Loading...
HomeMy WebLinkAbout2013-041 04V/ WORK ORDER NUMBER, _5 y This Work Order Number 1 is entered into as of this 19th day of February , 201 3_, pursuant to that certain Continuing Contract Agreement for Professional Services entered into as of November 15, 2011 , (the "Agreement") by and between INDIAN RIVER COUNTY , a political subdivision of the State of Florida ("COUNTY*) and KIMLEY-HORN AND ASSOCIATES , INC . ("CONSULTANT") . The COUNTY has selected the Consultant to perform the professional services set forth on Exhibit 1 (Scope of Work) , attached to this Work Order and made part hereof by this reference . . The professional services will be performed by the Consultant for the fee schedule set forth . in Exhibit 1 (Fee Schedule) , attached to this Work Order and made a part hereof by this reference. The Consultant will perform the professional services within the timeframe more particularly set forth in Exhibit 1 (Time Schedule) , attached to this Work Order and made a part hereof by this reference all in accordance with the terms and provisions set forth in the Agreement. Pursuant to paragraph 1 .4 of the Agreement, nothing contained in any Work Order shall conflict with the terms of the Agreement and the terms of the Agreement shall be deemed to be incorporated in each individual Work Order as if fully set forth herein . IN WITNESS WHEREOF , the parties hereto have executed this Work Order as of the date first written above . CONSULTANT: BOARD OF COUNTY COMMISSIONERS KIMLEY-HORN AND ASSOCIATES , OF INDIAN RIVER COUNTY INC . By: By Kevin Schanen , P . E . �Jqdbph E . Fiescher, Chairman Title: Associate . Vice Prehl fTS�'•' ,�JGoM�f►• .T.S. s�ON ./Q-^ BCC Approved Date : 02-19- 13 a J��' •• ' •Vy: %* ;Attest: Jeffrey R . Smith , Clerk of Court and Comptroller c. y •. •oma,: B '•.'tio '��c;.•' Deputy Clerk •6'°°9�R�VER COV��'°•�• A proved : J seph . Baird , County Administrator Approved as to form and al sufficiency. Alan of ich , County Attorney EXHIBIT #1 Work Order Number 5 Bulk Acid Tank Replacement At South Oslo Water Treatment Plant PROJECT UNDERSTANDING The existing bulk acid tank is more than 12 years old and at the end of its service life, and therefore, replacement of the tank necessary. Since the acid demands have been reduced in the feedwater with the use of alternative scale inhibitors, a smaller sized bulk tank is suggested. Associated piping and containment coatings should also be addressed as part of the tank replacement. The scope of work consists of design plans and specifications for a new tank and associated supply piping, coordination with FDEP, and limited construction phase services . SCOPE OF WORK Task le. Review Existing Conditions Consultant will review existing tank and piping at the South Oslo Road plant and evaluate options for a replacement tank. Consultant will develop a phasing plan to allow replacement of the existing tank without interrupting service. Task 2 : Design Plans and Specification Consultant will prepare plans and specifications for a replacement tank. Plans will consist of a site plan, tank supports, piping, tie-in details, and general details . Photos may be used to depict details. It is anticipated that approximately four (4) drawings will be prepared Specifications will be prepared and consist of the replacement tank, associated piping, coating of existing containment area, and demolition of existing tank. Consultant will provide 90% plans and specifications for review and comment as well as final plans and specifications for construction. Drawings will be provided in electronic (Pdf — portable document format) form. Task 3 : Coordination Consultant will prepare a letter of notification to Florida Department of Environmental Protection (FDEP) regarding tank replacement. It is assumed that a FDEP permit is not required for the tank replacement, but that justification for a reduced size tank will be necessary. Consultant will answer questions from contractors regarding the scope of work during the price proposal phase . Consultant will review one set of shop drawings on the tank and piping during the construction phase of the project. SCHEDULE CADocuments and Settings\mikeh\Local Settings\Temporary Intemet Files\OLKA\Acid Tank Scope rev (2).docx Page I of i Services for Tasks 1 through 3 are anticipated to be completed within 3 weeks of notice to proceed. Task 4 will be concurrent with project construction and is anticipated to be completed within 64 months, depending on contractor' s schedule. FEES We will provide these services in accordance with our Continuing Services Contract Agreement for Professional Services dated November 15 , 2011 , with Indian River County. The Consultant will provide professional services for a lump sum fee as follows: Task No. Task Task Fee Task 1 Review Existing Conditions, Phasing Plan $ 2,300 Task 2 Design Plans and Specifications $ 129800 Task 3 Coordination $2, 800 TOTAL LUMP SUM FEE 1 $17,900 I CADocuments and Settings\mikeh\Local Settings\Temporary Intemet Files\OLKA\Acid Tank Scope rev docx Page 2 of 2 - - - - -- - -- - -