon notification by SWDD, RSI, or the selected Contractor.
BUDGET ESTIMATE
Geosyntec proposes to perform this work on a time and materials basis for a not-to-exceed
amount of $ 3 , 985 . Should additional work be required beyond the 3 days estimated time ,
Geosyntec will request authorization from SWDD prior to proceeding with work.
CLOSURE
Geosyntec appreciates this opportunity to offer our services . Please call the undersigned with
questions you may have as you review this proposal .
Sincerely,
Kwasi Badu-Tweneboah, Ph.D . , P .E .
Associate
JL13079UL13079_11'roposa( for CQA Services
engineers I scientists I innovators
EXHIBIT 1
PROFESSIONAL SERVICES
Geo syn to & Vero 20th Street, Suite 201
Vero Beach, Florida 32960
PH 772.564. 8717
consultants FAx 772.564. 8719
www. geosyntec. com
17 October 2013
Mr. Himanshu Mehta, P .E .
Managing Director
Solid Waste Disposal District
Indian River County
1325 74th Avenue SW
Vero Beach, Florida 32968
Subject: Proposal to Provide Construction Quality Assurance Services
Class I Landfill — Indian River County Landfill Facility
Vero Beach, Indian River County, Florida
Dear Mr. Mehta :
Geosyntec Consultants (Geosyntec) is pleased to submit this proposal to the Indian River County
(IRC) Solid Waste Disposal District (SWDD) to provide Construction Quality Assurance (CQA)
services for the Class I Landfill at the IRC Landfill (IRCL) facility located in Vero Beach, Indian
River County, Florida. The proposal presents the scope of work, schedule, and budget estimate
to provide CQA services at the Class I Landfill . The proposal was prepared in response to a
request from Mr. Himanshu Mehta P .E . , Managing Director of SWDD, to Dr. Kwasi Badu-
Tweneboah, F.E . of Geosyntec in an email dated 19 September 2013 . Geosyntec has prepared
this proposal as Exhibit 1 of Work Order No . 8 for the Continuing Contract Agreement for
Professional Services between IRC SWDD and Geosyntec, dated 15 November 2011 .
The remainder of this proposal presents : (i) project background ; (ii) proposed scope of work;
(iii) schedule ; and (iv) budget estimate .
PROJECT BACKGROUND
The Phase 2 construction of Cell I of Segment 3 Expansion (Phase 2 project) began on May 21 ,
2012 and was substantially completed on February 6, 2013 . The Phase 2 project was approved
for waste acceptance by the Florida Department of Environmental Protection (FDEP) on April 5 ,
2013 . Geosyntec provided CQA activities for the Phase 2 project .
As a part of the Phase 2 project, an east-west temporary diversion berm and a rain flap were
constructed to divide Cell 1 into approximately two halves in order to separate the landfilling and
leachate in the northern half of the cell from stormwater in the southern half of the cell . A pump
was installed at the low point in the southern half to pump out the collected stormwater to the
perimeter drainage channel .
JL13079UL13079_Proposal for CQA Services
engineers I scientists I innovators
Mr. Himanshu Mehta, P . E .
17 October 2013
Page 2
Since inception of waste acceptance within Cell 1 , Republic Services Inc . (RSI), the Class I
landfill operator, has been placing waste within the northern half of Cell 1 . Geosyntec
understands that with the current on- site waste operations, RSI would like to utilize the southern
half of Cell 1 for waste placement. In order to utilize the southern half of the cell , the east-west
temporary rain flap needs to be removed, and the leachate collection system (LCS) for Cell 1
including the primary geocomposite drainage layer, leachate collection pipe and leachate
collection corridor (aggregate) need to be connected to collect and transmit leachate to the
leachate sump at the northern half of the cell .
In view of the above, SWDD decided to obtain bids for Cell 1 East- West Rain Flap Removal
(Project) through RSI under their operations contract. SWDD requested Geosyntec to prepare bid
documents for the Project . Geosyntec subsequently completed the preparation of the bid
documents including a bid form and construction drawings for obtaining bids for the Project. On
September 19, 2013 , SWDD requested Geosyntec to provide a proposal for provision of CQA
monitoring services during the Project. This proposal addresses the proposed CQA services for
the Project .
PROPOSED SCOPE OF WORK
Geosyntec will provide CQA monitoring services during the removal of the temporary diversion
berm and rain flap and connection of the primary geocomposite drainage layer, leachate
collection pipe and aggregate gravel within the leachate collection corridor as described in the
bid form and depicted on the construction drawings .
Geosyntec will provide a CQA senior engineering technician (SET) who will be on-site during
Contractor' s work (estimated to be 3 days total) to monitor the field activities and prepare daily
field reports, including photographic documentation . Based on the bid documents, Geosyntec
has assumed a 3 -day construction schedule for the Project. The CQA SET will be on site for a
total of three (3 ) 10-hr days . If the Contractor anticipates the work to extend beyond three (3)
days, Geosyntec will coordinate with the Contractor and RSI to provide monitoring services for
the critical components of the project .
Following completion of field work, Geosyntec will provide SWDD with a brief summary
memorandum of the field work (with the daily reports as attachment) for recordkeeping or
submittal to FDEP if necessary. However, Geosyntec does not anticipate the need to submit this
to FDEP for review and approval .
JL13079VL13079_Proposal for CQA Seryices
engineers I scientists I innovators
Mr. Himanshu Mehta, P . E .
17 October 2013
Page 3
SCHEDULE
Geosyntec scope of work for provision of CQA services is based on a three (3 ) day construction
schedule as noted on the bid form issued to the Contractors . The CQA SET will mobilize to the
site upon notification by SWDD, RSI, or the selected Contractor.
BUDGET ESTIMATE
Geosyntec proposes to perform this work on a time and materials basis for a not4o-exceed
amount of $ 3 , 985 . Should additional work be required beyond the 3 days estimated time,
Geosyntec will request authorization from SWDD prior to proceeding with work.
CLOSURE
Geosyntec appreciates this opportunity to offer our services . Please call the undersigned with
questions you may have as you review this proposal .
Sincerely,
Kwasi Badu-Tweneboah, Ph .D . , P.E.
Associate
JL13079UL13079_Proposal for CQA Services
engineers I scientists I innovators