INDIAN RIVER COUNTY (County)
Change Order No. 6
PROJECT ; SECTOR 3 BEACH AND DUNE RESTORATION
CONTRACTOR: RANGER CONSTRUCTION INDUSTRIES, INC. (Ranger)
101 SANSBURY 'S WAY
WEST PALM BEACH, RL 33411
The purpose of Change Order No . 6 is to modify the Contract quantity of Sand Fill to be
provided, placed, and graded by Ranger. Change Order No . 6 reduces the total contacted sand
fill quantity by 25 ,818 cubic yards .
Ranger' s mine sub-contractor was unable to provide the entire Contract quantity of Sand Fill. To
resolve completion of the Construction Contract, Ranger placed the remaining compliant sand
from the mine to construct the berm only section of the Sector 3 design template, affecting a
small section of the dune design template between Treasure Shores Beach Park and a point 1 , 500
feet south.
As a result of the above, the Contract quantity of Sand Fill is reduced from 586,410 cubic yards
to 560, 592 cubic yards. Additionally, the total fuel cost adjustment re aining on the co 4s,
$36,555 . 57) �� l� ;Cl1 iS pctntcit' c( pol� 4 -\�Q C'e ► � rcrC — /` � / - L .
CURRENT CONTRACT PRICE $ 10,582,921 . 67
NET CHANGE IN CONTRACT PRICE
DUE TO THIS CHANGE ORDER
25 ) 818 cy at $ 15 . 66/cy + ($440,865 .45)
Remaining fuel cost adjustment of $36, 555 . 57 =
$440,865 . 45 = ($404, 309 . 88 + $36, 555 . 57 = $440 ,865 . 45)
CONTRACT COMPLETION DATE 5/ 1 / 12
MAXIMUM CONTRACT PRICE INCLUDING
THIS CHANGE ORDER $1011421056.22
Sector 3 Beach and Dune Restoration Project Page 2 of 2
Change Order No . 6
ENGINEER ' S RECOMMENDATION
I have examined the above changes . The changes are reasonable and I recommend that the
changes be made .
Engineer :
Witness : COAST, , L TECHNOLOGY CORPORATION
B : r
Print Name : . ! Michael P . Walther, President
Date : S ti CCV j 20 c
CONTRACTOR ' S APPROVAL
I agree that the above changes in said Contract, in accordance with Specifications for the price
changes shown are satisfactory .
Contractor :
Witness : RANGE TI N INDUSTRIES
By : .
Print Name : q N Ne A's Bob Schafer, Vice Pr sident
Date : l 'Aa a �j 2012
BOARD OF COUNTY COMMISSIONERS ,
ATTEST : Jeffrey K . Barton, Clerk of Court INDIAN RIVER COUNTY, FLORIDA
B
Y •
Deputy Clerk Gary C Pheeler, Chairman
Approved : BCC Approved : May 15 , 2012
fF t y �OMM18sjo
WF
LA
By : to
to
Q i• 4
�bseph Baird , County Administrator : Ci . *41 0 ;
a
Approved as to form and _ 1Q Tal sufficiency . : 2
- o •
•CR CW
7 YYIMY MM .. Y .
By : .
Alan , Polackwrch, Sr . , County ttorney