Loading...
HomeMy WebLinkAbout2008-180�- 3- 06 15.B.5- �o - /so WORK ORDER NUMBER 16 This Work Order Number 16_ is entered into as of this L� day of _, 2001 pursuant to that certain Continuing Contract Agreement for ofessional Services entered into as of August 10, 2004 and amended effective July 24, 2007 (as so amended, the "Agreement'), by and between Indian River County Solid Waste Disposal District, a dependent special district of Indian River County, Florida ("District') and Geosyntec, Inc., a Florida corporation ("Consultant'). The District has selected the Consultant to perform the professional services set forth on Exhibit 1, attached to this Work Order and made part hereof by this reference. The professional services will be performed by the Consultant for the fee schedule set forth in Exhibit 1 and within the timeframe more particularly set forth in Exhibit 1, all in accordance with the terms and provisions set forth in the Agreement. Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work Order shall conflict with the terms of the Agreement and the terms of the Agreement shall be deemed to be incorporated in each individual Work Order as if fully set forth herein. IN WITNESS WHEREOF, the parties hereto have executed this Work fQ er as of the date first written above. GEOSYNTEC, INC. By: �_1_9-- Thomas A. Peel, Ph.D. Title: Vice PrEsk ent 1` INDIAN RIVER COUNTY SOLID WASTE [fiPPO,SA,L DIST ICS Q�tlda�-��_ Sandra C . 0,mlel?, ChairmAn Attest: J.K. Barton, Clerk -df By Deputy Clerk ph A.lBaird, County Administrator to form and legal su iciency: E. I ", ssistan"t County Attorney EXHIBIT 1 PROFESSIONAL SERVICES Geosyritec� 2258 Riverside Avenue Jacksonville, Florida 32204 consultants PH 904.388.8821 FAX 904.388.8163 w%vw.geosytec.com 26 February 2008 Mr. Himanshu Mehta, P.E. Managing Director Solid Waste Disposal District Indian River County 1325 74h Avenue SW Vero Beach, Florida 32968 Subject: Proposal to Provide Engineering Services Class I Landfill Vertical Expansion Construction Indian River County Landfill Facility Vero Beach, Indian River County, Florida Dear Mr. Mehta: Geosyntec Consultants (Geosyntec) is pleased to submit this proposal to the Indian River County (IRC) Solid Waste Disposal District (SWDD) for the provision of engineering services related to the construction of the Class I Landfill Vertical Expansion (hereafter referred to as the Project) for the Class I Landfill at the IRC Landfill (IRCL) facility located in Vero Beach, Indian River County, Florida. The proposal presents the scope of work, schedule, and budget estimate for the design modification, permitting, construction documents, procurement support, and construction - phase services for the Project. The proposal was prepared in response to a verbal request from the SWDD during a 16 December 2007 meeting at the IRCL site with Mr. Himanshu Mehta P.E. of SWDD and Dr. Kwasi Badu-Tweneboah, P.E. of Geosyntec. Geosyntec has prepared this proposal as Exhibit 1 under Work Order No. 16 for the Continuing Contract Agreement for Professional Services between IRC SWDD and Geosyntec, dated 10 August 2004 and amended 11 August 2007. The remainder of this proposal presents: (i) project background; (ii) proposed scope of work; (iii) budget estimate; (iv) schedule; and (iv) the assumptions that were used in the development of this proposal. PROJECT BACKGROUND The IRCL facility is located in southern Indian River County, east of Interstate 95, south of Oslo Road, and west of Rangeline Road in Vero Beach, Florida. The SWDD operates both the Class I landfill and Construction and Demolition (C&D) disposal facility at the IRCL facility. The Class XL07232/JL80057.doc eilhitlt'cr' I `ciciiti`wI I liillovators Mr. Himanshu Mehta, P.E. 26 February 2008 Page 2 of 11 I landfill includes Segment 1, Segment 2, and an Infill Area located between Segment 1 and Segment 2. Segment 1 is approximately 20 acres, unlined, and was initially closed in 1990 with a cover system that included 8- to 12 -in. thick compacted clay cap. Segment 2, which is approximately 38 acres in total footprint, has a 60 -mil thick high-density polyethylene (HDPE) geomembrane single liner. The Infill Area has: (i) a single composite liner comprised of a 60 - mil thick HDPE geomembrane placed on top of 2 -ft thick compacted clay liner over a 5 -acre area between Segment 1 and Segment 2; and (ii) a 60 -mil thick textured HDPE geomembrane single liner over the 7.5 acres of the eastern side slopes of the closed Segment 1 landfill. Leachate from the lined Segment 1 eastern side slopes, Segment 2, and Infill Area is collected through a combination of leachate collection system (LCS) drainage media and HDPE pipes, and conveyed to a pump station located at the northwest corner of Segment 2. The leachate is then transferred through a force main to the West Regional Wastewater Treatment Plant for treatment and disposal. In June 2005, the Florida Department of Environmental Protection (FDEP) issued the SWDD with an expansion permit, under Permit Modification No. S031-0128769-011, for the disposal of C&D debris over the south and west slopes of the closed Segment 1 landfill using 3 horizontal to 1 vertical (311:1 V) side slope geometry. The westward top slopes of the C&D expansion would extend to elevation (El.) 129.5 ft National Geodetic Vertical Datum (NGVD) and grade to the east at a 5 percent slope. The Segment 2 and Infill Area were also permitted to have 3H:1V waste slopes from El. 55 to El. 145 ft NGVD. In August 2006, FDEP issued the SWDD with an expansion permit for placement of C&D debris over the north slope of the closed Segment 1 landfill using 3H:1 V side slope geometry, extending the elevation to approximately 125 ft NGVD, under Permit Modification No. S031-0128769-013. Because of the significant decline in construction activity in the County, the C&D debris placement over the slopes of the previously - closed Segment 1 landfill, under the current FDEP Permits, is presently projected to reach final grades by March 2009. A modification of the current permit is required to facilitate construction of the Class I landfill vertical expansion described below. In order to improve aesthetics at the IRCL facility, the SWDD has voluntarily elected to place cover soil and sod over portions of the C&D debris that had reached final grades in a "close -as - you -go" manner. In April 2007, the SWDD authorized Geosyntec under Work Order No. 6 to design and permit the closure system for the C&D placement on Segment 1 slopes in order to meet the closure requirements of the solid waste regulations. In June 2006, FDEP issued the SWDD with a permit for the vertical expansion that includes the construction of a liner system over the top slopes of the previously -capped Segment 1 of the Class I landfill and raising the final elevation of the lined Class I landfill from the 145 ft NGVD to approximately 185 ft NGVD (Permit Modification No. 5031-0128769-012). This additional XL07232/JL80057 IRC PROPOSAL.doc Mr. Himanshu Mehta, P.E. 26 February 2008 Page 3 of 11 permitted capacity extends the life of the Class I landfill until January 2011, based on current and projected waste acceptance rates. As previously discussed, the current FDEP permits for C&D placement on Segment I with 5 percent top deck slopes would reach final grades in March 2009 before the Class I landfill vertical expansion can be constructed. However, the vertical expansion represents the next phase of the scheduled capacity additions to the Class I landfill. Its projected delay due to the decline in the deliveries of C&D debris for landfill disposal, places it on the critical path of the capacity addition schedule. SWDD requested that Geosyntec modify the vertical expansion design to allow for earlier start of the construction date. The outcome of such modification would be to increase the disposal capacity of the Class I waste at the expense of the unlined C&D disposal area. However, since the SWDD Board has made the decision in August 2007, as part of Amendment to Work Order No. 4, to discontinue the separate disposal of C&D debris in unlined landfill cells, this design modification would be in line with the Board directive to be protective of the environment. The IRCL facility is currently regulated under the New Source Performance Standards (NSPS) for municipal solid waste (MSW) landfills as identified in Subpart WWW of 40 CFR, Part 60 (Subpart WWW). The NSPS states that MSW landfills that exceed certain size thresholds (waste -in-place of more than 2.5 million Mg or 2.5 million m) or emission thresholds (emissions of non -methane organic compounds of greater than 50 Mg/yr) are required to collect and control its landfill gas. Currently, the IRCL does not exceed the thresholds prescribed by NSPS; however, the IRCL has a voluntarily -installed active gas collection and control system (GCCS), which includes 40 vertical gas collection wells, 13 horizontal gas collectors, blowers and flare system. As part of Work Order No. 6, SWDD authorized Geosyntec to design a GCCS expansion/phasing plan for the Class I landfill facility, which included upgrading the system to account for the future waste placement that will occur in the existing Segment 1, Segment 2, and Infill Area. Implementation of this upgraded GCCS system will also increase the economic viability of the landfill gas utilization project that SWDD and the County are currently pursuing. PROPOSED SCOPE OF WORK This project includes professional engineering services that will be performed for the design modification, permitting, and construction of the Class I landfill vertical expansion, including expansion of GCCS in Segment 1, Segment 2 and Infill Area. The scope of work is based on the requirements of Chapter 62-701, Florida Administrative Code (FAC) and Geosyntec's understanding of the project based on information provided by the SWDD. In addition, Geosyntec will also provide engineering support services for the construction and operation of an on-site borrow pit to supply fill material for construction of the vertical expansion and as cover material for the Class I landfill operations. XL07232/JL80057 IRC PROPOSAL.doc F,npiiieci , I sciez.tists I innovators Mr. Himanshu Mehta, P.E. 26 February 2008 Page 4 of 11 Geosyntec will provide all engineering services necessary to complete the engineering design modification, permit modification application, and address requests for additional information from FDEP related to the design modification. The scope of services also includes construction - phase services, such as, preparing construction bid documents, providing procurement support, construction management, and construction quality assurance (CQA) monitoring, testing, and certification services. The proposed budget and schedule are based on the assumption that Waste Management, inc. of Florida (WMIF) will provide the construction services for the entire project in accordance with the terms of the operating agreement between the SWDD Board and WMIF. For budgeting purposes, the scope of work will be performed in four phases, as presented below. • Phase 1: General Consulting/Meeting Support/Project Management; • Phase 2: Vertical Expansion Design Modification and Permitting; • Phase 3: Construction Procurement Services; and • Phase 4: Construction Support Services. Each of these phases is briefly described below. Phase 1: General Consulting/Meeting Support/Project Management Phase 1 consists of three components: general consulting, meeting support, and project management. Geosyntec will provide SWDD with consulting services necessary to initiate the project and attend pre -application and in -progress review meetings with the FDEP Central District office. Geosyntec will prepare presentation graphics, engineering drawings, and other documents required to support the meetings and project coordination activities. A kickoff meeting with SWDD is proposed before the start of project activities so that the specific project requirements can be discussed. If required by SWDD, Geosyntec will prepare for and attend a meeting with the SWDD Board to explain the project scope and budget requirements. Geosyntec will also schedule and attend, with SWDD staff, a meeting with the Central District office of FDEP to discuss specific permitting issues. Following each meeting, Geosyntec will prepare meeting minutes that document decisions reached in the meetings. Project management activities will include: budget and schedule tracking, invoice review, and project communications, including the preparation of a monthly progress report. The project report will include a description of the activities completed during the month and planned activities for the following month. In addition, the progress report will identify any technical or administrative issues that require SWDD's attention and the current status of the budget and schedule. XL07232/JL80057_IRC PROPOSAL.doc ghieers I scientists i innovators Mr. Himanshu Mehta, P.E. 26 February 2008 Page 5 of 11 For the purpose of this budget estimate, Geosyntec has included four meetings: (i) one kickoff meeting with SWDD; (ii) two meetings with FDEP and SWDD staff, and (iii) one meeting with the SWDD Board, if requested by SWDD. Progress meetings during construction of the vertical expansion liner system and GCCS are included in Phase 4. Phase 2: Vertical Expansion Design Modification and Permitting Phase 2 consists of design modification and preparation of permit application to decrease the Segment 1 top deck slopes from 5 percent to 2 percent to accelerate construction of the vertical expansion. For budgeting purposes this phase has been divided in the following three tasks, as presented below. Task 1: Eneineerin2 Design Under this task, Geosyntec will perform engineering analysis and design necessary to reduce the slope of the top of Segment 1 in the west -to -east direction from the current 5 percent. Geosyntec will perform the design analyses and calculations required to modify Permit Modification Nos. S031-0128769-011, S031-0128769-012, and S031-0128769-013 for C&D placement on Segment 1 slopes as well as the Class I landfill vertical expansion. Geosyntec will perform the following activities as part of the engineering design: • modifying the layout and grading of C&D debris placement on the top and side slope areas of Segment 1; • re-evaluating of stability and settlement of the final cover system; • waste containment design analyses to demonstrate gravity flow of leachate from Segment 1 vertical expansion into the Infill Area leachate collection system; • modification of the design of the surface water drainage system to collect and convey the storm water runoff from the final cover system to the perimeter toe ditch; and • modification of financial assurance calculations, if necessary. Task 2: Vertical Expansion Permit Application Under task, Geosyntec will prepare the Permit Modification Application for the Class I landfill vertical expansion. The permit application will include the engineering reports and drawings in support of the permit modification application in accordance with Chapter 62-701, FAC. For budgeting estimating purposes, Geosyntec has assumed that a Minor Modification Permit XL07232/JL80057 IRC PROPOSAL.doc t'II ll1E { t'S `::;!C.'1iCt (5 itmovators Mr. Himanshu Mehta, P.E. 26 February 2008 Page 6 of 11 Application will be required for this work. Geosyntec will provide four complete copies of the application to FDEP Central District and two copies to SWDD. Task 3: Response to Re2ulatory Comments Following submittal of the permit modification application, Geosyntec will meet with FDEP to present and discuss the contents of the application. Geosyntec will provide FDEP with written responses to requests for additional information (RAI) throughout the course of the permit review process. For the purpose of the budget estimate, Geosyntec has estimated response to one RAI will be required. Phase 3: Construction Procurement Services Geosyntec will provide the engineering services required for SWDD to procure the construction of the following: (i) Class I landfill vertical expansion liner system; (ii) expansion and upgrade of the GCCS; and (iii) operation of the on-site borrow pit for supply of fill material. It is understood that SWDD will contract the construction services of the project to WMIF, the current contractor for operation of the Class I landfill, including the on-going placement of C&D debris on Segment 1. As part of this phase, Geosyntec will prepare construction documents and a construction cost estimate as described below. Task 3.1: Construction Documents Geosyntec will prepare a set of construction drawings for each of the three components of the construction project. The construction drawings for the Class I landfill vertical expansion will be extracted from the permit application drawings and will include sufficient details necessary for construction of each component of the project. The construction drawings will include control points along the top of berms, toes of slopes, and other critical locations, including 50 -ft grid intervals, liner system details, and cross sections to facilitate construction and certification of the project. Construction drawings for the GCCS and borrow pit operations will be prepared, as necessary. Technical Specifications and the CQA Plan will be compiled as part of the Construction Documents. The specifications will be prepared using the industry -standard Construction Specification Institute (CSI) format. Task 3.2: Construction Cost Estimate Geosyntec will also prepare an Engineer's Estimate of Probable Construction Cost for the three phases of the project to serve as a basis for comparison of bids from WMIF during the procurement process. Probable construction cost will be based on estimated construction XL07232/JL80057_IRC PROPOSAL.doc ('?1011cel'S I SK_; el)l i5t� I ltillovators Mr. Himanshu Mehta, P.E. 26 February 2008 Page 7 of 11 quantities for the project and engineering estimate of the probable unit cost for each item. Probable construction costs will be based on such catalogues as R.S. Means, information provided by product manufacturers, and Geosyntec's professional judgment and experience with similar expansion and closure systems and installation projects. Additionally, Geosyntec will prepare a construction schedule based on Geosyntec's understanding of the project and experience with similar landfill construction projects. Phase 4: Construction Support Services Geosyntec will perform the construction -related services and provide engineering support associated with construction of the Project under three main tasks: (i) Field CQA Services; (ii) Construction Management; and (iii) Resident Engineering/Certification Services. Task 4.1: Field CQA Services Under this task, Geosyntec will provide CQA services during construction of the vertical expansion and GCCS and on-site borrow pit operations. Quality assurance monitoring, testing methods, test frequencies, and the reporting requirements will be performed in accordance with the CQA Plan, ASTM Standards, and applicable portions of Chapter 62-701, F.A.C. The work will be executed by an experienced project team consisting of office managerial staff and on-site CQA representatives. Geosyntec will provide on-site monitoring services for the activities associated with construction of the Project. The CQA services will be provided by a CQA Site Manager and Engineering Technicians, as needed. The CQA Site Manager will be responsible for CQA activities throughout the project including monitoring construction, coordinating soils and geosynthetics testing, and maintaining documentation of CQA activities at the site. Geosyntec will assign one CQA field personnel for every major construction activity being performed by the Contractor. For geosynthetics installation, one field CQA personnel can monitor two welding technicians. If at times several liner system installation operations are conducted simultaneously, the on-site CQA personnel will monitor those operations that are considered most critical to the performance of the liner system. Any non -conforming or questionable practices observed by Geosyntec will be brought to the attention of the concerned parties for review and correction. Geotechnical Laboratory Services Geosyntec will provide independent geotechnical QA/QC laboratory testing related to the construction. Experienced laboratory technicians will perform the required soils conformance XL07232/JL80057 IRC PROPOSALAOC e!ighieers i SCie iSts i it1ll(Wiltors Mr. Himanshu Mehta, P.E. 26 February 2008 Page 8 of 11 tests in accordance with the test methods described in the Technical Specifications and CQA Plan. The test results will be reviewed by the CQA Site Manager. SWDD will be provided with regular updates of the conformance testing activities and results. Summary reports of the laboratory conformance test results will be presented in the certification report. Geosynthetic CQA Laboratory Services Geosyntec proposes to perform: (i) conformance testing of the geosynthetic materials; and (ii) destructive testing of the geomembrane seams at an off-site geosynthetic CQA testing laboratory. Conformance sampling of the geosynthetics will be undertaken at the manufacturing plant prior to shipment of the geosynthetics to the site. This will expedite the conformance testing and eliminate delays in the field waiting for test results. Geosyntec will be responsible for coordinating collection of conformance test samples with the geosynthetic CQA laboratory and geosynthetic manufacturer. The geosynthetic CQA laboratory will be responsible for all conformance testing. The results will be faxed to the site in order to achieve a prompt response on test results. Task 4.2: Construction Manazement Under this task, Geosyntec will provide construction management services throughout the duration of construction. Construction management activities will include conducting pre - construction and weekly construction progress meetings with WMIF and its subcontractor(s), preparing a detailed construction schedule using critical path method (CPM) of scheduling for evaluating construction progress, assisting WMIF and SWDD in identifying critical construction phases and material procurement activities, providing assistance to WMIF in formulating plans to regain the project schedule in case of unforeseen delays, evaluating WMIF payment requests and verifying quantities and conformance with the plans and specifications, and providing contract administration to include construction -related correspondence with WMIF and SWDD. Task 4.3: Resident Enalneerin� Under this task, Geosyntec will provide resident engineering support services throughout the duration of construction. Resident engineering support services will include Construction Drawings and Technical Specifications interpretation or clarification, an evaluation of any changed conditions, and engineering analyses for any design changes or improvisations. Geosyntec will also provide support to SWDD in the preparation of modifications, deletions, or additions to the contract documents and correspondence with FDEP on such requests. Contractor change proposals will be evaluated for technical merit, conformance with design intent, and reasonableness with respect to pricing, and likelihood of acceptance by FDEP. Geosyntec will also assist SWDD in the review and approval process for submittals required by XL07232/JL80057_IRC PROPOSAL.doc ?t; itteers I scici,,Osts i itmovators Mr. Himanshu Mehta, P.E. 26 February 2008 Page 9 of 11 the contract documents. Resident engineering support services are expected to include engineers, administrative assistants, CADD operators, and word processors, as needed. As part of the Resident Engineering Phase, Geosyntec will prepare a final CQA certification report, which will include as -built record drawings, including geomembrane panel layout drawings, for the Project. The report will contain a narrative describing, in detail, the aspects of field activities associated with the Class I landfill vertical expansion and GCCS construction, specifically with reference to the activities identified in this proposal. The report will also include a summary of all conformance and performance tests conducted, testing frequencies, and test results showing compliance with the Technical Specifications and the CQA Plan. The documentation of construction activities (presented on daily summary reports, monitoring logs, test data sheets, nonconformance identification and corrective measures reports, and design change records) will be included as appendices to the final report. The as -built record drawings will be prepared for the project, in AutoCAD format, in order to illustrate the details of construction, any approved design changes, and other relevant information. The final CQA certification report and as -built record drawings will be signed and sealed by a registered professional engineer in the State of Florida. Geosyntec will prepare the report within 30 days of completing the construction activities. Five copies of the final CQA certification report will be submitted to FDEP for approval on behalf of SWDD. An electronic copy of as - built drawings in AutoCAD format will also be submitted to SWDD. BUDGET ESTIMATE A budget estimate for the scope of work outlined in Phases 1 through 4 of this proposal is summarized in the following table, and a detailed budget estimate is provided as Attachment 1. The budget estimate does not include permit fees that will be required at the time the permit modification application is submitted to FDEP. Phase 1: General Consulting/Meeting Support/Project Management $41,580 Phase 2: Vertical Expansion Design Modification $11,783 Phase 3: Construction Procurement Services $26,017 Phase 4: Construction Support Services $290,997 TOTAL $370,377 Geosyntec will not exceed the cost estimate without prior approval and written authorization from SWDD. XL07232/JL80057_IRC PROPOSAL.doc c !i ;incers I...iei' i ., I innovators Mr. Himanshu Mehta, P.E. 26 February 2008 Page 10 of 11 SCHEDULE Geosyntec has prepared a schedule for the Project, which is included as Attachment 2. The schedule, as presented, assumes a start date of 5 May 2008 and projects a Permit Modification Application submittal to FDEP on 2 June 2008. Geosyntec has assumed that the required permit will be obtained within three months of submission. Response to FDEP comments will be performed during this three-month period. Therefore, it is anticipated that the permit for the vertical expansion will be issued by 4 August 2008. Geosyntec will proceed with Phase 3: Construction Procurement Services during the permit review period and anticipates completion of the Construction Documents for procurement with WMIF by 4 August 2008, with contract negotiation and award by 18 August 2008. The placement of C&D debris on the slopes of Segment 1 by WMIF will continue without interruption and will be completed by 1 September 2008. During this period, Geosyntec will periodically monitor progress to ensure that the work progresses on schedule and in accordance with the design grades. The on-site borrow pit preparation activities will commence on 4 August 2008, and is expected to be completed within 30 days. Thereafter, the borrow pit will commence operation to supply material for the various construction components. Construction of the vertical expansion and GCCS should start by September 2008 and be completed by August 2009. For budgeting purposes, however, Geosyntec has assumed a six- month construction period for on-site monitoring and testing activities. Construction certification report and approval by FDEP should be completed by 30 September 2009. Geosyntec recognizes the importance of the schedule for SWDD and their need to obtain the required disposal capacity from the Class I landfill vertical expansion. Throughout the duration of the Project, Geosyntec will work diligently to meet those milestones and the schedule developed for the Project. XL07232/JL80057 IRC PROPOSAL.doc C11011cel.S i scienlis(5 i iil)lovalor5 Mr. Himanshu Mehta, P.E. 26 February 2008 Page 11 of 11 CLOSURE Geosyntec appreciates this opportunity to offer our services. If this proposal is acceptable, please indicate your agreement by signing the attached work authorization, which references this proposal. Please return one signed work authorization to Dr. Badu-Tweneboah's attention. Please call either of the undersigned with questions you may have as you review this proposal. Sincerely, Kwasi Badu-Tweneboah, Ph.D., P.E. Associate Attachments XL07232/JL80057_IRC PROPOSAL.doc e,3g itleek-" I scieniis:s I ilmov<1101-s ATTACHMENT 1 BUDGET ESTIMATE Table 1 BUDGET ESTIMATE DESIGN, PERMITTING & CONSTRUCTION SERVICES INDIAN RIVER COUNTY CLASS I LANDFILL VERTICAL EXPANSION PHASE 1: Proiect Management and McPtinac ITEM BASIS RATE QUANTITY ESTIMATED BUDGET ,Professional SeYvices , , �_, _ x: ^§ .0�_. a. Principal hr $189� $0 b. Associate hr $179 104 $18,616 c. Senior Project Engineer hr $158 0 $0 d. Project Engineer hr $125 64 $7,982 e. Engineer hr $109 0 $0 f. Senior Staff Engineer hr $97 24 $2,322 g. Staff Engineer hr $81 0 $0 Subtotal Professional Services $28,920 rTecl►nic dmiaiistxatiye Setvi�e�s ' ;. r >7�' a. CADD Designer hr $115 0 $0 b. Senior CADD Operator c. Drafter/CADD Operator hr hr $ 113 $70 16 16 $1,845 $1,125 d. Technical/Administrative Assistant hr $79 44 $3,459 e. Technical Word Processor hr $80 1 0 $0 f. Clerical hr $48 80 $3,861 Subtotal Technical/Administrative Services $10,290 00 .eaxrm,AM* a. Lodging day $100 0 �- " $0 b. Per Diem day $21 0 $0 c. Communications Fee 3% labor 0.03 39,210 $1,176 d. CADD Computer System hr $15 32 $480 e. Vehicle Rental day $150 4 $600 f. 8.5"xl l" Photocopies each $0.12 200 $24 g. CADD Drawings each 1 $31 30 $90 Subtotal Reimbursables $2,370 ` Xt.07232MI-80057J1-80057_Vertical Expansion Budget.xls Geosyntec Consultants Table 2 BUDGET ESTIMATE DESIGN, PERMITTING & CONSTRUCTION SERVICES INDIAN RIVER COUNTY CLASS I LANDFILL VERTICAL EXPANSION PHASE 2. TASK 1: Engineerine Design ITEM BASIS RATE QUANTITY ESTIMATED BUDGET A: PrQfes iona];Services ;.: ,�* F �, "NON ON 1. a. Principal hr $189 0 $0 b. Associate hr $179 8 $1,432 c. Senior Project Engineer hr $158 0 $0 d. Project Engineer hr $125 16 $1,996 e. Engineer hr $109 0 $0 f. Senior Staff Engineer hr $97 12 $1,161 g. Staff Engineer hr $81 0 $0 Subtotal Professional Services $4,588 e � - d' ni �tive Serviees'� � a. CADD Designer hr $115 10 $1,153 b. Senior CADD Operator hr $113 0 $0 c. Drafter/CARD Operator hr $70 14 $984 d. Technical/Administrative Assistant hr $79 0 $0 e. Technical Word Processor hr $80 4 $321 f. Clerical hr $48 6 $290 Subtotal Technical/Administrative Services $2,748 OK�Re ab s 5 a. Lodging day $100 0 $0 b. Per Diem day $21 0 $0 c. Communications Fee 3% labor 0.03 $7,337 $220 d. CADD Computer System hr S15 24 $360 e. Vehicle Rental day $150.00 0 $0 f. 8.5"x11" Photocopies each $0.12 500 $60 g. CADD Drawings each $3 50 $150 Subtotal Reimbursables $790 . r$. 1�;7`� "MOM* � XL06230/JL70002/JL80057_Vertical Expansion Budget.xls Geosyntec Consultants Table 3 BUDGET ESTIMATE DESIGN, PERMITTING & CONSTRUCTION SERVICES INDIAN RIVER COUNTY CLASS I LANDFILL VERTICAL EXPANSION PHASE 2, TASK 2: Permit Annlication ITEM BASIS RATE QUANTITY ESTIMATED BUDGET k, a. Principal hr $189 0 $0 b. Associate hr $179 4 $716 c. Senior Project Engineer hr $168 0 $0 d. Project Engineer hr $125 0 $0 e. Engineer hr $109 0 $0 f. Senior Staff Engineer hr $97 8 $774 g. Staff Engineer hr $81 0 $0 Subtotal Professional Services $1,490 T C C a. Site Manager/Construction Manager hr $95 0 $0 b. Senior Engineering Technician hr $71 0 $0 c. Engineering Technician hr $55 0 $0 d. Senior CADD Operator hr $113 0 $0 e. Drafter/CADD Operator hr $70 0 $0 f. Technical/Administrative Assistant hr $79 0 $0 g. Technical Word Processor hr 1 $80 2 $161 h. Clerical hr 1 $48 2 $97 Subtotal Technical/Administrative Services $257 a. Lodging day $100 0 $0 b. Per Diem day $21 0 $0 c. Communications Fee 3% labor 0.03 $1,747 $52 d. CADD Computer System hr $15 0 $0 e. Vehicle Rental day $150.00 0 $0 f. 8.5"xl l" Photocopies each $0.12 100 $12 g. CADD Photocopies each $3 15 $45 Subtotal Reimbursables $109 r TA ,ESTI I I B[JAG7'9T'4 .-PHA Ir lk 2, XL06230/JL70002/JL80057_Vertical Expansion Budget.xls Geosyntec Consultants Table 4 BUDGET ESTIMATE DESIGN, PERMITTING & CONSTRUCTION SERVICES INDIAN RIVER COUNTY CLASS I LANDFILL vERTICAL EXPANSION PHASE 2. TASK 3: Response to Re2ulatory Comments ITEM IF - BASIS RATE QUANTITY ESTIMATED BUDGET a. Principal hr $189 0 $0 b. Associate hr $179 2 $358 c. Senior Project Engineer hr $158 0 $0 d. Project Engineer hr $125 0 $0 e. Engineer hr $109 0 $0 f Senior Staff Engineer hr $97 8 $774 g. Staff Engineer hr $81 0 $0 Subtotal Professional Services $1,132 Of 3IRM Z""w 411a�-"W-.J'""'� 7171qw 35541d' a. Site Manager/Construction Manager hr $95 0 $0 b. Senior Engineering Technician hr $71 0 $0 c. Engineering Technician hr $55 0 $0 d. Senior CADD Operator hr $113 0 $0 e. Drafter/CADD Operator hr $70 0 $0 f Technical/Administrative Assistant hr $79 2 $157 g. Technical Word Processor hr $802 $161 h. Clerical hr $48 + 2 $97 Subtotal Technical/Administrative Services $414 0 1 MI., R -K — mpA'374 Her a. Lodging day $100 0 $0 b. Per Diem day $21 0 $0 c. Communications Fee 3% labor 0.03 $1,546 $46 d. CADD Computer System hr $15 0 $0 e. Vehicle Rental Day $150.00 1 $150 f 8.5"x11" Photocopies each $0.12 100 $12 g. CADD Photocopies each. $3 15 $45 Subtotal Reimbursables $253 Vk#=77,:"�'777.77 ZIM-0,7 XL06230/JL70002/JL80057—VerticaI Expansion Budget.xls Geosyntec Consultants Table 5 BUDGET ESTIMATE DESIGN, PERMITTING & CONSTRUCTION SERVICES INDIAN RIVER COUNTY CLASS I LANDFILL vERTICAL EXPANSION PHASE 3, TASK 1: Construction Documents ITEM BASIS RATE QUANTITY ESTIMATED BUDGET ., Visional Services= . , . a. Principal hr $189 2 $378 b. Associate hr $179 20 $3,580 c. Senior Project Engineer hr $158 0 $0 d. Project Engineer hr $125 30 $3,742 e. Engineer hr 1 $109 1 0 $0 f. Senior Staff Engineer hr $97 40 $3,870 g. Staff Engineer hr $81 0 $0 Subtotal Professional Services $11,569 lifstrati�seSei vices' a. CADD Designer hr $115 24 $2,768 b. Senior CADD Operator hr $113 0 $0 c. Drafter/CADD Operator hr $70 40 $2,812 d. Technical/Administrative Assistant hr $79 0 $0 e. Technical Word Processor hr $80 6 $482 f. Clerical hr $48 4 $193 Subtotal Technical/Administrative Services $6,255 sa`b�e a. Lodging day $100 0 $0 b. Per Diem day $21 0 $0 c. Communications Fee 3% labor 0.03 $17,824 $535 d. CADD Computer System hr $15 64 $960 e. Vehicle Rental day $150.00 0 $0 f. 8.5"x11" Photocopies each $0.12 600 $72 g. CADD Drawings each $3 40 $120 Subtotal Reimbursables $1,687 XL06230/JL70002/JL80057_Vertical Expansion Budget.xis Geosyntec Consultants Table 6 BUDGET ESTIMATE DESIGN, PERMITTING & CONSTRUCTION SERVICES INDIAN RIVER COUNTY CLASS I LANDFILL VERTICAL EXPANSION PHASE 3 TASK 2: Construction Cost Estimate ITEM IF - BASIS RATE QUANTITY ESTIMATED BUDGET r'.$' -m d*'t`r .d , L '2�` Professional Services .. S "� hh Cz"s`7'` ,. , <. _. a. Principal hr $189 0 $0 b. Associate hr $179 4 $716 c. Senior Project Engineer hr $158 0 $0 d. Project Engineer hr $125 8 $998 e. Engineer hr $109 0 $0 f. Senior Staff Engineer hr $97 16 $1,548 g. Staff Engineer hr $81 0 $0 Subtotal Professional Services $3,262 a. CADD Designer hr $115 0 $0 b. Senior CADD Operator hr $113 20 $2,262 c. Drafter/CADD Operator hr $70 0 $0 d. Technical/Administrative Assistant hr $79 0 $0 e. Technical Word Processor hr $80 6 $482 f. Clerical hr $48 0 $0 Subtotal Technical/Administrative Services $2,744 C1�Reimbnrsabes a. Lodging day $100 0 $0 b. Per Diem day $30 0 $0 c. Communications Fee 3% labor 0.03 $6,005 $180 d. CADD Computer System hr $15 20 $300 e. Vehicle Rental day $150.00 0 $0 f. 8.5"x11" Photocopies each $0.12 20 $2 g. CADD Drawings each $3 6 $18 Subtotal Reimbursables $501 v s<OTAI ESTIIVIAET1BrtJDGE I`TASl 9 �`� � „'$6 XL06230/JL70002/JL80057_Vertical Expansion Budget.xls Geosyntec Consultants Table 7 BUDGET ESTIMATE DESIGN, PERMITTING & CONSTRUCTION SERVICES INDIAN RIVER COUNTY CLASS I LANDFILL VERTICAL EXPANSION PHASE 4. TASK l: Field COA Services ITEM IF - BASIS RATE QUANTITY ESTIMATED BUDGET Profess�onalSre c,;t ? a. Principal hr $189 0 $0 b. Associate hr $179 24 $4,296 c. Senior Project Engineer hr $158 0 $0 d. Project Engineer hr $125 36 $4,490 e. Engineer hr $109 0 $0 f. Senior Staff Engineer hr $97 60 $5,804 g. Staff Engineer hr $68 0 $0 81.37 fessional Services $14,590 a. Site Manager/Construction Manager hr $95 1,200 $114,240 b. Senior Engineering Technician hr $71 200 $14,272 c. Engineering Technician hr $55 100 $5,492 d. Senior CADD Operator hr $113 0 $0 e. Drafter/CADD Operator hr $70 24 $1,687 f. Technical/Administrative Assistant hr $79 0 $0 g. Technical Word Processor hr $80 0 $0 h. Clerical hr $48 24 $1,158 Subtotal Technical/Administrative Services $136,850 " Reimbnxsable. u.,:.. fl . . r.>.` a. Lodging day $100 215 $21,500 b. Per Diem day $21 215 $4,515 c. Communications Fee 3% labor 0.03 $151,440 $4,543 d. CADD Computer System hr $15 24 $360 e. Geotechnical Lab Testing est $5,000 1 $5,000 f. Geosynthetics Lab Testing est $7,500 1 $7,500 g. Vehicle Rental week $400.00 32 $12,800 h. Computer, Data Collectors, Camera week $25.00 1 32 $800 i. Nuclear Density Gauge week $125.00 6 $750 j. Consumables week $75.00 6 $450 k. 8.5'x11" Photocopies each $0.12 600 $72 1. CADD Photocopies each $3 50 $150 Subtotal Reimbursables $58,440 � <� �QT'SES,��Il1%IAEb,�BiJA�GIl'l�wP1�AS�4nT'ASKals, ��` $2Q9`$80��„�;M XL06230/JL70002/JL80057_Vertical Expansion Budget.xls Geosyntec Consultants Table 8 BUDGET ESTIMATE DESIGN, PERMITTING & CONSTRUCTION SERVICES INDIAN RIVER COUNTY CLASS I LANDFILL VERTICAL EXPANSION PHASE 4, TASK 2: Construction Management ITEM BASIS RATE QUANTITY ESTIMATED BUDGET a. Principal hr $189 0 $0 b. Associate hr $179 120 $21,480 c. Senior Project Engineer hr $158 0 $0 d. Project Engineer hr $125 100 $12,472 e. Engineer hr $109 0 $0 f. Senior Staff Engineer hr $97 80 $7,739 g. Staff Engineer hr $81 0 $0 Subtotal Professional Services $41,691 eServlxs��� " a. ,' NOW a. Site Manager/Construction Manager hr $95 0 $0 b. Senior Engineering Technician hr $71 0 $0 c. Engineering Technician hr 1 $55 0 $0 d. Senior CADD Operator hr $113 30 $3,393 e. Drafter/CARD Operator hr $70 0 $0 f. Technical/Administrative Assistant hr $79 6 $472 g. Technical Word Processor hr $80 8 $642 h. Clerical hr $48 6 $290 Subtotal Technical/Administrative Services $4,797 a. Lodging day $100 0 $0 b. Per Diem day $21 0 $0 c. Communications Fee 3% labor 0.03 $46,488 $1,395 d. CADD Computer System hr $15 100 $1,500 e. Vehicle Rental day $150.00 30 $4,500 f. 8.5"x11" Photocopies each $0.12 200 $24 g. CADD Photocopies each $3 50 $150 Subtotal Reimbursables $7,569 TOTi:,.,ESI1ViATED BUDGETi.HsASr9`. ' XL06230/JL70002/JL80057_Vertical Expansion Budget.xls Geosyntec Consultants Table 9 BUDGET ESTIMATE DESIGN, PERMITTING & CONSTRUCTION SERVICES INDIAN RIVER COUNTY CLASS I LANDFILL VERTICAL EXPANSION PHASE 4. TASK 3: Resident Endneerine ITEM IF - BASIS RATE QUANTITY ESTIMATED BUDGET of s yei vice a. Principal hr $185 4 $740 b. Associate hr $160 40 $6,400 c. Senior Project Engineer hr $142 0 $0 d. Project Engineer hr $109 40 $4,349 e. Engineer hr $89 0 $0 f. Senior Staff Engineer hr $82 60 $4,894 g. Staff Engineer hr $68 0 $0 Subtotal Professional Services $16,383 w=0 In M-1 1150 a. Site Manager/Construction Manager hr $81 16 $1,299 b. Senior Engineering Technician hr $60 0 $0 c. Engineering Technician hr $47 0 $0 d. Senior CADD Operator hr $91 50 $4,548 e. Drafter/CADD Operator hr $54 30 $1,620 f. Technical/Administrative Assistant hr $70 6 $421 g. Technical Word Processor hr $66 8 $527 h. Clerical hr $42 8 $338 Subtotal Technical/Administrative Services $7,454 $�"N .: a. Lodging day r ..q. $100 . 0 . $0 b. Per Diem day $21 0 $0 c. Communications Fee 3% labor 0.03 $23,837 $715 d. CADD Computer System hr 1 $15 100 $1,500 e. Vehicle Rental day $150.00 4 $600 f. 8.5"x11" Photocopies each $0.12 900 $108 g. CADD Photocopies each $3 100 $300 Subtotal Reimbursables $3,223 x + .?arc-,,t�w.w .TO'TAL'EST11tiI5ATED'-BUDGE ��..>'I3AS .,4�.� 2 XL06230/JL70002/JL80057_Vertical Expansion Budget.xls Geosyntec Consultants ATTACHMENT 2 SCHEDULE