HomeMy WebLinkAbout2014-010SECTION 00942 - Change Order Form 4/oV/•Q iy4ori, Jib No, 01 DATE OF ISSUANCE EFFECTIVE DATE. OWNER: Indian River County CONTRACTOR ,R,J,._Sayan _Corporation Engineer Atkins Project: WESTREGIONAL WWTP ANAEROBIC. TANKS ODOR CONTROL SYSTEM DESIGN Project No. UCP .4067 Bid No. 2013013 You are directed to make the following changes in the Contract Documents: Description: See attached Itemized list for the description, Reason for Change Order See attached Itemized description list for the justification: Attachments: (List documents supporting change) See attached Itemized description list for the supporting documents CHANGE IN PRICE: CONTRACT Description_ _ -- ---_____ Description �____ Amount Original Contract Price $12015.000 00 Net previous Increase (Decrease) Change to from Orders No $D (days) 0 0 Contract Price prior to this Change Order: $1,015,000,00 (days or dates) 240 270. Net increase Change Order (decrease) Substantial Final this Completion: Completion: Net increase (decrease) of this Change Order: $'1441.180.97) Contract Price approved Change with all Orders: Time $8701819,03 (days 330 or dates) ACCEPTED: B COfRACTOR (Signature) Date: 71/,‘ CHANGE IN CONTRACT TIMES Description_ _ -- ---_____ Time Original Contract Time: Substantial Completion: Final Completion: (days 270 or dates) Net change Orders No. from previous Change to . : (days) 0 0 Substantial Completion: Final Completion: Contract Time prior to this Change Order: Substantial Completion: Final Completion: (days or dates) 240 270. Net increase Change Order (decrease) Substantial Final this Completion: Completion: (days 99. or dates) i Contract Change Orders: Time with all approved Substantial Completion: Final Completion: (days 330 or dates) RECOMMENDED Raj , P g. (Atkins) By: ENGINEER (Signature) Date: January 10, 2014 00942 - 1 O NER (Signature) Peter D. O' Bryan, ,0 Date:or - . •' *:. • ii Change Order No 1 Form withodWTyra CHANGE ORDER NO. One (1): Change Description DESCRIPTION OF CHANGES: Add Deduct Item 1: County Direct Purchase of Major Equipment A. Direct Purchase of Hydro International explosion -proof motors ($8,500.00) B. Direct purchase Biorem odor control equipment ($210,000.00) C. Direct Purchase of Mid -Western FRP duct ($38,000.00) D. Tax Savings due items 1A, 1B and 1C above ($14,430.00) Justification: The Contract for this project includes the opportunity for the County to reduce costs by making the Direct Purchase of certain materials thereby, saving sales tax expenses. In accordance with the Contract procedures this item of the Change Order deducts from the Contract Price the amount paid by the County for all direct purchases plus taxes for the items listed -see attached proposal Rem 2: PCO #01A - Drainage changes to buffer area $16,026.40 1 Justification. Existing storm water ditches created water ponding by holding drainage and had potential impact these concerns - see attached proposal. on buffer growth. This change alleviated Item 3: PCO #02A - Coupling at Air Release Valve $692.35 Justification: Existing buned pipe had insufficient length available for a standard length coupling. A shorter re -stocked - see attached coupling proposal. was provided and the standard coupling was Item 4 PCO #03B - Landscaping changes ($14,997.42) Justification: Upon the final review of the existing buffer area, switched some of the original planting and eliminate re -mulching and fertilizer etc. - see attached proposal Item 5: PCO #04B - Clarifier rehab $112,267.00 Justification: Existing clarifiers no. 1 and 2 mechanisms had detenorated to a point a point where it impacted performance and the pedestrian walkway between these clarifiers has also deteriorated to appoint to be unsafe. This proposal included walkway replacement and rehabilitation of the mechanisms- see attached proposal. Item 6: PCO #05A - Changes for roll -up doors $6,478.98 Justification: County building permitting department required a change in the door operation design and power for - see attached the proposal. overhead doors was added for easier door Rem 7 PCO #06 - Dispose of ditch cleaning debris $6,281.72 Justification: The existing storm water ditch in the buffer vicinity was overgrown with vegetation and required clean-up. County removed the with vegetation from the ditch and the contractor hauled it off - see attached proposal Totals: $141,746.45 ($285,927.42) Net Change: DEDUCT ($144,180.97)