HomeMy WebLinkAbout2013-213 � o i3 • af3 WORK ORDER NUMBER 6 451h Street Streetscape Design Project This Work Order Number 6 is entered into as of this day of 2013� pursuant to that certain Continuing Contract Agreement for Professional Services entered into as of November 15 , 2011 (the "Agreement" ) , by and between INDIAN RIVER COUNTY, a political subdivision of the State of Florida ( " COUNTY" ) and Kimley- Horn and Associates, Inc . ( "Consultant" ) . The COUNTY has selected the Consultant to perform the professional services set forth on Exhibit A (Scope of Work ) , attached to this Work Order and made part hereof by this reference . The professional services will be performed by the Consultant for the fee schedule set forth in Exhibit B ( Fee Schedule ), attached to this Work Order and made a part hereof by this reference . The Consultant will perform the professional services within the timeframe more particularly set forth in Exhibit C (Time Schedule ) , attached to this Work Order and made a part hereof by this reference all in accordance with the terms and provisions set forth in the Agreement . Pursuant to paragraph 1 . 4 of the Agreement, nothing contained in any Work Order shall conflict with the terms of the Agreement and the terms of the Agreement shall be deemed to be incorporated in each individual Work Order as if fully set forth herein . IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the date first written above . CONSULTANT: BOARD OF COUNTY COMMISSIONERS Kimley- H n a ssociat s, Inc . OF INDIAN RIVER COUNTY � edrnuwinnnRr,n op, ' By : By . Zc2eez� � ra�o�. .* J ph E . Flescher - �r Title : � � .� men _ BCC Approved Date : 11 41"itt 4 Attest : Jeffrey R . Smith, Cie of Court and om {3 � 1�►'}3i i' By . Deputy Clerk Approved : Joseph tak ird, County Administrator C2 Approved as to form and legal sufficien ' Dylan T. Reingold, County Attorney EXHIBIT A SCOPE OF SERVICES ENGINEER will provide professional services as specifically stated below: 1 . Landscape Opportunities & Constraints Analysis — ENGINEER shall use COUNTY supplied survey for 45th Street from 43 `d Avenue to US Highway 1 and overlay that survey onto an aerial using CADD technology . ENGINEER will then conduct a field inventory of existing conditions that directly influence landscaping in the right-of--way, including overhead utilities, curbs or no curbs , existing trees or tree canopies, drainage canals, and other improvement, ENGINEER will also plot FDOT clear zone requirements for vertical obstructions and sight triangles at intersections on the overall base map . ENGINEER will then prepare an opportunities and constraints map depicting areas along the corridor that can be landscaped or could be landscaped with some modifications to existing conditions . ENGINEER will then meet with COUNTY to discuss the opportunities and constraints for landscaping along the corridor and establish areas that COUNTY wants to pursue landscaping within the $ 350 , 000 project implementation budget. ENGINEER will provide three (3 ) hardcopy sets of plans . 2 . Conceptual Landscape Design Plans — After COUNTY has established the general areas that where it wants to install landscaping, ENGINEER will prepare conceptual landscape plans (30% level) for these areas depicting proposed landscape materials using CADD technology and prepare opinions of probable costs for implementing the conceptual landscape plans . ENGINEER will provide color rendered exhibits , which could include plan view and section view to illustrate the proposed landscape design, and photos of the proposed landscape palette for COUNTY to use for community workshop meeting(s) to present the conceptual landscape plans and gain community support of the locations proposed to be landscaped and the overall landscape theme within the $ 350 ,000 project implementation budget . ENGINEER will provide three (3 ) hardcopy sets of plans . 3 . Modified Landscape Design Plans — After COUNTY attends the community workshops and has identified community preferences , ENGINEER will update the Conceptual Design Plan to a 60% complete level for the areas determined to be landscaped as part of the $ 350,000 project implementation budget. The 60% plan will depict landscape locations , key dimensions , botanical & common names of proposed landscape materials and their specifications using CADD technology. Work Authorization No. 6 Gifford Neighborhood 45th Street Streetscape Design Plans Indian River County ENGINEER will update the opinion of probable cost to correspond to the 60% plans and submit to COUNTY the OPC and the 60% Design Plans for its review. ENGINEER will provide three (3 ) hardcopy sets of plans . 4 . Final Landscape Design Plans — After COUNTY has reviewed and approved the 60% Landscape Design Plans, ENGINEER will prepare final bid-ready documents using CADD technology suitable for submittal to COUNTY for permitting and bidding by Contractors, including planting details, specifications , and general notes plan sheet. ENGINEER will provide three (3 ) hardcopy sets of plans . Page 2 of 4 Work Authorization No. 6 Gifford Neighborhood 45th Street Streetscape Design Plans Indian River County EXHIBIT B FEE SCHEDULE The basic compensation mutually agreed upon by ENGINEER and COUNTY is as follows : Task Labor Fee Lump Sum Components Landscape Opportunities & Constraints Analysis $ 6 ,000 Conceptual Landscape Design Plans (30% Plans) $ 65000 Modified Landscape Design Plans (60% Plans) $6 ,000 Final Landscape Design Plans ( 100% Plans) $74000 Total $25 , 000 Page 3 of 4 Work Authorization No. 6 Gifford Neighborhood 45th Street Streetscape Design Plans Indian River County EXHIBIT C TIME SCHEDULE Task Due Date Landscape Opportunities & Constraints Analysis November 21 , 2013 Conceptual Landscape Design Plans (30% Plans) December 30 , 2013 Modified Landscape Design Plans (60% Plans) March 26 , 2014 Final Landscape Design Plans ( 100% Plans) May 27 , 2014 Page 4 of 4