WORK AUTHORIZATION DIRECTIVE
No . 2012 -00I
HZC — 27111 AN tenue 24 " FNI Crossinw at 5r ' ' Street SW
I ) ATI - O1 ISSI ' :ANCI . : Scptemha , 013 [ I I }�: ( ' 11V1 . UA 1 I : : Octc ) her
3013
OWNIK Ind Wit ItncrC' uun -- _
CONI RAC 1 ' OR : Melvin Bush Construction . Inc . -
CONI RAC I . WA I ER . SI U LR AND RECLAIM WA - 1 I : RLINI 'd R1 1 ' I A ( I MI ; N 1
I . N I { NSIO '� S
AN \ 1 _I_S ( I J. LAN 1:017S 1_. A_110IZ. ( Oti " fRAC -1Ill NO . 3010052 , .1% Yk ARDI .1 )
Sc tcmher 7._ 2010 . extended 0ct _I ; ) 012_
11ROJI : C I Curl trust `4- lorce m ) ) n crossing_ o1 27 ' 1 ' Avenue at � `I St SW
COLiN l Y t l ' ll _ I1 Y PRO .ILCI NO . : ti (A ) . 4080 CUNTRAC` YOWS I ' RO .IL, (I MY : N
/ A
CM FY Wrl 1 ) . No . X171 - 169000 - 12503 -
You are diI&CCICd to IimcCCxl promptly with the lullovFint work :
OCSCription : ( - onstruct 21 -1 - ' PVC ' pipe crussini.) of ' . . " ' Av : nuc
Purpose oi ' Work Authorization Direclivc : t he construction will Sore the cost 01' a directional hore in the Motors
Attacholcnts : ( List (IOCLIInCIIIS ulppor•ting work )
Method ofdeterminint, Contract Price :
Z Unit Prices : Bid loans as established pursuant to Bid No . 21010052 , ,old awarded by the Board of ' County
(_ onuni� sionecs
oil September 7 , 2010 to Melvin Bush C ' onartiction . Inc . , cucnded Oct . I . 2012)
❑ I unip Sunt
❑ oll of the Work oven " n noun ," . .
.•• ;, COM. . . . . . MSS
I- he Cost of tabor. Continency mid Contract I into is summarized helow : * cj
Lstintaled Labor Coel 516 ,653 .00 I , stirltated C`onu-ac. t lime . 3I d 1 \ �
:y
1 Old I Slimatcd Labor Costs X10, 653. 60 `;'y .f
I - --- - - — --- -- `s,'Q • Q~�
COUNfN
ACCHI1l 1 R1='COM MI : N DI AW : APkw C
I ' I F U : " � " • ^ °
1
Melvin Bush Cunstr . . Inc . . ( I don fl SpaIt . r � Peter D . O ' Bryan , Vice C ( airman
Lahor Contractor I . nvironnicntal Lntyrneer
XDate : Date :
Attachment 3
APPROVED AS TO FORM
AND LEGAL- ENCY
DY e�l
ALAN S. P CKWICH
1ulh011 /, llfM ti , l lolI -uhl - _ = 1h �: nu : _ I m0h I vI , d < Ilf �I 1 U Jot�
COUNTY-ATTORNEY
i
PROPOSAL / CONTRACT AGREEMENT
Ranger Construction Industries Inc .
1200 Elboc Way
Winter Garden Florida 34787
Contact: Blair Johnson Cell (407) 948-6100
Phone: 407-65&9255
Fax : 407-656-3188
cote To : FDOT Proposal No : 1209036
Address : Bid Date ; 09/06/ 12
Proiect Name : 27th Avenue ATS Pipe Crossings
Phone No : Location :
Fax No : County
Contac Plan / Revision
E-Mail Address:
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT
Mobilization 1 .00 LS 5,734.94 5,734.94
Demo Existing Curb and Driveway 1 .00 LS 12128. 18 11128. 18
MOT 1600 LS 21903.52 2,903.52
Pipe Installation & Connection 1 .00 LS 41 ,445.78 41 ,445 .78
8 " Limerock 67.00 SY 43.05 2,884.35
SP 9.5 TL-C 2. 5" 67.00 SY 70.48 49722. 16
Type F Curb & Gutter 25 .00 LF 14.46 361 .50
6" Concrete 15.00 SY 37.35 560.25
GRAND TOTAL $59,740.68
Attachment 1
Indian River County Department of Utilities
BID FORM 0030-5A
Project : 27th AVENUE MILLING & RESURFACING - 24 " Pipe Crossing
Sep- 12
Bid Bid Item Estimated Unit of Labor Unit Total Labor Total
Material Material
Unit Price
Item No. Description Quantity Measure Price Price Price
Water Main Replacement Project
291 Fumish & Install 24" PVC DR 25 Stomtwater Force Main 70 LF 18 . 00 11260 .00 65 .00 4,
550 .00
7 Install Fitin s (2-24" Caps, Restraints)
I TON 3 ,500 .00 3 ,500 . 00 3 ,500 .00 3. 500 .00
53c Remove, Dispose of and Replace Sub-Grade (7'd X 80'l X 8'w) 290 TON 13 .00 3,770.00 25 .00 7,250
.00
51b Remove, Dispose of and Replace Base Course (2'd X 801 X 8'w) 40 TON 13 . 00 520 . 00 25 .00 1 ,000 .
00
53aInstall 2 . 5 " Asphalt Over Trench ( 10' X 32') 4 TON 32 .00 128. 00 70 .00 280.00
57d Install Type F Curd & Gutter 25 LF 8.00 200.00 10 . 00 250.00
66a Well Point Dewatering 1 LS 11000.00 1 ,000.00 0 . 00
66b Well Point Dewatering, Additional Points 100 EA 25 . 00 2, 500.00 0. 00
21 Pot Hole / Test Holes 5 EA 200.00 100 .00 0 . 00
Subtotal L3 ,878 . 00 16, 830 .00
13 MOT, MOB. 1 10% 17387 . 80
Subtotal 157265 . 80 16, 830 . 00
Contingency 10% 17526. 58 1 .683 . 00
14 1 10% 161653 .60 18.513 . 00
15 L151166 . 60
TOTAL Labor & Materials60
Attachment 2
Zcmtre cr's Bid item List
W0 5A