Loading...
HomeMy WebLinkAbout2008-184� GIN ,#-AIA Document G701TM -2001 Change Order ��s ��� IA UG(V s d C�Lf�LI 3 PROJECT (Name and address): CHANGE ORDER NUMBER: 018 OWNER: Indian River County Jail Expansion DATE: May 08, 2008 ARCHITECT: 4055 41st Avenue CONTRACTOR: Vero Beach, FL 32960 TO CONTRACTOR (Name and address): ARCHITECT'S PROJECT NUMBER: 04083 FIELD: ❑ Peter R. Brown Construction, Inc. CONTRACT DATE: June 07, 2005 OTHER: ❑ 13830 58th Street North, Clearwater, FL CONTRACT FOR: General Construction 33760 THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable; airy undisputed amount attributable to previously executed Construction Change Directives) Final contract adjustment to close out the contract with the Indian River BOCC for the Indian River County Jail Expansion Project. The attached copy of Pay Appiicatton #25 dated March 30, 2008 identifies final contract savings. Below summarizes the items by category: Builder's Risk Allowarrce',............................................................($ 1,042.10) - Surety Bond..... .. ......................................................................($ 16,194.00) Allowances (Surveyor, Testing, Earthwork, Dewatering, HVAC Testing...... ($$ 75,379.01) 03) Precast Concrete ..................................................... ($ 815.80) ProjectContingency.. ,...'.......................................................... . Owner Contin nc ($ 77,059.42) - Escalation.......'' ......... .............................................................($ 99,524.00) Total---- •--- - - ------- -- -- -----------------------------------------------------------($270,014.36) $ 18,301,631.00 The original Guaranteed Maximum Price was $ (547,150.10) The act change by previously authorized Change Orders $ 17,754,480.90 The Guaranteed Maximum Price prior to this Change Order was 270,014.36) The Guaranteed Maximum Price will be decreased by this Change Order in the amount of ; 17,484,466.54 The new Guaranteed Maximum Price including this Change Order will be The Contract Time will be unchanged by Zero ( 0 ) days. The date of Substantial Completion as of the date of this Change Order therefore is September 10, 2007 NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. Clemons -Rutherford & Associates, Inc. Peter R. Brown Construction, Inc. Indian River County BOCC ARCHITECT (Firm n CONTRACTOR (Firm name) OWNER (Firm name) FL 13830 58th Street North earwate 7� 33760 William D. Rutherford( I/ Eduardo (Typed�na�ne) (Typedr � DATE ATE 1840 25th Street, SuitcNI18, Vero Beach, AIA Document G701111-2001. Copyright 01979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA'"` 1 Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA'v Document, or any re potion it AIA software I at 08:33:58 oin 05/15/ 008 undel and criminal a0 der No.100 03378511 which expires on lties, and will be prosecuted to the maximum /10/2009,and isnot for resale. (2192435619) e law. This document was of n seve User Notes: