AT 9:50 O'CLOCK P.M. THE WORKSHOP SESSION RECONVENED
WITH ALL THE SAME MEMBERS PRESENT,
COMMISSIONER MASSEY ASKED, "WHY DOES FIRE CONTROL
RAISE THE COST OF WATER SYSTEMS BY 3077"
DR. SMITH STATED, "IT INCREASES COST OF SUPPLYING
STORAGE, VOLUME AND PIPE SIZES."
DR. SMITH THEN PRESENTED THE VARIOUS OPTIONS SHOWING
HOW SUBAREAS COULD BE DEVELOPED. THESE OPTIONS ARE BEING MADE
A PART OF THESE MINUTES.
BOOK 18 .PAGE 1
as
RESTUDY OF INDIAN RIVER COUN'T'Y WATER AND SEWERAGE PROGRAM
3942—A
9-10-73
Question Option No. 1
Actions to be Taken
Should County proceed with a Purchase treated water from City of
1.
Establish the subareas within
CoCo
water supply program? Vero Beach for Region II - construct a
which water supply is to be
new treatment plant for Region I.
provided.
t�
2.
Decide whether fire protection is
fl
to be provided.
. m
3.
Decide > whether storage and
transmission facilities should be
sized in accord with the master
plan or should be reduced in size.
4.
Prepare layouts and cost estimates
for revised system.
5.
Determine method of project
funding; i.e., revenue and
assessment bonds, or revenue
bonds only.
6.
Obtain F.H.A. approval.
Option No. 2
Actions to be Taken
Construct a new treatment plant for
1.
Same as for Option 1.
the area south of Vero Beach and a
new treatment plant for the area
... �._..a
north of Vero Beach and Region I.
Option No. 3
Actions to be Taken
Purchase and renovate Mid-Florida
and UDU water systems only.
1.
Prepare layouts and cost estimates
for renovated systems.
Construct package treatment plants
')s
Determine method of project
for each system.
funding.
LLJ
3.
Obtain FHA approval.
Page 1
._ ."
.. - -�,.__ .. �.'�`. wso`.:�.di'=..',u"LE'"'..v�i ^E' Se's.+='. 4.:44��...:C .. c. .c>.i-✓^'cT.-..>.-e.... '-r-.��c �;-..
r®Ras
- --4 a.'nea2varnaw+!�t�r.'.-oer...-....
."
Question
Option No. 1
Actions to be Taken
Should County proceed with a
sewerage program assuming it
Purchase sewage treatment from Vero
Beach for Region
1.
Establish the subareas within
will receive an EPA grant? (no
II - construct a new
treatment for
which sewerage is to be provided.
plant Region I and
grant funds are available for
Indian River Shores.
2.
Prepare layouts and cost estimates
2-3 years minimum)
for revised system. Establish pro
rata costs for I.R.S. Escalate
project costs to 1977.
r
3.
Revise contract with Vero Beach.
4.
Execute contract with I.R.S.
S.
Prepare modification to Region II
EPA plan to delete I.R.S. from
area and obtain approval of
ECFRPC, DPC and EPA.
6.
Determine method of project
funding.
7.
Inform FHA that project will be,
delayed about 3 years.
Option No. 2
Actions to be Taken
Purchase sewage treatment from Vero
1.
Establish the subareas within
Beach for Region II- construct a new w
which sewerage is to be provided.
treatment plant for Region I. Indian
River Shores to wark out agreement
2.
Prepare layouts and cost estimates
with Vero Beach and remain in
for revised sym. steEscalate to -
Region II.
1977.. _ v :
3. •-
' Determine method of project,,
funding.
4.
Revise and resubmit Region I
EPA Plan.
5.
Inform FHA that project will be
delayed about 3 years.
1L
Page 2
Page 3 •
Question Option No. 1
Actions to be 'Taken
Should County proceed with a Purchase sewage treatment from Vero
1.
Establish the subareas within
is to be
sewerage program assuming no Beach for part of Region II - construct
which sewerage provided.
EPA grant? new treatment plant for Region I,
2.
Decide whether transmission
Indian River Shores, and a part of
facilities should be sized in accord
Region II.
with master plan or should be
reduced in size.
3.
Prepare layouts and cost estimates
for revised system. Establish pro
rata costs for I.R.S.
4.
Revise contract with Vero Beach.
S.
Execute contract with I.R.S.
'
6.
Determine method of project
funding.
7.
Obtain FHA approval.
Option No. 2
Actions to be 'Taken
Construct a new treatment plant for
1.
Establish the subareas within
the ' area south of Vero Beach and a
which sewerage is to be provided.
new plant for the area north of Vero
2.
Prepare layouts and cost estimates
Beach, for I.R.S. and for Region I.
for revised system. Establish pro
rata costs for I.R.S.
4
4.
Determine method of project
funding.
5.
Obtain FHA approval.
LLA
Page 3 •
1
1
Option No. 3
Purchase and renovate UDU sewerage
system only. Provide treatment
capacity for I.R.S.
Action to be Taken
1. Prepare layouts and cost estimates
for renovated system. Estimate
pro rata costs for I.R.S.
2. Determine method for project
funding.
3. Execute contract with T.R.S.
4, Obtain FHA approval.
D
COMMISSIONER DRITENBAS ASKED, "DO YOU HAVE ANY
PRIORITIES FOR THESE SUBAREAS?"
MR. BEINDORF ANSWERED, "NO.."
CHAIRMAN LOY ASKED, "WOULD YOU HAVE TO MAKE A MORE
IN-DEPTH STUDY TO MAKE PRIORITIES?"
MR. BEINDORF STATED, "YES."
COMMISSIONER SIEBERT STATED, "I AM STILL NOT SURE
WE WANT TO SEWER THE COUNTY."
DR. SMITH STATED, "WE CAN SIZE THE PIPE FOR GROWTH
FOR 5, 10, 15 OR 20 YEARS."
COMMISSIONER SIEBERT ASKED, "WHAT IS THE NEXT STEP -
GET TOGETHER WITH THE CITY OF VERO BEACH?"
COMMISSIONER BOGOSIAN ASKED, "WOULD THE F.H.A. LOAN
BE REDUCED BY THE SIZE OF THE PROGRAM?"
MR. BEINDORF ANSWERED, "YES."
COMMISSIONER BOGOSIAN STATED THAT HE FIGURES WE SHOULD
GET STARTED ON SOMETHING.
CHAIRMAN Loy STATED THAT AS SOON AS THE ENGINEERS ARE
READY, COULD WE MEET.- ABOUT OCTOBER 1ST, 1973,
.JACK STINSON ASKED, "IF THE CALIFORNIA
PLAN FOR AD VALOREM TAXATION ON AGRICULTRUAL PROPERTY MIGHT BE
USED,AS A BASE FOR FINANCING THE SEWER AND WATER PROGRAM?"
COMMISSIONER SIEBERT STATED THAT SOME OF US ARE LOOKING
INTO THIS.
THERE BEING NO FURTHER BUSINESS, ON MOTION MADE,
SECONDED AND CARRIED THE WORKSHOP SESSION ADJOURNED AT 10:30
O�CLOCK P.M.