Loading...
HomeMy WebLinkAbout2013-245�a,/3/ / 3 isB . b.1. WORK ORDER NUMBER 2014 Solid Waste Management Plan This Work Order Number 1 is entered into as of this 3rd day of December , 2013 pursuant to that certain Continuing Contract Agreement for Professional Services entered into as of November 15, 2011 (the "Agreement"), by and between INDIAN RIVER COUNTY, a political subdivision of the State of Florida ("COUNTY") and Neel -Schaffer, Inc. ("Consultant"). The COUNTY has selected the Consultant to perform the professional services set forth on Exhibit A (Scope of Work), attached to this Work Order and made part hereof by this reference. The professional services will be performed by the Consultant for the fee schedule set forth in Exhibit B (Fee Schedule), attached to this Work Order and made a part hereof by this reference. The Consultant will perform the professional services within the timeframe more particularly set forth in Exhibit C (Time Schedule), attached to this Work Order and made a part hereof by this reference all in accordance with the terms and provisions set forth in the Agreement. Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work Order shall conflict with the terms of the Agreement and the terms of the Agreement shall be deemed to be incorporated in each individual Work Order as if fully set forth herein. IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the date first written above. CONSULTANT: Neel -Schaffer, Inc. By' G l By: BOARD OF COUNTY COMMISSIONERS OAF, INDIAN RIVER COUNTY III hII II IIIIryM :510NFRS,,,F4 Attest: Jeffrey R. Smith, Clerk of Court and Comptroller By: approved: Approved as to form and legal sufficiency: T. Reingold, County Attorney Exhibit A- Work Order No.1 Scope of Engineering Services 2014 Solid Waste Management Plan Update Solid Waste Disposal District Indian River County, Florida BACKGROUND In 2005, the Consultant updated the 2001 Solid Waste Disposal District's (SWDD) Solid Waste Master Plan to reflect rapid growth in population and solid waste generation. The 2005 update provided a master plan for continued operations of the Indian River County Solid Waste Management System (the "System') including a master site development plan for future landfill disposal areas and related infrastructure, a master plan to improve or expand the five Customer Convenience Centers (CCC), and developed a short-term and long-term capital improvement planning program. In early 2006, the SWDD Board of County Commissioners decided to forego development of the landfill's north parcel as a dedicated disposal area for future use. Thus, only the remaining acreage on the original Landfill property and the southern parcel would potentially be developed for solid waste disposal activities. The County requested a revision to the draft 2005 Solid Waste Master Plan to reflect the north parcel development restrictions and Board directives. The final Solid Waste Master Plan ("2006 Plan") updated the landfill facility development planning, disposal area development and identified the Capital Improvement Plan (2006-2011 CIP) to reflect the SWDD's solid waste management objectives. During the past six years several major changes has taken place related to solid waste management and operations of the Indian River County's System. Among those are: • The County stopped operating the C&D disposal area and closed the C&D material disposal site. • The County selected and entered into a contract with a new private company to operate the landfill disposal area. The new operating contract allowed the County to dispose of C&D material in the Class I landfill. • The INEOS Bio -refinery was constructed by a private developer next to the landfill property to use waste material as feed stock in production of ethanol and power. • The County subsequently entered into a contract with INEOS for accepting the County's yard waste as feed stock in the plant. The private developer has indicated to the County that their future plans include accepting Municipal Solid Waste (MSW) as feed stock. • The County purchased additional properties west of I-95 for future use • A private C&D facility is permitted to be developed next to the County landfill. • In 2010, the FDEP rules were modified to set a 75% recycling goal without any additional guidelines to local communities or state level funding mechanism to achieve that goal. • The economic downturn during the past five years has negatively impacted solid waste generated in the County and processed by the System. This change, similar to other surrounding Counties, has resulted in loss of revenues with no change in fixed costs. Work Order No. 1 -Solid Waste Master Plan Update These changes have impacted the current 2006 Plan requiring it to be updated. The County has requested an update to include a solid waste composition study. The solid waste composition study, which was performed in 1995 and 2000, will provide the updated data needed to enable the County identify solid waste recycling and collection opportunities including waste separation and/or processing to meet the State's 75% goal. In addition, the updated composition study will help with INEOS's future plans for use of MSW as feedstock in the Bio - refinery plant. The 2014 updated plan will provide the County with recommendations to manage the county -wide solid waste management issues related to collection, recycling, operations and disposal of the solid waste. The updated 2014 Solid Waste Management Plan will be submitted to the SWDD within twenty-six (26) weeks of authorization to proceed from the County. A portion of the work related to solid waste composition study, collection alternatives and recycling plan will be performed by others and the results will be summarized in the updated 2014 Plan. SCOPE OF SERVICES The Consultant will provide the services identified in the following tasks to prepare to update the Solid Waste Management Plan: 1. Kickoff and Project Control Plan 2. Background Data Collection and Review 3. Solid Waste Projections and current Cost -of -Service Analysis 4. Update Plans for Landfill Development & Customers Convenience Centers 5. Solid Waste Composition Study 6. Solid Waste Processing Alternatives and Recycling Opportunities 7. Capital Improvement Program Update 8. FY 2014-20 Solid Waste Management Plan Report 9. Presentation to the Board of County Commissioners Task 1- Kickoff Meeting and Project Control Plan The Consultant will meet or phone conference with County and SWDD Manager to discuss project goals and objectives, and confirm planned meeting dates and project milestones. The Consultant will prepare an agenda for the meeting and a draft Project Control Plan which will include a preliminary project schedule. At the kickoff meeting, individual subtask and action items for each task in the scope of work will be discussed, and project deliverables and County's desired project milestones will be established. The Consultant will prepare a draft Project Contr ol Plan that will define the project team and responsibility, lines of communication, scheduled progress meetings/ phone conferences with SWDD Manager and others, and a specific list of deliverables and deliverable schedule. Quality control management will be addressed in the document. County comments will be incorporated in the draft Project Contr ol Plan and the final copy will be distributed electronically to all team members. Throughout the duration of the project, if deviation is necessary in the project scope of work or the project scheduling, the Consultant will notify SWDD Manager specifying the reason for such deviation. However, in no event shall the Consultant perform work outside of the approved scope of work without written authorization from SWDD. The Consultant will prepare the meeting summaries for distribution to the project team and attendees following the meeting or conference call. [2] Work Order No. 1 -Solid Waste Master Plan Update Task Deliverable: • Draft and Final Project Control Plan- electronic submittal • Meeting agenda and summary. electronic submittal Task 2- Background Data Collection &Review The Consultant will prepare a list of information and data needed and submit the list to the County. The Consultant will collect from SWDD the requested information including the existing available information related to landfill operations, CCC facilities, and historical waste flow by categories, historical CIP expenditures, approved fiscal year budget summaries, and other pertinent documents. The information will also include updated topographic and aerial surveys, current disposal area and remaining permitted disposal capacities, personnel and administration costs, landfill operations contracted costs, other private and public SWDD contracts, closure financial reports, landfill site plan revisions since the 2006 Master Plan, and status of existing permits and renewal schedules. The Consultant will coordinate with other consultants to receive updated site and development plans for County's solid waste facilities. The Consultant will visit the landfill and the CCC facilities for observation of the current conditions and review the plans for improvements. The Consultant will discuss the operations with the County and staff at of the CCC, landfill, recycling and household hazardous waste collection center, and other facilities. The Consultant will collect from the County updated data an d engineering plans and construction cost estimates prepared by other Consultants related to new properties purchased, landfill facility site development, CCC expansion/ improvement plans and other on-going CIP engineering design plans. If warranted and as requested by the County, the Consultant will schedule a meeting/ phone conference with other Consultants to collect other available updated information related to solid waste recycling and processing, landfill permitting plans and collect other available information in order to eliminate duplication of work. Conceptual or planning level design of improvements or expansions to the landfill or the CCC facilities is not included in this task. These are assumed to be available from the County. Task Deliverable: • The draft Section 1 will be submitted as a Technical Memorandum (TM) for SWDD review and comment prior to integration into the 2014 Management Plan Report. Task 3- Solid Waste Projections and Current Cost -of -Service Analysis The Consultant will utilize the current data fr om the annual closure cost financial responsibility reports, recent historical solid waste flow to the landfill (contracted tonnage summaries), waste compaction rates and capacity utilization, current population estimates and trends to prepare m update of the solid waste flow projections for the duration of the useful life of the existing landfill. This will include projections and breakdown of the projected solid waste flow quantities requiring processing and disposal. Based on this projection and current regulatory requirements, the Consultant will identify the disposal and operations processing needs of the System for the duration of the 25 -year planning period. The current agreements in place for yard waste disposal, solid waste collection and transfer operations at the CCC facilities, on-site C&D processing and landfilling with the current Class I solid waste, and the potential private C&D facilities in the vicinity of the landfill will be considered. ill Work Order No. 1 -Solid Waste Master Plan U Based on the existing disposal capacity and projections, the Consultant will update the County landfill facility development plan, if current conceptual permit plan requires revision. The Consultant will revise the permitted conceptual plan showing the existing landfill site and acquired property at build -out. No solid waste disposal areas will be located on the northern property per the January 2006 guidance from the County Commission. This build -out development plan will update conceptually the overall areas for solid waste landfills, stormwater ponds, and ancillary operational facilities and areas for solid waste processing needs. The Consultant will review and modify, if necessary existing planning level estimates of disposal area capacities. The estimated landfill life expectancy will be updated based on waste quantity projections. It is assumed the County will discontinue operation of C&D debris in a separate landfill from Class I solid waste landfill. The Consultant will utilize existing information regarding stormwater management and wetland mitigation as designed and prepared by other consultants in preparation of the build -out plan drawing. Based on the recent historical operating costs, contracted costs, and other expenditures and the volume of different categories of solid waste managed by SWDD during these periods, the Consultant will assist the SWDD to determine the cost allocation for various components of the System. The County will provide a summary of expenditures by facility, by payment for private contracts or other breakdown by cost centers. The Consultant will use the information provided to prepare the cost allocation summary and to determine the cost -of -service provided by the County for managing various component of the solid waste stream. The deliverable will be an excel spreadsheet showing the annual costs of various operations of the SWDD along with the total tonnage for each facility or system component. These will include the cost allocation or unit cost of managing MSW, C&D debris, yard waste and other categories of solid waste received by the County. The cost calculation may further be broken down into the unit cost of providing disposal capacity, transportation, operations, permitting, administration and closure A landfills. The County will provide the Consultant the summary of historical expenditures for each operation, facility cost center or category of waste. Analysis of existing rates, charges and fees is not included in this task. Task Deliverable: • Update of solid waste volume projections and planned disposal capacity • Solid waste cost allocation and cost -of -service analysis- draft and final worksheets • Updated site development, disposal capacity analyses, determination of processing and landfill needs • The draft Section 2 will be submitted as a TM for SWDD review and comment prior to integration into the 2014 Management Plan Update. Task 4- Customers Convenience Center Improvements The Consultant will verify with SWDD that the conditi ons and assumptions used in the draft 2006 Update for the CCC facilities relocation, expansions and/or improvements are still valid over the near term. The Consultant will coordinate with other County consultants to obtain conceptual plans and or engineering drawings, and their budgetary or hard construction cost estimates for improvement or expansion. The Consultant will update the 2006 master plan based on the collected information and discussion with the County for the CCC facilities relocation, expansions and/or improvements. [4] Work Order No. 1 -Solid Waste Master Plan Update Task Deliverable: • An update of CCC conditions, operations and recommendation for improvements or expansions. • The draft Section 3 will be submitted as a TM for SWDD review and comment prior to integration into the 2014 Management Plan Update. Task 5- Solid Waste Composition Study The Consultant will contract and coordinate with Kessler Consulting, Inc. (KCI), the subconsultant preparing the solid waste composition study. The Consultant will participate in meetings/conference calls as budgeted and requested by the County, and provide review comments on solid waste sorting protocols and parameters, and the final study data and draft report. The Consultant will coordinate with subconsultant and the County to review comments on the waste composition study and final report. The Consultant will include a summary of the waste composition study along with final data and results of the analysis and include it in the 2014 Management Plan Update. Task Deliverable: • A brief summary of solid waste composition study and results. • The draft Section 4 will be submitted as a TM for SWDD review and comment, prior to integration into the 2014 Management Plan Update. • The full copy of the solid waste composition study will be attached as an exhibit to the 2014 Management Plan Update. Task 6-Sol0 d Waste Collection &Processing Alternatives and Recycling Plan The Consultant will coordinate with KCI who will be preparing the solid waste collection and processing alternatives and recycling opportunities. The Consultant will attend meetings as budgeted and as requested by the County, and provide review comments on solid waste collection, processing alternatives and recycling plan. The Consultant will meet/conference call with SWDD, KCI, and if necessary or requested by the County with representatives from other consultants, to review current and proposed collection and recycling programs, along with any changes to the system practices and operations. KCI is tasked to prepare a summary of the key requirements of HB 7243 and other relevant legislation that passed during the 2010 Legislative Session, as well as any policy directives, recommendations, or decisions issued by the FDEP in response to such legislation. The Consultant will include a brief summary of the recycling plan recommendations prepared by KCI in the 2014 Management Plan Update. The Consultant will review the existing interlocal agreements and ordinances related to the operation of SWDD and management of solid waste in the County. The Consultant will prepare recommendations to the County for updating these ordinances and interlocal agreements for improved waste flow control. The Consultant will include a summary of the current solid waste ordinances and interlocal agreements and the recommendations in the 2014 Management Plan Update. Task Deliverable: • A summary of solid waste recycling recommendations and solid waste processing alternatives as prepared by others. 151 Work Order No. 1 -Solid Waste Master Plan U • A summary of the current solid waste ordinances and interlocal agreements and the recommendations. • The draft Section 5 will be submitted as a TM for SWDD review and comment prior to integration into the 2014 Master Plan Update report. • The final solid waste collection and recycling plan recommendations report will be attached as an exhibit to the 2014 Master Plan Update. Task 7-Update of Capital Improvement Program Based on the results of Sections 1 through 61 the Consultant will prepare and update the FY2014-20 Capital Improvement Program (CIP) based on the identified needs to achieve the objectives of the 2014 Master Plan Update. The Consultant will prepare an engineer's opinion A probable cost estimates for landfill disposal area and infrastructure, and the CCC facilities' expansions and/or improvements. The cost estimates will be broken down to construction costs based on conceptual plans prepared by other consultants, engineering, permitting and construction inspection and quality control cost. A time and priority schedule will be provided for implementation of the recommended FY 2014-20 CIP. The Consultant will also review specific recommendati ons or items in the KCI prepared Recycling Plan that may require capital expenditure by the County, such as development of an on-site waste processing facility, during the planning period for inclusion in the Capital Improvement Plan. Preparation of construction cost estimate for on-site processing facilities is not included. Task Deliverable: • Updated FY 2014-20 CIP along with cost estimates and schedule for implementation • The draft Section 6 will be submitted for review and comment prior to integration into the 2014 Management Plan Update. Task 8- 2014 Solid Waste Management Plan Report The Consultant will combine the Sections 1 through 5 into one report, and prepare an executive summary listing the goals and objectives of the SWDD, identifying the needs and requirements, and summarize findings and recommendations of the updated CIP for FY 2014-20. The Consultant will provide a plan of action along with atime-line for implementati on by the SWDD for addressing the long-term needs and requirements of the Solid Waste Management system. This will include future action items related to updating current ordinances related to the County's solid waste management and obtaining interlocal agreements with the municipalities within SWDD service area. The final Report is not anticipated to be more than 100 pages. Task Deliverable: • Five (5) copies of draft 2014 Solid Waste Management Plan for review and comments • Twelve (12) copies of the fina12014 Solid Waste Management Plan Report Task 9- Presentation Upon request from the County, the Consultant will prepare a presentation or a workshop to the Board of SWDD detailing the updated Master Plan, the FY 2014-20 CIP and the recommended plan of action. One (1) presentation to the Board of County Commissioners is budgeted. [6] Work Order No. 1 -Solid Waste Master Plan Update Task Deliverable: • Exhibits and planning drawings for distribution at meetings and presentations • Twelve (12) copies of the Executive Summary will be provided to the County SUBCONSULTANT Cl shall perform certain portions of the scope of services. The scope of services that the Consultant will subcontract to KCI is defined and presented as Attachment4 to Work Order No. 1. The total value of the subcontracted services for this Work Order will be $68,945.00. COMPENSATION Compensation to the Consultant for services performed under this Scope of Services will be lump sum method of payment in accordance with paragraph 5 of the Continuing Contract Agreement. The total amount authorized by this Work Order No.1 is $148,202 including all subconsultant costs and direct expenses. Man-hour estimates and summary of fees for this Scope of Services are presented in Exhibit B. Exhibit B-Work Order No. 1 SCHEDULE OF ALLOCATED MAN -HOURS & COMPENSATION ENGINEERING SERVICES FOR UPDATED THE SOLID WASTE MANAGEMENT PLAN SOLID WASTE DISPOSAL DISTRICT INDIAN RIVER COUNTY, FLORIDA Engineers Technicians C Total TASK sr. sr. Project Task Principal Engineer Manager/ Projace staff GIs/sr. Tachn. Admin/ Total Estimated Estimated Manager Manager Sr, Engineer Engineer Engineer Techn. 11 clerical Noun Fee Fee Task 1. Kidz-off Meeting & Project Control Plan Project set-up, Subconsultant contract, Draft Project Control Plan & Kickoff Meeting/Conf Call 4 8 4 2 1 19 $2,608 Finalize Schedule, Project Control and Distribute 1 4 4 1 10 $1,303 Subtask Total 0 1 5 12 1 4 4 2 0 1 0 2 29 $3,911.00 Task 2. Data Collection & Review Data Collection & Review 4 4 6 6 4 24 $2,852 Site Visit & Meeting/Coordination with Others 4 8 8 20 $2,860 Facility Improvements/Expansions Needs 4 4 8 8 4 28 $3,680 Update Section 1 Document 4 8 12 4 3 31 $3,914 SubtaskTotal 0 16 24 34 8 6 8 0 7 103 $130306.00 Task 3- Solid Waste Projections and Current Cost-of- Services Anaysis Coordinate with other Consultants 1 2 4 7 $965 Update Solid Waste Projections 1 2 3 $465 Update Disposal and Operation Needs 4 8 8 2 $20860 Update Landfill Facility Developemtn Plan & Site Life 2 8 4 2 $1,870 Historical Expenditures & Cost Allocation 8 16 8 2 $4,720 Cost-of-Service Anaysis 4 8 16 24 $7,460 Update Section 2 Document 1 4 8 13 $1,745 Subtask Total 4 25 1 56 52 0 0 4 1 0 0 1 29 1 $200085.00 Task 4. Citizens Convenience Center Improvements Coordinate Improvements Evaluation by Others 1 2 3 $435 Improvement/Expansion Plan 1 2 3 $435 Update Section 3 Document 1 4 4 4 2 15 $1,653 Subtask Total 0 3 4 8 0 0 0 4 2 21 $2,523.00 Task 5- Solid Waste Composition Study Coordination With Subconsultant 4 8 12 $1,860 Conf Calls with County and Subconsultant (2 budgetted) 4 4 4 12 $1,800 Review of Study Data Analysis & draft Report 1 2 2 5 $835 Summary Consultant report- Prepare Section 4 1 2 8 11 $1,675 Subtask Total 2 12 22 4 0 0 0 0 0 40 $6,170.00 Task 6- Solid Waste Collection and Processing Alternatives and Reading Plan Coordination With Other Consultants 4 8 0 $10860 Conf with County and Other Consultants (2 budgetted) 4 4 8 $1,300 Summary of Relevant Regulations/ Information 4 4 8 $1.300 Integrate Subconsultant info. Into report- Section 5 1 2 4 4 2 2 15 $10877 Subtask Total 1 14 20 4 0 0 0 2 2 31 $6,337.00 Subtask 7- Update of Capital Improvement Program Update CIP, Cost Estimates & project Scheduling 4 6 8 8 26 $3.580 Review with County and Incorporate Comments 4 4 8 $1,300 Updated Section 6 Document 1 2 8 2 2 15 $2,041 Subtask Total 1 10 1 18 10 1 8 1 0 0 1 0 2 34 $6,921.00 Task 8- 2014 Solid Waste Management Plan Report Prepare Draft Master Plan Update Report 2 8 12 16 8 8 4 58 $7,346 Review with County and Receive Comments 4 8 8 2 22 $30050 Finalize Report and Submit to County 2 4 8 16 6 8 44 $50132 Subtask Total 2 16 28 40 8 0 2 14 12 80 $15,528.00 Subtask 8- Presentation Presentation to BOCC (1 presentation) 4 8 8 4 4 8 36 $4,476 Subtask Total 4 8 8 0 0 0 4 4 8 36 $4,476.00 TOTAL- NEEL-SCHAFFER,INC. 12 97 170 152 28 8 18 2a 35 363 $79,257.00 SUBCONSULTANT- Kessler Consulting Inc. $68,945'00 $148,202.00 TOTAL LUMP SUM COMPENSATION: Exhibit C- Work Order No. 1 Project Schedule Solid Waste Management Master Plan Update Solid Waste Disposal District Indian River County, Florida PROJECT SCHEDULE The Consultant anticipates completing the work required in this Work Order within 26 weeks after the County issues a Notice to Proceed. A detailed project schedule will be presented to the County staff at the kick-off meeting which more clearly defines the anticipated project performance schedule, meetings and milestones. It is noted that the schedule of work of the Consultant is dependent on work of others and data to be obtained from the County and coordination with other consultants. kessler consulting Inc. innovative waste solutions A-r-r-ach MENr-1. TO WORK ORDER NO. 1 Indian River County, Florida Solid Waste Disposal District Scope of Work for Solid Waste Management Master Plan Update November 1, 2013 BACKGROUND As a sub consultant to Neel -Schaffer, Inc. (Consultant), Kessler Consulting, Inc. (KCI) proposes to assist in updating Indian River County's (County) Solid Waste Master Plan. Specifically, KCI will assist with elements of the Master Plan related to waste composition, collection and processing alternatives, and recycling opportunities to work toward meeting the State's 75 percent recycling goal by 2020. Based on discussions with County staff, KCI proposes to approach this work focusing on action -oriented recommendations and developing a strategy for implementation. SCOPE OF SERVICES Outlined below are the tasks to be performed by KCI to complete this project and the activities that will be conducted in each task. Task 1: Project Initiation (Tasks 1 and 2 of Work Order No. 11 • Part icipate in one strategic planning meeting with County staff and Consultant to review the County's existing solid waste management system and to clearly define the County's goals and objectives for this system. • Request and review relevant information, including, but not limited to, collection, recycling, and disposal tonnage for FY 2006 to current; existing collection, transfer, and processing contracts; existing collection and processing fees; annual solid waste reports submitted to the Florida Department of Environmental Protection (FDEP) for CY 2006 to current; and education and outreach materials. • Request and review solid waste projections from Consultant. • Conduct a site visit to relevant facilities, including the citizen convenience centers, transfer station, landfill, and yard waste and C&D debris processing sites. • Determine an appropriate sampling and sorting area for the Waste Composition Study (Task 2 below). 14620 N. Nebraska Ave., Bldg. D, Tampa, FL 33613 1 Tel: 813.971.8333 1 Fax: 813.971.8582 1 www.kesconsult.com If'i I_APfvlAS1V Manning ?U l.!VIndian River Co Scope rev_KU 11011 i Scope of Work for Solid Waste Management Master Plan Update 1 11/1/2013 1 Page 2 of 5 Task 2: Waste Composition Study (Task S of Work Order No. 11 KCI will conduct a Waste Composition Study (WCS) to determine the percentages of various types of materials found in the solid waste delivered to the County's landfill for disposal. This information will assist the County in developing future solid waste programs, including more focused and cost-effective resource management and recycling systems. The tasks listed below are based on conducting one five- day sorting event targeting three generator sectors: (1) single-family residential, (2) multi -family residential, and (3) commercial/institutional. The option of a two -season study also is discussed below. Subtask 2.1—Review Existing and Relevant Information Review available and relevant data, provided by the County, necessary to plan the study approach and protocols. Information needs include, but are not limited to, the following, some of which will have been provided as part of Task 1: • County's most recent annual solid waste report to FDEP. • Data regarding the quantities of solid waste, including yard waste, recyclable materials, white goods, and household hazardous waste, received at the landfill during CY 2010, 2011, and 2012 to date. If possible, tonnage data should be broken down by hauler, generator type (single- family residential, multi -family residential, commercial/institutional, convenience centers, residential self -haul, commercial self -haul, C&D debris, etc.), and source (unincorporated county, municipality, etc.). • Data regarding the quantities and types of County solid waste, yard waste, or recyclable materials received at facilities other than the County landfill. • Current contact information (name, phone number, and e-mail address) for the County's franchised collection service providers. • Information regarding solid waste collection in each municipality, including the name and number of a contact for each city and for each city's collection service provider. • A list of any other waste haulers that provide service within the County, with contact information for each (names, phone numbers, and e-mail addresses). Subtask 2 2 — Develop Sort ine Event Parameters, Protocols and Schedule • Develop a list of material categories into which waste samples will be sorted, ensuring that these categories are consistent with current state reporting requirements and include appropriate recyclable materials. • Confirm the list of generator sectors that will be targeted in the study. • Develop a sampling schedule to obtain the desired number of samples from each generator sector. Based on the number of generator sectors targeted, KCI anticipates the sort ing event to last five days. If appropriate, KCI will develop information packets and truck placards to be distributed by the County to the haulers in advance of the sorting events. • Develop a sampling and sorting protocol and a site safety plan. • Review and discuss the above items with County staff and make any necessary modifications. • Coordinate equipment needs and plans for project mobilization with County staff. • Prepare data recording forms, container labels, and field notebook. kessler consulting inc. innovative waste solutions IRC 1p N1\Sw' Planning 'Ot1VIndian Rider <o Smpc rev _KCI LiOI t3 Scope of Work for Solid Waste Management Master Plan Update 1 11/1/2013 1 Page 3 of 5 SubLas k 2.3 —Conduct Sorting Event • Obtain the necessary equipment for conducting the sorting event. KCI will provide a scale, customized sorting table, all sorting equipment and tools, safety equipment, protective gear, and fluids to keep workers hydrated. The County will be asked to provide the following: o A 20' x 20' tent (or other covered area) to protect workers from the elements while sorting. o A bobcat (or small loader) and operator for pulling samples. o Roll -off containers and transport for sorted and unsorted garbage if the sorting event does not take place near the working face of the landfill. • Provide a Study Supervisor and Sampling Supervisor, as well as day laborers to assist with the sorting activities. If the County prefers to provide the day laborers, the budget will be adjusted accordingly. • Conduct the sorting event. The sorting event will be performed during the winter months to account for seasonal residents, as approved by the County. Specific work hours will depend on the facility's operating hours and typical waste delivery patterns. Representative samples of at least 200 pounds will be pulled from each selected load of waste. The samples will be sorted into the material categories identified in Subtask 2.2 and weighed. KCI will conduct a training meeting, prior to starting work each day, to review safety and sorting procedures with workers. Subtask 2.4 — Analyze Study Data and Prepare Final Report • Analyze the data to calculate the percent by weight of each material category for each generator sector. The data for all generator sectors will then be combined based on the relative tonnages each contribute to the waste stream to calculate the overall composition of solid waste disposed at the landfill. • Review the County's most recent annual solid waste report to FDEP and recent data regarding the quantities and types of County solid waste, yard waste, and recyclable materials received at County facilities and other facilities. • Incorporate this data, as well as results of the Recyclables Composition Study performed by KCI in October 2013, into the WCS results. This will provide the County not only with the composition of waste disposed at its facility, but also a broader understanding of the make-up of waste generated within the County. • Prepare a draft WCS report. • Review the draft report with County staff and Consultant and discuss possible implications to the County's solid waste management program. • Revise and finalize the WCS report. Task 3: Collection Analysis (Task 6 of Work Order No. 1) The County's existing collection agreements with Waste Management and Republic expire in 2015. The purpose of this task is to review the County's existing contracts and services and to provide recommendations regarding opportunities for improvements. • Review the County's existing collection agreements. • Update, as appropriate, the previously prepared comparative analysis of the County's service level and collection fees with those in other comparable or neighboring Florida jurisdictions. kessler consulting inc. innovative waste solutions IRL', '� � JJ Pla �.ning ?bL-1 Undian River Co tieepe �� ��I 1 L01 Li Scope of Work for Solid Waste Management Master Plan Update 1 11/1/2013 1 Page 4 of 5 • Identify and discuss with County staff the advantages and disadvantages of various changes in collection service that might encourage additional recycling, lower costs, and/or enhance efficiencies. Such changes might include universal solid waste collection in all or part of the unincorporated County, automated collection, weekly instead of twice per week solid waste collection, single stream recycling, etc. • Participate in one meeting with County staff, management, and/or elected officials, as deemed appropriate, to gauge interest in and support for potential service changes. • Work interactively with County staff to develop recommended changes in the existing collection system and a strategy to bring about these changes. Task 4: Recvcline Opportunities (Task 6 of Work Order No. 1) The purpose of this task is to identify and evaluate opportunities to expand and improve the County's recycling program. • Evaluate the County's existing recycling programs, including curbside recycling, convenience centers, yard waste processing, and C&D debris recycling. • Identify policy and program opportunities to maximize recycling and enhance the current solid waste management system. Such opportunities might include single stream recycling, recycling carts with RFID, comprehensive commercial recycling program, organics recycling, etc. • Participate in one meeting with County staff, management, and/or elected officials to review these opportunities and identify those having the greatest materials recovery potential and most appropriate for the County. • Evaluate those options determined to be most viable and having the greatest materials recovery potential. Such analysis will include reviewing recognized regional and national programs, evaluating the potential applicability to the County, estimating the potential materials recovery impact, and identifying implementation issues. Task 5: Findines and Recommendations (Tasks 8 and 9 of Work Order No. 11 • Based on the results of Tasks 1-4, prepare a recommended plan, for incorporation into the Master Plan, for future collection services and recycling programs and policies (traditional recyclables, organics, C&D, etc.) aimed at maximizing recycling and enhancing the current solid waste management system. • Participate in up to two meetings to assist the Consultant in presenting the Master Plan recommendations to County staff, management, and/or elected officials. DELIVERABLES All deliverables will be transmitted electronically unless otherwise indicated. • WCS material category list, generator sector list, sampling and sorting protocol, and site safety plan. • Draft WCS report. • Final WCS report. • Updated comparative analysis of collection service and fees. • Summary of collection, processing, and recycling recommendations to maximize recycling and enhance the current solid waste management system. • PowerPoint presentation of findings and recommendations. kessler consulting inc. innovative waste solutions IRC�PM\SW plannuig tUll\Indian Ryder Co y( .ope n'v Icil L1U1 L; Scope of Work for Solid Waste Management Master Plan Update 1 11/1/2013 1 Page 5 of 5 • Participation in up to five meetings/site visits, not including the WCS sorting event, and additional audio or video conference calls as needed. COMPENSATION KCI proposes to conduct this scope of work for a lump sum of $68,945, inclusive of labor costs and direct expenses. A budget breakdown is attached. SCHEDULE KCI anticipates completion of the above described scope of work within 26 weeks of receiving notice to proceed from Consultant. KCI will submit a project schedule following the kick-off meeting. Submitted by Kessler Consulting, Inc. A4 Mitch Kessler, President Attachment kessler consulting inc. innovative waste solutions Ike AF'Ibl\5w Planning 7011VIndian Hice� n Scope rev IU_I 11011, �� tD t0 �:'� O O ti H O N ti N H h M O� 1�- M► N H � 0 V U � � v v 'c 'c + + v c a� c r 0 c 0 v m m Y m 7 m O N Ol C C C a a U e0 e0 M' I M H W tD t0 �:'� O O ti H O N ti N H h M O� 1�- M► N H � 0 V U � � v v 'c 'c + + v c a� c r 0 c 0 v m m Y m 7 m O N Ol C C C a a U