HomeMy WebLinkAbout9/17/1973 (2)='o AT 9:50 O'CLOCK P.M. THE WORKSHOP SESSION RECONVENED WITH ALL THE SAME MEMBERS PRESENT, COMMISSIONER MASSEY ASKED, "WHY DOES FIRE CONTROL RAISE THE COST OF WATER SYSTEMS BY 3077" DR. SMITH STATED, "IT INCREASES COST OF SUPPLYING STORAGE, VOLUME AND PIPE SIZES." DR. SMITH THEN PRESENTED THE VARIOUS OPTIONS SHOWING HOW SUBAREAS COULD BE DEVELOPED. THESE OPTIONS ARE BEING MADE A PART OF THESE MINUTES. BOOK 18 .PAGE 1 as RESTUDY OF INDIAN RIVER COUN'T'Y WATER AND SEWERAGE PROGRAM 3942—A 9-10-73 Question Option No. 1 Actions to be Taken Should County proceed with a Purchase treated water from City of 1. Establish the subareas within CoCo water supply program? Vero Beach for Region II - construct a which water supply is to be new treatment plant for Region I. provided. t� 2. Decide whether fire protection is fl to be provided. . m 3. Decide > whether storage and transmission facilities should be sized in accord with the master plan or should be reduced in size. 4. Prepare layouts and cost estimates for revised system. 5. Determine method of project funding; i.e., revenue and assessment bonds, or revenue bonds only. 6. Obtain F.H.A. approval. Option No. 2 Actions to be Taken Construct a new treatment plant for 1. Same as for Option 1. the area south of Vero Beach and a new treatment plant for the area ... �._..a north of Vero Beach and Region I. Option No. 3 Actions to be Taken Purchase and renovate Mid-Florida and UDU water systems only. 1. Prepare layouts and cost estimates for renovated systems. Construct package treatment plants ')s Determine method of project for each system. funding. LLJ 3. Obtain FHA approval. Page 1 ._ ." .. - -�,.__ .. �.'�`. wso`.:�.di'=..',u"LE'"'..v�i ^E' Se's.+='. 4.:44��...:C .. c. .c>.i-✓^'cT.-..>.-e.... '-r-.��c �;-.. r®Ras - --4 a.'nea2varnaw+!�t�r.'.-oer...-.... ." Question Option No. 1 Actions to be Taken Should County proceed with a sewerage program assuming it Purchase sewage treatment from Vero Beach for Region 1. Establish the subareas within will receive an EPA grant? (no II - construct a new treatment for which sewerage is to be provided. plant Region I and grant funds are available for Indian River Shores. 2. Prepare layouts and cost estimates 2-3 years minimum) for revised system. Establish pro rata costs for I.R.S. Escalate project costs to 1977. r 3. Revise contract with Vero Beach. 4. Execute contract with I.R.S. S. Prepare modification to Region II EPA plan to delete I.R.S. from area and obtain approval of ECFRPC, DPC and EPA. 6. Determine method of project funding. 7. Inform FHA that project will be, delayed about 3 years. Option No. 2 Actions to be Taken Purchase sewage treatment from Vero 1. Establish the subareas within Beach for Region II- construct a new w which sewerage is to be provided. treatment plant for Region I. Indian River Shores to wark out agreement 2. Prepare layouts and cost estimates with Vero Beach and remain in for revised sym. steEscalate to - Region II. 1977.. _ v : 3. •- ' Determine method of project,, funding. 4. Revise and resubmit Region I EPA Plan. 5. Inform FHA that project will be delayed about 3 years. 1L Page 2 Page 3 • Question Option No. 1 Actions to be 'Taken Should County proceed with a Purchase sewage treatment from Vero 1. Establish the subareas within is to be sewerage program assuming no Beach for part of Region II - construct which sewerage provided. EPA grant? new treatment plant for Region I, 2. Decide whether transmission Indian River Shores, and a part of facilities should be sized in accord Region II. with master plan or should be reduced in size. 3. Prepare layouts and cost estimates for revised system. Establish pro rata costs for I.R.S. 4. Revise contract with Vero Beach. S. Execute contract with I.R.S. ' 6. Determine method of project funding. 7. Obtain FHA approval. Option No. 2 Actions to be 'Taken Construct a new treatment plant for 1. Establish the subareas within the ' area south of Vero Beach and a which sewerage is to be provided. new plant for the area north of Vero 2. Prepare layouts and cost estimates Beach, for I.R.S. and for Region I. for revised system. Establish pro rata costs for I.R.S. 4 4. Determine method of project funding. 5. Obtain FHA approval. LLA Page 3 • 1 1 Option No. 3 Purchase and renovate UDU sewerage system only. Provide treatment capacity for I.R.S. Action to be Taken 1. Prepare layouts and cost estimates for renovated system. Estimate pro rata costs for I.R.S. 2. Determine method for project funding. 3. Execute contract with T.R.S. 4, Obtain FHA approval. D COMMISSIONER DRITENBAS ASKED, "DO YOU HAVE ANY PRIORITIES FOR THESE SUBAREAS?" MR. BEINDORF ANSWERED, "NO.." CHAIRMAN LOY ASKED, "WOULD YOU HAVE TO MAKE A MORE IN-DEPTH STUDY TO MAKE PRIORITIES?" MR. BEINDORF STATED, "YES." COMMISSIONER SIEBERT STATED, "I AM STILL NOT SURE WE WANT TO SEWER THE COUNTY." DR. SMITH STATED, "WE CAN SIZE THE PIPE FOR GROWTH FOR 5, 10, 15 OR 20 YEARS." COMMISSIONER SIEBERT ASKED, "WHAT IS THE NEXT STEP - GET TOGETHER WITH THE CITY OF VERO BEACH?" COMMISSIONER BOGOSIAN ASKED, "WOULD THE F.H.A. LOAN BE REDUCED BY THE SIZE OF THE PROGRAM?" MR. BEINDORF ANSWERED, "YES." COMMISSIONER BOGOSIAN STATED THAT HE FIGURES WE SHOULD GET STARTED ON SOMETHING. CHAIRMAN Loy STATED THAT AS SOON AS THE ENGINEERS ARE READY, COULD WE MEET.- ABOUT OCTOBER 1ST, 1973, .JACK STINSON ASKED, "IF THE CALIFORNIA PLAN FOR AD VALOREM TAXATION ON AGRICULTRUAL PROPERTY MIGHT BE USED,AS A BASE FOR FINANCING THE SEWER AND WATER PROGRAM?" COMMISSIONER SIEBERT STATED THAT SOME OF US ARE LOOKING INTO THIS. THERE BEING NO FURTHER BUSINESS, ON MOTION MADE, SECONDED AND CARRIED THE WORKSHOP SESSION ADJOURNED AT 10:30 O�CLOCK P.M. -17- SEP 17 1973 1 F