WORK ORDER NUMBER 7
Water Distribution System Modeling Support
This Work Order Number 7 is entered into as of this 4th day of February , NIL
pursuant to that certain Continuing Contract Agreement for Professional Services entered into as
of November 15, 2011 (the 'Agreement"), by and between INDIAN RIVER COUNTY, a political
subdivision of the State of Florida ("COUNTY") and Kimley-Horn and Associates, Inc.
("Consultant").
The COUNTY has selected the Consultant to perform the professional services set forth on
Exhibit 1 (Scope of Work), attached to this Work Order and made part hereof by this reference.
The professional services will be performed by the Consultant for the fee schedule set forth in
Exhibit 1 (Fee Schedule), attached to this Work Order and made a part hereof by this reference.
The Consultant will perform the professional services within the timeframe more particularly set
forth in Exhibit 1 (Time Schedule), attached to this Work Order and made a part hereof by this
reference all in accordance with the terms and provisions set forth in the Agreement. Pursuant to
paragraph 1.4 of the Agreement, nothing contained in any Work Order shall conflict with the
terms of the Agreement and the terms of the Agreement shall be deemed to be incorporated in
each individual Work Order as if fully set forth herein.
IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the date
first written above.
CONSULTANT:
Kimley-Horn and Associates, Inc.
4/
By: ,'4 in t By
Title: V
t.:3 (sir
BOARD OF COUNTY COMMISSIONERS
OF INDIAN RIVER COUNTY
`\ .jZ1 •cohi;y ss�^BCC Approved Date:
rk5,,ectme,
Peter D Q'B ryan , airm
an
February 4, 2014
gtest: Jeffrey R. Smith, Clerk of Court and Comptroller
By:
Approved:
Deputy Clerk
Baird, County Administrator
Approved as to form and legal sufficiency:
an T. Reingold, County Attorney
EXHIBIT #1
Work Order Number
Water Distribution System Modeling Support
PROJECT UNDERSTANDING
Indian River County Utilities (IRCU) desires to update their water system hydraulic model
to reflect current GIS (Geographical Information System) data and better represent their
current water distribution system configuration. The existing water system model is in an
older version of WaterCAD format, but is outdated and does not reflect current system
configuration. In order to integrate the GIS data into a water system hydraulic model, GIS
shapefiles will need to be imported into WaterGEMS in order to provide a basis for water
system hydraulic modeling and planning. Consultant will prepare a working water system
model in WaterGEMS due to its more robust capabilities in developing new models, but
will provide a duplicate running model that is compatible with WaterCAD v8.
The scope of services detailed below will consist of using WaterGEMS Version V8i (64-bit
version), developing a working water distribution model with limited demand data and
major nodes and pipe system. The scope will also consist of defining system demands
based on monthly operating reports (MOR's), pump station flows and capacities, fire flow
requirements, and system design criteria.
SCOPE OF SERVICES
Task 1 Collect Information and Import GIS Shapefiles into WaterGEMS
• Consultant will attend up to three (3) coordination meetings with IRCU staff to
discuss the information related to shape files, and information relevant to the
development of the new hydraulic model.
• Consultant will identify the service area to be studied and prepare a map with its
boundaries based on information and discussions with IRCU staff.
• Using the ModelBuilder feature of WaterGEMS, Consultant will create a hydraulic
model network of the existing water distribution system from the latest GIS shape
file provided by IRCU. The new physical alternative of the hydraulic model will
consist of
o Existing pipes that are 6 -inch in diameter and larger.
o Junctions associated with pipes and GIS shapefiles
o Tanks (WTP and remote elevated reservoirs — Roseland, Oslo, 58th Ave)
o Valves and hydrants
• Consultant will use ModelBuilder to provide connectivity of pipe system and nodes.
Consultant will work with IRCU staff (IRCU staff to update GIS files if necessary)
should pipe connectivity not be possible based on the assumption pipe ends (nodes)
to be within 0.1 ft. Up to 20 hours of effort is designated for this task, assuming that
the pipes ends are within 0.1 ft and significant effort beyond this amount should be
considered additional services
KXWPB CiviaC3eneral\Milier\indian River CountyVVRCU Water System Modeling Preparation KHA Scope rev3.doc PAGE - 1 -
• Consultant will collect information on the existing water system, including areas of
known low system pressures, and discuss approach to developing the water system
model with IRCU staff.
• Consultant will run Skelebrator to minimize model size, consisting of merging of
pipes in series, merge pipes at isolation valves and hydrants, maintaining knowledge
of valves and hydrants, etc.
Task 2 - Develop New Water System Hydraulic Model
• Consultant will review MORs and water meter data to develop unit flow rates for
the system. Consultant will review elevated storage and repump operations and
update model to include these operations
• Consultant will update and develop water system design and operating criteria,
consisting of fire flows, peak factors, system pressures, and water demand
allocations. Peak factors will be defined based on MOR's and distribution flow
meter data. Fire flows will be defined based on ISO and Fire Marshall requirements
and IRCU input.
• Using the LoadBuilder feature of WaterGEMS, preliminary system demands for
TODAY conditions will be developed for up to ten (10) areas for various types of
land uses currently identified. These land use types include single family,
multifamily, industrial and commercial. Meter reading sets will be evaluated and
compared with the demand data to develop these demands. It is assumed that
customer meter data is not geocoded and will need to be developed as an additional
or future task. It is assumed that an existing spatial relationship between the
customer billing database and the base parcel locations data will be manipulated to
complete this task and that up to 30 hours of effort is designated for this task.
Significant effort beyond this amount should be considered additional services.
• Incorporate the specific physical hydraulic features into the model. The physical
attributes of the existing system will be imported into the new hydraulic model.
Examples of these features include tank sizes, control valve settings, pump curves,
and several node elevations where necessary.
• Consultant will update elevation data provided by IRCU staff of each node
throughout the system that is significant.
• It is assumed that nominal pipe diameter will be used for modeling and be based on
GIS input pipe diameters database.
• Deliverable: A basic hydraulic model network of the water system in WaterCAD
v8 format with one (1) topology configuration being TODAY conditions assuming
maximum daily flows (MDF) and average daily flow (ADF). Output files of system
pressures, flows, and fire hydrant flow test results will be provided.
Future Tasks
Model results from the scope provided herein will provide initial results of a functioning
water system model. It is anticipated that future tasks will include more modeling runs and
evaluation including the following:
K:\WPB Civil\General\MillerUndian River County\IRCU Water System Modeling Preparation KHA Scope rev3 .doc PAGE - 2
• Better define operation of remote elevated storage tanks and high service pumps
• Determine operation of existing high service pumps
• Identify weaknesses and low pressure areas in system
• Re-establish Stage 2 Testing locations if necessary
• Run extended period simulation with elevated tanks
• Field calibration of water system model
• Develop system scenarios for 5 yr, 10 yr, 20 yr, and buildout conditions
SCHEDULE
In general, the following schedule is anticipated and consultant will work as expeditiously
as possible to meet a mutually agreed upon schedule:
Collect Info and Import GIS File 4 — 6 weeks from NTP
Develop Model 6 - 10 weeks from NTP
FEE SCHEDULE
We will provide these services in accordance with our Continuing Services Contract
Agreement for Professional Services dated November 15, 2011, with Indian River County.
The Consultant will provide professional services for Task 1 through Task 2 on a lump sum
fee basis as follows:
Task No.
Task
Task Fee
TASK 1
COLLECT INFO & IMPORT GIS FILE
$ 9,300
TASK 2
DEVELOP BASE MODEL
$ 15,400
TOTAL
$ 24,700
ADDITIONAL ITEMS NOT INCLUDED UNDER SCOPE
• Improvements outside the primary service area are not included.
• Multiple scenarios beyond those listed
• Cahbration of model
• Geocoding of system wide meter data will need to be developed as an additional
service
• Updating IRCU's GIS files
• Effort to connect the system pipes or develop system demands beyond the hours
described in this scope of services
• Meetings beyond those fisted herein can be provided as an additional service.