HomeMy WebLinkAbout2014-083ATTACHMENT 1
LABOR
US 1 South
Replacement
from 21st
10" PVC
Project : Young's
Date: June 2, 2014
Force
Market
Indian River County
AND MATERIALS COST ESTIMATE FROM
LABOR CONTRACTOR: MELVIN
12" HDPE Directional Bore
of Existing 10" AC Water Main
Street SE 1000' to the North and
Main Replacement n/o
Department
LABOR
BUSH
of Utilities
CONTRACTOR'S BID ITEM LIST
CONSTRUCTION, INC.
MELVIN BUSH LABOR COST
MATERIALS
Bid
Item No.
Bid Item
Description
Estimated
Quantity
Unit of
Measure
Labor Unit
Price
Total Labor
Price
Material Unit
Price
Total Material
Price
71
Mobilization,
Demobilization, MOT
10%
%
0.10
$8,425.00
Olc
Install 6" PVC
Water Main
100
LF
6.00
$600.00
4.00
$400.00
Old
Install 8" PVC
Water Main
100
LF
7.00
$700.00
7.00
$700.00
Olf
Install 12" PVC
Water Main
100
LF
$9.00
$900.00
$15.00
$1,500.00
05e
Install
Pipe
Replacement)
and
12"
MJ
HDPE
Adapters
Directional
(Water
Bore
Main
Including
and
Force
Fusion of
Main
1,350
LF
$41.00
$55,350.00
$17.00
$22,950.00
17b
Install 6" Gate
Valve
1
EA
$125.00
$125.00
$450.00
$450.00
17c
Install 8" Gate
Valve
1
EA
$160.00
$160.00
$750.00
$750.00
17d
Install 10"
GV&B
1
EA
$175.00
$175.00
$950.00
$950.00
17e
Install 12"
GV&B
2
EA.
$250.00
$500.00
$1,200.00
$2,400.00
19b
Install 2" ARV,
Directional
Bore
GV, Manhole structure and cover on
Water Main
2
EA
$700.00
$1,400.00
$3,500.00
$7,000.00
19Directional
Install
4" ARV,
GV, Manhole
Bore Force
Main
structure and
cover on
2
EA
$1 000.00
$2,000.00
$4,500.00
$9,000.00
29f
Install 10" PVC
Force Main
100
LF
$9.00
$900.00
$11.00
$1 100.00
I lb
Grout Pipe
12"
Abandoned
and Left in Place, 10" through
1,300
LF
$8.00
$10,400.00
$0.00
07
Install Mechanical
Restrained Joint DI Fittings
2.00
TON
$3,500.00
$7,000.00
$3,500.00
$7 000.00
21
Test Holes
/
Potholes
20
EA
$200.00
$4,000.00
$0.00
64a
Lawn Restoration
(Topsoil and Sod)
100.0
LF
$0.40
$40.00
$2.50
$250.00
Subtotal Water
System
$84,250.00
$54,450.00
SubtotalMaterials,
Subtotal
Water
&
System
Permitting
Labor,
Mob.,
Demob.,
MO
f,
$92,675.00
Public
$100,000.00)
Construction
Bond
Allowance
(labor
cost
over
1
0
0.04
$3,707.00
Force Accnt.
IRCDUS Contingency
Account
1
%
0.10
$9,267.50
$5,445.00
II
TOTALS
$105,649.50
559,895.00
LABOR TOTAL
ROUNDED
$106,000.00
MAT. TOTAL RC
$60,000.00
11
TOTAL ROUNDED
$166,000.00
ATTACHMENT 1
WORK AUTHORIZATION DIRECTIVE
No. 2014-001
IRC — REPLACE 10" AC WM NORTH OF 21STREET SE TO YOUNG'S MARKETAND 10"
PVC FORCE MAIN NORTH OF YOUNG'S MARKET WITH 12" HDPE DIR. BORES
DATE OF ISSUANCE: June 2014 EFFECTIVE DATE: June 2014
OWNER: Indian River County
CONTRACTOR: Melvin Bush Construction, Inc.
CONTRACT: WATER SEWER AND RECLAIM WAl ER LINE REPLACEMENT / EXTENSIONS
AND MISCELLANEOUS LABOR CON I RAC h BID NO. 2010052 AWARDED
September 7, 2010, extended Oct. 1. 2012 to Sept 30, 2013
PROJECT: Construct 1350' 12" HDPE Dir. Bores from 21' St. SE North to replace 10" AC water main,
Install two 12" Gate Valves, Install 200' of 12" HDPI. n/o Young's Market to replace 10" PVC force
main to resolve conflicts with new entrance drive to strmcenter on east side US 1 at Highland Drive,
Install two ARV's.
COUNTY UTILITY PROJECT NO.: UCP #4096
COUNTY WIP. No. 471-23536-044699-13502
CONTRACTOR'S PROJECT NO.: N/A
You are directed to proceed promptly with the following Naork:
Description: Replace the 10" AC water main from 21' Street SE to north of Young's Market, reconnect Young's
Market to new main after testing and chlorination. replace about 200 feet of 10" PVC force main north of Young's
Market in conflict with a proposed driveway and install two ARVs, ons on each side of the directional bore.
Purpose of Work Authorization Directive: The construction will remove an active 10" AC water main from under the
proposed pavement of US 1 requested by the FDOI' and relocate a section of 10" PVC water main in conflict with a
proposed driveway.
Attachments: (List documents supporting work)
Method of determining Contract Price:
Unit Prices: Bid Items as established pursuant to Bid No. 2010052, and awarded by the Board of County
Commissioners on September 7 2010 to Melvin Bush Construction. Inc., extended to Sept. 30, 2014.
Lump Sum
Cost of the Work
12
■
■
The Cost of Labor, Contingency and Contract Time is summarized below:
Estimated Labor Cost (rounded) _
$106,000.00
Estimated Contract Time.
30 days
Estimated Labor Cost (rounded)
ACCEPTED:
By:
•
J
elvin Bush Constr., Inc.,
Labor Contractor
$106,000.00
REC0IMMENDED:
By(cfr( C24
Gordon E. tips P.E.
Environmental I ngIn e$ntSSI0�yF9s•.01
Date: 6 - a y Date:
F:\users\mary\Downloads\A3 - Work Authorization No. 2014-001
l
AP' '0 ED
By
Jo
COUNTY CHAIR ASN
Peter D O'Bryan
Date: Mune 10, 2014
Attachment 2