Loading...
HomeMy WebLinkAbout2012-086 o / o1 / I w , 1a . 3 . a . WORK AUTHORIZATION DIRECTIVE No. 2010- 006 a v / 01 • b $ G IRC — Repair Manhole in Highlands on 21 " Street SW at 4th Avenue SW DATE OF ISSUANCE : May 2012 EFFECTIVE DATE : May 2012 OWNER: Indian River County CONTRACTOR : Melvin Bush Construction , Inc . CONTRACT : WATER , SEWER AND RECLAIM WATER LINE REPLACEMENT 1 EXTENSIONS AND MISCELLANEOUS LABOR CONTRACT, BID N0. 2009026 , AWARDED September 7 , 2010 PROJECT : Repair Settled Manhole on 21 Street to Original Condition COUNTY UTILITY PROJECT NO . : UCP 44091 CONTRACTOR ' S PROJECT NO . : N/A COUNTY WIP . No . 471 -23536-044699- 12509 You are directed to proceed promptly with the following work : Description : Construct of repairs to settled manhole on 21 " Street backing up sewage Purpose of Work Authorization Directive : The repair will restore normal sewage flow and restore the pavement to original grade . Attachments : (List documents supporting work) Method of determining Contract Price : © Unit Prices : Bid Items as established pursuant to Bid No . 2010052 , and awarded by the Board of County Commissioners on September 7 , 2010 to Melvin Bush Construction , Inc . ❑ Lump Sum ❑ Cost of the Work The Cost of Labor, Contingency and Contract Time is summarized below : Estimated Labor Cost = $ 16, 145. 03 Estimated Contract Time : 45 days Total Estimated Labor Costs= $ 169145.03 ACCEPTED : RECOMMENDED : APPROVED : By : By : ✓�� ✓ By : � M2 vin Bush onstr. , Inc . , 'G don . Sparks4 . E . y"r, pMMoun I* /S ..Gat eeler Labor Contractor Environ ental ngineer ar"� , TY , CHAIRMAN Date : / 7 /02. Date : 7 v = te : • Q,�3—O1 - 1 ?_ • • Qf APPROVED AS TO FO RNt sq m e n t 2 AND LEGAL SUF ICIEN¢Y ° 1'9�; to •• R COU � 4ou 'jujIluu "N "" EiY C�UNTYf� ORNEY CA\Documents and Settings\mary\Local Settings\Temporary Intemet Files\Content . IF5\5R9102NQ\A2°/o20m %20 Work%2OAuthorization%2ONo. %202010-006%20--%2011 igh lands%2OManhole%2ORepair[ 11 . doc