HomeMy WebLinkAbout2006-187 As-Built(Fourth Reso.) 4/22/04(ENG)RES4.MJM/kp
RESOLUTION NO. 2006- 187
A RESOLUTION OF INDIAN RIVER COUNTY CERTIFYING
"AS-BUILT" COSTS FOR CERTAIN PAVING AND DRAINAGE
IMPROVEMENTS TO 34th AVENUE FROM 12" STREET TO
14TH STREET, DESIGNATED AS PROJECT NO. 0126, AND
OTHER CONSTRUCTION NECESSITATED BY SUCH
PROJECT; PROVIDING FOR FORMAL COMPLETION DATE,
AND DATE FOR PAYMENT WITHOUT PENALTY AND
INTEREST.
WHEREAS,the Board of County Commissioners of Indian River County determined
that the improvements described herein specially benefited the property located within the
boundaries as described in this title, designated as Project No. 0126, are in the public interest and
promote the public welfare of the county; and
WHEREAS, on December 16, 2003, the Board held a public hearing in the
Commission Chambers at which time the owners of the property to be assessed were afforded an
opportunity to appear before the Board to be heard as to the propriety and advisability of making
such improvements; and
WHEREAS, after such public hearing was held the County Commission adopted
Resolution No.2003-166 which confirmed the special assessment cost of the project to the property
specially benefited by the project in the amounts listed in an attachment to that resolution; and
WHEREAS, the Director of Public Works has certified the actual "As-Built" cost
now that the project has been completed is $.24 per square foot,which is equal to $.24 per square
foot in the confirming Resolution No. 2003-166.
F:\Engineering\Petition Paving\0126 34th Ave,12th to 14th St\0126 PP Resolution As-Built-11-30-06-mjm.doe
1
RESOLUTION NO. 2006- 187
NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY
COMMISSIONERS OF INDIAN RIVER COUNTY, FLORIDA, that:
1. Resolution No. 2003-166 is modified as follows: The completion date for Project No.
0126 is declared to be August 17,2006 and the last day that payment may be made avoiding interest
and penalty charges is ninety(90) days after passage of this resolution.
2. Payments bearing interest at the rate of 7.00% per annum may be made in 5 equal
installments,the first to be made twelve(12)months from the due date and the subsequent payments
to be due yearly from the due date. The due date is ninety (90) days after the passage of this
resolution.
3. The assessment roll for said project listed in Resolution No.2003-166 shall be as set forth
in attached Exhibit "A" to this resolution. `
4. The assessments as shown in attached Exhibit"A"shall stand confirmed and remain legal,
valid, and binding first liens against the property against which such assessments are made until
paid.
5. The assessments shown in Exhibit "A", attached to Resolution No. 2003-166 were
recorded by the County on the public records of Indian River County, and the lien shall constitute
prima facie evidence of its validity.
FAEngineering\Petition Paving\0126 34th Ave,12th to 14th St\0126 PP Resolution As-Built-11-30-06-mjm.doc
2
RESOLUTION NO. 2006-187
This resolution was moved for adoption by Commissioner
0' Bryani i and the motion was seconded by Commissioner
Fl escher and, upon being put to a vote, the vote was as follows:
Chairman Gary C. Wheeler Aye
Vice-Chairman Sandra L. Bowden Aye
Commissioner Wesley S. Davis Aye
Commissioner Joseph E. Flescher Aye
Commissioner Peter D. O'Bryan Aye
The Chairman thereupon declared the resolution duly passed and adopted this
12th day of December _' 2006.
BOARD OF COUNTY COMMISSIONERS
OF INDIAN RIVER COUNTY, FLORIDA
a.
Gary .Wheeler, Chairman
Attest: ... a ��ws>, c�i`�`'�
C'CsY/:JEFFREY K. BARTON, Clerk `
Attachment: Exhibit "A"
Approved as to form
and legal suficien
By. K7
0
William K. Debraal, Asst. County Attorney
F:\Engineering\Petition Paving\0126 34th Ave,12th to 14th St\0126 PP Resolution As-Built-11-30-06-mjm.doc
3
FINAL COST ESTIMATE FOR:
34TH AVENUE, 12TH STREET TO 14TH STREET
Project# 0126
TOTAL L.F. 1,338.77
TOTAL SQ.FT. 321,648.00
1. CONSTRUCTION $88,347.56
2. ENGINEERING $8,834.76
(10% of construction costs)
TOTAL CONSTRUCTION & ENGINEERING $97,182.32
3. PERMIT FEES $350.00
4. TESTING $650.00
5. ROW ACQUISITION & $0.00
TITLE SEARCH
6. RECORDING FEE $50.50
SUB-TOTAL $98,232.82
7. 2.725% ADMINISTRATION FEE $2,676.85
TOTAL COST OF PROJECT $100,909.67
75% TO BE PAID BY PROPERTY OWNERS $75,682.25
25%TO BE PAID BY COUNTY $25,227.42
2% COLLECTIONS FEE (75% FIGURE) $1,513.65
TOTAL ASSESSMENT $77,195.90
COST PER SQ.FT. $0.24000117
0126 Final Cost Estimate-mjm 12/4/2006
FINAL ASSESSMENT ROLL FOR PAVING AND DRAINAGE IMPROVEMENTS
TO: 34TH AVENUE, 12TH STREET TO 14TH STREET
IRC PROJECT NO. 0126 TOTAL SQUARE FEET.... 321,648.00
COST TO OWNERS........... $77,195.90
COST PER S.F SQUARE FOOT $0.24000117
NAME &ADDRESS LEGAL DESCRIPTION SQ.FT. COST/SQ.FT. TOTAL COST
1 Moxley, Mark D & Heather J. 10-33-39-00010-0000-00004.0 15,553.00 $0.24000117 $3,732.74
1206 34th Avenue Lot 4, less road right-of-way, Vero Park Sub
Vero Beach, FL 32960 No. 2 (Unrecorded)
2 Miller, Elizabeth Ann 10-33-39-00010-0000-00008.0 21,593.00 $0.24000117 $5,182.35
1250 34th Avenue Lot 8,Vero Park Sub No. 2 (Unrecorded)
Vero Beach, FL 32960
3 McClure, Sara H. & Gary B. 10-33-39-00010-0000-00012.0 21,593.00 $0.24000117 $5,182.35
36 Marble Court Lot 12,Vero Park Sub No. 2 (Unrecorded)
Carbondale, CO 81623
4 Seifarth, Armin D. 10-33-39-00010-0000-00016.0 21,593.00 $0.24000117 $5,182.35
1266 34th Avenue Lot 15,Vero Park Sub No. 2 (Unrecorded)
Vero Beach, FL 32960
5 Hawkins, Reid W. 10-33-39-00010-0000-00020.0 21,593.00 $0.24000117 $5,182.35
P.O. Box 8791 Lot 20,Vero Park Sub No. 2 (Unrecorded)
Pt. St. Lucie, FL 34985
6 10-33-39-00010-0000-00024.0 21,593.00 $0.24000117 $5,182.35
Snader, Kenneth M. & Shirley Lot 24,Vero Park Sub No. 2 (Unrecorded)
1346 34th Avenue
Vero Beach, FL 32960
7 Larsen, John E. & Elizabeth 10-33-39-00010-0000-00028.0 21,593.00 $0.24000117 $5,182.35
1356 34th Avenue Lot 28, Vero Park Sub No. 2 (Unrecorded)
Vero Beach, FL 32960
!1fi '
EXH1..B.1T:.:., A
0126 FINAL Assessment Roll 11-30-06 1 12/4/2006
FINAL ASSESSMENT ROLL FOR PAVING AND DRAINAGE IMPROVEMENTS
TO: 34TH AVENUE, 12TH STREET TO 14TH STREET
IRC PROJECT NO. 0126 TOTAL SQUARE FEET.... 321,648.00
COST TO OWNERS........... $77,195.90
COST PER S.F SQUARE FOOT $0.24000117
NAME &ADDRESS LEGAL DESCRIPTION SQ.FT. COST/SQ.FT. TOTAL COST
8 Danaher, Thomas & Lori 10-33-39-00010-0000-00032.0 21,593.00 $0.24000117 $5,182.35
1386 34th Avenue Lot 32, Vero Park Sub No. 2 (Unrecorded)
Vero Beach, FL 32960
9 Diaz, Mario& Raquel 10-33-39-00010-0000-00000.6 23,064.00 $0.24000117 $5,535.39
901 SW 102nd Avenue Vero Park Sub No 2 (Unrecorded)a por of
Miami, FL 33174 Lot E more part desc as foil: Com 30 ft N of
SE cor of Tr 7, run W 980 ft, th N 1083 ft to
POB, from POB cont N 186 ft, th E 124 ft th S
186 ft, th W 124 ft to POB
10 Conboy, Thomas 10-33-39-00010-0000-00000.7 12,400.00 $0.24000117 $2,976.01
1345 34th Avenue N 100 ft of Lot F, Vero Park Sub No. 2
Vero Beach, FL 32960 (Unrecorded)
11 Patterson, William & Laurene 10-33-39-00010-0000-00000.8 24,924.00 $0.24000117 $5,981.79
1305 34th Avenue Lot F, less N 100 ft, Vero Park Sub No. 2
Vero Beach, FL 32960 (Unrecorded)
EXHIBIT.,
" All
0126 FINAL Assessment Roll 11-30-06 2 12/4/2006
FINAL ASSESSMENT ROLL FOR PAVING AND DRAINAGE IMPROVEMENTS
TO: 34TH AVENUE, 12TH STREET TO 14TH STREET
IRC PROJECT NO. 0126 TOTAL SQUARE FEET.... 321,648.00
COST TO OWNERS........... $77,195.90
COST PER S.F SQUARE FOOT $0.24000117
NAME &ADDRESS LEGAL DESCRIPTION SQ.FT. COST/SQ.FT. TOTAL COST
12 Moody, Ralph W. Jr. & 10-33-39-00010-0000-00000.9 20,257.25 $0.24000117 $4,861.76
1285 34th Avenue Vero Park Sub No. 2 (Unrecorded), Por of N
Vero Beach, FL 32960 1/2 of Lot G, also desc as foll: Ind Riv Farms
Co Sub PBS 2-25 Beg at SE cor of Tr 7, Sec
10-33-39; th run N 30.0 ft along E line of said
Tr 7; th run W, para W/S line of Tr 7, 856.0 ft;
th run N para to E line of Tr 7, 466.50 ft to
POB; th run W, para W/S line of Tr 7, 149.50
ft to a pt on E line of Rosedale Blvd Sub PBI 3.
90; th N along said E line of Rosedale Blvd
Sub, 135.5 ft; th run E, para W/S line of Tr 7,
149.5 ft; th run S para W/E line of Tr 7, 135.5
ft to POB.
EXHBIT :":. "A'
0126 FINAL Assessment Roll 11-30-06 3 12/4/2006
FINAL ASSESSMENT ROLL FOR PAVING AND DRAINAGE IMPROVEMENTS
TO: 34TH AVENUE, 12TH STREET TO 14TH STREET
IRC PROJECT NO. 0126 TOTAL SQUARE FEET.... 321,648.00
COST TO OWNERS........... $77,195.90
COST PER S.F SQUARE FOOT $0.24000117
NAME &ADDRESS LEGAL DESCRIPTION SQ.FT. COST/SQ.FT. TOTAL COST
13 Trampus, Greg 10-33-39-00010-0000-00001.0 24,742.25 $0.24000117 $5,938.17
1277 34th Avenue Vero Park Sub No 2, S 1/2 of Lot G, as D Bk 83,
Vero Beach, FL 32960 PP 457&also inc a parc of land 25.5 ft by 301.0 ft
abutting W side of Lot G, less the foil: Ind Riv
Farms Co Sub PBS 2-25 Beg at SE cor of Tr 7,
Sec 10-33-39;th run N 30.0 ft along E line of said
Tr 7;th run W para w/S line of Tr 7, 856.0 ft;th run
N, para to E line of Tr 7,466.50;th run W on a line
para w/S line of Tr 7, 124.0 ft to POB;th from
POB,cont on said line W, 25.5 ft to E line of
Rosedale Blvd Sub PBI 3-90; th N along said E
line of Rosedale Blvd, 135.5 ft;th run E para w/S
line of said Tr 7, 25.5 ft;th run S, 135.50 ft to POB
&inc the foil desc pcl;the S 15.0 ft of N 1/2 of'Lot
G'of Vero Park, Unrecorded Plat, more part decr
as foil: Ind Riv Farms Co Sub PBS 2-25 Beg at
SE cor of Tr 7, sec 10-33-39;th run N 30.0 ft
along E line of said Tr 7;th run W, para w/S line
of Tr 7,856.0 ft;th run N 451.4 ft para to E line of
Tr 7 for a POB;th run N 150.5 ft on a line para w/E
line of Tr 7;th run W 124.0 ft on a line para w/S
line of Tr 7;th run S, 150.5 ft on a line para WE lin(
E X H I B-1 T ;.-...
0126 FINAL Assessment Roll 11-30-06 4 12/4/2006
FINAL ASSESSMENT ROLL FOR PAVING AND DRAINAGE IMPROVEMENTS
TO: 34TH AVENUE, 12TH STREET TO 14TH STREET
IRC PROJECT NO. 0126 TOTAL SQUARE FEET.... 321,648.00
COST TO OWNERS........... $77,195.90
COST PER S.F SQUARE FOOT $0.24000117
NAME &ADDRESS LEGAL DESCRIPTION SQ.FT. COST/SQ.FT. TOTAL COST
14 Dimino, Nick 10-33-39-00010-0000-00001.1 18,662.00 $0.24000117 $4,478.90
1255 34th Avenue N 1/2 of Lot H, Vero Park Sub No. 2
Vero Beach, FL 32960 (Unrecorded)
15 Campbell, Allen &Glenna 10-33-39-00010-0000-00001.2 13,702.00 $0.24000117 $3,288.50
1205 34th Avenue S 1/2 of Lot H, less S 40 ft, Vero Park Sub
Vero Beach, FL 32960 No. 2 (Unrecorded)
16 Conboy, Shawn M. 10-33-39-00010-0000-00001.4 17,192.50 $0.24000117 $4,126.22
1375 34th Avenue Vero Park Sub No 2 A por of Lot E more part
Vero Beach, FL 32960 desc as foll: Com 30 ft N of SE cor of Tr 7,
run W 980 ft, th N 968 ft to POB, fro POB
cont N 115 ft, th E 124 ft th S 115 ft, th W 124
ft to POB & inc a paarc of land 25.5 ft by 115
ft abutting the W side of S 115 ft of said Lot E
321,648.00 $0.24000117 $77,195.90
TOTAL SQ.FT. COST SQ.FT. TOTAL ASSESSMENT
A
E KT'.
SIB .
0126 FINAL Assessment Roll 11-30-06 5 12/4/2006
N.T.S.
VERO PARK SURD/VIS/ON NO. 2
(UNRECORDED)
2042.25 20,257.25 17,192.5
13,702 S.F 18,662 S.F. S.F. S.F. 65. 24,924 S.F.Lo 12,400 S.F. 23,064 S.F.
S. .
Z T�2 1.1 1.0 0.� h Nj 0.8 0.7 1 ��
Q CAMPBELL DIMINO TRAMPUS MOODY Z PATTERSON CONBOY CONBOY DIAZ/
110.5' 150.5' ��L65.5 135.5' ►.� 201' ,100 115 186'/
w �
103' 143' 143" 143' 143' 143' 143' 143'
30' 70' ��� �1�11N�kl
/RAW MOXLEY MILLER �MCCLURESEIFARTH iHAWKINSER LARSEN DANAHER
4 8 u' "'� 12 '° 16 `n "'j 20 to 24 r' 28 `)/ 32 f'
z 15.553 /� // // // //
S.F. 21,593 S.F. 30, 21,593 S.F. 21,593 S.F. 65, 21,593 S.F. 21,593 S.F. 30 21,593 S.F. 21,593 S.F.
V£RO PARK SUBDIVISION NO. 2
(UNRECORDED)
DESIGNATES PROPERTY TO BE ASSESSED
341`1y A VENUE
FROM 12TH STRf-ET TO 14TH STREET
A SSESSUEN T IVAP