Loading...
HomeMy WebLinkAbout2011-128 aoII • 5-/a yl I I V"* ? , s Board of County Commissioners Administration - Building A 1801 27th Street Vero Beach, Florida 32960 Telephone : (772) 567-8000 FAX : 772 -778 -9391 Project : Old Dixie Highway from 69th Street to North of CR 510 Topographic Survey Indian River County Project 0934A WORK ORDER NO . 2 ( Engineering/Surveying ) FOR PROFESSIONAL SERVICES AGREEMENT ANNUAL SURVEYING and MAPPING/GIS SERVICES WITH Masteller, Moler, Reed and Taylor, Inc . In accordance with Contract No . 1032 2010-2011 This Work Order No . 2 is in accordance with the existing AGREEMENT dated October 19 , 2010 between Masteller, Moler, Reed and Taylor, Inc . ( SURVEYOR ) and Indian River County ( COUNTY) . This Work Order No . 2 amends the agreement as follows : SECTION I — PROJECT LIMITS This Work Order No . 2 is for the SURVEYOR to perform all related field and office Surveying and Mapping services in connection with the Topographic Survey of Old Dixie Highway from 691h Street to North of CR 510 . Limits include all side street intersections for a minimum 100 feet and all properties associated with the project . SECTION II - SCOPE OF SERVICES As agreed upon between SURVEYOR and COUNTY , the SURVEYOR shall provide Professional Land Surveying services to complete all tasks as outlined in this Work Order No . 2 ; specifically detailed in the attached proposal Exhibit A . Remainder of page left blank intentionally FAPublic Works\ENGINEERING DIVISION PROJECTS\0934A-Dixie Hwy_69th St to CR510 Topo ( MMRT)\Survey\Work Orders\ 11 - 05-09 IRC WO No . 2 - Job No . 0934A. doc I RC Work Order No . 2 Masteller, Moler, Reed and Taylor, Inc Old Dixie Highway from 69th Street to North of CR 510 May 9 , 2011 Page 2 of 3 SECTION III — TIME FOR COMPLETION & DELIVERABLESJ'WORK PRODUCT 1 . Project shall be completed as follows : a . Time of 100 % " Paper Submittal " review (final review prior to request for final deliverables ) submittal shall be 120 calendar Days from notice to proceed . b . Time of FINAL project completion shall be within 15 calendar days of receipt of the County' s review comments . 2 . Deliverables -The SURVEYOR shall provide the COUNTY : a . 100 % Phase Submittals for COUNTY review and comments . All submittals shall include one ( 1 ) paper " hardcopy" along with AutoCad Files and an ASCII file for all survey points . COUNTY shall strive to provide review comments within 10 calendar days of preliminary submittal . b . FINAL five ( 5 ) paper " hardcopy" signed and sealed sets and one ( 1 ) signed and sealed MYLAR set in adequate recording fashion ( I . E . Borders ) . Sheeted and model space ( as applicable ) AutoCad drawing file in release 2004 through 2009 and PDF formats on CD . c . Survey set/sheets shall include a cover sheet with location sketch , survey certifications , and related title and Project No ; survey notes/legend/abbreviation sheet and right-of-way plan view sheets . d . Work Product and digital versions are to prepared and submitted so that the COUNTY or other consultants can readily use it for the design and analysis of the area , as defined . It shall contain all information necessary for third - party surveyor to independently recreate and/or utilize the survey work . It is acknowledged all final products become property of Indian River COUNTY and will be available for use by the public at large . e . The SURVEYOR ' S work product shall meet or exceed the minimum standards as defined by Sections II , III and IV or the COUNTY will not approve the SURVEYOR ' S request for payment . SECTION IV — COMPENSATION The COUNTY agrees to pay, and the SURVEYOR agrees to accept, for the above described services rendered as identified in Sections I , II , and III of this Work Order No . 2 , for a total lump sum fee of $28 , 550 . 00 . All and /or any additional services not described hereon shall be pre -approved by the COUNTY . Approved additional services shall be invoiced at the rates disclosed in the approved fee schedule with the SURVEYOR for the contract year( s ) of October 19 , 2010 through October 19 , 2011 . All invoicing shall include Project Number ( 0934A ) , Work Order No . 2 (WO 2 ) , Contract Number ( 1032 ) , itemized man - hours and materials expended to complete the Scope of Services . Payments shall be in accordance with the original Professional Surveying and Mapping /GIS Services Agreement , Contract No : 1032 with the COUNTY and as stated in Section II , III and IV hereon . F :\Public Works\ENGINEERING DIVISION PROJECTS\0934A- Dixie Hwy_69th St to CR510 Topo ( MMRT)\Survey\Work Orders\11-05-09 IRC WO No. 2 - Job No . 0934A . doc IRC Work Order No . 2 Masteller, Moler, Reed and Taylor, Inc Old Dixie Highway from 69"' Street to North of CR 510 May 9, 2011 Page 3 of 3 The AGREEMENT is hereby amended as specifically set forth herein . All remaining sections of the AGREEMENT shall remain in full force and effect , and are incorporated herein . IN WITNESS WHEREOF the parties hereto have executed these presents this 24th day of May 2011 . OWNER Masteller, Moler, Reed and Taylor, Inc . BOARD OF COUNTY COMMISSIONERS INDIAN RIVER COUNTY, FLORIDA °au°uaaaa , k e J� ' ' •' �F-�°/•�° c Z=f- 416 all 1, 6 % (Signature) o (Sig ure) Bob Solari , Chairman ? i a �/y} • o 06 ✓�4 cry l t / v1 • �° rinted name and ti e) 9 ' ." CoUN d d pba aaaaaaa° Approved by BCC 05 - 24 - 11 ATTEST : Jeffrey K . Barton , Clerk of Circuit Court Witnessed by : Deputy Clerk (Si gnat re) Approved as to Form and L I Sufficiency : Alan S . Po ackwic , Sr. , COUNTY Attorney (Printed name) oseph air , CO NTY Administrator F :\Public Works\ENGINEERING DIVISION PROJECTS\0934A- Dixie Hwy_69th St to CR510 Topo ( MMRT)\Survey\Work Orders\11-05-09 IRC WO No . 2 - Job No. 0934A. doc _. __ _ ... ... .... . .. . . .. .. ..... . . ..... O ( 58th AVENUE ® 1 L. I 1d�� cn N o W P3 m I � d O C3 N + Fu 0 h � I V S i. /V ® 1 M 0 s A N `t �V A Z D.pa j v I 1 W I AZ I 1 m D A Z �p I 1 1 O 1 1 I I 1 < z I p � - 1 1 Q o 1 1 EXHIBIT " A" AGREEMENT FOR PROFESSIONAL SERVICES Work Order No . 2 ( Engineering/Survey) Continuing Professional Surveying and Mapping/GIS Services Contract # 1032 Indian River County Project # 0934A PROJECT : Old Dixie Highway Topographic Survey PHONE : Work - ( 772 ) 226- 1386 CLIENT NAME : Indian River County - Thomas Croonquist PHONE : Fax - ( 772 ) 778-9391 SITE Old Dixie Highway MAILING 1801 27th Street ADDRESS : 691h Street to County Road 510 ADDRESS . Vero Beach , FL 32960 Wabasso , FL 32967 Old Dixie Highway, 691h Street to CR 510 Topographic Survey Pursuant to our Annual Land Surveying and Mapping/GIS Services Contract 1032 , MMRT , Inc . is pleased to provide Indian River County with this proposal for performance of a Topographic Survey for property located in Indian River County and lying in Section 03 , Township 032 South , Range 039 East and Section 33 , Township 031 South , Range 039 East described as and to include the following : Project Outline and Limits : The Topographic survey limits are generally described as the Old Dixie Highway Right of Way from 691h Street to 1 00 ' feet north of County Road 510 and 25 feet outside of the limits on each side and 100 feet each way along all side streets . The survey limits shall also include County Road 510 , 200 feet each way of Old Dixie Highway, extending 25 feet outside of County Road 510 right of way. The approximate length of the right of way limits is 11 , 500 linear feet ( 2 . 17 miles ) . Scope of Services : Task 1 : Topographic Survey 1 ) Project initiation , including review of existing deeds and surveys , files and field notes , preparation of work orders and field crew folders . 2 ) Find , recover and tie into existing survey control based upon existing Right of Way map as prepared by Carter & Associates to be provided by the County . Horizontal Control shall be based upon the coordinate system on said existing Right of Way map . 3 ) Find and recover existing vertical control . Elevations hall be based upon the National Geodetic Vertical Datum of 1929 ( NGVD 29 ) with a conversion to the North American Vertical Datum of 1988 ( NAVD 88 ) provided . Perform bench run and establish benchmarks along the survey corridor at maximum 1000 foot intervals . 4 ) Field locate and record vertical ground elevation cross sections within and 25 ' outside of right of way at even 100 ' baseline stations and all distinct locations ( inverts , retention areas , swales , ditches etc . ) and changes in contour along the right of way corridor . 5 ) Field locate and record vertical ground elevation cross sections 100 ' each way along side streets , 25 ' outside the existing rights of way at 50 ' intervals and all distinct locations ( inverts , retention areas , swales , ditches etc . ) and changes in contour along the side street right of way . 6 ) Field locate and record vertical ground elevation cross sections 200 ' each way along County Road 510 , 25 ' outside the existing rights of way at 50 ' intervals and all distinct locations ( inverts , retention areas , swales , ditches etc . ) and changes in contour along the side street right of way . 7 ) Field locate and record existing improvements and man made features within and 25 ' outside the existing Right of Way and 100 ' in each direction along side streets . Masteller, Moler, Reed & Taylor, Inc. 1655 27th Street, Suite 2 Vero Beach , FL 32960 Phone : 772 -564-8050 Fax: 772 -794-0647 �� e-mail : dt5243@bellsouth . net EXHIBIT " A " AGREEMENT FOR PROFESSIONAL SERVICES Work Order No . 2 ( Engineering/Survey) Continuing Professional Surveying and Mapping/GIS Services Contract # 1032 Indian River County Project # 0934A 8 ) Field locate and obtain west invert and structure size of all U . S . Highway 1 cross drains via drainage outfalls , ( swales , ditches canals etc . ) . Tie to existing baseline as appropriate . 9 ) Process field data and prepare Topographic survey in accordance with Minimum Technical Standards . Survey shall show Old Dixie right of way and baseline and related data . Prepare survey set sheets , including cover sheet with location sketch , certifications , related title and project number, notes , legend , abbreviations and plan view sheets . Prepare final deliverables . Notes : County to provided one hard copy and AutoCad digital file of Right of Way Map for Old Dixie Highway within 10 days of notice to proceed . Phase submittals shall be provided for billing support . Time of Completion and Deliverables : 10 ) Deliverables : a ) Final review shall include one 100 % " Paper" copy be submitted prior to the Final Deliverables for the project to ensure all previous comments have been addressed . b ) FINAL — Five ( 5 ) paper " hardcopy" signed and sealed set and one ( 1 ) signed and sealed MYLAR set in adequate recording fashion ( I . E . Borders ) . Sheeted and model space ( as applicable ) AutoCAD drawing file and PDF formats on CD . • Survey set/sheets shall include a cover sheet with location sketch , survey certifications , and related title and project number; survey notes/legend/abbreviation sheet , and right-of-way plan view sheets . Compensation . Payments shall be in accordance with the original Professional Surveying and Mapping/GIS Services Agreement , Contract No . 1032 with the Indian River County. I . Project initiation , including review of existing deeds and surveys , files and field notes , preparation of work orders and field crew folders . Find , recover and tie into existing survey control based upon existing Right of Way map as prepared by Carter & Associates to be provided by the County. Horizontal Control shall be based upon the coordinate system on said existing Right of Way map . Find and recover existing vertical control . Elevations hall be based upon the National Geodetic Vertical Datum of 1929 ( NGVD 29) with a conversion to the North American Vertical Datum of 1988 ( NAVD 88) provided . Perform bench run and establish benchmarks along the survey corridor at maximum 1000 foot intervals . Surveyor 6 hours @ $ 120 . 00 /hr . . . . . . . . . . . . . . . . . . . . . . . . . . $ 720 . 00 Field Supervisor 4 hours @ $ 90 . 00 /hr . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 360 . 00 r Masteller, Moler, Reed & Taylor, Inc. 1655 27th Street, Suite 2 Vero Beach , FL 32960 Phone : 772-564-8050 Fax : 772-794-0647 e-mail : dt5243@bellsouth . net EXHIBIT " A " AGREEMENT FOR PROFESSIONAL SERVICES Work Order No . 2 ( Engineering/Survey) Continuing Professional Surveying and Mapping/GIS Services Contract # 1032 Indian River County Project # 0934A Survey Crew ( 2 men ) 32 hours @ $ 115 . 00 /hr . . . . . . . . . . . . . . . . . . . . . . $ 39680 , 00 TotalI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0 $43760 . 00 II . Measure and mark even 100 foot stations along baseline for performance of cross sections . Cut and open cross section lines at even 100 foot stations as necessary to facilitate open view for performance of differential leveling to obtain elevations in obstructed view areas as required . Field locate and obtain west invert and structure size of all U . S . Highway 1 cross drains via drainage outfalls , (swales , ditches canals etc . ) . Tie to existing baseline as appropriate . Surveyor 2 hours @ $ 120 . 00 /hr . . . . . . . . . . . . . . . . . . . . . . . . $ 240 . 00 Field Supervisor 6 hours @ $ 90 . 00 /hr . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 540 . 00 Survey Crew ( 2 men ) 48 hours @ $ 115 . 00 /hr . . . . . . . . . . . . . . . . . . . . . $ 5 , 520 , 00 Total 11 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $6Y300 . 00 III . Field locate and record vertical ground elevation cross sections within and 25' outside of right of way at even 100 ' baseline stations and all distinct locations ( inverts , retention areas , swales , ditches etc . ) and changes in contour along the right of way corridor. Field locate and record vertical ground elevation cross sections 100 ' each way along side streets , 25 ' outside the existing rights of way at 50 ' intervals and all distinct locations ( inverts , retention areas , swales , ditches etc. ) and changes in contour along the side street right of way. Field locate and record vertical ground elevation cross sections 200 ' each way along County Road 510 , 25 ' outside the existing rights of way at 50 ' intervals and all distinct locations ( inverts , retention areas , swales , ditches etc . ) and changes in contour along the side street right of way. Field locate and record existing improvements and man made features within and 25' outside the existing Right of Way and 100 ' in each direction along side streets . Surveyor 3 hours @ $ 120 . 00 /hr . . . . . . . . . . . . . . . . . . . . . . . $ 360 . 00 Field Supervisor 5 hours @ $ 90 . 00 /hr . . . . . . . . . . . . . . . . . . . . . . . . . . $ 450 . 00 Survey Crew ( 2 men ) r Masteller, Moler, Reed & Taylor, Inc. 1655 27th Street, Suite 2 Vero Beach , FL 32960 Phone : 772-564-8050 �( Fax: 772 -794-0647 I e-mail : dt5243@bellsouth . net EXHIBIT " A" AGREEMENT FOR PROFESSIONAL SERVICES Work Order No . 2 ( Engineering/Survey) Continuing Professional Surveying and Mapping/GIS Services Contract # 1032 Indian River County Project # 0934A 40 hours @ $ 115 . 00 /hr . . . . . . . . . . . . . . . . . . . . . $4 , 600 . 00 Total III . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 5 , 410 . 00 IV. Process field data and prepare Topographic survey in accordance with Minimum Technical Standards . Survey shall show Old Dixie right of way and baseline and related data . Prepare survey set sheets , including cover sheet with location sketch , certifications , related title and project number, notes , legend , abbreviations and plan view sheets . Prepare final deliverables . Surveyor 24 hours @ $ 120 . 00 /hr . . . . . . . . . . . . . . . . . . . . . . $ 2 , 880 . 00 Survey Technician 120 hours @ $ 75 . 00/hr . . . . . . . . . . . . . . . . . . . . . $ 9 , 000 . 00 Administrative Assistant 5 hours @ $ 40 . 00/hr . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 200 . 00 Total IV. . . . . . . . . . : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 12 . 080 . 00 TOTAL I — IV . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $28 , 550 . 00 Lump Sum Fee I , the undersigned , agree to all the terms of this Agreement . 5/04/2011 David Taylor , President Date Masteller, Moler, Reed & Taylor, Inc . Masteller, Moler, Reed & Taylor, Inc. 1655 27th Street , Suite 2 Vero Beach , FL 32960 Phone : 772 -564-8050 M,�, � Fax : 772-794-0647 I`� 2e-mail : dt5243@bellsouth . net