HomeMy WebLinkAbout2008-439AMENDMENT NUMBER 1 TO WORK ORDER NUMBER 11 This Amendment Number 1 to Work Order Number 11 is entered into as of this 23rd day of December , 200 , pursuant to that certain Continuing Contract Agreement for Professional Services entered into as of April 6, 2004 and amended effective April 7, 2007 (as so amended, the "Agreement"), by and between Indian River County, a political subdivision of the State of Florida ("County") and MASTELLER & MOLER, INC. ("CONSULTANT"). 1. The County has selected the Consultant to perform the professional services set forth in existing Work Order Number 11 , Effective Date January 8, 2008. 2. The County and the Consultant desire to amend this Work Order as set forth on Exhibit 1 attached to this Amendment and made a part hereof by this reference. The professional services will be performed by the Consultant for the fee schedule set forth in Exhibit 2 and within the timeframe more particularly set forth in Exhibit 3, all in accordance with the terms and provisions set forth in the Agreement. 3. From and after the Effective Date of this Amendment, the above -referenced Work Order is amended as set forth in this Amendment. Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work Order shall conflict with the terms of the Agreement and the terms of the Agreement shall be deemed to be incorporated in each individual Work Order as if fully set forth herein. IN WITNESS WHEREOF, the parties hereto have executed this Amendment to Work Order as of the date first written above. CONSU ANT: BOARD OF COUNTY COMMISSIONERS MAS R & MOLER, INC. INDIAN RIVER COUNTY By: B`" Stephen E. Moler, PE Wesley S. Davi; _Cbaimvan Title: Vice President BCC Approved Date: nxember 23, 2oo8 Date: December 9, 2008 Attest: Mary Louise Scheidt, Clerk Ad Interim By ' Qom` Deputy Clerk County Adm /Approved as to form Wd legal sufficiency: "Marian E. Fell Assistant County Attorney Attachment 1 Our File 0773 December 9, 2008 NON-EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT CONTINUING CONSULTING SERVICES ADDENDUM #1 TO "EXHIBIT 1" Background The Indian River County Utilities Department has decided to amend Work Authorization #11 which was approved by the Board of County Commissioners January 8, 2008. In preparation of the State of Florida Department of Transportation's (FDOT) plans to construct a four -lane to six - lane roadway expansion project along SR -60 between 66th Avenue and 82nd Avenue in Indian River County construction plans were developed to detail utility adjustments required in the proposed construction area. The County's intent was to provide the utility contractor a "one- step" construction process that would allow the required adjustments to be constructed without the need to return and make further adjustments after the completion of the FDOT roadway improvements. As a result, the adjustment planned for the existing 12" sewer force main at the southeast comer of SR -60 and 70 Avenue was designed to re-route the main under the existing 60" and proposed 84" storm pipe in the Indian River Farms Water Control District lateral canal. Although this design meets the intent of the "one-step" construction process, this design will result in a sewer force main being constructed extremely deep and in close proximity to existing and proposed traffic signal mast arms, signal switch gear, drainage pipes, and the Range Line Canal. While this is the best design following the "one-step" policy, it is not desirable since it will be difficult to construct and future maintenance would jeopardize the structural integrity of nearby roadway and drainage improvements. Although this design will require a "two-step" construction process to relocate the force main to its adjusted location, having the force main above rather than below the storm culvert justifies this modification to the construction concept. Scope of Services The additional services covered by this Amendment #1 to Work Authorization #11 will generally consist of the following • Prepare Construction Plans revisions and modifications to IRFWCD Permit to allow the force main to pass over the proposed new FDOT culvert at said location. • Prepare Construction Plans revisions and modification as requested by Indian River County Utilities to amend the design of the water main modifications on the south side of SR60, west of 74th Avenue. (Y:\mm\Projects%2007%0773WDMIMContracts%Addendum#110773 Amend #1 Attach 1_120908.doe) Our File 0773 December 9, 2008 NON-EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT CONTINUING CONSULTING SERVICES AMENDMENT #1 TO "EXHIBIT 2" Method and Amount of Compensation Masteller & Moler, Inc. proposes to provide the Scope of Services for Addendum #1 based on the following lump sum fee: Task A — Surveying & Construction Plans Location of Utilities System Components, Engineering Design; Preparation & Submittal of Permit Applications; Preparation of Specifications & Bid Documents Utilizing Standard IRC Bid Documents. Forms, Documents & Drawings will be in electronic format Task B — Construction Services Original Fee . $ 82,730.00 Assistance during Bidding, Bid Evaluation, Contract Award & Construction Administration; Periodic Administration and Periodic Construction Observation $ 19.960.00 TOTALS $102,690.00 Amendment #1 Total Fee Increase Fee . $ 4,827.50 $ 87,557.50 $ 0.00 $ 19.960.00 $ 4,827.50 $107,517.50 (Y:\mm\Projects\2007\0773\ADMIN\Contracts\Addendum#1\0773 Amend #1 Attach 2_120908.doc) r N z f - LU m O K z W W z 0 g m H W W LL W CL M J ca W V W co z 0 E- V F cc z O V z Q 0 z W Cc a. �- ed z z W Z � W a� �z LU Q W 3 z Z 0 W vUJ iz �0� Q P G g .0.. C m E O U 0 o CD w o 0 0 LO 0 U o to rn In .�, M 41 C O O H O O O O C LO c ' wi M O wi p c0 E M cl t0 N Q C 6a Ns 49 cf) bH a 0 O n 0 L0 � o o U 0 Cl ri ai 6-, 641� 61), GFA 64), m C.4 O O N ILI O O O O C ' 40 t- :3 111 OOD 1l O � O � m Cc 69. GRI 611� 69. 64). m= o o LO Ln O O r 1 O CD , O O C O Q O U O 01 Q m c u4 �s tis va 613� .y C2 m 0 O O O O 0 LO CDo� 0 , O co co C r N w O N Q sr o 4s v). v). 41s u3. y Ca .m. OO O m co a = N M N 8 CO)c€ � wa v C w O U o 0 r` LO r` O r Cl C d C .y N 0 rn c •c m m c c w 2 Our File 773 December 9, 2008 NON-EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT CONTINUING CONSULTING SERVICES AMENDMENT #1 TO "EXHIBIT 3" Time of Performance The estimated time frame for completion of services from the approval of this Amendment #1 to Work Authorization #1 is as follows: Revise Plans & Permit for Force Main And Water Main Modifications Engineering Design & Preparation of Revised Construction Plans and Revised Permit *COMPLETION DATE Two (2) weeks after County Approval of this Addendum #1 Y:\mm\Projects\200710773\ADMIMContracts\Addendum#1\0773 Aniend #1 Attach 3_120908.doc