Loading...
HomeMy WebLinkAbout2011-219 io - is � 1 12 . s . � . Change Order Dorm � ° a No, ! INS DATE OF ISSUANCE . EFFECTIVE DATE :t7 ! i7 11 OWNER : Indian River Countv CONTRACTOR Timothy Rose Cnnfr!= rflr% ry Inc Contract : Project: N WTP Raw Water Transmission System WNER's Contract No, UCP 2422 ENGINEER's Contract No . ENGINEER PBS&j You are directed to make the following changes in the Contract Documents : Description : Miscellaneous Contract Additions 6 Deletions — Various Line Items Reason for Change Order: Materials & Scope Of Work Adjustments — Various Line Items Attachments : ( List documents supporting change) TRC — Requested Change Order Breakdown (WCD # 3) CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES �Descri tion Amount Descrt tion Time Original Contract Price $2, 382 . 879,43 Original Contract Time: (days cr dates) Substantial Complstlon ; M2 Net increase (iteersaee) from 5 Final Completion : 270 �' Net change from previous Change 40 previous Change Orders No, j Orders No, g to Z: (days) to ;2 Substantial Completion; M Final Com letion : Contract Price prior to thisSZ.66841311 Contract Time prior to this Change Change Order Order; (days or dates) Substantial Completion ; M Net increase decrease of this Final Cam latton; (decrease) Vat In (decrease) this 182 Change Order Change Order, (days or dates) Substantial Compietl an; An Cornolet Contract Price with eli approved $2 , 57— _ 0 903 dg Contract Time with( alliapprov dbn : Change Orders . Change Orders; (days or dates) Substantial Completion ; J, Final Com letion A ACCEPTED: RECOMMENDED : APPROVED, : —w ey: By: •• .. By. CO ACTO Sl nature EN INLNq g ) Ignatu Nb oari , ChairmurSl scoData: Data: 4D %' r : Otber 16 , 2Jll �cl = Chinge Order Fora; 3 FINA11..doc 00600 - 30 TIMOTHY ROSE CONTRACTING, INC. 1360 Old Dixie Highway SW, Suite 106 Vero Beach , Florida 32962 ( 772) 564 7800 ( 772 ) 564 7888 Timrose7@comcast . net September 30, 2011 Indian River County Utilities Attn : Mike Hotchkiss 180027 th Street Vero Beach , FI 32960 RE : N WTP Raw Water Transmission System FINAL REQUESTED CHANGE ORDER (WCD # 3 ) Change Order Proposal for Final Contract Changes Per As Builts : IRCU Items : Fiber Optic Cable ( L3 Scandia ) — 1, 600 LF Add : $ 21268 . 00 Conduit and Cable from R105 To PLC Cabinet ( Paragon ) Add : $ 1, 021 . 20 On Site Repair Service for Well # 5 ( Watertronics Tech ) Add : $ 391 . 00 Bearing Made @ Apple Machine Add : $ 123 . 00 16" Raw Water Main — Adjust 395 LF ( Verified Per As Built ) Add : $ 15 029 . 75 16" 90" Bends — (Actual Per As Built ) Add : $ 21099 . 00 16" 45 ° Bends — (Actual Per As Built ) Add : $ 11871 . 00 20" Raw Water Main — Adjust Less 59 LF (Actual Per As Built ) Deduct : <$ 31401. 35 > 24" Raw Water Main — Adjust Less 82 LF (Actual Per As Built ) Deduct : < $ 81938 . 00 > 6 " Thick Concrete Pads — Adjust 2, 208 SF (Actual Per As Built ) Add : $ 61182 . 40 6" Thick No . 57 Stone — Adjust 2, 904 SF ( Unused Material Per As Built ) Deduct : <$ 5, 140 . 08> 20" Gate Valve — Adjustment To CO # 2 Add : $ 357 . 00 16" 900 Bend — Adjustment To CO # 2 Deduct : <$ 20340. 00> 16" 45 ° Bend — Adjustment To CO # 2 Add : $ 11286 . 00 Parks Dept , Items : Re-Grade & Sod Slopes @ RV Park Add : $ 850. 00 Double Gate Installed @ Ag Building Add : 831 .46 Total Requested Change in Contract Add : $ 12, 490 . 38 If you have any questions, do not hesitate to contact our office . Thank you — Vickie Wright Timothy Rose Contracting, Inc.