HomeMy WebLinkAbout2013-183 I1Jr1ao
01, . O
AO 13
AMENDMENT NUMBER 1 TO WORK ORDER NUMBER 6 410
SEWER FEASIBILITY STUDY FOR THE NORTH SEBASTIAN AREA
This Amendment Number 1 to Work Order Number 6 is entered into as of this 17th day of
�PnrPmhPr 20U pursuant to that certain Continuing Contract Agreement for
Professional Services entered into as of November 15 , 2011 , (the "Agreement") by and
between INDIAN RIVER COUNTY , a political subdivision of the State of Florida ("COUNTY")
and MASTELLER & MOLER , INC . ("CONSULTANT") .
1 . The County has selected the Consultant to perform the professional services set
forth in existing Work Order Number 6 , Effective Date August 20 , 2013 .
2 . The County and the Consultant desire to amend this Work Order as set forth on
Exhibit 1 attached to this Amendment and made a part hereof by this reference . The
professional services will be performed by the Consultant for the fee schedule set forth in
Exhibit 1 and within the timeframe more particularly set forth in Exhibit 1 , all in accordance with
the terms and provisions set forth in the Agreement .
3 . From and after the Effective Date of this Amendment , the above -referenced Work
Order is iamended as set forth in this Amendment. Pursuant to paragraph 1 . 4 of the
Agreement , nothing contained in any Work Order shall conflict with the terms of the Agreement
and the terms of the Agreement shall be deemed to be incorporated in each individual Work
Order as if fully set forth herein .
IN WITNESS WHEREOF , the parties hereto have executed this Amendment to Work
Order as of the date first written above .
CONSULTANT : BOARD OF COUNTY COMMISSIONERS
MASTELLER & MOLER , INC . OF INDIAN RIVER COUNTY
z _
By : _ By:
isslp°""a , Jo eph E . Flescher, Chairman
°° . . . . . . NFA
Title : President °A � 0 `4-
BCC Approved Date : q =tEP rbPr i 7 , 2013
aa • -
: U
* o Attest : Jeffrey R . Smith , Clerk of Court and
Comptroller
'/ASO/� ER � y . Deputy Clerk
proved :
J eph A . Baird , County Administrator
proved as to form and legal sufficiency :
DykI6 Reingold , County Attorney
Our File # 1351
9/5/2013
NON -EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT
CONTINUING CONSULTING SERVICES
AMENDMENT # 1 TO WO #6
" EXHIBIT 1 "
SEWER FEASIBILITY FOR NORTH SEBASTIAN AREA
(Scope of Work)
• Project Description
Masteller & Moler, Inc . (MM ) is pleased to present you with Amendment # 1 to Work Order #6
.
Work Order #6 was approved by the Board of County Commissioners on August 20 , 2013 , Work
Order #6 provides for professional engineering services in connection with preparation of a Sewer
Feasibility Study and Report related to replacement of septic tank systems along or within close
proximity to the Indian River Lagoon . The Feasibility Study and Report covered an area generally
described as having a western limit of US Highway #, 1 , an eastern limit of the Indian River Lagoon ,
the Northern Limit of Indian River Drive connection to US Highway # 1 , and the Southern Limit as
Main Street.
Amendment # 1 to Work Order #6 covers a study area to be added to the Feasibility Study and
Report. The additional study area borders the southern shore line of the Saint Sebastian River .
This study area is presently developed with residential uses served by existing septic systems . The
study area can be described as the community of Ercildoune Heights plus approximately 100 acres
north of Roseland Road bordered by Kelso Place on the east , 128th Court to the west, Roseland
Road to the south , and the shoreline of the Saint Sebastian River to the north . Consistent with the
objective of original Work Order # 6 , the Feasibility Study and Report amended by the inclusion of
this study area will provide design and cost information for the construction of a sanitary sewer
gravity system to replace the existing septic systems . Pollution of groundwater by existing septic
systems that migrates into the Saint Sebastian River will be eliminated due to the construction of
these sanitary gravity sewers .
+ Scope of Services
The Scope of Services as originally outlined in Work Order #6 will also apply to this Amendment # 1 .
Even though the two (2 ) study areas (the original study area as covered under Work Order #6 and
the additional study area as covered under this Amendment # 1 ) are not contiguous , the report will
evaluate the two (2 ) study areas as one ( 1 ) project . The objective of eliminating the use of septic
systems which cause pollution of the Indian River Lagoon and Saint Sebastian River is a common
goal of both study areas . It is anticipated that the Sanitary Sewer Feasibility Study and Report will
be used as a key element in making application for future funding assistance needed to construct
this much needed sewer project .
Our File # 1351
9/5/2013
" EXHIBIT 1 "
SEWER FEASIBILITY FOR NORTH SEBASTIAN AREA
( Fee Schedule)
Method and Amount of Compensation
Masteller & Moler, Inc . proposes to provide the above Scope of Services based on the following lump
sum fees :
Original Amendment # 1 Total
Fee Fee Increase Fee
Fee for Feasibility Study and Report $ 29 , 960 . 00 $ 19 , 715 . 00 $ 491675 . 00
Our File # 1351
9/512013
" EXHIBIT #1 "
SEWER FEASIBILITY FOR NORTH SEBASTIAN AREA
(Time Schedule)
• Time of Performance
The estimated time frame for completion of services from the approval of this Amendment #1 to Work
Order # 1 is as follows :
MILESTONE COMPLETION DATE
Completion of Feasibility Study and Report Add 20 calendar days to the original
60 calendar days after BCC Approval
(YAmm\Projects\2013\1351 \ADMUContracts%mend # 1 \1351 _Amend #1 to WO #6_13-0905 .doc)
( end
_Le
I 9 , A Tdo yI To � do Fee
IT, Fof Orginal Study Are�71 Toa, OF e I/IT yf✓�
Name �\ \\ , '\\ /
,-i
Troll
Tdod
/, /
To
� �
/,
'r'\ /OF
Extended Study Area ;✓\
9 i1. Joe
r\
dol 'i - , ,\ �Fee 1 FIT 1 ITT
--f
do of
ON eke TTO IT
/✓ / \yr \\ � Too
- 0 rox To
Wi
lood
INDIAN RIVER COUNTY r do 04'Ill \
/"a \ / /�%/ % r/
DEPARTMENT OF UTILITY SERVICES _ \/y,/ i\V `\\ ` �
ORTH COUNTY FEASIBILITY STUDYAREA C ,\ 00 ';.
do \ \, /\� /
To t ' \ r',' 'WITT \✓\\I IF
r y ,'
T"o do TO IT
old s 1 IT
Follow lo, / \ de
IF vro I 1f j\r //// /
0 1 Tod OF IF To do
k do do 11
F ,J' // /do ell T/
FIT I c ! .' /�/ ff�'/�jodl do
r /
/ \ � do IT I
Fell
f Food
do
To Qse AT
d 001,
\ � ..�.,I f \/ dell
do or I
/ �, F I A le ,�
IT To O'd OFF dodoll
/ do Fee /OFF I OFF
OF 10 old
Teo /6 \/ y
{ �' r
\\ IT / OF :� ' .. f/
do, do b, do
/ Todo, \\
IF 0 Y\\ \\,
F. \\ \ \
Too / \
OF I Told To \ R i�/ TOF Tr I
\/
✓�
�/
IN TIF I I To/ \ \� doo \do \;
� ,
To �� \ \ �� , . n.IF do I do /
OFF Too I
OF I
el IT No
ell VA. � \� / loo /�
do 3 To I To�r TA
�, j " .� � To
�� IT do I led ��
I IF
� rr
\ � � , l IT dlo IF
/
old I
>I
% To
\, �To� A ' dod �� �\ \ \' \ l \ \
do I
OFF TA 1 11 1 do
IF led FIT
do N doll To N
y.To do
\ �/, \� A \ �.
IT \� �V� To IF�, , �- To IFV : OF
/ F OFF
��'I ITT �do,
/ � ,
or OF
FIT V � '�% OFF
\ \ o To N
W! ( TUDYAPI. Ford 0
EX�TE CzD
\Nd or
' \ , \.� `Sources6III . Esri ,/DeLorme , I% TEO , TomTom Intermap , mcremenYP Corp . ,
OF, OFF To\ � \ > < GEBCO ; USGS� FAO 'NPS NRCAN , GeoBa$e IGN Kadaster NToo L, Ordnance
OF vim// V ��, 'OF ' � �� Syi�rey;� fi �Japan METN� E$n China _(Hlfnt� Fon } Wis"�topo ancDate: 9isrzol3-
�i �`� �` Food
Document Path: G:1Proposed ProjectslKevin OIArcMap ProjectslNorthCountyFeasibilityStudy_08 2013WorthCountyFeasibilityStudy_08_2013.mxd