HomeMy WebLinkAbout2014-083ATTACHMENT 1 LABOR US 1 South Replacement from 21st 10" PVC Project : Young's Date: June 2, 2014 Force Market Indian River County AND MATERIALS COST ESTIMATE FROM LABOR CONTRACTOR: MELVIN 12" HDPE Directional Bore of Existing 10" AC Water Main Street SE 1000' to the North and Main Replacement n/o Department LABOR BUSH of Utilities CONTRACTOR'S BID ITEM LIST CONSTRUCTION, INC. MELVIN BUSH LABOR COST MATERIALS Bid Item No. Bid Item Description Estimated Quantity Unit of Measure Labor Unit Price Total Labor Price Material Unit Price Total Material Price 71 Mobilization, Demobilization, MOT 10% % 0.10 $8,425.00 Olc Install 6" PVC Water Main 100 LF 6.00 $600.00 4.00 $400.00 Old Install 8" PVC Water Main 100 LF 7.00 $700.00 7.00 $700.00 Olf Install 12" PVC Water Main 100 LF $9.00 $900.00 $15.00 $1,500.00 05e Install Pipe Replacement) and 12" MJ HDPE Adapters Directional (Water Bore Main Including and Force Fusion of Main 1,350 LF $41.00 $55,350.00 $17.00 $22,950.00 17b Install 6" Gate Valve 1 EA $125.00 $125.00 $450.00 $450.00 17c Install 8" Gate Valve 1 EA $160.00 $160.00 $750.00 $750.00 17d Install 10" GV&B 1 EA $175.00 $175.00 $950.00 $950.00 17e Install 12" GV&B 2 EA. $250.00 $500.00 $1,200.00 $2,400.00 19b Install 2" ARV, Directional Bore GV, Manhole structure and cover on Water Main 2 EA $700.00 $1,400.00 $3,500.00 $7,000.00 19Directional Install 4" ARV, GV, Manhole Bore Force Main structure and cover on 2 EA $1 000.00 $2,000.00 $4,500.00 $9,000.00 29f Install 10" PVC Force Main 100 LF $9.00 $900.00 $11.00 $1 100.00 I lb Grout Pipe 12" Abandoned and Left in Place, 10" through 1,300 LF $8.00 $10,400.00 $0.00 07 Install Mechanical Restrained Joint DI Fittings 2.00 TON $3,500.00 $7,000.00 $3,500.00 $7 000.00 21 Test Holes / Potholes 20 EA $200.00 $4,000.00 $0.00 64a Lawn Restoration (Topsoil and Sod) 100.0 LF $0.40 $40.00 $2.50 $250.00 Subtotal Water System $84,250.00 $54,450.00 SubtotalMaterials, Subtotal Water & System Permitting Labor, Mob., Demob., MO f, $92,675.00 Public $100,000.00) Construction Bond Allowance (labor cost over 1 0 0.04 $3,707.00 Force Accnt. IRCDUS Contingency Account 1 % 0.10 $9,267.50 $5,445.00 II TOTALS $105,649.50 559,895.00 LABOR TOTAL ROUNDED $106,000.00 MAT. TOTAL RC $60,000.00 11 TOTAL ROUNDED $166,000.00 ATTACHMENT 1 WORK AUTHORIZATION DIRECTIVE No. 2014-001 IRC — REPLACE 10" AC WM NORTH OF 21STREET SE TO YOUNG'S MARKETAND 10" PVC FORCE MAIN NORTH OF YOUNG'S MARKET WITH 12" HDPE DIR. BORES DATE OF ISSUANCE: June 2014 EFFECTIVE DATE: June 2014 OWNER: Indian River County CONTRACTOR: Melvin Bush Construction, Inc. CONTRACT: WATER SEWER AND RECLAIM WAl ER LINE REPLACEMENT / EXTENSIONS AND MISCELLANEOUS LABOR CON I RAC h BID NO. 2010052 AWARDED September 7, 2010, extended Oct. 1. 2012 to Sept 30, 2013 PROJECT: Construct 1350' 12" HDPE Dir. Bores from 21' St. SE North to replace 10" AC water main, Install two 12" Gate Valves, Install 200' of 12" HDPI. n/o Young's Market to replace 10" PVC force main to resolve conflicts with new entrance drive to strmcenter on east side US 1 at Highland Drive, Install two ARV's. COUNTY UTILITY PROJECT NO.: UCP #4096 COUNTY WIP. No. 471-23536-044699-13502 CONTRACTOR'S PROJECT NO.: N/A You are directed to proceed promptly with the following Naork: Description: Replace the 10" AC water main from 21' Street SE to north of Young's Market, reconnect Young's Market to new main after testing and chlorination. replace about 200 feet of 10" PVC force main north of Young's Market in conflict with a proposed driveway and install two ARVs, ons on each side of the directional bore. Purpose of Work Authorization Directive: The construction will remove an active 10" AC water main from under the proposed pavement of US 1 requested by the FDOI' and relocate a section of 10" PVC water main in conflict with a proposed driveway. Attachments: (List documents supporting work) Method of determining Contract Price: Unit Prices: Bid Items as established pursuant to Bid No. 2010052, and awarded by the Board of County Commissioners on September 7 2010 to Melvin Bush Construction. Inc., extended to Sept. 30, 2014. Lump Sum Cost of the Work 12 ■ ■ The Cost of Labor, Contingency and Contract Time is summarized below: Estimated Labor Cost (rounded) _ $106,000.00 Estimated Contract Time. 30 days Estimated Labor Cost (rounded) ACCEPTED: By: • J elvin Bush Constr., Inc., Labor Contractor $106,000.00 REC0IMMENDED: By(cfr( C24 Gordon E. tips P.E. Environmental I ngIn e$ntSSI0�yF9s•.01 Date: 6 - a y Date: F:\users\mary\Downloads\A3 - Work Authorization No. 2014-001 l AP' '0 ED By Jo COUNTY CHAIR ASN Peter D O'Bryan Date: Mune 10, 2014 Attachment 2