HomeMy WebLinkAbout2011-082 Board of County Commissioners
1801 27th Street
Vero Beach , Florida 32960
Telephone : (772) 5674000 FAX : (772) - 778-9391
Field and Laboratory Quality Control ( QC )
for
Oslo Road , Phase II Roadway Widening
( 43rd Avenue to 27th Avenue )
IRC Project No . 0533
WORK ORDER NO . 2 ( Engineering Division )
FOR
FOR PROFESSIONAL GEOTECHNICAL SERVICES AGREEMENT
FOR ANNUAL GEOTECHNICAL SERVICES CONTRACT RFQ No . 2010021
WITH
UNIVERSAL ENGINEERING SCIENCES , INC .
All services performed under this contract shall be supervised and certified by a licensed
Professional Engineer ( PE ) registered with the State of Florida and staff employed directly with
your firm .
Scope of Services
All work shall be performed on a unit price basis in accordance with the attached Scope of
Services ( Exhibit A ) dated February 15 , 2011 and shall comply with Standards enumerated in
the ANNUAL GEOTECHNICAL SERVICES CONTRACT RFQ 2010021 WITH UNIVERSAL
ENGINEERING SCIENCES , INC . Renewal Date March 1 , 2011
Minimum Specification Requirements as follows :
Soil Compaction
Concrete Compressive Strength Testing
Asphaltic Roadway Surfacing Testing
All work shall also comply with the current Florida Minimum Technical Standards .
COMPENSATION .
The COUNTY agrees to pay , and the Geotechnical Professional agrees to accept , a fee for
services rendered according to the " Scope of Services " identified in the attached EXHIBIT "A"
Fee Schedule and Man Hours .
C :\ Documents and Settings\rhoaghn\Local Settings\Temporary Internet Files\OLK86\0533 BCC Agenda WO# 2 UNIVERSAL ENGINEERING
3 - 10 -
1 Ldoc
, A
WO #2
Oslo Road , Phase II Roadway Widening
(43 `d Avenue to 27" Avenue)
IRC Project No . 0533
A Not-to- Exceed Amount of: $ 55 , 446 . 00 to be paid on a unit price basis for actual
work
performed in accordance with the schedule of services and fees set forth in Exhibit A of
RENEWAL OF THE ANNUAL GEOTECHNICAL SERVICES CONTRACT RFQ 2010021 WITH
UNIVERSAL ENGINEERING SCIENCES , INC .
TIME FOR COMPLETION
This work order No . 2 shall run concurrently with the construction work for the Oslo Road , Phase
II Roadway Widening (43 `d Avenue to 27th Avenue )
IRC Project No . 0533
IN WITNESS HEREOF the parties hereto have executed these presents .p •• OOftnoo
••'�:I CON10;�••
This 5th day of Apri 1 2011 . •,.•�@� . . • • • • • • . . , SiO•.,
00 d
OWNER UNIVERSAL ENGINEERING SCIENCES , INC . n IV
oe a
BOARD OF COUNTY COMMISSIONERS s �:
INDIAN RIVER COUNTY , FLORIDA oo •.
no � • � .o� e
OQ o0
�o
�� � •e�ee9 RCOU�
4b4e4pop Gp0p Gp
(97gna111) e) Signature)
Bob Solari , Chairman Richard E . Hoaglin , P . E . , Regional Manager
Approved by BCC 04 - 05 - 11 Witnessed by :
ATTEST :
Jeffrey K . Barton , Clerk of Circuit Court c
Ck% �ccni �
Deputy Clerk (Printe name)
Approved as to Form and Legal Suffici cy :
Alan S . Polackwich , Sr. , CountyAttorney
I I A - , 30, J
seph A , Ba rd , County Administrator
C :\Documents and Settings\rhoaglin\Local Settings\Temporary Intemet Files\OLK86\0533 BCC Agenda WO# 2 UNIVERSAL ENGINEERING
3 - 10 -
1 Ldoc
a
LOCATIONS:
Atlanta
UNIVERSAL M Daytona Beach
ENGINEERING SCIENCES • Fort Myers
• FortPierce
Consultants In: Geotechnical Engineering • Environmental Sciences • Gainesville
• Jacksonville
Geophysical Services • Construction Materials Testing ° Threshold Inspection • Kissimmee
Building Inspection • Plan Review • Building Code Administration • Leesburg
Miami
Ocala
Orlando (Headquarters)
L�
February 15 , 2011 o (� n Panama Cit
Panama City•
• Pensacola
Rockledge
Sarasota
Mr . Mike Nixon Tampa
Roadway Production Manager West Palm Beach
Indian River County Engineering Division
1801 27th Street
Vero Beach , FL 32960
Reference : Budget Estimate Proposal for Construction Materials Testing Services
Oslo Road Improvements from 43rd Ave to 27th Ave
Indian River County , Florida
Universal Proposal Number : 0310 . 0211 . 00012
UES DOCS Number : 881184
Dear Mr . Nixon :
Universal Engineering Sciences , Inc . ( Universal ) is pleased to provide this proposal for
Construction Materials Testing ( CMT) services at the above- referenced project in accordance
with the project specifications and Indian River County requirements .
We are confident that our experience , quality of service , professional attitude and proximity to
the site will be of value throughout the design and construction phases of the project .
PROJECT DESCRIPTION
We understand that this � roject is the 2nd phase of roadway improvements on Oslo Road
from 43rd Avenue to 27t Avenue in Indian River County , Florida . These improvements
include stormwater utility installation , new sidewalk installation , roadway reconstruction ,
widening and resurfacing . We estimate the following quantities :
• +/- 300 LF of 2 foot depth of embankment fill
• +/- 57000 LF of stabilized subgrade and base course on Oslo Road
• +/- 4 asphaltic concrete driveways with stabilized subgrade and base course
+/- 57100 LF of storm drain and 10 cross drains
• +/- 42 storm drain structures/inlets
• +/- 16 , 100 SY of mill and overlay 1 " SP 9 . 5
• +/- 361500 SY of 2 " SP 12 . 5 and 1 " SP 9 . 5
• +/- 11 , 000 LF of curb and gutter including intersecting streets
0 +/- 67500 LF of sidewalk
Oslo Road Improvements from 43"' Ave to 27`h Ave
Universal Proposal No. 0310. 0211 . 00012
Page 2
SCOPE OF WORK
Based on review of the project documents and our experience in the area , Universal will
provide the following :
• On-call earthwork , asphalt and concrete testing
• Engineering overview of our services
The laboratory testing will be performed out of our Fort Pierce , Florida office with additional
support from our Rockledge , Florida office , if required . During the duration of the project all
technicians and personnel involved with the construction testing and inspection will be
supervised by a Professional Engineer ( P . E . ) registered in the State of Florida .
The following assumptions were made to develop the estimated scope of services :
• Roadway construction will be phased into two separate operations , one per travel
direction , and compaction tests will be performed every 500 linear feet .
• Curb pad , sidewalk subgrade , and stabilized shoulders will be constructed as separate
operations from the mainline roadway construction , and compaction density tests will
be performed every 500 linear feet .
• Stabilized subgrade will be sampled and tested for Limerock Bearing Ratio ( LBR)
every 1 , 000 linear feet per width of roadway operation . Compaction density tests will
be performed every 500 linear feet as a single 12 -inch lift .
• Base course will be sampled and tested for Limerock Bearing Ratio ( LBR) every 2 , 000
linear feet per width of roadway operation . Compaction density tests will be performed
every 500 linear feet as two 4- inch lifts .
• Utility pipe trenches and structure backfill will be tested for compaction density for the
full depth of fill in 6 - inch lifts at 100 % of a standard Proctor test (AASHTO T99 ) in
accordance with the project plans . Tests will be performed at a minimum frequency of
one per every 200 linear feet or one per pipe run .
• Embankment will be tested for compaction density at a frequency of one per every 500
linear feet .
• Asphalt will be tested in accordance with FDOT Local Area Practice ( LAP )
specification for Superpave asphalt . LAP testing specification consists of one
extraction gradation and three cores for thickness and density for each day ' s
placement .
Cost of Services
The services listed herein will be invoiced on a unit rate basis per the estimated scope . Note
that the budget is an estimate of our services and may change as the result of unforeseen
events such as requested standby time , overtime , retesting , etc . Pick up charges are not
included in soil or concrete testing rates . A minimum of four density tests are required per
trip . The estimated cost of services is separated into three individual phases based on the
construction documents .
Soils
In Place Density Tests ( embankment)
Estimate 16 each @ $24 . 00/each . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 384 . 00
Oslo Road Improvements from 43rd Ave to 27th Ave
Universal Proposal No. 0310. 0211 . 00012
Page 3
In Place Density Tests ( stabilized subgrade )
Estimate 28 each @ $ 24 . 00/each . '. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 672 . 00
In Place Density Tests ( base course)
Estimate 55 each @ $ 24 . 00/each . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 1 , 320 . 00
In Place Density Tests (sidewalk subgrade and curb pad )
Estimate 40 each @ $ 24 . 00/each . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 960 . 00
In Place Density Tests (storm pipe backfill )
Estimate 700 each @ $ 24 . 00/each . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 16 , 800 . 00
In Place Density Tests (storm structure backfill )
Estimate 800 each @ $ 24 . 00/each . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . 0 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 19 , 200 . 00
Limerock Bearing Ratio ( LBR) Tests ( base and stabilized subgrade)
Estimate 18 each @ $ 240 . 00/each . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4 , 320 . 00
Moisture/Density Relationship Tests (embankment and utility backfill )
Estimate 10 each @ $ 80 . 00/each . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0 . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 800 . 00
Concrete
Make and Break Concrete Cylinders ( set of 4 )
( Includes 1 hour of on site time per set)
Estimate 40 sets @ $ 80 . 00/set . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 3 , 200 . 00
Field Technician for Stand - by Time ( in excess of 1 hour per set)
Estimate 10 hours @ $ 38 . 00/hour . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
0 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 380 . 00
Sample Pickups (when no other work is performed )
Estimate 10 hours @ $ 38 . 00/hour . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 380 . 00
Asphaltic Roadway Surfacing
Extraction/Gradation Test
Estimate 20 each @ $ 160 . 00/each . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 3 , 200 . 00
Asphalt Cores (6- inch diameter by 2 . 5- inch thickness )
Estimate 60 each @ $ 37 . 50/each . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 2 , 250 . 00
Asphalt Core Density
Estimate 60 each @ $ 20 . 00/each . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 1 , 200 . 00
Sample Pickups (when no other work is performed )
Oslo Road Improvements from 43rd Ave to 27th Ave
Universal Proposal No. 0310. 0211 . 00012
Page 4 - --
Estimate 10 hours @ $ 38 . 00/hour . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . 0 . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 380 . 00
Budget Estimate Total . . . . . . . . Wanow ' Wess go $ 559446 , 00
General Notes
( 1 ) All unit fees are portal to portal for normal work hours Monday through Friday from
6 : 00 a . m . to 5 : 00 p . m . daily . Work performed in excess of 40 hours per week
,
nights , Saturday , Sunday and holidays will be invoiced per our annual contract .
(2 ) Professional consultations and meetings will be invoiced at our contracted unit rates
for those services rendered .
( 3 ) If no other work is performed during the jobsite visit , sample pickups will be invoiced
at the technician ' s contracted hourly rate .
All work will be performed in accordance with this proposal and our annual contract terms
and conditions . We believe the information supplied in this proposal is satisfactory for your
current needs . If this proposal is acceptable , please issue a work order to our office .
We look forward to working with you on this project . Please contact us if you have any
questions or require additional information .
Sincerely ,
Universal Engineering Sciences , Inc .
Richard E . Hoaglin , P . E .
Regional Manager
Attachments : Work Authorization Form