Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
1990-22
t 8128190(WCORD2)LEGAL(WGClnhm) ORDINANCE NO. 90-_U_ AN ORDINANCE OF INDIAN RIVER COUNTY, FLORIDA ESTABLISHING TITLE Vlll, CHAPTER 800 - COMPREHENSIVE PLAN OF THE CODE OF INDIAN RIVER COUNTY; PROVIDING REPEAL; PROVIDING SEVERABILITY; AND PROVIDING AN EFFECTIVE DATE. BE IT ORDAINED by the Board of County Commissioners of Indian River County, that: SECTION 1. COMPREHENSIVE PLAN. Chapter 800 - Title Vill - The Code, Comprehensive Plan, as set forth in Attachment "A" to this ordinance is hereby adopted. SECTION 2. REPEAL. Those portions of the Indian River County Code (1974 edition) superseded or in conflict with the provisions herein adopted, in particular Chapter 171-03 are hereby repealed and the remaining portions renumbered as Chapter 800. SECTION 3. SEVERABILITY. If any section, or if any sentence, paragraph, phrase, or word of this ordinance is for any reason held to be unconstitutional, inoperative, or void, such holding shall not affect the remaining portions of this ordinance, and it shall be construed to have been the legislative intent to pass the ordinance without such unconstitutional, invalid or inoperative part. SECTION 4. EFFECTIVE DATE. This ordinance shall become effective upon confirmation from the Secretary of State. Approved and adopted by the Board of County Commissioners of Indian River County, Florida, on this 18 day of September 1990. 1 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:07 - OfficialDocuments:672, Attachment Id 0, Page 1 ORDINANCE NO. 90- 2L phis ordinance was advertised in-ttv"ero Beach Pre s s -J ournai on -the 2#t-h-day-of-Augus-t -, 1990, for-a-pub-lic hearing to-be---ieldon the�18th day of September, 1990, at which time i -teras mouPd_'ot adoption by Commissioner Scurlock Bird �— — seoond-ed by Commissioner Bird _ and adopted by the following vote: Chairman Carolyn K. Eggert -Ave Vice Chairman Richard N. Bird �yg Commissioner Margaret C. Bowman _-&Y-L Commissioner Don C. Scurlock, Jr. Ave Commissioner Gary C. Wheeler __&LL BOARD OF COUNTY COMMISSIONERS INDIAN RIVER COUNTY, FLORIDA sr ' By' Carol K. egg �, Chairman --- _�''Atte§Vb, F �k— J ff KJ orlon Ilerk IfRA r5f_y f f` •. �z4cknowledgment by the Department of State of the State of Florida, this 21st day of Se tember 1990. --- --�' --- Effective date: Acknowledgment from the Department of State received on this 21st day of September , 1990, at 10:30 a.m./p.m. and filediin the 01:>icof t e he Tie�f-the-Boaro of County Commissioners of Indian River County, Florida. 2 SmeadSok Reprint Date: Monday, August 12, 2013 - 15:22:07 - OfficialDocuments:672, Attachment Id 0, Page 2 Indian River Cu Approved Date Admin. Legal f•L° 4C q lC a 111 Q8 Budget 7vl/t Dept. XAdkI$ Risk My. NIA SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:08 - OfficialDocuments:672, Attachment Id 0, Page 3 �x P. ..: y �4r.OKI TI -TLE V111 cOM FLAN . t Vidian RIM County—lFl���d SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:08 - OfficialDocuments:672, Attachment Id 0, Page 3 TABLE OF CONTENTS TITLE VIII---�-COMPREHENSIVE PLAN SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:08 - OfficialDocuments:672, Attachment Id 0, Page 4 Chapter--800-Comprehensive Plan Sec. 800.01 Short Title Sec. 800:0-2 Purpose anziIntent Sec. -800.0-3--Adopted Indian River- County -Comprehensive Plan Sec. W_q4 Legal Status of the Comprehensive Plan Sec. 800.05 Timetable for Comprehensive Plan Amendment Sec -.ADD -.06 Establishment Amendments Sec. 800.07 Procedures for of Fee-ffo-r�omprehensive I Comprehensive Plan Amendments Section 800.01 Short Title This dhapter, shall . be known as the Adopted Ind ann River County Comprehensive-P-lan ordinance. Section 800.02 Purpose and Intent die 1990 rndian--River-County Comprehensive -Plan was prepared—in accordance -with -Chapter =.161, Par -t -II, Florida Statutes, "The -Local Government Comprehensive Planning and Land Development Regulation Act of 198511, and Florida Administrative Code Rule 9J-5, "Minimum Criteria or eview of Local Government Comprehensive Plans --and Determination o -f --C- ompliance" . This -plan replaces the -1982-County Comprehensive Plan which was prepared pursuant to the requirements of the Local Government Comprehensive Planning Act of 1975. It -is --the intent o --this Plan to encourage the most appropr4ate--use of -land, water, -and resources consistent with the public interest; to overcome present deficiencies and deal effectively with future problems that may result from the use and development of land within the unincorporated areas of Indian River County; to facilitate the adequate and efficient provision of transportation, water, sewerage, parks, recreational facilities, housing, and other senvices; and to conserve, develop, utilize, and protect natural resources -within t -he -unincorporated ar-eas-,of Indian River County. Furthermore mechanisms to facilitate intergovernmental coordination between the county, its municipalities, regional agencies, and smote agencies panning and development activities -arm Rr-eeented. ection X0 03 Adopt—ed Indian Iver County Comprehensive -Plan The 199L -Indian River _County Comprehensive Plan has been reproduced in two forms. These two forms are the completed comprehensive plan and the adopted portion of the comprehensive-rlan. The-adopted-portiorrcon�ists-o-f the -pian SmeadSok Reprint Date: Monday, August 12, 2013 - 15:22:08 - OfficialDocuments:672, Attachment Id 0, Page 5 9/7/90 components formally adopted by the Board of County Commissioners. Consisting of all goals, objectives, and policies of each plan element, various map series, the entire pita -1 --improvements elemen , and, other omponents, the adopted portion of -the plan contains -those -required components identified in 9J-5.005 (1)(c). The Indian River County Comprehensive Plan has been adopted by Ordinance No. 90-3, The adopted portionof than, consistsof the following: plan, (a) Goals, Objectives, and Policies of all elements The goals, objectives and policies are the most important part of the plan. These are the actions which the county will take in order to direct the community's development (See Appendix "All). Following are the definitions of these terms and their relation to each other: I. Goal: Long term end toward which programs or activities are ultimately directed. 2. Objective: A specific, measurable, intermediate end that is achievable and marks progress toward a goal. 3.iz cy:The couree of action or way in which programs and activities are conducted to achieve an identified goal or objective. (b) Required Maps Showing Future Conditions This section includes required maps pursuant to FAC 9J - 5.005(c). which show future conditions. The most important map is the future land use map series which depicts the type, density, and intensity of uses within uninco-rpor�ions of the county_.—The-Lollowing is the list of maps which have been adopted. I. Land Use Maps: Figures 2.10, 2.14, 2.16,.2.17, 2.18, 2.21, 2.23, a., and 2.34 2. Ports, Aviation, and Related Facilities Maps: Figures 6.1, 6.3.1, 6.3.2, 6.5.1 and 6.5.2 3. Recreational Facilities Ma ps. Figures -10_1, 10 _2_, 10-._3_, and l07 4. Traffic Circulation Maps: Figures 4.13, 4.13.2, 4.13.3 SmeadSok Reprint Date: Monday, August 12, 2013 - 15:22:08 - OfficialDocuments:672, Attachment Id 0, Page 6 9/7/90 5. Conservation -Element -Maps-: Figures 8.1, 8.9_, 8.10, 8.11, 8.12 .14, and 8.25 6. Coastal Management Element Maps: €igUres 9: X9:6 -j-9.7—,-9-. 8, X23;-9:23, 9.35; and (c) Capital Improvements Element T 490IndianRiver County Comprehensive Plan completes the growth management initiative started by Indian River County by providing a direct linkage between land use decision making -and the- fiscal-capabilityto provide infrastructural -support-while- enhancing- environmental protection. Pursuant to the requirements of 9J - 5.005(1)(c), FAC, the following sections are included in -he Cam a improvements lement (S-ee Appendix "R"-) 1. Requirements for capital improvements implementation 2. roce ures for monitoring and e — ua of the lndiae ve County --Plan 3. Concurrency Management System Maps and Tabs -es- Adopted by—Reference 1. Gals Objectives, and Policies_SeCtion This section inclu ed s all the maps and tab lesw ich have - beer, referenced in the goals, objectives, and -p J-1es section, but not included in the required mapssection. (2) Besides the adopted portion, another form of the comprehensive plan has been reproduced. That is the complete comprehensive plan. This form of the plan not only contains the adopted portion, but also consists of the support documents; the support documents contain the data and analysis upon which t e adopted portions- are -based. Filling -over -�fl pages -in -two -- volumes, the complete -plan serves as both a policy document and a reference guide. For policy purposes, however, the adopted portion of the plan is a complete ocumen . Section .800.04 Legal Status of.the Comprehensive Plan Upon -adoption of the -19 -9 -0 --Ind ian River County Comprehensive -Plan, pursuant to Florida Statutes 163.3194, all development undertaken 3 SmeadSok Reprint Date: Monday, August 12, 2013 - 15:22:09 - OfficialDocuments:672, Attachment Id 0, Page 7 9/7/90 by-all-acti-onstaken in regard -to -development orders approved Indian River County- government the adopted comprehensive plan. enacted or amended shall be comprehensive plan. agencies -shall be consistent with All land development regulations consistent with the adopted Section 805 Timeta a for ompr�iv�lan madmen Submittal (1) 'Pursuant to section 163.3187 F.S., comprehensive plan amendments may be submitted two times during any calendar ear. -Tie countywrrl accept -comprehensive pian amendment applications during -the -entire months of -January and July of each year. To inform the public of comprehensive plan amendment timeframes, the planning staff will publish notices or the acceptance -of comprehensive ply amendment applications immediately prior—to—and duringthe months of January and July. (Z) P-ursuant to Section 1-63: 3187(-1) F.S. , f- owing are the-- exceptions heexceptions to -twice -a yearL--compreh4nslve-plart----lnnd u -se amendment. (ate -n e case of an emergency, comprehensive pan amendments -maybe-made-m rre oftan than—twice—during the calendar year if the additional plan amendment receives the approval of all of the members of the Board of County commissioners.- Emergency means any occurrence or thr thereof whether accidental or natural, caused by man, in war or peace, which results or may result in substantial injury or harm to the population or substantial damage to or loss of property or public funds. (b) Any local government comprehensive plan amendments directly related to a proposed development of regional impact, clue ing changes whicrihave bei ermined o be substantial deviations -and Lnc udimg- Fl-orida-Qual3 y Developments pursuant to s.380.061, may be considered by the Board of County Commissioners at the same time as the app 'cat on for eve opment approval withou r rd to statutory limits on the-frequency--of-consideration-of amendments to the comprehensive plan_, Nothing inthis subsection shall be deemed to require favorable cons' eration of a plan amendment solely because it is reiat-edto-development 6i--regional-impact. (c) Any local government comprehensive plan amendments irectly related to proposed small scale development SmeadSok Reprint Date: Monday, August 12, 2013 - 15:22:09 - OfficialDocuments:672, Attachment Id 0, Page 8 ti it-ies-may limits on the to the local conditions: 9/7/90 be approved without regard tostatutory frequency oi-consideration of amendments comprehensive plan under the following 1. The proposed amendments a_residential-land_use of 5 acres or less and a density of 5 units per acre or less or involves other land use categories, singularly or -i -n -- combination with residential i s , of 3 ar-res or less-and.- a. ess-and; Section 800.0 a. The cumulative effect of the above condition hall not exceed-3"cres-annually; b _The- proposed amendment -does not -involve the same property more than once a year; and C. The proposed amendment does not involve the same owners pro erp matin 200 teet of property---grant-ed a-c-iange-within a period of Establishment of Fee for Comprehensive Plan Amendments The Board of County Commissioners shall by resolut-ion-estabiish-a fee_for_Comprehensive-Plan Amendment -applications. Section -80-. 07---Pr=edure-s-for-Comprehensive-PIarrAmendments (1) The procedure for amendment of an adopted comprehensive plan or element shall be as for the original adoption of the comprehensive pian or element as set forth in Section 163.3184 F.S. The following procedures sat out local regulations intended to implement the Comprehensive Plan Amendment procedures of Section 163.3184 and 163.3187, Florida Statutes (1989), -as -amended; --In the event -of any—conflict-between he provisions_ of these local -regulations---and-the Comprehensive Plan amendment procedures of Section 163.3184 and 163.3187, F.S., the local regulations shall be interpreted and applied so—s-to- implement the -amendment -:procedures of sectio 163.184 -and 163.3187 FF}S. (1989) , as -amended. Comprehensive plans may only be amended in such a way as to preserve -the- internal consistency -of the-rlarF-pursuant-to Section163-.3177(2),—F. S. Corrections,- updates, --r modifications of current costs which were set out as part of the comprehensive plan shall not be deemed to be amendments. SmeadSok Reprint Date: Monday, August 12, 2013 - 15:22:09 - L7ffCIalDocuments:672, Attachment Id 0, Page 9 9/7/90 The county shall transmit copies of any amendments of its adopted comprehensive plan to the Department of Community Affairs. -2�--The county may initiate Comprehens-ive Plan -amendments pursuant to Section 1631.3184 and 163.3187, F.S. (1989), as amended. (3) The steps outlined in Section (3) through (11) below are the procedural -requirements which are to be followed whe the county receives a petition_to_amend the Land Use -Element -of the Comprehensive Plan. (a) The Community Development Department shall publish a notice statingthat-the--Commun;+vel-opment-Department is accepting petitions for amendments to the Comprehensive Plan. This notice shall be advertised the last weeks of December and June, and four (4) times during the months of January and July or as otherwise warranted by the Community Development Director's determination. (b) Applications to amend the Comprehensive Plan may be submitted by the owner or owner's agent of property proposed for amendment. The Community Development Department shall initiate the evaluation of amendment requests by reviewing each application for adequacy and completeness. The application will not be considered complete until the following items have been submitted: 1. tiotorized letter of authorization if applicant is other than the owner; 2. Verified statement naming every individual having legal or equitable ownership of the subject property; 3. Warranty deed; 4. Title insurance or Attorney's opinion of title; 5. Sealed survey of property which also shows the surrounding and adjacent land uses within 300' of property. The -surrounding- landuses-d-onot--nee-dto be surveyed, rather the land use designations shall be recorded on the survey; 6. Proposed land use -requested by the comprehensive Plan Land Use amendment: 7. Existing zoning and land use of parcel; SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:10 - OfficialDocuments:672, Attachment Id 0, Page 10 9790 8—. -A -valid concurrency determination certificate -or -an application for concurrency determination certificate; and licable Fees--)- (c) Within ten (10) days of receipt of the application, the Community Den�opmenn D-epa-rtment--haal-transmit wetter o the applicant notifying -him that�the-app3.-icati-onAs complete -or -identifying those items required to make the application complete. fd�If— he Compreherisive Plan amendment -is --&--land use ma amendment,-theCommunity Development -Department-shall review the application to see if the proposed land use conforms to existing zoning. If it does not conform, the community Development Department shall forward a -rezoning application to the -applicant -,-m that -the rezoning _and land use amendment requests can be processed concurrently. if -a rezoning is necessary, -the -Community -Development Department shall schedule the review process and required public hearings simultaneously with the an use amendmentrequest. (e)The Community Development Department shall prepare a location map for the requested land use amendment. The deppar shall also. prepare a lend use map, -uei-ng- aerial-photographs as--he=base-map , This map shah delineate the -property for which the land use amendment is being requested, as well as all the adjacent land uses within 300' of the subject property. This information �- obtained „r=,e.. and supporting W. be obtained from the survey pp g information submitted by the applicant. 14 -y -Review -of -the- complete application-shall-begi-n-by- completing the following -steps for the public hearingbefore efore the Planning and Zoning Commission. {a)—,€ter tie- application--is—complete-,---the Community Development Department shall review it for reasonableness. The Community Development Department -'sh l l determine whether th proposed and use amendmen is compatible-wi-th the-surrounding-land-uses-andwhether it will comply -with the -intent of the land use element of the Comprehensive Plan as well as the intent of the other .elements of the Comprehen-sive Plan. Thefoowing '-terns shai-1 be-eva-luated during the -review -process SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:10 - OfficialDocuments:672, Attachment Id 0, Page 11 9/7/90 L—The impact of the land use amendment the traffic circulation-and-str€et-conditions in -the -county. 2. The impact of the land use amendment on the county uti-Litre. Fo-r--the purpose of this- review, ut-ilit3-es-shal-1-4nc-l-ude pub-licwat-er,- wastewater-, and solid waste facilities., —3.The impacts the la-nuse amendment onthe o er ser-vi-ces—and--facdlities wlyic"ave established levels of service such as drainage and parks. 4 The of -the land use change onthe County s envirorlmentsquality. This shall ielud, but -ntrt be limited-o,anevaluation oL__theeffects on environmentally_ sensitive land, groundwater quality, flood control, existing vegetation and agricultural 5. The impact of the proposed land use amendment upon any particular need in the county such as housing, agriculturalproduction, special—commercial --Gr-- ---industrial needs, and other needs--as-applicable 6. Proximity and potential impact for other services �itch-as educaa-tional facilities,- police protection, fire -protection, -and emergency medical services. 7. Compatibility, of proposed land uses with existing uses. and land use dtesignaaaaaons of surrounding propert4es (b) The Community Development Department shall make an initial recommendation on each amendment request. A staff report including this recommendation shall be prepared as an agenda item for Planning and Zoning Commission review. (r The Community. Development Department _%M14 compose a title for an ordinance to amend the Comprehensive Plan. This ordinance shall be all inclusive, containing each Individualrequestsubmitted for-that-su-Nmittal perio . (d) .The Community Development Department shall prepare a public notice of the time, date, and place of the Planning- and Zoning ommm ssion meeting a is the public hearing -to- consider -recommendations—an—the Proposed amendment will be held. This public hearing notice will be published at least fifteen (15) days prior o thud ate of e public hearing. SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:10 - OfficialDocuments:672, Attachment Id 0, Page 12 9/7 l-"ubl-ic- notice"cr- concurrent rezonings wi-l- bp- scheduled escheduled for the same meeting as the public hearing for amending the plan. -e) The Community Development Department -shall---prepare rezoning signs containing a -copy of the -notice of the public hearing and a location map. These signs shall be posted on the property being rezoned. ( f)--Courtes-y letters shall, --to the extent teas-ibLe-, send to all property owners within 300' of the land involved in land use changes, describing the location of the propose Xchange and time-, date; and�lace�ot the public hear ingbefore-the -Planning-and Zoning -Commission—This step may be waived for requests involving more than 5% of the total land area of Indian River County. he--gublo►earing,helannnq and—Zoning Commission will make a recommendation concerning each comprehensive plan amendment request to the Board of oun yoC mmissioners. (h) The Community Development Department shall send a letter to all applicants informing them of the outcome of the Planning and1ron-ing Commiss on meeting. J-51Thenext-public-hearing-i.sthe "transmittalIpublic hearing before the Board of County Commissioners. )—The Community Devel-opment Department shall notkfy�the secretary to the Board of County- Commissioner"_BCC� of the comprehensive plan amendments which have been received and identify the date of the public hearing at which the Board will review these amendments. (b) The .Community Development Department shall prepare an agenda item for each comprehensive pan amendment request—. -This-item must include -the recommendations of the Planning -and- Zoning Commission. Also to be prepared is a resolution for the Board of County Commissioners to authorize transmittal of.approved amendmento the Department o -f Community—Affairs for—review. This resolution_ shall be accompanied by a brief agenda item outlining the amendment procedures. The Community Development Department shad sendeonrtes letters to- all owners of property _involved in the amendment. This letter must state the proposed amendment, a general description of the area involved, and the Ume,--place—,and date -of --the Board- of-Coonty SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:10 - OfficialDocuments:672, Attachment Id 0, Page 13 9/7/90 Commissioners meeting --This-- step -may -be -waived for requests involving more- than -9 -of -the -total land area of Indian River County. (AY -The Community Development Department shalt, to the extent feasible, send all surrounding property owners within 300' of the subject property letters of notification of scheduled public hearings. This letter shall state that no Tinel action -vi -11 be takew-on-this- request at meet-ing-!!-, and shel-1-include-a general -description of th8 area involved, the time,,place and date of the public Bearing. This step may be waived for request involving more than -the toaZ�rid—area offn�ian�tiver (e) The, Community .Development Department shall prepare p an amendment signs containing a copy of the noticeo public -hearing and the location map -.—This sign should read "NO- FINAL ACTION WILL -RE-TAKEN AT THIS MEETING". The sign shall be posted on the property requesting Comprehensive Plan Land Use Amendment. (tf--The- Community -Development -Department -shall prepare legal -notice of the transmittal public hearing before the Board of County Commissioners; this notice shall contain the -title—of the ordinance -amending the . mprehensive plan unci-shalomstate that -this -meeting in to consider transmittal of the amendments to the _ Department of Community Affairs. This notice shall be located in Section' -A of a newspaper -of general circulation, The notice =shall-be-no--less-thanes quarter page in size, and the headline of the advertisement must be in type no smaller than 18 point. The advertisement must be accompanied by a map showing the geographic location of all areas involved in the amendment to the -land use map. This, public hearing otice sha l— a pu ll'shed-approximately 7 ays ricer to the -date "he-trs-nsmittai-pub-iio-hearing-. (g) The Community Development Department will present each itev-to the -Board o -County -Commissioners . - The -Board-- shall-consider the Boardshall-consider-the transmittal—Bach-amendment of the comprehensive plan to the State Department of Community Affairs (DCA). Any amendment for which the Board denies transmittal s—automaticaaaay -en ed If amamendment which ,has-been denied transmittal includes a-c-oncurrent rezoning, that- rezoning -ie--also automaticsl<ly denied. At the end of the public, hearings, the Board will announce their intent ion�old an adopt on pub is SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:11 - OfficialDocuments:672, Attachment Id 0, Page 14 9/7/90 hear ing -ttr consider those -pian amendment--app-lieat-ons transmitted -to DCA. (6) The next step is the Department o CommunityAffair review of the -comprehensive plan -amendments. (a) Within five days after the Board has determined which amendments will be transmitted to the DCA for the -0 day review, the Community -Development -Department shall prepare-atransmi ttal-letter to -the -DCA -for transmittal of all approved amendments. The letter shall be accompanied by ten (10) copies of each amendment approved or transmittal. -The transmittal -letter shallcontain a brie# -description -of all act-i�taken-to-date-, and -the contact person for the county who will be familiar with the amendment request. (7) The adoption pubile-hear-i-nq-ail-l-be-bet-or-e-the-Board-of-County Commissioners. (a) The Community Development men , within—i0-days of -receipt 'of the comments f-r-omDha-1-1--schedule-the amendments-f9r- the adopt ionpublic hearing before the Board of County Commissioners. The Community -Development Department shall notify the secretary tothe-Boar"d-of County Commissioners (BCC) of the comprehensive plan,amendments and -identify the date of the public hearing at which the Board w consider hese-amendments. The Community Development Department shall ensure that the public -hearing date for concurrent rezonings coincides W1 11 the date for the pub' hearing before the BGC for related comprehensive plan amendments. The Community Development Department shall notify property owners of the public hearing for rezonings pr o�the meet-ing of the Board. (b) The Community Development, Department shall, to the extent feasible,d courtesy letters to all owners of property involved inland use amendment. --This letter will state the date, time and _general location. of the area involved in the amendment. Surrounding property owners (SPOs) letters will also be sent for concurrent rezoning requests-. --Thi-s step may -be -waived for request-invoiv-ing more than 5% of the total- land area io-L-indian River County. tcj--The velopment Department Shall-revrseth 11 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:11 - OfficialDocuments:672, Attachment Id 0, Page 15 9/7/90 comprehensive plan amendment agenda items presented to the Board of County - Commissioners for consideration at the transmittal hearing to reflect the action taken at the first BCC meeting and include any comments generated by (d) The Community Development Department shall prepare and 'publish the standard public notice for concurrent rezonirrgs pursuant tithe requirements -of -chapter -902, 'Administrative Mechanisms, The Community DevelopmenttDepartment shall also prepare a pubs -ie noticeor the adoption pul�c hearinore Boarder#is public-. not -ice shawl—corLt�in—alb information items contained in the notice._prepared for the transmittal public hearing, including maps. This notice shall -be publ"ishe ap roxproxp matly five (5) days priorto -theado*pti-oto publichearin (e) The Community Development Department shall prepare a rezoning sign and post the sign in the same manner as required for the publichearings before the Planning and Zoning Commission. (f) The Community Development Department shall present each item to the Board of County Commissioners. The Board of County -Commissioners -shall then make its final decision .regarding each amendment request. The Board of—County Commissioners—will approve plan amendments only if at- least one of the- following criteria has been mets 1. The proposed amendment will correct an oversight in the adopted plan. 2. The proposed amendment will correct a mistake in the adopted plan. The proposed amendment—is—warranted based --on, a substantial change in circumstances affecting the subject property. (g"he Community -Development Department shall prepare an action letter to each applicant informing him of the final decision of the Board. (8 -).-The Community Development -Department -shall forwar-dL-the adopted Comprehensive Plan amendments to the Department of Community Affairs. SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:11 - OfficialDocuments:672, Attachment Id 0, Page 16 -er The -Community- Development Depertment--shal-.L, within -5 working days of the comprehensive plan approval, prepare a transmittal letter to the DCA for the transmittal of all approved amendments.. Theletter shalrte accompanied - by five =fes copies of -the agenda -it -em far each approved amendment, -and five -(5) copies of the -executed ordinance amending the comprehensive plan: The letter shall contain a review of all action which occurred prior to fIna 1-transmittai-,and-the-name-ofthe-contaefpersonnfer the County -who -is familiar with the amendment. (b) The Community Development Department will ma a all changes to the land-use--plan-map, land used -an -text, t, xening alas -and -any -other reference maps -to -reflect all approved concurrent rezonings. urs an, to the Florida Statutes -,--the--- Department of Community-kff-ai-rs-will-,-wi-this€orty-t ve-(45) days -of reeeipt of the adopted comprehensive plan amendment, the Department of Community Affairs will review the amendment to determine compliance with t e stat requirements. -The state -landplanning agency�sha3l-issu"-irrough-a-" d r administrator other than the secretary, as specified in the agency's procedural rules, a notice of intent to find that the 1 -o -cal actions in compliance or not in compliance. ---A notice of intent -shall be issued by publication -of -the _ notice in- the manner required by paragraph (15)(c) (notice in the local newspaper) and by mailing a copy to the local government and to persons who` request notice -.-Notwithstanding the content requirement of paragraph _-c}-,-the content of the- notice _shall be sufficient to inform the public of the action taken. (5) Process if Local Pian or Amendment is in Compliance. (a) If the state land planning agency issues a notice of intent to find that the comprehensivep an transmied pursuant -to -s-.1-6-3.3167 or -s. 16-3-.31-91--is-in compliance with this act, -any -affected person, within 21 days after the publication of notice, may file a petition with the agency pursuant to s: 120.57. In this pr a ing he local- plan -or -plan amendmentshall-be- determined to -be in compliance -if the local government's determination of compliance is fairly debatable. b) The hearing shall be:conducted by a hearing �fiicer -of the Division of Administrative -Hearings of -the Department of Administration who shall hold the hearing in the affected local jurisdiction and submit a recommended order -to the state nd—pl-ann ag-agenc�The-state-land SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:11 - OfficialDocuments:672, Attachment Id 0, Page 17 9/7/90 planning agency shall--all-ow-ID days -for the--filing-of exceptions to the recommended—order—and—shall issue a final order within 30 days after receipt of recommended order if the state land planning agency determines that hs plary--is in-complia-nce. - the s ate land -planning �-agency determines that the -plan or-plen-amendment is -not in compliance, the agency shall submit, within 30 days after receipt, the recommended order to the minis ration Commissionof f nal agency acton. (10) Process if Local Plan or Amendment is not in Compliance. a"f-tie sta-e-l-a-n-d-planning agency—issues a notice of intent to --find the -comprehensive plan or plan amendment not in compliance with this act, thenotice-of-intent shall be forwarded to the Division of Administrative Hearings of t e Department.of Administration, which shall conduc -a proceeding under s-.10:f7-iJn the affected local jurisdiction. -The part iesto t�roceeding shall be the state land planning agency,.the affected local government, and any affected person who intervenes. In the proceeding, the -local government's determination that -- e -comprehensive plan hate-comprehensive-plan or plan amendment -is in -compliance is presumed to be correct. The local government's determination shall be sustained unless it is shown by a preponderance of evidence that thL-comprehensive plan =--plan -amendment is -not in comp-iiance_The local government`s determination that elements of its plans are related to and consistent with each. other shall be ustaised if the--determina ion is. tairly de ata e. bL The hearing officer assigned by the division shall submit a recommended order to the Administration Commission for final agency action. ( M-Admin-istrati-on Commi (a) If the Administration Commission, upon a hearing pursuant to subsection (9) or subsection (10), finds that the 91;omprehensive plan -or plan amendment is not in -compliance with this act, -the commission shall specify remedial actions which would bring the comprehensive plan or plan amendment into compliance. The commission may direct stateagencies not to provzcle funds toonczease the capacity -of roads, bridgas-,or water and -sewer- systems within the boundaries of those loca"overnmental entities which have comprehensive plans or plan elements t-iat are determine d not to be in comp ianc e. The SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:12 - OfficialDocuments:672, Attachment Id 0, Page 18 SmeadSoft Reprint Date: Mon( 9/7/90 commission order may al-so--specify—that the-1-00al government shall not be eligible for grants administered under the following programs: 1. The Florida Small -Cities Community Development Bloc-� -. g=rant .Prog_ram, as authorized by ss. 290.0401- 290.049. 2—he Florida Recreation- Development Assistance program,-as-authorizedbg chapter 3-75- 3. Revenue sharing pursuant to ss. 206.60, 210.2 0, ani 1 :61 and -part -I of chapter-ii—,to-the extent -tom p edged to--pay�-bacl--bonds (b) If the local government is one which is required to include a coastal a as as management element Inns comprehensive -- plan pu-rs-uant-tA)--s omprehensiveplan-pu-rs-uant-tA)--s163-.337-7-(6-)fig)-, the commission order may_also specify that the local government is not eligible for funding pursuant to s. 161.091. The commission order may also specify that the fact -that -the coastal management -element has-been determined to be -not in_ compliance shall be a consideration when the Department of Natural Resources considers permits under s. 161.053 and when the Board of Trustees of -the Internal Improvement Trust Fund considers whether to-sell—,convey any interest -in,—or-lease- any sovereignty lands or submerged lands until the element is brought into compliance. \u\v\s\chap800 15 lay, August 12, 2013 - 15:22:12 - OfficialDocuments:672, Attachment Id 0, Page 19 j comprehensive-lan -Amendment--- Flowchart AmendmentFlowChart Submittal to_ Community Development Department kation may be made in January or July Community Development Director shall initiate reviev. -Incomplete Applicationio Determination of Application 3P Complete Application completeness and data sufficiency shall be made. Within io Days Public Hearing 1 before Planning 6 Zoning Written --notice- to Commission forwarded to Applicant specifying dsN Nennina Insufficiencies Planning 6 Zoning Commission addressed -bby Recommendation to the BCC Applicant and A plication process re-initiated pp Cat on Denied TranBoard smittal.Puof blic Hearing Cou Before nty Comments requested from Treasure Coastal Regional Planning Council, Nearby Local Governments, and other state and Regional Agencies SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:12 - OfficialDocuments:672, Attachment Id 0, Page 20 Application Transmitted to the Department -of -Community Affair . Within -40 -Days VePartisent of Community Affairs Community Development Department Incorporates the DCA comments in the agenda item to the HCC Within 60 Days Board of County Commissioners holds W A11Ts9me or none of the proposed amendments are adopted Adopted amendments will be I Within 45 Days Department of Community Affairs will review -the Transmittedamendment todetermine- Compliance with state requirements. i I I I I 119TY VIVPREHL.111%01V �L® GOP.! S, OEJErTIVE.; Ivo Nom Noon 1\)ooc�A, 0 0 K)00" tv� NO _IQWOI �®�[ t) O O GJ M O O S _ "on oet,(O� - ft_ I OO���v�� � SmeadSott Reprint Date: Monday, August 12, 2013 - 15:22:12 - OfficialDocuments:672, Attachment Id 0, Page 21 FUTURE LAND USE ELEMENT FUTURE LAND USE Goals /ObjectiveslP_olicies Goal -Land development -in Indian River -County will cur in an orderly and controlled manner which ensures balanced growth that maximizes the potential for economic development, provides or the effcien use of fac:L11ties-and services- and -ensures the-protectioofth county's rich-,and—varied—environmental-resources. OBJECTIVE 1 COMPACT, LOW-DENSITY Indian R v-ex�--County will -have --an- efficient -and -compact land use pattern which reduces urban sprawl, while maintaining the overall low density character of the county, and ensuring adequate land for utility facilities necessary to support development. POLICY 1.1: Indian River County hereby adopts the Future Land Use Goals, objectives, policies and maps 2.10, 2.14, L-16, Z-. 33a, an '.'4, as the basis f -or directing ail 1-anddevelopment regulations in the County-. POLICY 1.2: The Indian—River County Future -Land -Ise Map contains the following -l -and use designations Conservation ___Agriculture Residential Commercial .Industrial Public Facilities Recreation POLICY 1.3: Indian River County shall adopt various zoning designations in the form of special districts, overlay dist-ricts or addlti-onai use -districts as may be warranted to ensure the implementation of the comprehensive plan. Indian River County -shall adopt land development regulations far—the--purpose of implementingthe Comprehens_ivQ- Plan. These regulations shall include provisions for: - The use of land -and -water consistent with the- Future -Land-Use--Map-and the Comprehensive-P_lanr; ° The sudivision of land; ° The use of areas subject to periodic flooding and the provision of aequate drainagL-and stormvater ° The protection of potable water wellfields; r' ° The protection of environmentally sensitive lands; ..: Ther I&Cion of signage,an sd caping and othe esthetic controls ° The provision -ossa-fe--n�ite and offsite traffic circulation and adequate parking; 88 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:13 - OfficialDocuments:672, Attachment Id 0, Page 22 FUTURE -,AND USE ELEMENT ° mhe r-eview-o falldevelopment applications W modifications to ensure that all provisions of the Comprehensive Plan are enforced. D I� 1.4: --Tire Conservatiort---Land-Us-e---des-ignetIons—are applied to those az s which contain _or- possess lands with qualities and features which play a vital or essential role in the norma'1___funationing -of—the ecosystems and have been so 'dent -if -ed inthe-conservation-elemen . POLICY 1.5: Development of conservation land shall be limited to uses as foo ows: C-1 Conservation Uses Recreatioal Uses C-2 Conservation Uses Recreational Uses Residential urri-t/4-0 acres fon-si to 1 unitIl-aero (rfer Development Right). POLICY 1.6: -Conservation designated lan s s a77 be considered for public acquisition. t POLICY 1.7: The Agricultural Land Use is applied to those areas of the- county that—have een traclitionally us for agricultural purposes and -are -sufficiently removed €row -urban areas. The Aaricultural Use category will ensnrp the continuation of the industry, protect agricultural lands from urban encroachment and-provideevaluahle green and- open space. POLICY 1.8: Development of agriculturally designated lands shall be limited to the following: Agricultural -uses _such -.-as F7arming, Groves, Range and Livestock activities and Forestry Excavation Activities Res idem a -1 --Us e 1 unites acres Agricultural Research Agricultd—rally Related Business Recreational Use Public Facilities and Institutions 89 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:13 - OfficialDocuments:672, Attachment Id 0, Page 23 FUTyRE_,AND USE ELEMENT POLICY 1-_9-: _The_tur_al land use designations are-appliedto those areas which contain a mix of agricultural, residential and open lands. The Rural Residential areas shall serve as a offer between Agricultura-1-and-irban--Area . POLICY 1.1_0: Development in Rural areas shall be limited to ..the following uses: Excavation Activities Residential Uses Inst-ittitiona-1-Uses Recreational Uses Public Facilities POLICY Tie—Low-Dens-its Residenta�&and�lse designations are intended for areas which are suitable for Urban and Suburban scale development. These areas shall be limited to the urban service area and, be located proximity -to-existing Urban Centers. POLICY 1.12: Development in Low -Density Residential Areas shall be limited to thefollowing: Residential Urea (_Single-F-amily--&-Multi-Family_) 3 units/acre L-1 District 6 units/acreL 2 District Recreational Uses Public Facilities Institutional Uses Agricultural Usesas permitted in policy 6.3) POLICY 1.13: The Medium -Density Residential Use Designations are intended for areas which are suitable for Urban scale development and intensities. The area is limited to lands east of I795 except that certain lands adjacent to S.R. 60 and _west of I-95 are designated as Medium Density. These Districts shall be located within the Urban Service Area. POLI Y 1.14 -Viand development--i-n the Medium -Dens t Districts shall be limited to the following: �Keesidential-Usesing�Fam 1i y, M�-u1Motile Homes) 10 units/acre M-2 District 8 units/acre M-1 District on uses SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:13 - OfficialDocuments:672, Attachment Id 0, Page 24 -----FUTURE—LAND—USE ELEMENT Ptrbli-c Facili Institutional POLICY 1.15: The Commercial Land Use designation is intended for—use including-. -retail—and whotesaie trade, officers, business and __- per sona-1 services, -residential--txeatmen} centers, limited residential uses and other similar type uses. All commercial areas must be located within an existing or�future-Urban Service—Area. POLICY 1.16: Land development regulations shall provide performance standards for commercial development which _.-a a minimum adress the flowing: Land use campatibility, buffering and landscapincl; Access points, traffic controls, and parking; Signage; Gress f-loa area, impe-rvious—srface—ratios; Character of an area; Environmenta—1—Impar POLICY 1.17: The Industrial Land Use designation is_intended for uses including manufacturing, assembly, materials processing, eav�r services, outdoor equipment storage and similar—wes as -well as,-supportive—and related commercial uses_. X111 industrial_ areas_ must be— located within an� existing or future Urban Service Area. POLICY 1.18 Land development regulations shall provide performance standards for industrial development which at a minimum address the following: Land use compatibility, buffering and landscaping; Access points, traffic controls and parking: Signage; Gross floor area, impervious surface ratios; Open Space,- Character pace;Character of the area Environmental Impact. POLICE( 1,19! Commercial —and Industrial ---Land Uses—are designated as corridors and nodes. These corridors and nodes shall be located along roads and at intersections with functional—c ifications appropriate to the vel o activity. POLICY 1.20: Nodes shall have a designated size based on the intended use c assitication an service area population, existing land -se pattern—andother—demand-characteristics. POLICY 1.21: Node boundaries are designated to provide for efficient land uses and maximum use oftransportation an pub-licfacrl-ities wtri-.e eliminating —spratrl--and stri development - 91 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:13 - OfficialDocuments:672, Attachment Id 0, Page 25 FUTURE LAND -USE -ELEMENT POLI -C1-1.-. 2 -2 -.Nodes shall not—be—created ter- expanded within /1 miles of an existing node. This policy s: not apply to Neighborhood Nodes. POLI-CY-1 2-3: No—Node- should -be- considered---f-or- expans unless-701-of-the--land-area (le-ss-rights-of-mayl is-develc or approved for development, or otherwise warranted by proposed development. the P_0LICY--t 24-: Commercial -and -industrial -land -use designations approved in response to a landuse plan map amendment request -by-an applicant.shall revert to their former designation i construction -on the--site-bas-not commenced -within a -two daryo period, unless -such -timeframe -i.s- modified by the -Board o County Commissioners, as part of a development agreement. POLICY -1-.Z-:---Each Node shall be -designated accord general typeof- development activity --for whi intended. Nodes may be designated as follows: Commercza Industrial Commercial/Industrial Tourist Commercial Hospital Commercial - Node -locations and sizes a POLICY 1.26: The County shall also designate Neighborhood Commercial Nodes, not to exceed.5 acres, for limited retail and -convenience uses-.--Nev-Neighbor-hood Nodes shall --be no closer than 1 mile to existing commercial nodes. Neighbor- hood Commercial Nodes are not shown on the Future Land Use Map.- The existence of a neighborhood node shall nom prevent the expansion of an existing non -neighborhood node POLICY 1.27: The Public Facilities designation is intended for public facilities and services including, but not limited, -to- government officies, service centers,- public utilities and transportation facilities, schools, parks, libraries, police and fire stations. Not all public land uses are shown -on the Future Land Use-Map.---Pub-i-ic-fac-rlities arenot --limit-ed--to the PublicF-acilities Land Use designation. L -I -C L -M The- Recreation Use designation is intended nnhlic parks and_ recreation -facilities. Not -all recrea sites are shown on the Future Land Use Map. Public parks recreation facilities are not limited to this land designation. POLICY 1.29: The Blue Cypress Improvement special lar Cypress Fis Development family -and d use designation applied to tl i pam on tt�tern shore of Bl -within-this-district-shal1--be I mobile home- residential uses an( the provisions outlined in Ordinance 85-55. 92 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:14 - OfficialDocuments:672, Attachment Id 0, Page 26 and use District is a existing Blue on The BCID is .not Ev, RE-LAND-USE-ElEMEN3' intended -fax expansion to adjacen or otherwise undeve opl eco -= property—Densities in -the D --shall not exceed -1 -0 -units -- per acre. POLICY -30: The county zoning code seal -I chain provisions for a-Professional--O-f-f-iee D-istri- t in -medium and -1 -ow densrt residential districts along arterial -roadways t4 encourage infill development and the redevelopment of blighted resit a tia-r--areas. POLICY 1.31: The exact boundaries of the -C -2 -Conservation District shall be determined by environmental survey. 0 E 2 URBn"V SERVICE AREAS By 1991, all new residential development greater than .2 unit/acre, commercial and industrial development shall occur with n -t -he Urban -Service Areas which contain -the -infrastructure and services needed to accommodatesuch development. POLICY 2.1: Indian River County hereby adopts the Urban Service Area boundary depicted on thL-land-use-map-M-3-3. POLICY 2.2: Urban Service Areas include areas which contain services deemed necessary to support development in an urban or suburban- setting at levels identified in th" a- other elements -of the Comprehensive Plan. i At a minimum those areas shall be considered suitable for development which have in place centra water anti sewer, improved r�oadvay-s-,- salid-,caste-col-leetion,drainage-,-Lpal-ice protection, fire protection, educational and recreational facilities. POLICY 2-3. Tndian Ruler County also adopts Future Urban Service Area boundaries which delineate areas which either have in place or have programmed atleast central water., sewer and improved roadways. POLICY 2.4: Urban Service Area designations are shown as an overlay on the Landuse Map. POLICY 2.5: Indian -River County -shall encourage and direct growth into Urban Service Areas through zoning, subdivision and -lance development regulations. POLICY 2.6: Indian River County shall required -1 development except agricultural uses, residential uses with ess t an . units/acre, and recreation -open space uses to be located wit1rin Urban-- Service -Area -s. POLICY 2.7: Indian River County shall not issue any development order which would exceed the established levels of service. 93 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:14 - OfficialDocuments:672, Attachment Id 0, Page 27 FUTURE LAND -USE -ELEMENT -- POLICY 1A:—Pubic services -and facilities shall be designed withc��pac ties sufficient to meet levels of service established in this plan, support the needs of the projected population�t a ntens'ty o —future development as identified on the --Future Land -Use-Map POLICY 2.9: The expansion -of public services and facilities shall be based on the areas environmental suita-b-iiity for urban izati-on; enc sting and—future—land uses—and the availability of-other__serv-ices and facilities-. POLICY 2,10: General future public facility site an corridor -locations shall be ident-ified in currents undeveloped areas to provide for needs of future development while minimizing disturbance to existing development. tiOIrIC-2.-U.--Ind-i-an-ltiver County shall coordinate with the Florida Department of Transportation to define the needed right-of-way for proposed roadway improvements, extensions or new corridorsand sha-1 establish -mechanisms -far right-of-way aqii-is-ition and protecti-on-, as identified -in- the Traffic Circulation Element of this plan. POLICY 2.12c—I-n-dian River County shai-1 implement a pregram to locate -and--acquire property�-for the--services—and facilities identified in the Traffic Circulation, Infrastructure, Recreation/Open Space and other elements of POLICY 2.13: Indian River County shall provide the following services based on the following criteria: ire & Emergency Services Stations shall be located to enable a response time of 6 minutes based on a 30 m.p.h. speed and a 3 mile service radius within urban service areas— Access shall be on roadways of sufficient capacity to adequately accommodate delivery of emergency services. Branch .libraries shall generally be located no closer than 5 miles -from existing- Libraries . ibrary -size-and locations shallhebased on service- population and demand. Libraries shall be developed at the standard of 527 square -feet -of library per 1000 population. Jail facilities shall be based on historic, existing prp3ec ed Jai bed usage, population a crcrime rates. 94 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:14 - OfficialDocuments:672, Attachment Id 0, Page 28 FUTURE LAND -USE -ELEMENT Public Administration facilities including the Courthouse, Government Offices and Service Centers and "ea-lth fa-ei-lities--should be- located -within commercia office or downtown -areas- to provide -easy -access for county residents. Branch facilities when appropriate s o lbe encouraged. e? School facilities -should be located within the -areas tin be served and of sufficient size to accommodate projected enrollment and type of facility (elementary, middle,- etc Location should rim1 the hazards and disturbances-from-tra€fic-and commer-cW-and industrial areas and buffer adjacent. residential areas. Joint' educational and recreational facilities should be encouraged. The County sla-11 coor ni ate with e School Board. POLICY 2.14: Indian River County shall develop a public facilities assessment -and -needs survey as an amendment to this- plan--and-the capit-&I�improvements pian by -193- . POLICY 2.15: Indian River County shall coordinate with private utility providers in -c uding electric, gas, telephone and cab]—TV to -ensure -the -efficient delivery of utilities. POLICY 2.16: Indian River County shall regulate the use of land inproxsmmity tolarge s ac �e public facilities including airports, landfills-,—et-cto protect --the facilities from - encroachment b romencroachmentby non -compatible uses and --protect the public from any potentially hazardous impacts. OBJECTIVE 3 LEVELS OF -SERVICE All future development will be consistent with the levels of service established in this plan for public services and infrastructure. POLICY 3.1: Facilities and services shall be developed to maiTtain-1eve -s of service establis-Lied in is and other elements of-the-comprehensivelan. POLICY 3.2: No development shall be approved unless it is consistent With -the- concurrency managemen system in e capital improvements -element. POLICY 3.3,: By 1990, the County shall develop procedures to review -proposed development, assess its impact on services and facilities -and makes determinati-on of -he adequacy or inadequacy of public facilities and services. POLICY 34: Traffic circulation smeet t-helevel serer cep.Ttandards a- spectf-ied--,rithin-the-Traffi-c-C-irculati-o Element. 95 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:15 - OfficialDocuments:672, Attachment Id 0, Page 29 FU-T-URELAND_ISEELEMENT P ICY 3.-5:--Land-development—regulationsshall provide standards which must be met by all proposed development prior to platting or site plan approval. n4LICY-3_.6-: regardless of 1 -and --use designation or zoning classif ation, no development activity shall be permitted to exceed the levels of service established in this element or ofher elements f the Comprehensive --P OBJECTIVE 4 EFFICIENT MIX OF USES TO REDUCE TRAFFIC DEMAND Indian Riveroun y wild reduce the number anength of trips -on county roadways-by�impiement3itg�a-land use patter which place activity centers such as commercial and employment centers near residential areas. POLICY- 4.l--Lan"se categori-es shai1--be-designated in a manner which concentrates urban uses therebydiscouraging urban sprawl. POLICY 4.2 -Urban land -use -categories -(-low--ancl--medrum-- ensi ty residential,- commercial and -industrial) --shall be limited to the Urban Service Area. POL-ICY 4.3 Activity centers -such as- commercial, office, a;7industrial _centers -shall -be -located within thecommercial and industrial nodes and corridors to ensure efficient utilization of the transportation network. POLICY -.4 ndian-?,i-ver_- Coil nty-shall-encou rage contiguous development around urban centers, infill and redevelopment of underdeveloped urban areas, by identifying targetareas.- (for infill and redevelopment), assessing the potential- for future development, reviewing infrastructure capabilities and needs, developing special overlay or use districts and regulations if warranted, and promoting development with property owners, developers and the public. OBJECTIVE 5 DIVERSITY OF DEVELOPMENT Im&an-River--Count"ill provide for a mix of land useswtvich pe,rmit and encourage a variety of development patterns and densities to accommodate a diversity of lifestyles. P 5 1 Speci is land- regulatian--isto be determined -by zoning, consistent with the provisions of the land use map and plan. SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:15 - OfficialDocuments:672, Attachment Id 0, Page 30 SmeadSoft Reprint Date: Mom FUTURE -LAND -USE -ELEMENT PGL -M -5 -.2 -----The- residential densities provided -i th�lan _use plan- and -nam represent the maximum densities -perm and should not be construed to represent the suggested or required density. Where density bonuses are applicable, ensity-maximums-may be -exceeded. POLICY 5.3: Indian River County shallrp ovide zoning designations to permit a variety of residential building and developmentstyles. POLICY 5.4: A special planned developmentPD) district may be designated as an overlay on the County Zoning Atlas. The PD is intended to provide for the deve opmen o projects which require f-lexlbiity from��e land developmen regulations in order to maximize open space an_d conserve natural features, incorporate recreational facilities, and mixed use projects. POLICY 5.5: Commercial uses shall be limited to less than 10% of a planned development, unless located within a commercial or indus ria- no e. POLICY 5.6; PD's shall be-permi-tted- within the -Urban -Service area, without amendment of the future land use map, provided the proposed development is own to be consistent with the goals-,- objectives---&nd poli-cies of the -Comprehensive Kan. PD's shall be cons -stent' with -the maximum density permitted by the Future Land Use Map unless density bonuses are permitted by Pricy 5.7. POLICY 5.1 The1and---d-e-velopment regulations —shall _ he structured to encourage the use of Planned Development (PD's) by al�ing_lor'. site bonuses or: a) The inclusion of low and moderate income housing units in the project in accordance with the housing element. b) Development --r3ghts transfered from Conservation Districts. Density bonuses -for PD -s shall not increase the project's density by more t-har----24%---o€ the—under nq Land us -e designation. 97 Jay, August 12, 2013 - 15:22:15 - OfficialDocuments:672, Attachment Id 0, Page 31 FUTURE LAND -USE ELE OBJECT-IVE 6 --AGRICULTURAL PROTECTION Indian River County will ensure that adequate land will be designated or agriculturaluse proec from encroachment by-oth . POLICY 6,1: Indian River County shall not provide public services or facilities which would induce or encourage the development o -f- agricultura-lly designated land-s—e e t . provide for—.he health, _safety and velfa-re of existing `residents. POLICY:.6- 2-: htdian-River-County shallprotect -and-conserve agriculturally -designated lands ---through -financial incentives and development regulations which could include tax incentives, public purchase, or transfer odeve lopment rights. POLICY 6,3: Indian River County shall permit the continuation of agricultural uses east of I-95 where they serve armor enhance ---open space -ancrgreen-belt areas of the county. Urban useswhich encroach on active agricultural areas shall provide adequate buffers. OBJECTIVE 7 PROTECTION OF NATURAL RESOURCES Indian River County will have a land use pattern which complements -the- n�l7feature of os the land including soils and topography, annatural features,- resources and systems. POLICY 7.1: Indian River County shall regulate development of areas Which are prone to flooding and areas within the 100 year floodplain in a. manner that is consistent with regulations established by the National Flood Insurance Program. POLICY 7.2: The County shall provide protection to environmentally, sensitive lands through land eve opment regulationsthat educe building -densities, require mitigation—for developed areas,- permit the transfer of development rights, and the use of conservation easements, dedications- and public acquisition. -- POLICY J�3_: env development ,_activity in areas designated as environmentally sensitive or important as defined in policies 5.4 and 6.11 of the Conservation Element shall require an - environmental-surveT-as part ot`the approval of a development order. POLICY, 7.4: Development in areas prone to flooding aue to soil conconditions or hydro oqy shall—trot negatively- impact �J-acent properties or receiving -sir-face- waterbody quality, 98 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:15 - OfficialDocuments:672, Attachment Id 0, Page 32 FUTURE LAND -USE ELEMENT POLICY -7-.5: Indian River County shall-develop-regulationsto protect -wetlands from -the- negative impacts of development, These regulations shall address at a minimum: building setbacks, protection from solid and liquid wastes including pesticides and -herbicides, the---dredging-or fMinq wetlands, the- incorporation o-"etlands into mite=s development scheme and the mitigation of lost or destroyed wetlands. P- IC -Y 7-.-6Indian River-C-0unty-acknoul-ledges--the enWiroh- _mental-importance of the prime aquifer recharge areas shown on map 2.26. The county shall regulate the development of hesearea . Regu a ions shall i ud-e-at a minimum an Overlay-4istrict-(s)-:which--Rr�rui,de--forthe-regu3-at�on ofland uses including special and conditional uses, increased open space ratios, special siting requirements for septic tanks to mitigate the --soil drainage c aracteristics and the regu ation of -other fact -ors --which- impact the recharge capabil-it"f the land. These regulations shall be ado Qted by --September 1, 1990. POLIO' 7 v7 -:-S --1�0, the -county shall -au vp a�aei f eid trot— ection ordinance which shall -regulate the use--f-land-and provide criteria to ensure that development within public wel-H ed coned influence does not negatively impact eilwaterqua1i�y-.-Regulation shill- include at a mini -puma overlay districtist--which- provide for the- regulation o- -Land uses including special and conditional uses, special siting requirements for septic tanks to mitigate the soil drainage char acters-ti-cs and the regulation- of other factors -chic could negatively impact water quality. Consistentwith the Potable Water Sub -Element, the county shall continue to extend the county water system, enabling the acq_uision of small public water systems, thereby reducing the number of residents using the shallow acquifer, which is subject to greater groundwater pollution threats. POLICY 7.8: Indian River County shall coordinate -w o Qr state, federal and local agencies to identify and conserve vegetativecommunities aS esta�iished inth—e—Conservation Element policies 6 -1 -through -6.7. POLICY 7.9: The county shall continue to regulate the siting of -septic- -cat tanks -in cooperation with -t e local division of HRS, including -siting requirements-tomit-ig-ate so -i1 characteristics. OBJECTIVE -8 PROTECTION OF HISTORIC RESOURCES Indian River County will provide for the preservation and protection of historic and archaelogically significant sites, and structures._ 99 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:16 - OfficialDocuments:672, Attachment Id 0, Page 33 FUTURE-IrAND-USE ELEMENT - POLICY -R-.l: A --committee on--H-istor-ic Resources ehal-. be appointed—to—provide guidance an_d advise_ the Board of County Commissioners on matters concerning historic and archaelogical preservation. Committee members s all represent a -broad-base of -county interests a-ndheve-interest in and knowledge -of -historic matters. The committee shall meet on an ad hoc basis to review pending regulation of historic resources and projects which may impact historical antra-rchaelog icaI-sites identified -on the -Florida Master Site File -or—designated -as signi fi cant b-�the Board of County Commissioners. POLICY 8.2: iridi an Rives County sbali by -1992 adopt a Histor ic—P servation -Ordinance -to pr-ovide-protection of locally significant historic resources. POLICY�---�----All—puhlic and private—development or redevelopment proposals--shall.-be r viewed -for --impact u n designated historic places. OLZCY. V4: Public and privy a eveopmen-tand-redevelopment aches, located iia-r-eas whey-"istorie or archaeological artifacts are discovered shall cease at least temporarily in order to allow for evaluation of historic significance. POLIMY 5.5 —indian R' - County -Bevel-opment regal-ations shall include rovisions for land use management techniques such as Transfer of Development Rights, Tax Relief, tigation or Puu C Acquisition to ensure comp -fiance with the prow s-f-ons--of-tbese poli -cies aed--0 minimize the impact: on property owners. OBJECTIVE 9 PROMOTE A -ESTHETIC DEVELOPMENT - Indian River Countv will continue to enhance the aesthetic quality of the community through land development regulations that include landscape design requirements, regulate the usage of signs, provide -for --traffic and pard-ing�contr-ol-and incorporate the use of natural buffers. POLICY 9 n---Indian--River. County-shai-l--estab-lssh guideline to ensure that all -public buildings--andfacilities -wi-il he compatible with the character of the neighborhood and/or design influence of any historic buildings. POLICY 9-.2- Indian River County shall- lan- and -develop scenic parkways, prepare landscape plans for existing and future rights-of-way for urban arterial and collector roadways, and require, through its subdivision ordinance, minimum landscape requirements far -local streets and subdivision collectors. The county shall continue to maintain rural rights-of-way because of their contribution to open space throughout the county, 100 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:16 - OfficialDocuments:672, Attachment Id 0, Page 34 FUTURE L-A -IISE-ELEMENT POLICY 9.3—Ind 4 an 'Lover County shall identify -potential scenic corridors and. determine the costs associated with developing a scenic corridor system. POLICY 4; Indian River County shams. -flan an scapee entrances -to -serve as gateways -t-0- the cown#y at—prine-' arterial roadway entrances within existing road rights-of-way. - pOLIGY 9-..5---Lnd-ian-Riv-er-Coun-ty land--developmentt regulations shall require the use of natural and manmade buffersbetween different land uses and intensities. These buffers shall be part -of the mooing, site plan andsou ivision ordinances. POLICY 9,6: By 1990, Indian Riv-er C shall, as pert of its land development regulation update pursuant to 8-1633A 20_211r, F.S., review its sign code regulation standards for tete type location; si-e, number maintenance of signs. POLICY 9.7 InUan River County shall require through its 'and development -regulations the use of native vegetation -in meetinglandsc_apin-g-requirements. DLICY-9._: Indian River County land development regulations s#ai include minimum 'Landscape and-- maintenance requirements for all development requiring site-p-lan approval. POLICY. 9-.9: Indian River County shall provide guidelines for se of-. andscaping and other buffers to shield parking-,- driveways arking;driveways and loading areas from surrounding development, and public rights-of-way. POLICY 9.10: Indian River County shall undertake the study of all principal arterial roads to determine the need for special aesthic policies and regulation including setbacks, landscaping, signage and traffic control. POLICY 9.11: Indian River County -shall support thecultural enrichment of the county by evaluating community cultural facilities and, where appropriate, incorporating.art3 stic and cultural amenities -in public -aS. 101 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:16 - OfficialDocuments:672, Attachment Id 0, Page 35 FUTURE -LAND USE ELEMENT OBJECTIVE 10 NON-CO*11ORI"INC USES ANDBLIGHTED AREAS Indian River County will reduce the number of uses which are inconsistent with the Future Land Use Map and will provide for the redevelopment of blighted areas. POLICY 10.1: Indian River County land development regulations shall include ammortization procedures to ensure that those existing land uses which are non -conforming with the Comprehensive Plan are gradually eliminated. Designated historical sites and structures which are non -conforming shall be exempt from this provision. POLICY 10.2: Indian River County shall permit the development of non -conforming lots of record established prior to July 17, 1985 to allow for the reasonable use of such properties. Provisions of this policy-shal-1 not -apply to plats of reclamati n_on_, _except when non-66nformi ng parcels have been transferred by deed prior to February 13, 1990. POLICY 10.3: Indian River County shall develop guidelines and - requlations to -designate blighted areas in --need of renewal or redevelopment. POLICY 10,4: Within .one year of designating a redevelopment area, Indian River County shall undertake a study to determine the needs and deficiencies as well as remedies and solutions for those areas,. Any land use studies or plans that may result shai1 lie 'Area Plan Amendments to the Comprehensive Plan and Future Land Use Map. POLICY 10.5: By 1990, Indian River County shall initiate action to rezone- property -to conform- with the ---land use designations- identified—on- th€- future- land -use map_#2-.-34 Prior to initiating this comprehensive rezoning process, the county will prepare, an administrative procedure for reviewing claims of vested rights. Through this procedure, landowners will have the ahility to demonstrate that they have a vested right to retain the ,existing density/intensity applicable to their property. Asan interim measure, all development smell be consistent with existing zoning and development regulations, however, in those cases where such regulations may be.in conflict with this plan, the provisions of the plan shall apply. POLICY 10-6: Indian River County shall eliminate any inconsistencies between the Comprehensive Plan and the zoning, subdivision and other Land Development Regulations by 1990. POLICY 10.7: Indian River County. shall adopt zoning regulations to meet and address the specific needs of small areas in need of redevelopment or renewal. 102 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:16 - OfficialDocuments:672, Attachment Id 0, Page 36 FiJTU EI - USE ELEMENT POLICY 10.8: Indian River County shh l encourage the development,—redevelopment and -up ndeveieped-and underdeveloped subdivisions through mechanisms such as Block Grant Programs, Municipal Service Tax Units, creative finance and development proposals, zoning and simplified replatting procedures. POLICY 10.9: Indian River County shall adopt procedures to develop and maintain a housing survey of the county in order to monitor -the structural condition of residences and assist in'code enforcement and redevelopment efforts. POLICY 10.10: Indian River County shall maintain a vigorous code enforcement program operating in all areas of the county. OBJECTIVE 1 COORDINATED PLANNING Indian River County will coordinate with the resource planning and management activities of the state and ensure that all future development will be consistent with approved management plans including the Hutchinson Island Management Plan. POLICY 11.1: The county acknowledges the application of the Hutchinson Island Resource Planning and Management Plan (HIRDMP) to Indian River County. Past county actions have resulted indevelopment_ regulations -consistent—with—the HIRPMP. All new development on the unincorporated barrier island will be consistent with the HIRPMP by implementing the policies of the Conservation, Coastal Mangement, Sanitary Sewer, Potable Water, Drainage, Traffic Circulation and Land Use Elements. POLIC-YA-1 . 2 The C-ount"ha11l-discourage th�devel-opment o areas within the Category 3 hurricane vulnerability zone and implement this through means such as transfer of development rights and public acquisition of property. POLICY _11.3: As part of the annual Ca.ptial_ Improvements Element evaluation and update process, the impact of new development on hurricane evacuation times, and the need for improvements and the timing of improvements to evacuation routes in order to maintain or reduce evacuation times shall be assessed.. POLICY 11.4: Indian River County shall include within the land development regulations a mechanism to assess the impact of new development on emergency evacuation. Provision of impact fees or municipal service units, as means to provide funding--far-adequate evacuation routes, small- be evaluated and implemented if found to be an essential means of providing hurricane evacuation facilities. 103 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:17 - OfficialDocuments:672, Attachment Id 0, Page 37 UTURE LAND USE—ELEMENT OBJECTIVE -12 LOCAL- PLANNING Indian River County will coordinate land use planning activities, the provision o �aci-lities and services, and tie fun ing and implementation -o-f---programs---with erther-local governments and regional agencies. POLICY 12.1: Indian River County shall establish a mechanism to ensure that -land developmentctivitiea development orders -and permits, and rezonings areL-coordinated-as_ may _b_e appropriate with the municipalities of the county, adjacent counties, regional and .special districts, and state and federalag-encies. POLICY 12.2: Indian River County shall take the lead to' examine the feasibility of the development of united. and consis en eve lopment reguiations� for tyre- county an municipalities within Indian -River County. POLICY 12.3: Indian River County shall coordinate with local municipalities -to ensuree tha—annexation wi-1-1--result� compatible-deve-lapmentpatternsby-: ° Identifing areas deemed suitable for annexation ° Develop -nq-joint-l-ann-ing-aTr-eements wh-i-chino-lude-land C use designations, the provision of services and extension of infrastructure. POLICY 12.4: Indian River County shall coordinate with municipalities to provide for the annexation of remaining enclaves y: 0 Identification and inventory of parcels, owners and existing uses of enclaves; and Pro-vision-o--f-technical-assis-tance-, as--reque-sted- OBJECTIVE1-3PLAi�i AMENDMENT AND REVIEW Indian River Count amendment of the 1� comprehensive -pian: will provide a mechanism for the review and I use element and the other components ofd POLICY 13.1 Indian River County shall provide for the amendment of the Comprehensive Plan in accordance with the provisions of Chapter 163(FS). Applications to amend -the future land use plan -map -may be submitted- bT-the-owner or owner's agent of property -proposed for redesignation, by the county planning staff, or by. the Board of County Commissioners. Where an inn vi3ual applica is submitted, ' andevelQpmentregulationsbH p provided aymentof-an-an 104 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:17 - OfficialDocuments:672, Attachment Id 0, Page 38 ----FUTURE-LAND-USE-ELEMENT— appropriate fee and disclosure—of--avYl individua-1-s-hav equitable interest -in the proposed change. ApplicatI amend other portions of the comprehensive m submitted by any interested party, the planning staff, comprehensive each vear-. POLICY— 13-.-2- comprehensive to consider Policies of all elements, and other timely issues. POLICY 13.3Indi-au--River--County sapprove amendments onl- a on a showing__thaf_one—off the—fol criteria has been met: ° Theproposed-amendment-wrl-17--correctanoversight approved plan. ° The propos approved p: 0 ent wiii correct a mis The proposed amendment substantial change in subject property. - OBJECTIVE 14 be or the is warranted based on a ircumstances affecting the PROTECTION OF PRIVATE PROPERTY RIGHTS Indian-R-iver County-wi H ensure that land use regulatory-activit twill be consistent with the protection -of private property rights POLICY 14.1: Indian River County will give due public notice to landowners of any proposal to rezone their land or change the land use designation, POLICY 14.2: Indian River County will regulate the land only -for a tra-l-id pub-lix purpose—kn a- reasonable - in accordance with due process. OBJECTIVE 15 PROTECTION-OFTHEINDIAN RIVER LAGOON Indian River County shall main value of water based resources hough -land—uses why comF systems and resources. By -14! class II water quality standare use of including the Indian River Lagoon amen t and enhance these na ural POLICY_r5:1: The county an eve opmentre uq ations shy require an --environmental impact analysis of deve1opmen within conservation -districts -or lands abutting the India River or St. Sebastian River. 105 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:17 - OfficialDocuments:672, Attachment Id 0, Page 39 FUTURE LAND—USE ELEMENT--- 177 POLICY -15-.-2 Tho county shall prohibit land use activity which-resu.lts in -the alteration, degredation-or destruction of coastal and estuarine resources except when necessary to prevent a public hazard or provide public benefits which exceed those os u as a results such activrt . POLICY 15.3: The county shall continue to provide technical, monetary and political support to conservation programs aimed atla�nc acquisition on the barrier island and—in-other coastal-conservat-on areas. POLICY 15.4: The county shall review all land use changes including -zoningo�istency wit i—policies sem or in the Conservation and Coastal-Management-iements. OBJECTIVE 16 Coastal Population Control The -countyrecognizes -the-importance of -hurricane evacuation -of offshore barrier islands.—The-countT will- continue -to -maintain an average residential density of less than 2 units/acre in unincorporated portions of the island. POLICY 16.1: The county shall not permit densities greater than 3 units%acre in the Coastal High Hazard Zone. POLICY 16-.-2:---The county shall support- programs of -Land acquisition on the barrier island for natural resource preservation, recreation or both. p4I�ICT---16.-3- The-county--shal-1 lunit densities to ensure timely evacuation of the barrier island, consistent with the regional hurricane evacuation plan. 106 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:17 - OfficialDocuments:672, Attachment Id 0, Page 40 SANIR SUB -ELEMENT GOAL, OBJECTIVES AND POLICIES GOAL It is the goal of Indian River County to have an efficient system of sanitary sewer disposal to prevent degradation of existing resource s,promote orderly growth within the county service area, and to meet existing and projected demands. OBJECTIVE 1 Service Concurrent with Development By 1991, the county will have adopted land development regulations --- requiring sanitary sewer service to be provided concurrent with development. POLICY 1.1: New development within the unincorporated portion of the Ind an Cody shall be approved only when capa"ty-iw� railable to provide needed sanitary sewer ' service. POLICY 1.2: All authorities within the county service area operating sanitary sewer facilities -shall monitor €ae33 it -y demands and capacity information as development orders are granted and shall continually advise the county of the remaining capacity and changes in demand. POLICY 1-3---The-level of service standards for the -count - ' s sanitary sewer facilities of 250 gallons per day (GPD), per equivalent residential unit (ERU), based on county ordinance 84-18, with a peak monthly flow factor of 1.25 are hereby adopted and shall be utilized for determining the availabil- ity .of -facility capacity and the demand generated by a development. POLICY 1.4: The county shall develop procedures to update. facility demand and capacity information as development orders or permits are issued. POLICY 1,5: The Utilities Department shall prepare annual summaries of capacity and demand information for each facili- ty within the county service area. POLICY 1.6: The county shall continue to allow the use of septic tanks in rural areas for single family units and for small retail establishments utilizing for --domestic waste disposal only, where approved by regulatory agencies consistent with the attached water and wastewater connection matrix (Table 3.A.16). OBv ECTkVii--r. Correction of Def; n; enc e—s By 1995, 40% of the existing residential units and 60% of the existing non-residential units within the 1995 wastewater service area shown in -Figure 3;A-Aof the sub -element will be --connected to a r-egional sanitary sewer system, 59 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:18 - OfficialDocuments:672, Attachment Id 0, Page 41 SANT'I'ARY SEWER SUB -ELEMENT POLICY 2.1:- The County shall continue to offer the utility assessment--program-to--areas wrt"eptic service-wrtlr1.11 the County Utilities Department service area. POLICY 2.2: By 1991, the County shall research and develop a program to offer -a. -more flexible utility assessment program to designated low income -areas with semis servic-ee with -in the County Utilities Department service area. This program shall:---- Providefor-more flexible -assessment terms, -or rates ° Allow amortization of assessed fees Use Community Development Block Grant Funds or other state and federal funds, when available POLICY . The subdivisions having undersized lots within the County Utilities Department service area designat- ed as requiring sanitary sewer service due to public health threats, shall be updated through an annual review process. These subdivisions shall be given priorit—y-for the provision of p!,hi ; c sanitary—se requesting service at the same time. POLICY 2.4: The county shall provide sanitary sewer service to areas -determined to -be -public-health threats. The county—( , shall recover costs through those connected to the system and directly benefiting from the improvement. POLICY 2.5: The County Utilities Department shall implement the programs identified on Table 3.A.12 of the Sanitary Sewer Sub -Element for the expansion of the plant capacity, and on —Figure s 3-. 1:5-, —3-. A.9- and 3.1-0 for expansion of to collection network in order to correct the existing defi- ciencies and maintain the established level of service standard. POSY 2,6: By -1992, the county shall expand its sanitary sewer services by finishing construction of the North County Plant, by expanding the north county force main, and by taking over the Grove Isle sewage treatment plant in the south county service area. As shown in Table 3.A.1, fifteen of the existing private plants will be connected to the county system by mid-1991. Since the majority of these fifteen plants are located along U.S. #1 in close proximity to the Indian River, the county will eliminate the possibility of these private plants contributing to water quality problems and nutrient enrichment of the Indian River Lagoon by above . 60 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:18 - OfficialDocuments:672, Attachment Id 0, Page 42 SANITARY SEWER SUB -ELEMENT OBJECTIVE 3 Surface Water By 1992, the county in coordination with the County Public Health Unit, Division of Environmental Health as part of the permitting process, will have a set of adopted requirements governing the use of septic tanks and package treatment plants to protect surface ,.,ter And groundwater quay. POLICY 3.1: The Unit, Division of annual" permitting county through the County Public Health Environmental Health shall initiate an program for evaluation. of all package and septic tanks; the results of this evaluation shall be used for prioritization of further expansion of sanitary sewer service. POLICY 3.2: The County Public Health Unit, Division of Environmental Health shall establish a program for continuous monitoring of septic tans and private wastewater treatment plants reported to have problems. POLICY 3.3: The County Public Health Unit, Division of Environmental Health s aal-1 con uct a random sampling of on site sewage— syys tms forbussin sses whi-ctrhave—bee- : d__L:.c_ as hazardous waste generators to ensure that hazardous waste is not discharged into ground or surface water. Violators shall be prosecuted according to the state and/or local regulations'. OBJECTIVE 4 Water Conservation By 1995, thecounty by spray irrigation as ident itied--in t ( will reuse a_minimum of 9% of its wastewater in "locations approved by regulatory agencies Sanitary Sewer Sub -Element. POLICY 4.1: The county shall continue to reuse wastewater by spray irrigation in the west service area and the central service area; in all new plants the county will employ reuse h"pray---ir-rigation with pe-rcolat-3an ponds—as back-up-,---as- identified on Table 3.A.2. POLICY 4.2: By 1995, the county in coordination with the City of Vero Beach shall implement a program for wastewater reuse by spray irrigation for the county's south service area as well as the City of Vero Beach service area. POLICY 4.3: By September 1990, the county shall include in its Land Development Regulations a requirement that 'developments which will use treated wastewater for spray county an effluent reuse line for treated wastewater. Large volume irrigation users, such as developments with golf `.... courses, will be required to take reuse water for spray irrigation., 61 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:19 - OfficialDocuments:672, Attachment Id 0, Page 43 SANITNRY SEWER SUB -ELEMENT ----OBJECT1V-E-5----Cap t-1 Improvements By 1995, the county will have completed improvements to the sanitary sewer facilities as outlinedin Table 3.A.12 of the sania sewer sub -element. The- county-will—also have completed the additional expansion to the collection- network -as_ identified in the sub -element. POLTC�5. l: Tie- county shall maintairr-a- f ive-year schedule of Wap al improvement needs -for public- facilities, -to---be updated annually in conformance with the review process for -- the _CapitalImprovements Element of this plan. POLICY.2: Proposed -capital improvement -projects -shall be evaluated and ranked according to the following priority level gu erines: Level One - whether the prqj-ect is- needed t"rote public health and safety, to fulfill the county's legal commitment to provide facilities and services, or to preserve or-a-clrieve full e o existing fadiies Level Two - whether the project increases efficiency of use of existing facilities.,. prevents or reduces future improvement costs, provides service to -developed areas lacking full serviceor--promotes in -fill development Level Three : whether the project represents a logical extension of- facilities and services within aes�ted service area POLICY 5.3: Design for additional capacity for regional faces itis shall begin when a facility is at 50% of its capacity; and construction of additional capacity shall begin when a facility is at 65% of its capacity in order to guaran- tee provision of more than the minimum level of service. All future -expansions wrle i b' ase�on t he committed and project - et -future demand. POLICY 5.4: The county shall treat sanitary sewer provisions as an -enterprise -system -which is financiall-y self-supporting. 5.5: The county shall continue to secure funds tarougn user tees, impact fees, and other appropriate fees for the--arderLl-y expansi-on-of thesan-itary-sewer system. POLICY_5.6: The county shall secure funds for capital . improvements and expansions through a developer's agreement, ssessment-and-other appropriate ming mechanisms descr ed in the Sanitary Sewie-r-Sub-Element. POLICY 5..7-:- The county shall pursue state and federal `. sources fun ng available for theimprovement and expan- sion-ofutiiitYserv-i-ees . 62 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:19 - OfficialDocuments:672, Attachment Id 0, Page 44 SANITARY-SEWER-S-0- POLICY ANITARYSEWER-S-UB- POLICY -5.0-: A11 improvements for -replacement, expansion, increase in capacity of facilities in the Indian -River Cou; Utilities Department service area shall be compatible w1611 adopted level of service standards for facilities. POLICY 5-.-9-a Consisten Use Element of this p sewer service shall be Figures -3-.". Sub -Element. OBJECTIVE 6 i� provision of centralized sanitary limited to the service areas shown on inspections, operation and maintenance of on-site wastewater treatment systemssi.n'gle a i7y units are exempteinorder to maximize the-use--of-existing-county teeriits nddiscourage urban sprawl. .OLICY_-6-J. Use o onsite wastewater ti shall -he limitedto-the following conditions: Sys ° Existing septic tank and package treatment plants may remain in service until such time Ias centralized service is made available; at -such time the-county-shamsenforce existing regulations requiring—single family units within 200 feet of county sewer lines to connect to the county system. When service is available, all units in subdivisions within 1/4 mile of -the county sewer line and all-commercial/industrial uses -shall be -connected to .the county system. Residential units and/or commercial/industrial establishments having a health problem dile to their sewer treatment system must connect to the regional system regardless of the distance. Use of septic tank: systems for new development shall be prohibited-urrl-ess--sutodevelopment meets -the Criteria set on the water and wastewater connect_ion matrix on Table 3.A.16. ° Use--af-package treatment plant -s ---shall be -limited to - residential, commercial and light industrial d_evelopment - projects in areas .of the county inside the 2010 Urban ServicereA as A c do have access to he existing e�unty--system-,-with-the-requirement-that when the county system is extended to this_area, these developments must connect to the regional system and pay the appropriate tees. T county unty shall modifyits ran -develop-ment regu-lations by-September-190-to-requi-re-the-developer to construct a dry line at -the -time of -construction when. 1 the above criteria apply. 63 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:19 - OfficialDocuments:672, Attachment Id 0, Page 45 SANITARY SEWER SUB -ELEMENT POLICY 6.2: Issuance of development orders or permits shall ( -_ ble federal, state and local permit requirements for on-site wastewater treatment systems. However, the Land Development Regulations, when adopted, shall require the connection to a centralized sanitary sewer facility, within sixty days of connection. POLICY 6.3 By September—lj490;the-cou-mt"ha-1-1--amend local ordinances to require that issuance of permits for replacement or expansion of existing on-site wastewater treatment systems be conditioned upon compliance with the most updated version of DER and HRS regulatory_ requirements and Federal and State water -quality--standards as identified on page 23 of the Sub -element. POLICY 6.4: The Utilities Department shall develop guide- lines for operation and maintenance of package treatment plants, u izing private sector sources for implementation. POLICY 6.5: The county, in coordination with the County Public Health Unit, Division, of Environmental Health, shall establi-sly---publ.ic- education programs on—the- proper use, t/ inspection requirements, maintenance, and abandonment septic tanks. The tank abandonment process shall be based on current state and local regulations. POLICY 6..6,:, All new package wastewater treatment plants shall . beuaccording to he current federal, state and local requirements. Any developer building and operating a package wastewater treatment plant must obtain a county permit for the construction of the plant and any future expansion or modification of the plant. Policy 6.7: By 1991, developments inside the not have access to the need a county permit to dedicate the plant t maintenance. the county shall require all 2010 Urban Service Areas, which existing county regional system build package treatment 1-4- o the county for operi 64 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:20 - OfficialDocuments:672, Attachment Id 0, Page 46 new do and 4-^ SmeadSoft Reprint Date: Monc SA-NI'rARY-SEVER SUB --ELEMENT-- POLICY 6_3: The county shall enforce existing -ordinances requiring pre-treatments#--commerciTi-- d---industria-l— aste before discharge into the county system. By September 1990, the county will have a grease/fuel oil ordinance to complement the existing industrial waste pre-treatment provision. POLICY 6.9: All future connections to the regional wastewa- ter system shall be consistent with the attached water and wastewater connection matrix (Table 3.A.16). OBJECTIVE 7 Intergovernmental Coordination By 1992, the county will establish a regular coordination mecha- nism with other local governments and agencies for an effective system of wastewater management. POLICY 7.1: Consistent with its interlocal agreements with thetheCiity of Sebastian and the Town of Orchid, the county shall provide sanitary sewer services to those.municipalities and continue to investigate new technologies by - 0 Identifying new technologies for wastewater treatment; ° Identifying new methods for reuse of irrigation quality ef-fluent; Assessing the feasibility of implementing these new technologies in Indian River County; ° Preparing cost/benefit analyses. for promising technologies. POLICY 7.2: The county shall continue to utilize existing interlocal agreements with other local governments, as identified on Table 13.3 of the Intergovernmental Coordination Element, to ensure maximum efficiency of wastewatermana_gement, by combining resources and eliminating duplications. POLICY 7.3: The county, in coordination with other local governments, shall study the feasibility of combining the operational responsibilities of all regional facilities SANITARY SEWER SUB -ELEMENT LICY 7.4: By 1991, the county shall review and comment on Lue UILy oz veru neacn elan ror the reuse or.treatea wastewater from the Vero Beach plant by spray irrigation, The County _shall identify some areas of the unincorporated County, such as -landscaped medians and rights of way, that can be used by the -city of Vero Beach for spray irrigation. POLICY 7.5: To ensure that local comprehensive plans and development permit procedures are compatible with the county plan, the county, through the Comprehensive Plan Advisory Committee (identified on the pages 6, 32 and 33 of tho s ~ Intergovernmental Coordination Element), shall coordinate with all local governments within Indian River County by: 0 Reviewing other local governments_ plans; auDmitting written comments TCRPC, and state agencies; and goverments, Participating in the Comprehensive Plan adoption POLICY 7.6: As part of its standard franchise agreement, the county will continue to receive a monthly and annual report from private franchised sewer providers to ensure maintenance of the- level -o -f service standard- established.in—poi-icy �A of the Sanitary Sewer Sub -element --Upon receipt of therep , the County will inspect the franchised plant and issue a report which will indicate the plant's available capacity. No development will be approved by the County where +t,a+ develoopment's demand would exceed the available capaci SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:20 - OfficialDocuments:672, Attachment Id 0, Page 48 65.1 POTABLE -WATER SUB_ -ELEMENT - GOAL, OBJECTIVES AND POLICIES GOAL It is the goal of Indian River County to have an efficient system of potable water provision to, prevent degradation of existing resources, promote orderly growth within the county service are and to meet existing and projected demands. OBJECTIVE 1 Service Concurrent with Development By 1991, the county will have adopted land development regulations requiring potable water service to be provided concurrent with development. POLICY L-L:—Jew development_�_within the .unincorporated portion of the Indian River County shall be approved only when capacity is available to provide needed potable water service. POLICY 1.2: All authorities within the county service.area operating potable water facilities shall monito�lity dellidrids and capacity information -mss- level-opi-Lient orde granted and shall continually advise the county of the remaining capacity and changes in demand. POLICY-L3:—The level of- servi-cestandards for -the county' -a potable- water facilities of 250 gallons per day (GPD) oar equivalent residential unit (ERU), based on county ordinance no. 84-18, are hereby adopted and shall be utilized for determining the availability of facility capacity and the 'demand- generated —by---a--development. - Wellfield- capacity, storage capacity and delivery pressure shall be based on the following: - Wellfield capacity shall be the average daily use plus the largest well being out of service Storage tank capacii y�sha�l be -ate 1-e-astt 112-- the average daily consumption volume - High service pump capacity shall at least be equal to the maximum daily demand Pressures of the high service pumps for the county plants shall be a minimum of 40 PSI delivery pressures. At fire flow conditions the system shall be able to provide delivery pressures of 20 PSI. Water quality shall at least meet EPA and State of Florida ( safe drinking water requirements. 45 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:21 - OffcialDocuments:672, Attachment Id 0, Page 49 POTABLE WATER SUB -ELEMENT POLICY 1.4: The county shall develop procedures to update TNCi y demand and capacity information, as development orders or permits are issued. POLICY 1.5: The Utilities Department shall prepare annual summaries of demand and capacity information for each facili- ty serviz"re . POLICY 1.6: The county shall continue to allow the use of private wells in rural areas for single family units and for small retail establishments where approved by regulatory agencies consistent with the a Cached water—and—wastewater ;connection matrix (Table 3.B.19). OBJECTIVE 2 Correction--af Deficiencies y 199b, jU% ot the existing residential units and 50% of the existing non-residential establishments within the 1995 potable water service area shown in Figure 3.B.8 of the sub -element will be connected to a regional potable water system. POLICY 2. 1 The county shall continue to offere utility assessment program to areas with private wells within the County Utilities Department service area. POLIC�2-.-2: By 1911 -,—the --county siraaaaa l research and develop a program to offer a—more flexihl€ uilit�assessmento designated low income areas with private wells within the County Utilities Department service area. This program shall: Provide for more flexible assessment terms or rates Allow amortization of assessed fees Use Community Development Block Grant Funds or other state and federal funds, when available POLICY 2.3: The list of subdivisions having undersized lots within the County Utilities Department service area designat- ed as requiring potable water service due to public health threats shall be updated through an annual review process. These subdivisions shall be given priority for the provision of public water over a new development requesting service at the same time. POLICY 2.4: The county shall provide _potable -water_ service to areas determined to lie public health threats. The county shall recover costs through those connected to the system and directly benefiting from the improvement. POLICY 2.5: The County Utilities Department shall -implement the programs identified on Figure 33.6 of the Potable Water —Sab—Element mar—tare- pansion u the plant capacities and on Figures 3.B.7, 3.B.8, and 3.B.9 for expansion of the 46 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:21 - OfficialDocuments:672, Attachment Id 0, Page 50 POTABLE WATERSUB-ELEMENT distribution--network-in order--ta--correct the existing defi- ciencies and- maintain- the established level of service standard. OBJECTIVE-3Potab-le Dater and Groundwater Quality By -1992-, th-e 'county as part of the Qeinitting process, will have a set of adopted requirements governing the use of potable water and groundwater�nsure the omppan ce with f-ede��tate laws POLICY 3.1:' The county shall maintain the existing treatment processes- to ensure aestffe-t-ically pleasing water, w i.le meeting -all EPA -and -DER requirements. POLICY 3.2: The county, through the County Public Health Unit,' Division of Environmental Health�, shall nitrate an annuar-permitting -program for- evaluation= -of all -private water treatment _plants. The _results -_f- this_ evaluation shall he used for the prioritization of further expansion of potable water service. OBJECTIVE 4 Water Conservation By 1995, the county wrrrhavea- program in-place for -reduction of water use -consistent with -federal, state and regional policy plan Goals and regulations. POLICY -4-.l---The county sheil--require the use of--irrigat on qua 1it I,-.-) )-off lue-int for irrigat-ion- in parks -and facil- ities having significant open_ space areas (golf courses, medians, etc.) which are located within the County Utilities Department service area and are within 1 mile of the nearest I,Q_ Line; where such rause is authori?Pd by regulatory agencies. When a project meets the above criteria, the developer shall be required to construct an effluent reuse 'lime -for treated wastewater -tome -sed -for -spray -irrigation. POLICY 4.2: The county shall support the activities of other muni 1 ties and�,—ut111t-les which use I.Q. e fluent to irrigate publicaad gr-ivate-parks, golf courses-,-and-other landscaped areas 1Ir: Provi3ing technicainformation on wastewater reuse for ° Designating county owned parks and landscaped medians and rights-of-way. which could be utilized by other municipalities -and- utilities fer-spray irrigation. POLICY 4.3: -By 1991, the county shall adopt land development regulations which encourage proper plant selection (drought tolerant vegetation), effic�en irri'ga-tion--systems, and pre-aer-vation of -ex -is -ting native-vegetati-on. 47 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:21 - OfficialDocuments:672, Attachment Id 0, Page 51 Dl1T TBTE B—ELLi 4EENiT POLICY 4.4: a policy requiring manual (_ operas ems -or --automatic— systems— with sensors, at county facilities during rainy seasons, in order to eliminate sprinkling cycles during rain or when ground is saturated. POLICY 4.5: The county shall investigate the feasibility and necessity ity of establishing a countywide authority to coordi- nate the management of water resources. POLICY C 6: By 1991, the county shall send a- letter -to the School Board requesting the inclusion of water conservation issues in the state minimum scholastic performance standards and the School Board's unified curriculum. POLICY 4.7: The county shall renew its annual contract with the SJRWMD to identify and require property owners to plug or valve free flowing artesian wells. POLICY 4.8: The county shall ensure that its Plumbing Code requires water saving devices and appliances, and is compati- ble with standard building code requiremen s. POLICY 4.9: feasibility install dual for outdoor By1992, the county shall investigate the of requiring all potable water customers to meter set-ups, one for indoor use and the other use. POLICY 4.10: By 1992, the county shall investigate the feasibility of setting up a charge system which is equitable for the average water user but provides for an exponentially increasing unit rate for the high volume user which are using more than three times the Level of Service standard estabkrshe-d—in poli-cTr3. POLICY 4.11: By 1993, the county shall investigate the feasibility of offering an incentive package, such as cost sharing- for microjet installation,. to agricultural uses adopting low volume irrigation systems. POLICY 4.12: By 1992, the county shall develop and implement a leak detection program for an efficient and timely response to any leakage. POLICY The county shall require the developer of a project which will use treated wastewater for spray irriga- tion to build an effluent reuse line at the time of con- struction. -Improvements By 1995, the county will potable water facilities potable water sub -element. have completed improvements to the as outlined in Figure 3.B,6 of the 48 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:22 - OfficialDocuments:672, Attachment Id 0, Page 52 ----POTABLE--WATER SU $-E L EMENT Policy 5.r: The county shall maintain five-year schedule of—capitalprovem�ents-needf se�pt�b�ic acilit-i-e, to be updated annually in conformance with the review process for the Capital Improvements Element of this plan. POLIE7--5.2: Proposed capital improvement projects shal-l7--b evaluated_ and_ ranked according to the following primo level guidelines: Level One - whether the project is needed to protect public health and safety, to fulfill the county's legal commitment to provide facilities and services, or to preserve or achieve full use of existing acs sties . ° Level Two - whether the project increases efficiency of; use of existing facilities, prevents or reduces future improvement costs, provides service to developed areas lacking full service — promotes in -fill development Level Three extension of service area whether the project represents a logical facilities and services within a designated POLICY 5.3: Design for additional capacity for regional facilities shall begin when a facility is at 50% of its capacity, and construction of additional capacity shall begin when -a facility is at 65% -o#-its capacity -in -order -to -guaran- tee provision of more than the minimum level of service. All future expansions will be based on the committed and project- ed future demand. POLICY 5.4: The county shall treat potable water provisions as an enterprise system which is financially self-supporting. POLICY 5.5: The county shall continue to secure funds through user fees, impactfees, and other appropriate fees for the orderly expansion of the potable water system. POLICY 5.6: The county shall secuxe--fund-s foncapital improvements and expansions through a developer's agreement, assessment, and other appropriate funding mechanisms de- scribed in the Potable Plater Sub -Element. POLICY 5.7:. The county shall pursue state and federal sources of funding available for the improvement and expan- sion of utility services. POLICY 5.8: All improvements for replacement, expansion, or increase in capacity of facilities in the Indian River County 11 t! 111 t!i ce "epartment service- area shall be compatible with adopted level of service standards for facilities, s 49 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:22 - OffcialDocuments:672, Attachment Id 0, Page 53 POTABLE WATER SUB_ -_ELEMENT__ POLICY 5.9: Consistent with the policies of the Future Land Use -Element ocentralized pottal le water service shall be limited to the service areas shown on Figures 3.B.7, 3.B.8, and 3.B.10 of the Potable water sub -element, and to areas where the county has legal commitments to provide facilities and services as of the date of ad0r----- of t_lisplan. OBJECTIVE—6- _ Privately Owned Public Plants and Private Wells By 1992, the county will have a set of mandatory requirements fir inspections, operation and maintenance of potable water treatment systems franchised by the county, in order to maximize the use of existing county facilities and discourage urban sprawl. POLICY 6.1: Use of on-site water treatment systems shall be limited to the following conditions: 0 Existing wells and privately owned public water treatment plants may remain in service until such time as centralized service is made available; at such time the county shall enforce existing regulations requiring all single family units within 200 feet o€county a water lines to connect to the county system. When service is available, all units in subdivisions within 1/4 mile of the county water line and all commercial/industrial uses shall connect to the county system Residential --units- and/or- commercial/ industrial .establishments havincr health problems due to their water treatment system must connect to the public water system regardless of the distance. 0 Use of private wells for new development shall be prohibited unless such development meets the criteria set on wat�ar and wastewater connection matrix on Tam re 3.B. 19. 0 All new developments utilizing on-site potable water facilities shall be required to construct a dry line at the time of construction. 0 Use of privately owned public water treatment plants shall be limited to residential, commercial and light industrial development projects in areas of the county inside the 2010 Urban Service Areas which do not have access to the existing county system, with the requirement that when the county system is exten a to this area, these developments must connect to the county system and pay the appropriate fees. POLICY 6.2: Issuance of development orders or permits shall be conditioned upon demonstration of compliance with 50 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:22 - OfficialDocuments:672, Attachment Id 0, Page 54 POTABLE WATER SUB -ELEMENT applicable federal, state and local permit requirements for Vll—.711.c wal..ci 610a6111o416 osobGitlo. IaVPIv &r a. u.., a+ .— -- L, ment Regulation, when adopted, shall require the connection to a centralized potable water facility, within sixty days of notification. The Utility Department shall enforce the connection. POLICY 6.3: By 1991, the county shall amend local ordinances to require that issuance of permits for replacement or expansion of existing on-site water treatment systems be conditioned upon compliance with the most updated revision of the DER, HRS and SJRWMD regulatory requirements and Federal and- State water quality standards as identified on page 19 - 21 of the sub -element. POLICY 6.4: The Utilities Department shall develop and implement inspection, operation and maintenance guidelines or private water treatment plants, utilizing priva a sector sources for implementation. POLICY 6.5: The county, through the County Public Health Unit, Division of Environments Health, shyl este s public -education programs on the proper use, inspection requirements, maintenance, and abandonment of private wells. POLICY 6.6: All new private potable water plants shall be built according to current federal, state and local require- ments. The private developer must obtain a county permit for the construction of the plant, expansion of the lines, and .,any future improvement. `POLICY 6..7: By 1991,._the county shall require all new developments inside the 2010 Urban Service Areas, which do no have access o the -existing county potable weer system and need a county permit to build water treatment plants, to dedicate the plant to the county for operation and maintenance. POLICY 6.8 A11- future connections to the potable water system shall be consistent with the attached water and wastewater connection matrix (Table 3.B.19). OBJECTIVE 7 Inter overnmental Coordination By 1992, the county will establish a regular coordination mecha- nism with other local governments and agencies for an effective system of potable water provision. 51 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:23 - OffcialDocuments:672, Attachment Id 0, Page 55 POTAB-L-E-WATER-SUB--ELEMENT POLICY 7.1: Consistent with its interlocal agreements with the City of Sebastian and the Town of Orchid, the county lr�l��2 csvld�G7atPr Cervi ra��finao m„n, -; ontinu,e-to- investig-ate-new-technologies ° Identifying new technologies for treatment of water from Flori3an Aquifer, ° Identifyingnew or im coved -water conservation_ methods. ° Assessin�hefeasibility of,implementing new technology _ in--lhd-ian R-i-ver--C-ounty, ° Preparing cost/benefit analyses for promising tec nologies. POLICY 7,2: The county shall continue to utilize existing interlocal agreements with other local governments as identified on Table 13.3--of--the In ergovernmental Coordination Flement,-to ens-ure-the maximum e f� c'ieno o water management by combining resources and eliminating duplication. POLICY -7 -3 -:--The county"n coordi-nat-on with--other—local governments, shall study the feasibility of combining the operational. responsibilities of all regional facilities existing -in the county under one department. POLICY 7.4: To ensure that local comprehensive—plans--and development permit procedures are compatible with the county ian, -the county, -through t Compre ena sive Pan Advisory Committee (identifiedon--pges--6, I , ana33 of the Intergovernmental Coordination Element)_, shall coordinate with all local governments within Indian River County by: Rev1Pwing other local governments' plans; ° Submitting written comments to, the local governments, C—;--and—statee agencies; and ° Participating in the Comprehensive Plan adoption hearings. POLICY 7-5L As part of its-standard-franchise-agr-eement,the county will continue to receive a monthly and annual report from private franchised potable water providers to ensure intenance-orf--the-Level of Service standard esublis ed in Policy 1.3--af-the- Potable-water-sub-element.—UpGn-ec-eipt�f the report, the County will inspect the franchised plant and issue a report which will indicate the plant's available capacity, No devel-opme-ntwill be approvev he County where -theievelopment s demand-would-exc-eed--the avei-lab-la capacity. SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:23 - OfficialDocuments:672, Attachment Id 0, Page 56 SOH-D-WASTE-SUB-EL-EMEN GOAL, OBJECTIVES AND POLICIES Goal It is , the -goal --of Indian River County-t"ave an--efficiant and environmentally sound so -1 -id -and -hazardous -waste management system to: -prevent spread of disease, to promote orderly growth within the county, and -to meet existing and projected demand for management and clispo-sat-of waste. OBJECTIVE 1 Service Concurrent with De-v-elooment ____By___1989,the counity wiritave and will continue o have an active , segment -of -the Ianclf-i-11which wii1--have an adegoat-se-capacity concurrent with development. POLICY 1.1: esign for adcTitional urial segments of the landfiF17 hall --be completed before the -active segment of the landfill i*at 70% omits capacity wand construction -of additional segments shall begin when a facility is at 75% of its capacity in order to guarantee provision of more than the minimum -leve -1 of service. POLICY 1.2:' New development within the Indian River County Solid WasteDisposal District service area shall continue to be approved only when -capacity-Is-available at--the-active segment—of—the landfill_ If active segment is at 9 -0% -of -its :capacity and new segment is not ready, additional development salr-not7be permitted. POLICY _h_3.:—The following _level ofservice- standards are - hereby adopted, and shall be used as the basis for determin- ing the availability of facility capacity and the demand generated by a development: Service Area Average Solid Waste Generation Rate ^County -wide fir. 5 pounds -per -capita -per-lay or POLICY -1. �t-. The counfyysh evelop procedures o update facilitesdemand and capacity-infom&t-ion as -development orders or permits are issued. POLICY -17.-S: The Soli Wa�isposalDistrict shall prepare annual -summaries of demand and capa-cityinformation for the active segment of the landfill, 38 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:23 - OfficialDocuments:672, Attachment Id 0, Page 57 SOLID WASTE SUB -ELEMENT OBJECTIVE.2 Special Waste and Hazardous Waste By 1992, the county will have appropriate equipment and sufficient capacity for the management of special wastes and hazardous waste. There will be a 50% decrease in the number of cases of improperly managed and illegally disposed of hazardous waste in the county. POLICY 2.1: The county shall dispose of stabilized sludge from wastewater treatment plants at the designated facility at the,Gifford Wastewater Plant, at the county sod farm, at the- county owned citrus groves, and other sites approved by "e DER POLICY 2.2: The county shall dispose of the screenings and grit accumulated at the wastewater treatment plants at the county landf-fll. POLICY 2.3: Since 1989, the county has not and will not accept septage at the county landfill. The current local ordinance will continue to require all septage haulers operating in the county to dispose of se gage at . the designated facility at.the Gifford Wastewater Treatment Plant and other sites approved by FDtH. POLICY 2.4: By 1991, the county, shall submit a written request to the County Public. Health Unit, Division of nvironmental Health to increase thenumber of inspections of l septic tanksused bind —4 - al-d—commercial-1--ent producing hazardous waste by products in order to eliminate illegal dumping of such wastes and to ensure that hazardous waste will be disposed of in accordance with the Solid Waste Disposal District procedures. POLICY 2.5: By 1992, the county shall prepare and distribute to generators of hazardous waste a document describing acceptable management and disposal techniques. The county shall utilize the media by means of news releases, articles, and media notifications to educate the general public of appropriate ways of handling solid waste -and hazardous waste. The county will provide two amnesty days per year wherein homeowners are allowed to bring in hazardous waste for disposal free of charge. POLICY 2.6: By 1991, the county—shall require that a .1 new applications for occupational licenses include a four digit Standard Industrial Classification (SIC) code to facilitate identification of potential hazardous waste and bio -medical waste generators. The county shall provide this information to the Solid Waste Disposal District. POLICY 2.7: By 1991, the county shall acquire a tire shred- der to handle the large number of tires received at the landfill, buy a pathogenic incinerator for the disposal of dead animals and expand the temporary storage facility at the landfill for residentially generated ste. The county will have a licensed hazardous waste transporter 39 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:24 - OfficialDocuments:672, Attachment Id 0, Page SS SOLID WASTE SUB -ELEMENT available at the landfill on a quarterly basis for providing county. POLICY 2.8: By 1991, the county shall increase the number of water quality tests to ensure that enclosed segment I of the landfill as well as active-' egme^'�f the-l-andfill--are not contaminating the surrounding groundwater and surface water. POLICY 2 -._9: --By 1991, the county shall establish a plan for the efficient collection and handling of the construction debris, demolition debris, and land clearing waste. POLICY 2,10: By 1991, the county Public Health Unit shall perform regular inspections of private licensed waste handlers to ensure that bio -hazardous_ wastes generated _by medical establishments and handled by private firms, is properly manages, when improper management of bio -hazardous waste is found during an inspection, the private waste handler (the violator) will be prosecuted and fined by. the Environmental Control Board. The county shall continue to nspecebio- rdous waste which enters the landfill. OBJECTIVE 3 Capital Improvements By 1995, the county will have completed improvements to the solid wastefacility—as—outlined in Tabl-e 3 0.12 of tine Solid Wast Sub -Element, to maximize the use of existing facilities and discourage urban sprawl. ,POLICY 3.1: The county shall maintain a five-year schedule _of capital —improvement_ needs—for- public _facilities�to be updated annually in conformance with the review process for the Capitamprovements Element of this plan. POLICY 3.2: Proposed capital improvement projects shall be evaluated and ranked according to the following priority level guidelines: 0 Level One - whether the project is needed to protect public health and safety, to fulfill the county's legal commitment to provide solid waste facilities and ser- vices, or to preserve or achieve full use of existing facilities ° Level Two - whether the project increases efficiency of use of existing facilities, prevents or reduces future improvement costs POLICY �_. county shall req solid wase service provisions as an enterprise system which is financially self-supporting. POLICY 3.4: The county shall con nue to secure funds through assessments waste facility. 40 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:24 - OfficialDocuments:672, Attachment Id 0, Page 59 SOLID WASTE SUB -ELEMENT POLICY 3.5: The county shall pursue state and federal sources oT funding available o e improvement-and-expan- sion Mrd -sion of solid waste services as well as the establishment of a recycling program. POLICY 3.6:- All improvements for replacement, expansion, or increase in capablity. of facilities in the Waste Dis- posal District service area shall be compatible with adopted level of service standards for facilities and shall be based on the capital equipment replacement projected on Table 3,C.3 " df -the solid waste sub -element. -� POLICY 3.7: The county shall establish a charge mechanism for the collection and management of special waste such as construction debris, bio -hazardous waste and all other wastes needing special collection handling_, a_nd disposal. OBJECTIVE 4 Recycling.and Waste Volume Reduction By 1994, the county through the recycling program will have reduced the volume of solid waste to be buried in the landfill by POLICY 4.1: In July 1989, the county, in coordination with its municipalities, initiated a recycling program to reduce the volume of waste. The County shall have the recycling faei� ties operational bd Mid=199©. POLICY 4,2: By 1991, the county shall initiate a mandatory door-to-door collection system to generate sufficient volume of waste for recycling, to efficiently separate waste at the place of generation and to solve the problem of illegal dumping along county roadways, private properties, and at transfer station se�Upon the estabrislime o door-to-door collection, the transfer stations will be closed. POLICY 4.3: The county, through its Recycling Coordinator, will continue -to a-ssist the school board -and -gill coordinate with the Board and' the DER for development and maintainance within the school curriculum of a course which would inform students of the impacts of mismanaged solid and hazardous waste. POLICY 4.4: To decrease open burning, by 1995 the county shall acquire a larger Air Curtain Destructor for the county landfill, which can handle a large volume of construction debris and other woody materials. 41 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:25 - OfficialDocuments:672, Attachment Id 0, Page 60 SOLID WASTE SUB -ELEMENT POLICY 4.5: By 1993, the county as part of its recycling program shall eliminate open burning in urban' areas by providing a facility for the recycling of organic waste, such as: land clearing debris, grass clippings, etc. into compost and mulch. POLr"tember 1990, the county - in coordination •with the Department of Environmental Health and the Division of'Forestry will draft and adopt an ordinance prohibiting open burning in urban areas by requiring the use of air curtain incinerators when . recycling is not feasible. Agriculturprocedures are exempted. The coordination in this ordinance will be as follows: Planning Department .will send a copy of all land clearing permits—to—the Health Department and Division of Forestry; ° Health Department will issue and enforce requirements; and ° Division of Forestry will police and control open -(---OBJECTIVE 5 Intergovernmental Coordination By 1992, the county will establish a regular coordination mecha- nism'with other local governments and agencies for an effective system of Solid Waste Management. POLICY 5.1: The county shall continue to follow existing in et rel agreements with other local governments in providing landfill capacity for solid waste disposal, for administering a countywide recycling program, and for studying and implementing new technologies. On-going studies shall identify the following: ° New technology for recycling; ° New methods for safe solid waste disposal; ° Assessing the feasibility of implementing these new technologies in Indian River County; ° Cost/benefit analyses for promising technologies. The county staff will continue to participate in the monthly meeting or Lne uuaa-county council or governments in stuaying the formation of a Quad -county Resource Recovery Unit/Electrical Generator Facility. The county is providing information and staff time. 42 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:25 - OfficialDocuments:672, Attachment Id 0, Page 61 SOLID WASTE SUB -ELEMENT POLICY 5.2: The county shall continue to utilize existing interlocal agreements, as identified on Table 1-3.3 o- the Intergovernmental Coordination Element, with other local governments to ensure maximum efficiency of solid waste management by combining resources and eliminating duplications. POLICY 5:3: To ensure that local comprehensive plans and -development permit procedures are compatible with the county plan, the county, through the Comprehensive Plan Advisory committee (identified on page 6, 32, and 33 of the Intergovernmental Coordination Element), shall coordinate with all local governments within Indian River County by: 0 Reviewing the other local governments plans; 0 Submitting written comments to the local governments TCRPC, and state agencies; Participating in the hearings. 0 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:25 - OfficialDocuments:672, Attachment Id 0, Page 62 comprehensive plan adoption 42.1 N 4TURAL-GROUNDWATER AQU-IFER-RECHARGE SUB_ -ELEMENT r. GOAL, OBJECTIVES AND POLICIES OAT. It is the goal of Indian River County to protect the function of naturalgroundwater aquifer recharge areas, -to-prevent e groundwater contamination and to extend- the-.-if-e--spar,--o-f-the aquifer through water conservation. Objectives Protection o Water Quality By 1995, all natural groundwater recharge ams -will -be protected against all sources of contamination, and a minimum of 50% of all prime natures ground-waxter aquifer recharge areas, identified in the Groundwater Basin- Resource AvaVabrli-ty Inventory--(GWBRAI) being prepared by the SJRWMD, wi-11ire-eft as a pervious -open space. D�L'CY-1-.-l: By 1M -2, -the county- shall prepare a program -for the protection of prime -natural -groundwater aquifer rechar-g areas of the shallow aquifer. " OLIC1�1. 2 -:may 1991, the county- shall offi-ciaiiy- request meetinwith the SJRWMD _for development-of---a-program prevent overpumping of groundwater that will result in contamination from saltwater intrusion. POLICY -3 By -_991-, the county -s -h- ail--Rrouide-ma which shows the areas of the county designated as' -prime aquifer recharge areas to the County Public Health Unit, Division of Environmental Heald ' and requester at Environmental--Health-nom permit -se ptir-tans d scharc ing industrial and hazardous wastewater in areas identified as prime natural groundwater aquifer recharge areas, and other areas prone to groundwater contamination. POLICY 1,4: The county, through its permitting processes s a l- ensure that drainage detention structures for developments -and s-ingl-e f-amil units,�meet-the- level of service standards specified in the drainage-sub--element-and are located in appropriate places to store and treat stormwater an gradual y re eas we ater into aquifer recharge areas as ident-ifi-ed-i-"-h"tormwater Managementand- l-ood Protection Ordinance. POLICY,he county shall adopt land development regulations wh-i-chpr-otect -the-functions-of natural -drainage features and prime naturalgroundwater aquifer_ recharge areas. SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:25 - OfficialDocuments:672, Attachment Id 0, Page 63 NATURAL GROUNDWATER AQUIFER RECHARGE SUB -ELEMENT - POLICY 1�6: The county, rough its permittingprocesses sh-a-11--prohibit new- developments -or ---changes -of uses—ah-i-ch would -produce hazardous material from locating on the Coastal Sand Ridge _and the 10 Mile Ridge areas as depicted on the Figure 3.D-.-2 of theme ement. POLICY —. By__19_9L, the county -shall officially-contact-DFIR requesting injection wells for the disposal of wastewater not county. -- - --� POICY__L._8__ Consistent with the_finding-snf the feasibility study referenced in policy 4.11 of the Potable water sub -element, the county shall discourage flood irrigation with water from -the -,Floridan aquifer -by -providing incentive for- low volume- irrigation- systems - OBJECTIVE 2 Preserving the Quantity of the Shallow Aquifer ByIW5, the county wi-11rhave no -significant -loss; in the -amount -of the groundwater in the shallow aquifer. POLICY---2-.l--.The county sham study the feasibility of requiring -ail development—on—the- Coastal Ridge and--10-mile— Ridge, nd--1O MileRidge, to leave at least 50% of total gross project area as pervious open space, POLICY.2 : By 1992-, the count shall.-study-the--feas-ib, '*v of providing an incentive package to encourage the use of pervious parking areas with normal load bearing characteris- tics -or new development within the county. POLICY_ 2.3: The county_ shall use water conservation mea- sures, as designated in the objectives and policies of the Potable Water and Sanitary Sewer Sub -Elements, to protect the shallow aquifer from depletion.. POLICY 2.4: The county shall consider the list of prime natural groundwater aquifer-recharge�ai-eas--for-passive- parks and open -space acquisition. POLICY 2.5: The county shall review the sand mining regu- lations for the Coastal Ridge --and 14--Mile-Ridge to -ensu that the -natural _features- of the primerecharge areasof_the shallow aquifer will be preserved. POLICY 2.6: The- county, through -its permitting- processes, shall _enforce -the Stormwater Management and Flood Protection Ordinance to preserve natural drainage features and promote use of drainage retention and detention structures to maximize -aquifer -recharge. 37 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:26 - OfficialDocuments:672, Attachment Id 0, Page 64 NATURAL GROUNDWATER AQUIFER RECHARGE SUB -ELEMENT OBJECTIVE 3 Preserving the Quantity —of the Floridan Aquifer By 1995, the county will have no significant loss in the amount of the groundwater in the Floridan aquifer. POLICY 3.1: The county shall protect and preserve open space . . the—west portio of the county,—which has been identified -as' the natural groundwater aquifer recharge area for the Floridan aquifer, by designating these areas as an agri- cultural with a very low residential density as shown on the -----future land use map. POLICY 3.2: The county shall encourage the use of low volume irrigation systems to prevent overpumping from the Floridan aquifer by providing incentives based on the findings of the feasibility study referenced in Policy 4.11 of the Potable Water Sub -element. POLICY 3.3: The county shall use water conservation measures and reuse of treated wastewater, as designated in the objec- tives and policies of the potable water and sanitary sewer sub-elements,o prem overpumping oftheF Floridan aquifer. POLICY 3.4: The county shall renew its annual contract with the SJRWMD to identify and plug or valve free flowing artesian wells. The county's land development regulations will require—property owners t"lug or valve free flowing artesian wells on their property. OBJECTIVE 4 Intergovernmental Coordination By 1992, the county will have a regular coordination mechanism wither ocal governments and agencies for identification and preservation of the function of natural groundwater aquifer recharge areas. POLICY 4.1: The county shall support, encourage, and cooper- ate with agencies such as the SJRWMD, that are performing assessments of prime aquifer recharge areas and shall review any recommendations for incorporation into the land develop- ment regulations. The county support shall include, but not be limited to, providing information, providing staff assistance, and implementing recommendations. POLICY 4.2: By 1991, the county shall officially request a meeting with the SJRWMD to review their plan and timeframe for completion of the Groundwater Basin Resource Availability Inventory (GWBRAI). POLICY 4.3: By 1991, the county shall officially request the SJRWMD's assistance for coordination with the other counties to the west and north west of Indian River County to protectthe natural groundwater aquifer recharge areas of -the 38 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:26 - OfficialDocuments:672, Attachment Id 0, Page 65 NATURAL GROUNDWATER AQUIFER RECHARGE SUB -ELEMENT Floridan aquifer by maintaining a very low land use density (- - III LIICSC diCdS, (:U1l1EJdLliJ1C W1LI1 UeIIbILJ Indian River County future land use map. POLICY 4,4: The county shall continue to utilize existing interlocal agreements with other local governments, as dent'intergovernmental Coordi nation Element, to ensure maximum efficiency of water manage- ment, by combining resources and eliminating duplication. —�_.- - POLICY 4.5: By 1992, the county, in- coordination with the - state and other local governments, shallstudy the—feasibil- ity of combining the operational responsibilities of all water related activities under one agency to eliminate duplication of effort and to ensure efficient protection and provision of water for various uses.. OBJECTIVE 5 Capital Improvements By 1992, the county will have a specific capital improvements program in place or the aquisition and protection ofthe prime groundwater aquifer recharge areas. POLICY 5.1: The county will maintain a five-year schedule of capital improvement needs for public facilities, to be updated annuallyin conformance with the- review process for the Capital Improvements Element of this plan. POLICY 5.2: By 1992, the county shall complete a study which ranks the primary aquifer recharge areas and the conservation areas for aquisition and identifies alternate sources of funding. POLICY 5.3: Beginning with Fiscal year 1993, the county shall allocate funds in its capital improvements program for the preservation, protection, and aquisition of the prime natural groundwater aquifer recharge areas as being iden- H i ,ed--iy the SJRWMD. -The--results of—the study of policy shall be incorporated in the Conservation and Recreation/Open Space Elements of the Comprehensive Plan to prioritize the use of allocated funds. POLICY 5.4: The county shall pursue state and federal sources of funding available for the preservation and pro- tection of environmentally sensitive areas, such as prime natural groundwater aquifer recharge areas. 39 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:26 - OfficialDocuments:672, Attachment Id 0, Page 66 NATURAL—GROUNDWATER-nUTFER RECHARGE SUB -ELEMENT POLICY 5.5: Proposed capital improvement projects for the acquisition and Pres-ervation of the prime natural groundwater aquifer recharge areas shall be evaluated and ranked accord- ing to the following priority level guidelines: Level One - Whether the acquisition is needed to protect public he-alth,- to protect the function of aquifer recharge, and to fulfill the county's legal commitment to provide water services, 0 Level Two - Whether the aquisition will improve the existing condition and prevent or reduce future capital costs. 39.1 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:27 - OffcialDocuments:672, Attachment Id 0, Page 67 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:27 - OfficialDocuments:672, Attachment Id 0, Page 68 DRAINAGE_SUB_-ELEMENT- GOALS, OBJECTIVES, AND POLICIES Indian River County experienced only minor urbanization prior to stormwater management legislation in the late 1970's. Because of this, many of the natural surface water systems are receiving treated runoff and aquifer recharge is substantial. However, the.Le J.0 U need to set County policy water manage- ment. The following goals, objectives, and policies constitute the County's drainage plan and provide for direction for stormwater management activities in the County. Provide a drainage system for Indian River County which reduces the risk of property damage and inconvenience from long term flooding,- promotes stormwater recharge pf the shallow aquifer, reduces stormwater pollutant loading of the Indian River Lagoon and receiving waters and provides proper floodplain management. OBJECTIVE 1 Flood Protection All new construct ionimprovements will be protectedfrom the 25 year/24 hour storm event. POLICY 1.1: The County hereby adopts the following level -of -service standard for all new drainage systems within the -unincorporated county: New development requiring major site plan approval or subdivision platting shall construct a complete drainage system to mitigate the impacts of a 25 year/24 hour design rainfall event using the Soil Conservation Service Type 2 modified rainfall curves. Post development _runoff shall -not—exceed- pre -development runoff unless a maximum discharge rate has been adopted for the applicable drainage basin and the discharge does not exceed that rate. If a maximum discharge rate has not been adopted for the applicable basin,'post development discharge may not exceed pre -development discharge. POLIC-Y 1.2— Ali new -buildings shall have the lowest habitable floor elevation no lower than the elevation of the 100 -year flood elevation as shown on the Federal Emergency Management Agency FIRM or as defined in a more detailed study report. POLICY 1.3: All new roads constructed in Indian River County after September, 1990, shall meet the following design criteria. i 65 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:28 - OfficialDocuments:672, Attachment Id 0, Page 69 -DRAINAGE-SUB--ELEMENT-- Local DRAINAGE SUB--ELEMENT Local Road Protection Level of Service 3 year storm/24 hr duration - no flood encroachment outside existing easement and right-of-way limits; 0 year storm/24 hr. duration - limited encroachment of s+^r^waters in front -a^,a-wear yards; ;25 year storm/24 hour duration - greater encroachment of stormwaters in front and rear yards with no minor street flooding(2" maximum); -100 vear storm/3day duration - some street flooding, but no flooding of existing or nr000sed residences. POLICY 1.4: All new storm sewers discharging into any canal or receiving water body shall be designed to convey the permitted discharge after tailwater conditions are POLICY 1.5: All major bridges will be designed to pass the 100 year/3 day storm event. P6T._Zcy_: All nnlvnrtS within allFS Sectio leo Drainage Districts' rights-of-way or easements shall be sized and approved by the Drainage District prior to Land Development Permits being issued. POLICY 1.7: Within all new subdivisions wide backlot and front yard drainage easements, as well as side lot swales to provide for localized runoff routing (20' wide minimum), will be required where centralized retention/detention facilities .are not provided. POLICY 1—.8- The County's stormwater management element of the land development code shall require that all new drainage systems connecting to all FS Section 298 drainage district canals be completed prior to certificates of completion being issued by the County. OBJECTIVE 2 Existing Drainage Systems By 1995, existing drainage systems in the county will on average accommodate the b year our storm event. This will maximize the use of existing facilities. POLICY 2.1: In existing developments, the County will econstruct existing nagesysteins and restore design capacity when road paving is programmed under the County's Petition Paving Program. 66 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:28 - OfficialDocuments:672, Attachment Id 0, Page 70 DRA-WAGE--S-UB--ELEMENT POLICY 2.2: By 2010, all existing roadways in the county sT 11 be improved to meet the fs1l-0wing—le-vel-of-service standard: 1. Minimum road crown elevation for existing roads shall be raised during resurfacing/rebuilding to the flood elevation resulting from the 2 year/24 hour storm event on local streets. 2. The center two lanes of rebuilt roads must be at or above flood levels resulting from a 10 year/24 hour storm event on Arterial and Collector roads. POLICY 2.3: All drainage basins will meet the following level of service standards: Byl-9-9-5 2=Year 4liour S o mr Event By 2000 5-Year/24 Hour Storm Event By 2010 10-Year/24 Hour Storm Event POLICY 2.4: By 2010, retention/detention facilities to treat the- first 1-.5—inches—of r-&in€al-l-will- be- provided -or constructed within all existing county jurisdictional drainage systems that directly discharge to the Indian River Lagoon within the B -Series and R -Series Basins, unless stormwater quality testing shows that state water quality Class II standards are being -met,-Priorities--fQr retrofitting are identified in the Opportunities for stormwater quality and capacity section of each basin analysis. POLICY 2.5: By 1994, the county will develop a comprehensive stormwater management plan to reduce pollutant oadings to --the-Indian R-iverLagoon and to-be-Arcempli-a-neewit-h-state water quality standards for receiving waters. Implementation of the plan shall begin by June 30, 1995. POLICY 2.6: The county will continue its program of drainage facility maintenance by maintaining existing drainage swales and enforcing maintenance of private on-site detention/retention facilities. To enforce maintenance requirements applicable to private drainage facilities, the county will use its code enforcement function. POLICY 2.7. The county- wilesthrough it-s---land-development regulations, require existing uses undergoing redevelopment to meet the new development requirements for stormwater management. POLICY 2.8: The county will continue its activities to retrofit the Vero Lake Estates drainage system. 67 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:28 - OfficialDocuments:672, Attachment Id 0, Page 71 DRAI NA-GE—SUB-EL-MEN'— OBJECTIVE 3 Capital Improvements As part of the Capital Improvements Element, the county will have an adopted 20 -Year Drainage Improvement Program, which guides all drainage improvements in the county. P LILY 1 1, The 20 -year Drainage -Improvements Program- shall be included within the Indian River County Infrastructure CIP, as outlined on the Table 3.E,4 of the Drainage Sub -Element and Table 13.23 of the Capital Improvements Element. POLICY 3.2: The County shall include in all major transportation improvement projects drainage facilities to serve the discharge needs of the entire upstream watershed area. Funding shall be included in the Transportation CIP. POLICY 3.3: Proposed capital improvement projects shall be evaluat and ranked according to the following priority level guidelines: Level One - whether the project is needed to protect public health an satiety, to f lf-1I1 t e county's legal commitment to provide drainage facilities and servicub, or to preserve or achieve full use of existing facil- ities. 0 -Level-Tao- whether -the-prof-ect increases of€ieiency of use of existing facilities, prevents or reduces future improvement costs, provides service to developed areas lacking full service or promotes in -fill development. Level Three - whether the project represents a- logical extension of facilities within a designated drainage POLICY 3.4: By June 1992, the county shall establish a stormwater utility to fund drainage improvements. OBJECTIVE 4 Intergovernmental Coordination By 1991, the County will have formal, established cooperative relationships with federal, state, and local agencies having s ormwa er jurisdiction within Indian River County. POLICY 4.1: By 1991, the County staff will attend appropri- ate meetings of federal, state, regional, and local agencies which have stormwater jurisdiction within the SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:29 - OfficialDocuments:672, Attachment Id 0, Page 72 DRAINAGE—SUB-ELEMENT POLICY 4.2: By '991, the County will officially request a meeting - with -_h the St—John"vex Water --Managemen"istrir_t to discuss the role of the district in working with state and local governments and independent drainage districts to improve the capacity of primary drainage facilities to a level of service consistent with reasonable growth expectations. POLICY 4.3: By 1991, the County shall draft and send a letter to all FS 298 Drainage Districts, requesting a meeting to discuss the adoption of maximum discharge rates for District facilities based upon adopted District drainage POLICY 4.4: By 1991, Indian River County will officially request a meeting with local drainage districts and the SJRWMD o develop. a plan -to monies and control -pump discharges to Drainage District canals which outfall to the Sebastian River Flood Plain during major storm events to decrease downstream flooding. POLICY 4 5: T -he county wi11�-continue to -include drainage district representatives on its Technical Review Committee. POLICY 4.6: The County will establish a stormwater coordina- tion system with applicable local governments and drainage districts to -provide notification to appropriate entities of_ development in one jurisdiction having potential impacts on another iuris i.ction. OBJECTIVE 5 Preservation of Floodplains and Floodways 8y Ie qh ty- will have a comprehensive floodp-lain management plan. POLICY 5.1: By September, 1990, development regulations shall require that all floodways tributory to the Sebastian River South Prong be preserved from encroachment by fill or structures, to the 100 -Year flood elevation. POLICY.5.2: By October, 1990, Indian River County will purchase a minimum of 100 acres of 100 -Year floodplain lands for preservation and management. POLICY 5.3: By 1994, the County will acquired data to determine the impacts the 100 year floodplain and prepare regulate filling within floodplains. 69 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:29 - OfficialDocuments:672, Attachment Id 0, Page 73 use existing and of filling land within a management plan to -DRAINAGE—SUB--ELEMENT POLICY 5.4: The County will mitigation which development, as identified Conservation Element. require restora are negative-ly in the Poli OBJECTIVE 6 Recharge of the Shall-oW-Aquifer on or 5.1 of the By September 1990, the county as part of its land development regulations will have requirements that stormwater management systems be designed to provide recharge to the surficial aquifer when soil conditions are conducive to recharge. POLICY 6.1: By September, 1990, the County Land Development code will require percolation into the ground of all runoff from new development located in prime shallow aquifer re- charge areas as identified on Figure 3.D.2 of the Natural Groundwater Aquifer Recharge Sub -Element. POLICY 6.2: The County will continue to require on-site retention detention in accordance with SJRWMD and DER performance standards, as outlined in the Stormwater Management and—Frond Protection Ordinance (Ord. X82:2 POLICY 6.3: By September, 1990, the County through Land ` Development Regulations will require reuse of stormwater runoff for irrigation of golf courses and other developments providing wet detentionlretention- Win- ponds with a surface area greater than one acre. OBJECTIVE 7 Nater Quality Protection and Immmmprovement By 2-0-1�waterways--outfa-l-ling-iri the Indian Kiver Lagoon and other receiving waters will meet Class II state water quality standards. POLICY 7.i: The County will cooperatively assist the Marine Resources Council, Florida instituteofTechnology, in inventorying pollutant loading and developing a plan to eliminate stormwater pollutants from entering the Indian River Lagoon by collecting and analyzing water samples in each basin beginning in January, 1991. POLIC e county will reduce suspended solids loading of stormwater runoff by paving unpaved county roads within developed areas which have drainage systems that discharge into the Indian River Lagoon. 70 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:30 - OfficialDocuments:672, Attachment Id 0, Page 74 DRAINAGE -SNS -ELEMENT POLICY "I J s By September, 1990—,the-Count vUl--rewire a —erosioncontrol-planfor all -new -construction. POLICY 7.4: The County will initiate a street sweeping program for County -mads -by October -3-0"9 1941. POLICY 7.5: Indian River County will continue to require sodding or grassing of steep slopes constructed in conjunction anspo tation-Improvement Projects. POLICY 7.6: Indian River County shall reduce the quantity of harmful dissolved solids, nutrients, heavy metals, chlorides, andother poriu at nein stoker runoff entering -thz India River --Lagoon by nearpor-at-incj---Eur€ac-eWater Improvement Management (SWIM) Plan policies for the Indian River Lagoon in its land development regulations and coordinating with the SJRWMD. The—County will coordinate wit tthe SJRWMII n he ° Applying for SWIM funds for implementation of programs designed to meet th goals oa s and objectives o the Submitting regular reports to the SJRWMD on progress of the programs; and ° Providing local -information to the SJRWMD. POLICY 7.7: The county shall eliminate point sources of pollution —fram—private sewer -plants and septic- tanks contributing to water --quality problems and nutrient enrichment of the Indian River Lagoon (as indicated in the Sanitary Sewer'Sub-Element policies) by: Expanding the regional sanitary sewer facility; Requiring annual evaluation of private sewer plants an Requiring monitoring of septic tanks; Reusing-rrigation qua3 t w-astewater foxsera irrigation; °miring new development ne �o c� to he regions ° Other policies of the Sanitary Sewer Sub -Element, SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:30 - OfficialDocuments:672, Attachment Id 0, Page 75 DRAINAGE BUB -ELEMENT POLICY 7-3-. The county wrl1--a11-ow -n -ne cii-rt- sources of discharge -not meeting class II state water--quaii- y- standards; as indicated in Objective 2 and Policy 2.1 of the Conser- vation Element. management practice. POLICY 7--10: The -county- hereby adopts tete-fo-liow -ng�-wat quality level -of -service standard* asp -minimum, retention_ the first 1" of rainfall is required prior to offsite disch additional 50% treatmentis required for all dire ---discharge i-nto-theI-ntli-an-River Lagoon due -to its -designate as---an-outstandingFlorida—water -,as required by C 17-25.025(9), F.A.C. POL-XY�7-.1-l:-Ai1- existing--u-ses shall -meet -the water quaYity levelrVice at time ofredevelopment. POLICY 7.12: The county will continue to require all new surface water bodies to include littoral -ones-as--speciflea' in -the -Conservation -Element. OBJECTIVE 8 Land Use A11 land -uses -and l- nd-us€-dens-Lt-es ill omply i h e future ` land use plan map. The map is based on drainage suitability and discouragement of urban sprawl. POLICY -&-1- The County-wi-11- allow only louden -city nd-1-0w intensity uses in areas designated as flood prone within the area of inundation by the 100 -year flood) as depicted on the Future Land Use map. The only exception is where platted subdivisions already exist. POLICY 8.2: The County will assess the drainage capal of air lands proposed -for--& change -in land us-e--dasigi and -tot approve land -usQ changes -where d ainag-es( levels will not be met. POLICY --1-i-3: The county shall promote nfirl--developme improving and maintaining the existing drainage facilit' the developed areas of the county. 72 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:30 - OfficialDocuments:672, Attachment Id 0, Page 76 TRAFFIC CIRCULL-ATT ELEMENT GOALS, OBJECTIVES AND POLICIES GOAL A safe, convenient and efficient motorized and non -motorized transportation system available for all residents and visitors to the countywith-a -minimum- detriment to the environment.. OBJECTIVE 1 CORRECTION OF DEFICIENCIES The county -acknowledges and -'it is documented in the- Analysis 'section of this element that there is only one existing roadway deficiency, however; technically this is not a deficiency under concurrency rules since this roadway improvement is in the first three years of FDOT's 5 -year Transportation Improvement Plan. By 1994_, the -existing roadway r-apacity _deficiency will be corrected. POLICY 1.1: The county hereby adopts traffic circulation level of service standards. These standards are as follows: Level of service "C" shall be maintained for rural principal arterials and rural freeways during peak hour, peak season and peak direction conditions. During peak hour, peak season and peak ection onditions, le el of service-D`or-better shall be maintained on all other freeway, arterial and collector roadways. POLICY 1.2 .Proposed roadway -projects -sham be -evaluated -and _--ranked-inorder of priority according to the following guidelines: a. whether the project is needed to protect public health and safety-,-moo-fulfill the county's legal commitment to provide facilities and services, or to preserve or achieve full use of existing facilities; b, whether the project increases efficiency of use of existing facilities, prevents or reduces future improvement cost, provides service to developed areas lack-iag�ful-1 s-evLice or—promotes in-#31-1-deve-lopment; C. whether the project represents a logical extension of facilities and services within a designated urban service area; d. whether the project is the most cost effective alternative; and e. whether the project provides the least adverse impact to the environment of the options. 24 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:31 - OfficialDocuments:672, Attachment Id 0, Page 77 -TRAFFIC CIRCn-AfiION-ELEMENT POLICY 1.3: The county shall defer any roadway projects neededto- serve -mew- developmenprojects—needed address the 1989 existing deficiency, particularly when high accident frequency is evident. If funds are removed from the Five -Year Schedule of Capital Improvements for roadway improvements needed to maintain the adopted level of service, then &ny -devel opmen�nrder based—o"$(that road will be amended, repealed or deferred in order to ensure f that levels of service are maintained. POLICE L-4: The county hereby adopts the -transportabion�-- capital improvements program (TCIP) incorporated within this element (Ref.: Tables 4.7.1, 4.7.2 and 4.7.3). This TCIP shall be reviewed and,updated on an annual basis. OBJECTIVE 2 ADEQUATE TRANSPORTATION SYSTEM The county.traffic circulation system will operate at or above the minimum service levels specified in Policy 1.1, and traffic system improvements (identified in Tables 4,7,1, 4.7.2, 4.7.3) needed to ensure operation of roadways at or above the adopted level of sery c stan'ard—w `-ll a o i e. POLICY 2.1: No development project shall be approved if the projected impacts of the project would serve to reduce service levels of any roadway on the traffic circulation system below— the - standards - iderit-if ed in Policy Conditions applicable to this policy are as follows: ° Development project shall be defined as any activity which requires issuance of a development order. This includes_: comprehensive_ plan amendment, rezonings, site plan approval, preliminary plat approval, preliminary approval, DRI developmen rr er approva1, and building permit approval for single family structures. Projected project traffic shall be based on the application of HE trip rates ("Trip Generation, 4th Edition or—subsequent editions), Indian River County trip rates, or applicant derived/county approved trip rates for the proposed use(s) to the project. ° Existing service level will be derived by using the peak hour/peak season/peak direction traffic volume ranges or average travel speeds of a link. Volume shall be the sum of existing demand and committed demand. This is described in the concurrency management system component of the Capital Improvements Element. 25 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:31 - OfficialDocuments:672, Attachment Id 0, Page 78 SmeadSoft Reprint Date: Mon r r engineering and/or by qualified professionals in the field of ,transportation planning who specialize in traffic impact. analysis. The study area boundary shall include all intersections within 1/�mile of th project site ss wei as any intersection-beyond-1-/1mi-l--there the projects- generated daily traffic would account for 5 percent or more of the existing plus project traffic volumes. (Reviewing agencies --may-require larger study�oundaries on a case -by ease basis) . Projected -project traffic shall be based on the application of ITE dip ra es (Trip Generafio�urren EdItion�Ind'an Rimmer Ca"—tri-p�ates , or appEcant-&r-ived]eeunty-app-ov-ed trip rates for th"roposed uses ) in the project. 26 Mond TRA-'�IC-G3RC-ULA-TFON— RLEMENT ---Capaci -e calc - ate d as specified zn Florida s Leve-i-,of-Semi-ce Standards and- Guide -lines Manual—, 1 88, "Generalized Daily Level of Service Maximum Volumes for Florida's Urban/Urbanized (5,000+) Areas", using peak hour pea season peak rection de a assump- ion . If based on the above analysis, the proposed development does not meet approval requirements, the eveloper may chop -sego- conduct amore cletailed—traffic impact analys-is as described�_in-Policy 2-2 POLICY 2.2: The county, through its land development regulations, -sh-al-1require submissron-cf---a traffic- impact analysis -for all projectspreje-cted-to generate/attract-1000 or more average daily trips, or 54 or more peak hour trips. A traf ic impact analysis will also be required of any development projected -to generates/atter-a£t 500 -or -mor -e --average daily trips or 27 or more peak hour trips, located within a "critical transportation area", as defined in the analysis sec ion f t1iis elemen an designated by .thie—pub-lic works director. The-raff3-c impact analysihe bas -is -for identifying site -related improvements required by a project as well as for assessing consistency with adopted level of service stan ar s. Specific requirements for the traffic impact anal_y-sis are described below: 1'1111.LIWAII1 iGti 1/11611{G 11 b.7 A. V.6 1.116 64. ail.6V i1UyVL%.6 Gi11PJ.,yQ .7 'ALG -V--- below: - All traffic impact analyses shall be performed by registered pro fesslona 1' - engineers who specialize ;in transportation August 12, 2013 - 15:22:32 - OfficialDocuments:672, Attachment Id 0, Page 79 TRAFFi-C CrRCUL-A7'ION- L -EMELT rs.p d1stribu ion and assignment sh-all ee ased on one of --the followin(y- techniques. a) Trip distributions based on studies of existing similar elopments in proximity to the proposed site. b) Experienced judgement -and -knowledge -af- loom gond-ition� This method requires approval and concurrence from the county. c -)--A- combination—of "a-!�—and "bA-. d) Using a special zip code analysis for a representative land-use-innproximity-to the proposed site. e) FSUTMS travel model results including trip tables by trip purpose. f�---Gr-avitT-mode- Existing levels of service shall be calculated for all ma or signalized and mor unsigna-ized7 intersections within the study ar-ea�€or--beth morning and -afternoon --peak hours -during the peak season. If the proposed development contains retail only, the analysis will be limited to the afternoon peak hourxstng peacr hours wi7�be identified from traffic r" count -s -between -7:G8 and--9;{}O--a-.-m. and 4-:,00- and 6:40 using 15 -minute intervals--Counts-not-taken- during the -pea season shall be factored, based on county traffic counts in �e proje`cc area, torepresent peak season conditions. Level f se-r-,tite calculations shall -ie based -on- the Operational Analvsis methodolnav desrrihart in the iQR9 Aimhmav rnnnr4+-.. Manual. Future levels of service shall be calculated for the buildout date of the proposed project, as well as for any intermediate development phases. Conditions with and without the proposed development shall --be evaluated and documented. Conditions with the development shail--be-based on--c-t---combined-traffic volume of the projected peak hour/peak season traffic generated by the site and the projected peak hour/peak season backgroundtraffic theacb kground traffic shall be calculated based on -ani-cif thEc�l�c�w�r�et,�, a) Increase the existing peak season traffic to the build -out -date base- n-his-torical growth rends over a minimum -of dye -ars -and a maximum -of -10 -years. generated by committed development-s--whichwQuld impact the study area shall also be included subject to appeal es. SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:32 - OfficialDocuments:672, Attachment Id 0, Page 80 TRAFFIC CI-RCULATIOV-ELEMENT b� Increase the exsfng peak season traffic to—the-- volumes projected by the county. The county reserves the right to require method "a" to be used if they feel their traffic projections may be inaccurate due to recent changes in land use or roadway improvements. Roadway improvements which are committed and scheduled to be complete at or before the project buildout, or development phase, date can be included when calculating future levels of service-. - Roadway improvements shall be identified to improve projected -peak hour -peak season peak direction condition to an acceptable level of service ("C" or "D"). POLICY 2.3: The county shall maintain its traffic impact fee process and shall review the schedule -at least -once -every two years. If necessary, changes to the fee schedule shall be made based upon the results of the fee schedule review. The county will have a transportation system review and evaluation prepared on an annual basis. (` POLICY 3.1: The county will collect and maintain data on all accidents in the county. On an annual basis, the staff will review accident data from the previous three years to identify above average accident locations. These reviews will lead to the identification of accident causes; where necessary, safety projects will be identified and included in the county' transportation caput-aI improvements- program. POLICY 3.2: Traffic count data will be collected on all thoroughfare roads on a quarterly basis. These data will be utilized to develop an annual report on tree Level of Service provided o_n__m_a_Jor__area roads; Tese findings will then be used to identify improvement needs and associated costs required to maintain the Levels of Service identified in Policy 1.1. OBJECTIVE 4 RIGHTS-OF-WAY By 2010, the county will have secured the ultimate right-of-way needed for all county collector and arterial roads within the urban area as referenced in Figure 4.13.2 (Thoroughfare Plan Map) of the Traffic Circulation Element. POLICY 4.1: The county hereby adopts minimum right-of-way standards as defined below: 28 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:32 - OfficialDocuments:672, Attachment Id 0, Page 81 TRAFFIC -CIRCULATION ELEMENT TYPE OF FACILITY URBAN RURAL Ei; S . l Corridor QLD— --- U.S. 1 Corridor - 6LD 130 240 U.S. 1 Corridor - 4LD w/frontage 140 240 roads 6LD Principal -Arterial 4LD Ari ipal niterial 4LD Minor Arterial 2 LD Minor Arterial - Collector Subdivision Collector -Roads Local, Minor or Residential Local, Minor or Residential (with closed drainage as well as curb and gutter) Marginal Access Roads * Easement or Row 100 200 100 100 80 80 60 60 50 POLICY 4.2: The county shall continue its current practice of -preserving exi`s ing and future transportation right-of-way by requiring necessary and appropriat land dedication through the plat and site plan review and approval processes in accordance with the provisions of the County's Land Development Code. Dedication for right-of-way, exceeding local road - standards,- shall be-compensatecl through traffic impact fee credits, density transfers, or purchase. POLICY 4.3: The county shall acquire right-of-way, consistent with the standards identified in Policy 4.1, to allow for landscaped open space_ adjacent to- all r -u----1 arterial roadways and applicable urban arterial roadways. POLICY 4.4: The county shall use available funds, such as one cent local option sales tax revenue, to pursue advance right-of-way acquisition. POLICY -4-5- The county shall --continue to -enforce the existing Subdivision Collector Map, Figure 4.13.3, Pg, 18.11, to ensure that proposed development provides for the extension of subdivision collector roadways to parcels which are presently landlocked. YULICY 4.b: By 1993, the county will prepare and adopt right-of-way reservation maps (ref. Ch. 336.02,F,S.) for at least the following roadways: Oslo Road (9th St. S.W.), 58th Avenue, 12th Street, 43rd Avenue, C.R. 510 and 66th Avenue (north o . 29 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:33 - OffcialDocuments:672, Attachment Id 0, Page 82 TRAFFIC CIRCULATION ELEMENT TRAFFIC CONTROL All development projects approved by the county will provide for adequate traffic control. POLICY 5.-1: he county will, through its land development ► ► at minimum, for the following: ° Adequate storage and turning bays; - ° Spacing and design of median openings -and -curb -cuts; ° Provision of service roads; ° Driveway access and spacing; and ° Traffic operations. POLICY 5,2: The county shall _review all—proposed land developments in order to ensure consistency with the goals, objectives and policies of this plan, and the county shall require coordination of traffic circulation plans and improvements with land use and infrastructure plans before development approval. �POLICY 5.3i The county shall review all access driveways and new roadway connections associated with redevelopment or new development to ensure safety, preserve roadway capacity, and ensure compatibility with the long range transportation plan. POLICY 5.4: The county shall ensure that the installation n all traffic control devices is consistent with the standards contained in the Manual on Uniform Traffic Control Devices (MUTCD). The MUTCD will be the standard used by the county to determine—the—need—for traffic control improvements, including signalization. POLICY 5.5: The county will review on-site traffic flow for all proposed development projects to ensure that circulation for motorized and non -motorized vehicles and pedestrians can be accommodated safely. POLICY 5.6: The county will, through its land development regulations, continue to require that all development projects provide a sufficient number of parking spaces for both motorized and non -motorized vehicles. Sufficient will be based upon- information from parking studies regarding demand by use category. The county will revise its off-street parking requirements, identifying minimum spaces per land use category, delineating space size, providing for shared parking, setting internal circulation standards, and addressing other parking characteristics. 30 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:33 - OfficialDocuments:672, Attachment Id 0, Page 83 TRAFFIC CIRCULATION ELEMENT POLICY 5.7: frontimg art access roads access roads easements are POT ICY 5-8: : regulations, facilities. The county shall require that all developments !rial roadways provide for frontage/margina or drives, as appropriate. These marginal may be parking lot access drives where access provided to the public. The --cousha31ugh— its land development provide for the use of shared driveway _OBJECTIVE 6 PEDESTRIAN/BI-YC-LE SYSTEM By 2000, the county will have a continuous pedestrian/bicycle system providing access throughout the urbanized area of the county. POLICY 6.1: The county hereby adopts the Indian River County Sidewalk7tgsicycle Plan as its pedestrian bicycle policy. The county will implement that plan by incorporating improvements identified in that plan in its TCIP. The county will review and update the plan at least every three years. POT -Try A - ? T By 1991, the county shall evaluate utility easements, railroad rights--of-way and drainage canal rights-of-way as locations for bicycle ways. This evaluation will,be based upon safety and cost considerations as well as negotiations- with appropriate agencies which control these i easements and rights-of-way. POLICY 6.3: By 1995, the county will assess all thoroughfare .plan roadways to .identify hazards to bicyclists. Where hazards are identified, improvements to- correct them will be programmed. POLICY 6.4: The county will ensure that pedestrian and bicycle access is provided to all park areas. OBJECTIVE 7 LAND USE COMPATIBILITY The traffic circulation system will be compatible with the land use element and other elements of the comprehensive plan. POLICY 7.1: The county will, as much as possible, -protect the character of existing neighborhoods from the intrusion of major thoroughfares (i.e. minor and principal arterials). The criteria used to determine whether major throughfares will be allowed to intrude in existing neighborhoods are whether there are problems maintaining level of service standards on the applicable roadways, whether there are safety problems, right 'zab l " y and whether there are viable alternatives to intruding into an existing 31 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:33 - OffcialDocuments:672, Attachment Id 0, Page 84 TRAFFIC CYFCULATrON ELEMENT neighborhood. In areas where minor and principal arterial provide buffers such as concrete walls, landscaped buffers, berms, and other similar buffers alongside the roadway(s). The county will also review the feasibility of relocating roadways when intrusion is eminent and limit the number of road.T917 conne-1 t!-Jons or acce Cs.es to the `MorouR�hfar - POLICY .7.2: Major roadways (i.e. minor and principal arterials) and intersections shall, to the extent possible, be located and designed such as. to not adversely affect .existing neighborhoods nor produce excessive traffic on local roads through residential areas. The following are some of the characteristics by which the county will determine whether, neighborhoods are adversely impacted: severed existing neighborhoods, more traffic other than local traffic using roadways, widening of roadways which.result in roadways constructed closer to residential homes, and other similar characteristics. In areas where minor and principal arterial roadways and their intersections adversely affect existing neighborhoods, the county will provide buffers as stated in the above Policy7-.L__-The countywi7Z also iew to feasibility of relocating roadways and intersections and limit the number of roadway connections and accesses. POLICY 7.3: The county shall locate and design roadways to minimize -adverse -environmental—impacts. Where sensitive environmental areas will be impacted by roadway construction, the county will mitigate those impacts by taking action as provided for in the Conservation Element of the plan. POLICY 7,_4: The county shall not fund transportation Mr ovements which will allow increased development in coastal---high-ha and areas. POLICY 7.5: The county hereby designates as historic and scenic roads the following: Jungle T -rail 00-ld Winter Beachoad Fellsmere Grade Quay Dock Road Gifford Dock Road The county will prepare,- adopt; and implement management plans for each of these roads in order to protect and enhance their scenic/historic character. OBJECTIVE 8 COORDINATION The county will have a system which ensures that all transpor- tation requi-rements, procedures, and improvements are coordinated with all applicable governmental entities responsible for transpor- tation activities and with the Hutchinson Island Resource �. Management Plan, 32 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:34 - OfficialDocuments:672, Attachment Id 0, Page 85 TRAFFIC CIRCULATION ELEMENT POLICY 8.1: The county recognizes that after the 1990 census Indian River County will be, designated urban and that a metropolitan planning organization will be established. The county will coordinate with FDOT to provide for transition to MPO status. This will involve, but not be limited to, the following county actions: maintaining and updating traffic u.aa.aaiviv wv uu.", U0%. Vi hilt FSUTMS, continued staff training. POLICY, 8.2: The county will coordinate with FDOT to establish written standards for sidewalk placement, access control,—mediancuts, signage,, ate,=a=n age, and other related physical roadway development activities. The county's Planning and Public Works Departments will schedule meeting(s), beginning the Fall of 1991, with appropriate FDOT officials—to review and -discuss- these issues and develop written standards agreeable to both entities. POLICY 8.3: The county will continue to use the Transpor- tation Planning Committee to promote intergovernmental coordination with the municipalities in the county_. rvLit,z o.s: 1ne counLy will estanllsn a mecnanlsm to share information with the municipalities in the county and with adjacent counties regarding proposed projects and their potential traffic system impacts on other jurisdictions. V The county will continue with the plans and programs of all transportation facility' providers, especially FDOT, the county will meet annually with representatives from each entity prior to formal adoption of individual transportation plans. POLICY 8.6: The county acknowledges that it is in compliance and will continue to comply with the level of service standards for roadways as identified in the 1983 "Hutchinson Island Resource Planning & Management Plan", Policy C.1, page 33. This policy states that roadways on the barrier island and connecting roadways that -ink tire --island to the mainland will maintain a minimum level of service of "C" on an average annual basis and level of service "D" for peak season traffic. 33 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:34 - OffcialDocuments:672, Attachment Id 0, Page 86 As with all elements or the comprehensive plan, 90415, VyJecLivca and policies are the basis of the Mass Transit Element. Not only do these objectives and policies establish the county's direction for mass transit and paratransit; but goals, objectives and policies also set community expectations for transit and courses of action which the county will pursue to meet those expec- tations. - GOAL it is River County—to—provide man-sportation system that serves the needs of all residents of the county, including those which are transportation disadvantaged. OBJECTIVE 1 ADEQUATE -TRANSIT SERVICES The county will ensure that the availability of transit services in Indian River County will not be decreased. POLICY 1.1: The county will not set level -of -service standards for mass transit, since the county has no mass transit system and therefore cannot establish criteria regarding headways, route spacing, service areas, facility capacity_, and other mass transit standards. POLiUY . e county will,hroug the future land use element, provide higher densities along major transportation corridors in order to facilitate future mass transit provision. POLICY -1.3-:- he cou-The-y-,--aft-er its---designation—as—urban and establishment of a metropolitan planning organization, will prepare a feasibility study for establishing a mass transit system. Upon establishment of a mass transit system, the comprehensive plan will be amended to establish a mass transit level -of -service standard. POLICY 1.4: The county will financially support the Council On Aging in the provision of paratransit services. SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:34 - OfficialDocuments:672, Attachment Id 0, Page 87 MA -SS -TRANS -IT ELEMENT OBJECTIVE 2 COORDINATION The county will ensure that all activities relating to mass transit and paratransit are coordinated with the plans and activities of the FDOT and other agencies. P LIry 2.1:On—an--annual basis; the county will review FDOT's proposed 5 year transportation improvement plan and other proposed programs for the provision of transit services, provide comments and recommendations to FDOT, and incorporate FDOT iniatives into the Indian River County Planning Program. POLICY 2.2: The county will coordinate with all paratransit providers in the county by: Compiling information on routes, schedules, facilities and vehicles for each provider; 0 Assessing the information to determine duplication; and 'By holding -meetings with providers to serve as—a—forum for discussing paratrans-it, Aervise to ensure that services are provided efficiently with minimal overlap and duplication. i OBJECTIVE 3 RIGHT-OF-WAY PROTECTION By 2010 the county will provide for protection of future mass transit rights-of-way and exclusive mass transit corridors within the urban area and consistent with the Traffic Circulation Element. POLICY 3.1: The county, upon establishment of a metropolitan planning organization, will study methods for protecting rights-of-way and corridors for future mass transit roadways and high speed rail. SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:35 - OfficialDocuments:672, Attachment Id 0, Page 88 C PORTS, AVIATION AND RELATED FACILITIES GOALS, OBJECTIVES & POLICIES As with all elements of the comprehensive plan, goals, objectives and policies are the basis of the Ports, Aviation and Related Facilities Element. Not only do these objectives and policies establish the county's direction for ports, aviation, and related facilities; but goals, objectives and policies also set community expectations for ports and aviation and courses of action which the county will pursue to meet those expectations. GOAL - -' It is' the goal of Indian River County to ensure that safe, convenient, and accessible ports and aviation facilities are available to Indian River County residents. OBJECTIVE 1 ADEQUATE AVIATION FACILITIES The county will ensure that aviation demand is met throughout the planning period. POLICY 1.1: Indian River County will support expansion of the St. Lucie County International Airport through: 0 Letters of support for grant application; 0 Correspondence with the St. Lucie County International Airport manager to maintain up-to-date information regarding the airport; and Review and comment on future expansion plans of the airport. POLICY 1.2: Indian River County will by 1995 evaluate aviation passenger demand by Indian River County residents. OBJECTIVE 2 CONSISTENCY The county will ensure that any airport expansion is consistent with the policies of other elements of the comprehensive plan. POLICY 2.1: The county will expansion to ensure that the land use, coastal zone, circulation element policies. evaluate any proposed airport expansion is consistent with conservation, and traffic POLICY 2.2: The county will develop, adopt and enforce an airport -zoning component of its land development regulations, prohibiting encroachment of incompatible uses, such as tall structures in airport clear zones and height restriction zones, and residential uses inside the 65 ldn noise contour zones associated with public use airports in the county. 10 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:35 - OffcialDocuments:672, Attachment Id 0, Page 89 PORTS, AVIATION AND RELATED FACILITIES POLICY 2.3: The county will ensure that construction of new airports or expansion of existing airports will occur where there are no significant adverse impacts on environmentally sensitive areas by: ° Including the appropriate Airport Manager in development review of major site Vidlib U11 Vity/ unty— bond ° Restricting zoning in areas near noise contour zones to lower densities; and ° Desivning a tall structure caution zone which will- show areas of development that require tall structure review and possible restriction of development. OBJECTIVE 3 TRAFFIC The county will ensure that all county roadways providing direct or indirect access to airport facilities maintain a minimum service level of "D on a peak hour/peak season peak direction POLICY 3.1: Indian River County will make traffic -circulation system improvements, as reflected in the traffic circulation element, to maintain minimum serviceeve ss on airport access roads. POLICY 3.2: facilities in established. Indian River County will consider airport any future mass transit service that may be OBJECTIVE 4 COORDINATION The County will ensure that any airport expansion plans are coordinated with appropriate jurisdictions and/or agencies. POLICY-4--.1-.—The county will review any airport expansion plans by the Sebastian or Vero Beach airports for impacts on unincorporated areas through the land use intergovernmental coordination review system established in this plan. POLICY 4:2: . The county will coordinate with the FAA and other appropriate agencies in establishing airport zoning requirements. 11 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:36 - OfficialDocuments:672, Attachment Id 0, Page 90 HOUSING ELEMENT GOAL'S, OBJECTIVES AND POLICIES GOAL 1 A housing supply which permits all households to enjoy safa and healthful living accommodations which meet accepted standards of affordability and which are located in pleasant environments where a sense of civic pride and personal well-being can be achieved. _OBJECTIVE 1 HOUSING AFFORDABILITY By 1990, Indian River County shall secure the means to reduce e cost of housing 'development and construction to ensure that affordable housing is available to the 60% of county households in the very low, low, and moderate income groups. POLICY 1, 1, All coo es, ordinaces, regulations, policies and procedures regarding residential development review and construction shall be reviewed to determine their impact on housing development costs. Those components which unnecessarily increase the cost o -f housing without impairing the health, sanitation, fire safety, structural integrity and maintenance requirements shall be eliminated. This review will focus on zoning district size and dimensional criteria, mandated infrastructure improvements, and review processing _ time. This review will be conducted aa_ part of the land development regulation update to be completed by September 1, POLICY 1.2: The county shall encourage infill development, by timely and effective maintenance of housing, removal of blighting influences, andstaiT —tion o —neighborhoods through educat-.-0n-a-1 means such—a� newsletters; meetings, research, and information exchanges as well as coordinated and joint programs and activities by public and private sectors. POLICY 1.3: An advisory committee shall be appointed by the Board of County Commissioners to provide additional guidance on county housing policies. Comprised of representatives of the housing industry, financial institutions, Housing Authority and citizens, the committee shall be advisory and terminated upon acceptance of its final report. This committee -s halmssubmit a final report to the Board of County Commissioners by 1993 containing the following: SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:36 - OfficialDocuments:672, Attachment Id 0, Page 91 44 HOUSING ELEMENT 1. Recommended strategies for housing and neighborhood conservation alternatives & feasibility; 2. Public/private joint sponsorship of activities and funding programs; 3. —Approaches housing costs and upgrade neighborhoods; 4'. Policies concerning the formation of non-profit housing sponsors; and 5. Principles and criteria to guide residential density planning, special housing facility locations, and effective means of integrating housing plann-inS-with general-community—planning. POLICY 1,4: The county planning staff shall by 1992 present to the Board of County Commissioners an update of the housing needs of the county based on new data from_ the 19H__ J.__. Census (particularly with regard to very low and low income households). Te update shail include a review of the effectiveness of coordination activities, and resulting impacts of County initiatives described in this Element for implementation following adoption of the Comprehensive Plan. POL!" I.r : Indian River Coll shall identify f-edeml, state and other sources of funding earmarked for low and moderate income housing and actively pursue these funds for local use. POLICY 1.6: By 1992, the county shall establish a Housing Finance Authority whose purpose shall be the issuance of bonds for financing housing programs for very low, low, and moderate income households. POLICY 1.7: The county shall encourage the stabilization and redevelopmentof—olderneighborhoods -by creaaaating -special zoning districts which recognize the limitations of older subdivisions by providing flexibility from setbacks and dimensional criteria, and the creation of Municipal Service Benefit Units to fund infrastructure improvements. 45 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:36 - OfficialDocuments:672, Attachment Id 0, Page 92 HOUSING ELEMENT OBJECTIVE 2 BALANCED HOUSING MARKET Indian River County shall have a balanced housing market which is responsive, to the housing and economic needs of all income groups and groups with special needs. This shall be achieved by ensuring the availability of sites through the land use and zoning ms,—t, a-ccommodate a mix ure-of-housing types based on the historic demand over the preceding 5 year period. _- POLICY 2.1: By 1992, a local fair housing ordinance will be adopted and implemented to Ensure equal housing opportunity in accordance with Title VITI of the Civil Rights Act of 1968 and the Florida Fair Housing Act, Chapter 760.020, F.S. POLICY 2.2: Indian River County through its future land use plan -map hereby _designates- land -for residential -land uses and support services for a wide variety of housing types (including mobile homes), densities, and physical environments to facilitate an equally -wide variety of housing costs for present and future residents with special consideration given to the following: 1. Lot sizes, setbacks, and land use mixes; 2. Proximity to public transportation, recreational facilities, and - community—services--sueh a shopping, ' -personal services, and. health care; and 3. Compatibility of land use relationships and neigh- borhood character. 4. Reduction of automobile travel to meet normal daily needs for access to employment, services, recreation and other local activities, Residential Land Use Districts District Gross Acreage Max Density—Res. Development M-2 2440 10 Multi-Fam., Mobile Home M-1 5341 8 Multi-Fam., Mobile Home T-� 21380 6 Multi=Fam., Mobile Home L-1 18340 3 Multi-Fam., Single Fam. R 11640 1 Single Family POLICY 2.3: The county shall provide technical assistance to existing and future community development corporations. 46 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:36 - OfficialDocuments:672, Attachment Id 0, Page 93 HOUSING ELEMENT POLICY 2.4: The c shall inventory all surplus used for affordable housing identification of such lands with Board, the SJRWMD and other public The county will "cooperate with properties that could be and will coordinate the municipalities, the School land owners in the county. the State Department of available for affordable housing development. r __--the --The county shall make these lands available for affordable -- housing development using a competitive Request for Proposal process, seeking proposals from the private sect -or. The county shall also provide direct land grants to private non-profit agencies. To ensure that these units will meet affordable housing needs, the RFP process shall require units produced average -less than85$ o€ county -median home -price and 90% of all units be less -than median price. Where surplus county land is available but not appropriate for affordable housing, the county shall make that land available to developers and propertyowners for exchange for suitable affordable housing. The county land shall be exchanged—for ldnCS whichare proximate to centers, transportation systems, and have other infrastructure which makes the land suitable for of affordable housing. employment necessary development POLICY 2.5: By 1991, the county's land development regulations shall provide density bonuses for PUD's and other large developments which set aside a certain percentage of units for very low, low and moderate income families. POLICY 2.6: By 1992, the county will identify private sector participants agreeable to participate in a low cost housing demonstration program. Together with participating builders, developers, financers, and other housing related groups, the county w3lI7--produce 'ow-cost—,no--f housing units: The county's role will involve land acquisition, technical assistance and permitting. 47 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:37 - OfficialDocuments:672, Attachment Id 0, Page 94 HHOU -S-ING ELEMENT— OBJECTIVE 3 IMPROVED PROPERTY MAINTENA Indian River County shall reduce the number of dwelling units with housing code violations through increased maintenance programs. By 1995, the number of code violations shall be reduced from 340 to 200. POLICY 3.1: The Standard Housing Code shall continue to be the county's standard for public health, safety, and welfare with regard to occupancy limits based on unit size, provision of adequate plumbing facilities and prevention of exterior physical deterioration. This code will be enforced by the building department and code enforcement department staffs. POLICY 3,2: An inventory of housing conditions shall be undertaken prior to 1993 on a neighborhood by neighborhood basis to determine units suitable for concentrated code enforcement, rehabilitation, demolition, and, if appropriate, relocation or other actions to achieve a suitable residential environment. POLICY 3: The. county sha=ms encourage improved housing maintenance by property owners by providing consumer information and technical assistance on new products and / their applications. POLICY 3.4: The county shall encourage improved neighborhood appearance by establishing' neighborhood awareness programs and providing annual merit recognition awards for - neighborhood improvement programs. ` OBJECTIVE 4--HOUSINGG ASSISTANCE The county shall provide direct affordable housing assistance to qualified applicants or assist them in securing assistance from private and non-profit organizations in lieu of public assistance -----for—at— least 100 --previously unassisted households annually beginning in 1992. POLICY 4.1: The Board of County Commissioners shall request the Housing Authority to identify by July 1, 1990, its agency objectives regarding the number and types of recipients the Authority is able to serve annually, based on data in its possession and presented in this Element, and its staff capabilities as well as additional assistance required for each program administered by it and the extent to which such efforts will meet the demonstrated need by the year 1995. 48 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:37 - OfficialDocuments:672, Attachment Id 0, Page 95 HOUSING ELEMENT POLICY 4.2: The Board of County Commissioners will evaluate the report of the Housing Authority and take appropriate actions through funding, policy revisions, and program initiatives to support, augment, and facilitate assistance to families and individuals who are unable to provide housing within acceptable cost limits of 30% of gross household o or who require rehabilitation - , financial, and/or technical assistance to assure safe, healthful, and affordable housing. POLICY The county shall develop and adopt an ordinance which provides a mechanism for the amortization of impact fees for newly constructed housing units which meet criteria of affordability. POLICY 4.4: The county shall establish a Housing Trust Fund which will provide below-market interest rate financing and/or grants for land acquisition, construction and other related costs for the development of -affordable -housing units in the unincorporated area. The fund will also assist non-profit aci i a ors with pre -development expenses associated with very low, low and moderate income housing development. Some disbursements from the Housing Trust Fund will be grants, but the majority of funds will be revolving loans, with borrowers paying bac c—into the trust; therefore ensur . ng a permanent source of financing. POLICY 4.5: The county shall request that the Florida Legislature -adopt legi—s ation-which-will permit the county to enact a surtax on documentary stamps to be -dedicated to local housing assistance related needs. The county will enact such a surtax as soon as permitted with a minimum of 40% dedicated to the Housing Trust Fund. POLICY 4-.-ry-: The countyshall sign interlocal agreements with any local municipality which desires to participate in the Housing Trust Fund. The amount and method of payment will be established prior to execution. SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:38 - OfficialDocuments:672, Attachment Id 0, Page 96 46. 1 HOUSING ELEMENT POLICY 4.7: The county shall permit a 10% density bonus (above the —fid use maximum to developers willing to contribute to the Housing Trust Fund. Participating developers shall be allowed to build affordable housing units off-site or contribute to the Housing Trust Fund a fee equal to 1.2 times- the designated housing production cost. The my sh get areas fur affordable hUUb.L11LJ production within 6 months of establishing the Housing Trust Fund. POLICY 4.8: The county 'shall develop mechanisms such as interest or fee penalties with developers, owners, and tenants of publicly subsidized units to ensure the continuation of the unit's affordability and eliminate the possibility of creating an economic windfall for participants. OBJECTIVE 5 BLIGHT REMOVAL Indian River County will reduce the estimated 800-1000 substandard housing units by 50% by 1995. POLICY 5.1: Spot removal of blighted structures and blighting influences, as well as groups of structures, shall be achieved through incentive programs offered by the County or cooperative ventures which minimize capitar outlay re Tui re -.1 the County, POLICY 5.2: Residents displaced by housing rehabilitation and redevelopment or other publicly -initiated activities, shall be provided -technics-"Td financ-i-&i assistance to expedite their relocation. POLICY 5.3: The County and the Housing Authority shall jointly develop appropriate principles to guide activities and priorities in housing conservation, rehabilitation, and redevelopment. POLICY 5.4: Indian River County will continue to utilize the adopted Standard Housing Code for housing and neighborhood quality standards. OBJECTIVE 6 SPECIAL HOUSING NEEDS Indian River County will continue to ensure that sites are available for group homes and care facilities in residential areas to accommodate an additional 300 residents by 1995. SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:38 - OfficialDocuments:672, Attachment Id 0, Page 97 48.2 ----HOUSING-ELEMENT POLICY 6.1: Indian River County shall coordinate its efforts in meeting the needs for special housing with efforts of the State Department of Health and Rehabilitative Services to ensure the provision of these homes and other special housing types in residential neighborhoods of compatible density. POLICY 6.2. The county shall—encourage private an non-profit sponsors to initiate projects and assist in obtaining financial assistance for those sponsors from all available sources to ensure that an adequate supply of group and foster care facilities is provided for county residents. POLICY 6.3: The County shall enact regulations requiring that all foster and group home developments include barrier -free design features. POLICY 6.4: The county land development regulations shall contain provisions to permit the development of group homes and foster care facilities in residential districts in densities which correspond with the prevailing development pattern. Indian River County shall maintain the number of existing farmworker housing unit$—arn�increase thequa-lity-of-the .units. POLICY 7.1: The County shall assist private agricultural businesses to secure assistance for funding construction and/or rehabilitation of farmworker housing. POLICY 7.2: The proposed Committee on Housing and Neighb�oo s a 1 e directed to consider cooperative activities of the agricultural industry and public regulatory/financial agencies as well as innovative approaches to improve the affordability of farmworker housing. POLICY 7.3: The county shall require permanent housing for farmworker households be located in areas which contain infrastructure necessary for safe and sanitary habitation and in proximity of other public services and facilities. Seasonal workers housing may be provided as an accessory on-site use in agricultural areas. This housing will be required to provide on-site infrastructure as required. OBJECTIVE -8 HISTORIC HOUSING Indian River County will increase the percentage of significant older dwelling units in excellent or good condition from 72% to 90% by 1995. SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:38 - OfficialDocuments:672, Attachment Id 0, Page 98 48.3 HOUSING ELEMENT POLICY 8 1: fiecfin cal assistance shalYbe provided -by -the County sta€f to—indi-vidua1s and organizations having individual or collective interests in conserving historic or architecturally -significant structures, neighborhoods, and areas. Assistance wi1Z, as a minimum, inc ude preparation of applications—f-r the t�istor-i-cPreservatian—Gr-anis --I-n Aid program administered bathe Division of -Archives, Histor and Records Management Bureau of the Florida Department of State. POL-I-CY-8.2--The---county shaH-adopt7---a H-.-stor-ic Pres-eviation Ordinance not later than -19.22_ OBJECTIVE 9 INTERGOVERNMENTAL COORDINATION Y-1991-,_ Indian River -County -will -have- interloc&l agreements with the municipalities to establish housing assistance and housing programs for affordable housing for the 10% of the population wh1ch-is-in need-offhousing-assistance. POLICY 9.1: The county will, through the Housing Authority and other means, coordinate with local municipalities to develop housing assistance, programs -.—A-s part of this coordination process, the county- will --accept- funds, -land, in-kind services, or other types of payments for housing assistance purposes from local municipalities which are unable o—grovsde sI -cost- housing wftlyin their POLICY 9.2: The county will encourage the municipalities with in the county to prwide lousing assistance to meet their share -0f county housing -needs: OBJECTIVE 10 RELOCATION HOUSING —1 an River County =�,�ill ensure that relocation ho sing 1s Ta 4i available to persons displaced by public action or activities. POLICY 10.1: The County Housing Authority shall- have responsibility--ta ensure that persons displaced by demolition of substandard housing are relocated to housing which meets the Standard Housing Code. p-OLIC-Y-1-0-.2- he--Boar-d--of County-Commissioners_shal_l provide funding to the Housing Authority on an emergency basis to ensure that households displaced by public action or activity e-guaranteed-adequatefi-ou�i SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:39 - OfficialDocuments:672, Attachment Id 0, Page 99 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:39 - OfficialDocuments:672, Attachment Id 0, Page 100 CONSERVATION CONSERVATION ELEMENT GOAL, OBJECTIVES AND POLICIES GOAL It is the goal of Indian River County to protect, conserve, enhance, or appropriately use the County's natural --resour ces in a manner which maximizes their natural functions and values. OBJECTIVE 1 Air Quality Air quality within IndianRiver County will C! nti nue to meet or better state and federal minimum ambient air quality standards. Policy_ -17.1: The county shall assess FDER local monitoring —station—air- quality data- annual-ly- end confer with FDERn sources' of air quality violations and abatement methods (as applicable). Policy 1,2: Indian River County shall require the use of air curtain incinerators to burn land -clearing debris associated with urban development and shall encourage the use of wood chippers to promote the reduction ot open burning an associated air pollution. The county shall study the feasibility of eliminating open burning in association with urban development (Ref. Policy 4.6 of the Solid Waste Sub -Element) . Policy 1.3: In coordination with the Office of Radiation Control and the county public health unit, the county shall make available information on the detection and control of radon aas. Policy 1.4: The county shall coordinate with the Division of Forestry to ensure that appropriate land -clearing debris burning precautions are implemented in conjunction with land -clearing activities. The county shall require a drying -out period for land -clearing debris as a measure to prevent green -wood open burning. Policy 1,5: Indian River County shall regulate land -clearing and excavation activities, through the County Tree Protection Ordinance and Excavation and Mining Ordinance, to ensure dust control methods—ax—e— implemented -a-&--needed to minimize sus- pended particulate air pollution. Policy 1.6: The county shall coordinate with the Department of Environmental Regulation and the HRS/County Environmental Health Department in evaluating air quality impacts of stationary air -pollution sources, to ensure such uses main- tain air quality within accepted standards. Policy -1.7: The county shall promote the reduction of vehicu- lar travel and associated emissions by encouraging planned residential deve opmen s, by promoting the establishment 72 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:40 - OffcialDocuments:672, Attachment Id 0, Page 101 CONSERVATION - bicycle and walking paths, and by'planning for limited retail land areas. OBJECTIVE-�2 Surface Water Quality By 1995, water quality—throughout—the n lan River Lagoon and the ct Gebass#an River slimeet tem quality standards, respectively, and the County will protect and appropriately -use these and other surface waters to maximize their natural --functions and values. Policy 2.1: Indian. River County shall include within county land development regulations the following standards for development in or adjacent to the St. Sebastian River or Indian River Lagoon Aquatic Preserves. a. A fifty (50) foot shoreline protection buffer for unplatted parcels, and a twenty-five (25) foot buffer for platted lots shall be established, measured from the mean high water line. er, no development ramps, pervious walkways and elevated walkways which provide the property owner with reasonable access to the water. C. No more than twenty (70) percent or twenty-five(25) feet, whichever is greater, of any shoreline may be altered for reasonable access. Native vegetation in the remainder of the shoreline protection buffer shall remain _unaltered,_ except as may be allowed through county trimming regulations. d. Shoreline alteration shall be prohibited, unless it is in the public interest or prevents or repairs erosion damage, or provides reasonable access to the water, and does not adversely impact water quality, natural habitat -or adj-aeent—share-1-ne-uses. e. No point -source discharge shall be allowed to enter the St. Sebastian River or Indian River Lagoon when such dis- charge is of poorer quality than. State Class II Water Quality parameter standards Public potable water supply reverse -osmosis plants shall be given a separate consideration, weighing public benefits and alterna- tives. icy .2.2: The county shall require the retention of native vegeta adjacent o drai nage canals or drainage ditches, where removal may otherwise result in surface water sedi- mentation, except when such vegetation interferes with canal or ditch maintenance. 73 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:40 - OffcialDocuments:672, Attachment Id 0, Page 102 CONSERVATION Policy 2.3: The county shall review the stormwater management and flood protection ordinance to ensure that off-site stormwater runoff ultimately 'draining into the Indian River Lagoon is minimized. Policy 2.4_:_ The county shall contact the Indian River Soil dlid Water Cons erv operations to implement conservation plans and best management practices. Policy__2_.5: The county small adopt a wetland -protection ordinance, as filr h.or deaeri ed in Policy 5.1 of this0 ment. Policy 2.6: To reduce surface water chloride pollution, the county- shall—prohibit -the--use---of Floridan -aquifer-ar-tesi-an flow wells to recharge new artificially created surface waterbodies in conjunction with urban development, except for four inch (4") or less diameter wells with working values consistent with SJRWMD approvals. Policy'2.7: The county.shall continue to coordinate with the Johns River Water management District, the Florida Department of Environmental Regulation, the Florida Depart- ment of Natural Resources, the U.S. Corps of Engineers, the HRS/County Environmental Health Department, and other juris- diction agencies, as applicable, to ensure sur ace water q"impacts associated with land development are min� imized. Policy 2.8: The county shall prohibit the creation of new navigahle-Lcanal-s ar-waterways- -connected- to--th"nalan River Lagoon or St. Sebastian River. Maintenance dredging of existing artificial navigable canals shall be the minimum necessary to accomplish the dredging purpose and shall be permitted only in compliance with all applicable state and federal jurisdictional agency regulations.. Excavation of any existing canal shall not be for the purpose of obtaining fill. Policy 2.9: The county shall continue to implement water management standards, including littoral zone establishment and maintenance, as set forth in the county Excavation and Mining Ordinance pertaining to created or expanded waterbodies: Policy 2.10: The county shall conduct a study, in coordina- tion with the St. Johns River Water Management District and the Florida Game and Freshwater Fish Commission, to determine the appropriate maximum allowable water depth for created surface waterbodies, to ensure allowed depths are not detrimental to surface water quality. 74 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:40 - OffcialDocuments:672, Attachment Id 0, Page 103 CONSERVATION OBJECTIVE 3 Groundwater Quality and,Quantity Groundwater--qualityin-Indian-River County-wil-1-e protected against degradation, and there will be minimal loss of the poten- tial yield of groundwater in the shallow aquifer or Floridan Policy 3.1: The county shall use water quality protection and groundwater --quantity preservation measures, as designated in fie objec ives anc olicies of -the N tural Groundwa er _ =Xq er Recharge Sub -E 1 ement-,-toprotect-grou-ndwater-ua33t andcruantit . 01icy_.i: The county s aus� er conservation measures, a"esignated in the-ob�ectives-andpoli-ies of the- Potable -Water and Sanitary Sewer Sub -Elements, to -protect the -shallow aquifer and Floridan aquifer from groundwater quantity Policy 3.3: By 1992, the count"ha7.1-establish- a shallow aquifer primary recharge overlay district, to include (but notbe limited -to) - the regulation of groundwater contaminate -uses. Policy,; - 3.4: By 1991, the county shall revise its present landscape ordinance to require that a minimum of 50%, of landscape plant material required under the ordinance -shall consist-o-L-drought-tolerantspecies. Existing native plant species preserved on site may be considered as credit toward t erd ougt-tolerant percentage requirement. Policy -5:. -The county -shall encourage -the use of-low--v-lame irrigation systems to prevent overpumping from the Floridan aquifer. The county will, by 1993, study the feasibility of prt�viding finanlial incentives to the agricultural industry in order to encourage groves to use microjet or low volume irrigation systems. Policy 3-.-6-: By 1990, the :county shalomimplement an abandoned flow -well pludng-program in con3unction with the SJRWMD and in coordination with the Indian River Soil and Water Conser- va,io' nD ricBy-4,995, allidentHied abandoned flow wells,"-in-ind}an-River-County shat-l-be-plugge . Policy 3.7: By 1991, the county shall establish an emergency warmer conservation plan consist with the plans of t est. Johns -Ri-ve-r-Water Management District including the following criteria: SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:41 - OfficialDocuments:672, Attachment Id 0, Page 104 CONSERVATro'N a. The county shall establish�l enorcement procedures eietizrg--to SJ'RWMD-shortage restrictions-; b. The county shall make available public information on water conservation techniques; and c. - -The-county--shall taken- active -role -in advertis ing water ---restriction requirements and water conservation techniques in the local press during drought conditions. _.0$JECTIvE4-Floodplain-, The flood storage capacity and other natural functions and values of I�0-0-year floodplain, in-Indlan river --County wil-l-be preserved, and--risk-to life-andproperty-w-U-1 be -reduced: r Policy 4.1: Indian River County shall continue to revise its Stormwate-r-Management me en and Flood --Pro ec on Or inance, as necessary, to -,remain' in c-arformance-vith Federal Emer enc Management.A EMA Ipo_c�ins-- ncirements and standards. Policy 4.2: The county strapregulate-dev€1opmtnt in areas designated- as regulatorl► floodways on 1989.FEMA Flood Insurance Rate Maps. (FIRM,) for Indian River County. The regulatory floodway, is based on the principle that the areafisY chosen -for -the- regulatory floodway -are designed -to carr-y�-the- water -of -a base -flood;-without -increasing water surface elevation of that -:flood more than one foot at any point. Encroachments, including fill, new construction, substantial improvements, -and other development within the adopted regulatory flood that would result -in any increase -in flood levels within the county during the occurrence of the base flood discharge, shall be prohibited. Policy 4;3: The county shall establish low land use den- sities, not to exceed three units per acre, for lands within flood prone areas of.Indian River County, with the exception of existing -lots -of record- of -a higher -density. Policy 4.4:- The county shall continue to regulate development witE-n f ood prone areas minimized storage capaci y reduction andero aff-ordprotection t -e lif-e- end proper -- within floodplains. Policy -4S -The county sa-11-protec the natural functions and -values-of-f-oodplain- wet -ands by_ adopt -i -ng a wetland protection. ordinance, as further described in. Policy 5.1 of this element. OBJECTIVE--5-Wet 1 ands There will be no net loss of the natural functions provided by wetlands or deepwater habitats in Indian River County. SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:41 - OfficialDocuments:672, Attachment Id 0, Page 105 CONSERVATION Polite 5.1: By 1991, the county shall develop and adonta comprehensive wetland and deepwater habitat protection ordinance. The ordinance shall include (but not be limited to) the following criteria. a, The definition of wetlands and deepwater habitats shall basedupon the publication Classification of Wetlands and Deepwater Habitats of the United States" (Cowardin et al,1979), and shall be consistent with federal, state, and regional jurisdictional regulatory agencies. b. Representatives of the Department of Environmental Regulation, Department of Natural Resources, U.S. Corps of Engineers, St. Johns River Water Management District, Soil -Conservation Service; Florida Game and -Freshwater Fish Commission, U.S. Fish and Wi ldl.ifa Ser -vice, FDAC Division of Forestry, Indian River County Mosquito Control District, and/or other applicable agencies will be contacted for assistance in identifying the extent and functional valu-s of wetlands and -deepwater habitat. C. USFWb NationalWetlands Inventory Maps (1984), submergent aquatic vegetation inventories, infrared aerials and property appraiser aerials shall be utilized for general identification of wetlands and deepwater haHtatsin Indian River County. It is recognized, however, that such -graphitesources do not depicte full extent of wetland and deepwater habitat delin- eations and function characteristics. Wetland and deepwater habitats shall be identified by survey at the time -of sate -development review on a s tu-by=site basis. d. The regulations of the ordinance shall apply to all wetlands and deepwater habitats in the county regardless of size. e. No activity shall be allowed that results in the altera- tion, degradation, or -desruction of wetlands •or deepwater habitats except when: 1. such an activity is necessary to prevent or elimi- nate a public hazard, provided wetland and deepwater hi fatfunctional loss isunavoidable and unavoidab - and minimized; 2, such an activity would provide direct public benefits which would exceed the loss of wetland or deepwater habitat functions and values, provided there is a public need, and wetland and deepwater habitat functional loss is unavoidable and minimized; or i 77 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:42 - OffcialDocuments:672, Attachment Id 0, Page 106 CONSERVATION 3. such an activity is proposed for wetlands or deepwater habitats in which the functions and values currently` provided are significantly less than those -typically associated with such habitats and cannot be -reasonably restored, and preservation of the habitat is not in the er . ._Mitigation shall be required for any activity that - results in the alteration, degradation, or destruction of wetlands or deepwater habits,, as provided for in P61 i, vSubsecti nn_n 5 5.1.g. of thi sAl€ment f. Factors to be considered in evaluating the present or future functions and values of wetlands and deepwater habitatsi-nclude: 1, relationship to similar or complementary habitats, Z. proximity to adjacent urban land uses, 3, degree of disturbance or invasion by exotic plant species, 4, importance to wildlife species, including aquatic species (as applicable), 5. frequency and length of inundation, and 6. degree of flushing or tidal influence (applying to estuarine wetlands). g� Wh�ancyo-,oar ani e�ctlanA n deepwater habitat is degradef�-0Y destroyed, mitigation shall be provided through the creation of new wetland or deepwater habitat, through the restoration of degraded habitat, or through the enhancement -of functions and -values-provided by.�-exi-tin habitats. Wetland creation 'or enhancement shall at minimum offset the wetland/deepwater habitat functions lost due to impacts. Mitigation proposals shall be evaluated for appropriateness on a case-by-case basis, and shall be consistent with all applicable jurisdic- tional regulatory agency regulations. 1. Preference shall be given for type -for -type mitiga- tion on-site or in close proximity to the wetland or deepwater habit loss. Off-site mitigation and/or nontype-for-type may be considered, only if on-site mitiaat' and/or type -for -type is not deemed appropriate': wlen weighing benefits and disadvantages to regional ecology and on-site ecology, 78 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:42 - OffcialDocuments:672, Attachment Id 0, Page 107 CONSERVATION 2. The minimum ratio of 2:1 (created to lost wetlands) shall apply. to wetland habitatcreation no wetland enhancement) proposals. The mitigation ratio for submergent aquatic vegetation (e.g. seagrass) shall be a minimum of 3:1 (created to lost habitat). 3. The preservation of upland habitat adjacent to preserved or enhanced wetlands (beyond buffer _---requirements) may be considered as partial mitiga- tion, if it is .determined as contributing. to the ecological functions and values of the preserved or enhanced wetland. 4. The Indian River Mosquito Control District (IRMCD) will be consulted whenever -wetlands -are—being created or restored to ensure that mosquito producing habitat is not created and source reduction mosquito control is effected. h. The establishment of conservation easements shall be required— o over ay all preserved, created, or enhanced wetlands or deepwater-AabilECLIL.0 %fand upland buffers, as applicable) associated with development site mitigation. Such easements shall ensure protection of these habitats and may allow certain activities (ie -passive recreation) not deemed - detrimental to- the healt"f- the +fologicai system. Indian River Mosquito Control nistrirt will be granted access easements to allow for mosquito inspection, treatment, and management. Policy 5.2: Indian Riv_e_r Count shall encourage the y-estor-a- tion and management of impounded estuarine wetlands as mstrga on o h ted filling of degraded wetlands, as described in Policy subsection 5.1.e.3., provided that: a. The benefits of the restoration and management of the impoundment to natural functions shall offset the losses of wetland functions associated witty—the limited wetland filling, with a minimum mitigation ratio of 10:1 (restored/managed impoundment to lost degraded wet- lands); b. A conservation easement is established for the impound- ment to ensure protection; in addition, IRMCD will be granted access easements to allow for mosquito inspection, treatment, and management;.and C. The restoration and management plan is consistent with JUL.Lsdictional agency regulations and is favorably reviewed by the Governor's Subcommittee on Managed Marshes, 79 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:42 - OffcialDocuments:672, Attachment Id 0, Page 108 CONSERVATION Policy- 5.3: Indian River County shall require a buf zone ate habitats which are constructed or preserved on new develop- ment sites. The buffer zone may consist of preserved or planted vegetation, but shall include canopy, understory, and ground cover of native species only. The edge habitat shall begin the upland limit of any wet -land- er--deepwte habi- tat: A minimum of ten square feet of such buffer shall be provided,-for.each linear foot of wetland or deepwater habitat -perimeter that lies adjacent, to uplands. The upland edge buffer shall be located such that no less than 50 percent. of feet of upland habitat. Policy 5.4: All estuarine wetlands and deepwater habitats shall be deemed environmentally, sensitive, in -recognition of their many natural functions and values, and in recognition of the need to protect ese resources, rom.incompatible and-_ uses, for the,, sake of the public interest. Development densities for environmentally sensitive wetlands and deepwater habitats shall be limited to a maximum density of 1 unit per 4u gross acres. however, environmentally sensitive wetlands shall. 1 dV 1 unit per gross acre. (ref. Policy 5.9). Policy 5,5c By 1991, the county shall establish a mitigation bank program, whereby funds entering -into the mitigation bank will be utilized to create; protect and manages, or enhance environmentally sensitive lands, including wetlands and deepwater habitat. Funds entering into the mitigation bank shall include fees that may be considered as off-site mitiga- tion.for _activities that -result-in-the alteration, degrada- tion,or destruction of wetland or deepwater habitat, as may occur in spec ificinstances as descrilieT in Po icy 5. .e, o this element. Fees for mitigation shall only be considered if all other mitigation alternatives, as set forth in Policy 5.1.g., are not feasible or are inappropriate given site characteristics. Funds entered into the bank as mitigation shall he ut-liz-ed—to create, enhance ,andlor- protect and. manage environmentally sensitive ,areas. of .the same type as that mitigated. As part of the mitigation bank program, the county shall identify environmentally sensitive areas that are suitable for protection; management and enhancement projects, and shall identify and may consider the acquisition 80 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:43 - OffcialDocuments:672, Attachment Id 0, Page 109 SmeadSoft Reprint Date: Mom CONSERVATION of property suitaa for environmentally sensitive area creation projects: Wetlands ordeepwater. habitats under consideration for -acquisition shall be reviewed in -accordance with a land acquisition guide as set forth and further defined in Policy 6.5 of. -this element. Policy 5,,-6-•- .Until -the- county -develops and adopts a-aet3and -and-'deepwater habitat protection ordinance as. described in Policy 5.1 of this element, the county shall continue to implement -wet -land -pro ec on andt mitigation regu a ions as set -forth inthe-coirity Si-te-glan Ordinance. Policy 5.7: The county shall continue to implement and enforce is mangrove protection regulations as set Forth in {°he-county-T-re"-rotect-ien-ionxnance, including the -require- ment that mangroves removed fogconstruction purposes -shall be minimized` and replaced or relocated, and including ,:mangrove trimming criteria tat m ninizes biomass reduction and ensur-es plant stirvival, consistent -with- state regu- lations. Policy -5:8: The countyshat oc ntinue 'to coordinate with jurisdictional regulatory agencies- pertainingto wetlands by providing comments to such agencies --in a_};me-ly fashion, regarding agency dredge and fill permits and other wetland a1 eration projects proposed in Indian River County. 2T-5 9: The -county -shall_ continue -to implement ci,�- mecha- nism for' transferring development density rights from en- vironmentally sensitive wetlands to approved contiguous uplands-,--inconjunction with-planrred--residential developments (PRDs1._ I ay_19-92, the county will evaluate -the feasibility -of expanding the transfer of density rights program to non-contiguous properties. OBJECTIVE 6 Upland Vegetative Communities Sufficient upland vegetative communities to maintain viable population"f—all native- plant-andanimal species, -and- represen- tative stands of each habitat tyke in Indian River County, will be preserved. Policy-6_1---The-county--sha-1 establish and;or-assist -state and federal .agencies in the establishment of preserves -for sand pine/xeric scrub,' tropical/coastal hammock, and coastal strand vegetative communities, of a sufficient size to maintain -,r-iabl"opu-lation-so-f--endemi-c -plant andf oranima species. Policy b2: By 19g17, -the county shall acquire a minimum of 50 acre --r O xe-ie scrub -vegetative- community,-an"al- coordi- nate with the -Florida -Game and Freshwater -Fish Commission (GFC) to ensure that use of the property is compatible with M he maintenance of viable populations of endemic plants ndlor anima' ecies, ne .or more o - the -fol mowing 81 Jay, August 12, 2013 - 15:22:43 - OfficiaMccuments:672, Attachment Id 0, Page 110 0 I gU-r VEGETATIVE COMMUNITIES FOR LAND AQUISITION CONSIDERATION Aonroxlmate Locations Sand pineiXerlc Scrub Ai I/Tropical � ffcows a rrrm o �k 'oaeiai Strand 7 A 7 Ax T. 7r _r (M : NORTH ----------- -- . ----- - --- - - .. R ALE Source: I.R.C. Planning Dept. Date: 1989 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:44 - OfficialDocuments:672, Attachment Id 0, Page 111 01 CONSERVATION potential. scrub -preserves, as identified in, the 1988 GFC repos reserva ion and Management of Coastal Xeric Scrub -Communities of the Treasure Coast Region, Florida," shall be considered for the acquisition site(s): a, site "IR -4," a 117± acre scrub tract between North and -``a-nd-Old Dixie Highway; b. site "IR -3," the western bank of the St. Sebastian River, a mixture of xeric communities,'' in conjunction with on-going state and federal. -land acquisitzis; _._ c. site "IR -6," located off Oslo Road east of U.S. #1, a 291 acre scrub tract adjacent to estuarine wetlands; and a site "IR -7," a 45i acre tract located east of Lateral J" canal and .immediately north of the south county line. Policy 6.3: By 1992, the county shall acquire andlo assist state and federal agencies in the acquisition -of coastal/trOpiUdi hammocks and complementary a stats or the protection of the vegetative community. The following sites shall be considered: a: coa-s al/tropical hammocks other complementary native 'Plant communities adjacent to the (IFAS) Florid-aMedical Entomology. Laboratory, north of Oslo Road, east of U.S. coastaltropical- hammocks -adjacent Trail, in' ,eo`ordination with the pr National Wildlife Refuge expansion; C. coastal/tropical hammocks on Orchid Island north of Wabasso Beach and east of S.R. AlA, in conjunction with the proposed CARL Wabasso Beach/Sea Turtle National Wilfil-i-fe Refuge project, and d. Coastal/tropical hammocks and other complementary native plant communities along the western bank of the St. Sebastian River, in;conjunction with ongoing state an federal.land acquisition -proposals, Policy 6.4: By 1992, the county shall acquire and/or assist state and federal agencies in the acquisition of coastal strand vegetative communities east of S.R. AIA and north of Wabasso Beach on. Orchid Island, in conjunction with the proposed CARL Wabasso Beach/Sea Turtle National Wildlife Refuge project., Policy 6.5: By October 1990, the coin shall establish a land acquisition guide, to be used by advisory makin! 'recommendations o the Indian River County County Commissioners regarding acquisition proposals SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:44 - OffcialDocuments:672, Attachment Id 0, Page 112 82 staff in CONSERVATION a. The land acquisition guide shall include factors to e posals, such as: 1. resource values/physical features, such as proximi- ty and value to other resources, and intactness; 2, environmental values, such as lands verified or expected to support rare, endangered, or threatened species; 3, impending development pressures, whereby develop- ment is incompatible with resource protection; 4. management considerations, such as feasible multi- ple public use of the proper, compatible with resource conservation; 5. financial considerations, such as funding availability; mar etconsiderations; 7.. social and economic values, such as historic preservation, environmental education, recreation, and scenic aspects; and ` 8. the need for acquisition to protect the .natural community. where appropriate protection* cannot be afforded by land development regulations. b. The land acquisition guide shall_ identify methods of .land acquisition to be .considered that may be appropri- ate, , deeming on any given proposal-,—inclpur- chase, donation, exchange, installment sale, use of intermediaries (e.g. Natural Conservancy) and condemmation. c. ?and acquisition shall.--be—considered only after a3� "non -acquisition" options for environmentally sensitive or environmentally important lands protection have been explored and rejected as inappropriate, including easements, rental (lease), withdrawal (public domain), zoning,.. acquisition ;.by,.: other entities, cooperative agreement, permit . restrictions, administrative regulation, and "no action Policy 6.6: The- county, shall encourage the preservation of native vegetative communities on publicly owned land in conjunction with developmentdesign, . Policy 6.7: The county shall encourage the preservation of mature trees on land,development sites by: 83 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:44 - OffcialDocuments:672, Attachment Id 0, Page 113 CONSERVATION a. revisi the county landsc s ordinance to additionallandscape credit for the preservation mature trees and trees of special concern, and ide of b. allowing a reduction in required parking for the purpose of preserving existing mature trees on site. Policy 6.8: The county shall adopt land development regu- lations requiring the removal of nuisance and invasive exotic vegetation (e.g.', Brazilian Pepper, Australian pine, _.._ Melaleuca) in conjunction with site plan project con-struction, V-ege--at,4 -n adjacentto jungle ViAil shall be subject to the provisions of the County Jungle Trail manage- ment Plan. The planting or sale of nuisance/invasive exotic vegetation shall be prohibited in Indian River County. Policy 6.9: By 1991, the county shall revise its tree pro- tection ordinance to afford increased protection to signifi- cant groupings of xeric scrub and coastal/ tropical hammock understory vegetation. Policy 6.10: By 1995, the county shall establish a GIS compute. inpp,ig inventory of vegetative communities in Indian River County, and shall utilize said inventory in the evaluation and regulation of land development activities. Policy 6.-11--Undeve of ped tracts o xeric scrub and coastalIt-r--opical- hammoc-ks 5 acres or larger shal-lie—deemed environmentally important, in recognition of their scarcity and natural values, and in recognition of the public interest in encouraging the conservation of plants and animals associated with th-ese—vegetative -communities. The- county- shall ountyshall encourage the conservation of ' xeric --scrub— and coastal/tropical vegetative communities by establishing density transfer and cluster development incentive land use regulations to apply to these environmentally important areas, Policy -6.12-: The countysna-l1---adopt regulations whereby development projects 5 acres or larger, excluding agricultural operations, shall set aside, through selective clearing and micro -siting of buildings and construction activities, a minimum of 15 percent of the total cumulative acreage of native plant_�__communities wh-i-ch occur on-site (e.g.-, flatwoods, xeric scrub, coastal/tropical hammock, etc.). In no case, however, shall the required set aside areas exceed 10 percent of the total project site property acreage. Such set aside areas shall be preserved in viable ,condition with intact canopy, understory, and ground cover, and shall e protected by the filing of conservation easements. The preserved set aside area(s) shall be allowed as credit toward other. county land development regulations such as landscape, buffers, open space requirements, and minimum yard setback requirements. 84 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:45 - OffcialDocuments:672, Attachment Id 0, Page 114 Where preservafion of l5 ofhe native ups ani plant ities! on site is not feasible given site specific characteristics, the county shall permit off-site preservation and/or habitat creation (type -for -type) as an alternative to on-site 15% preservation. Moreover, as an incentive to preserve Contiguous tracts .which provide more habitat value than linear buffer set aside areas, the county shall allow a percentage reduction to a minimum of 10% of the cumulative native plant community acreage, for those preserve areas that are set aside as a contiguous tract.. Development projects -proposed for lands currently consisting of native upland plant communities may, as an alternative to 15 percent preservation of the on-site community, pay a fee equivalent to (the average assessed value of one acre of the particular habitat type under consideration) X (the number of acres of habitat type that would otherwise- have been ,set a e payable to the county and shalle used by the county for acquisition of comparable native habitat preserve areas and for management of such lands. Polic". Y3: The coumty shall cont nu o nrohibit—, the stabilization setback line, with the walkover construction and other similar may be allowed subject to FDNB Division approval. OBJECTIVE 7 Wildlife and Marine Habitat exception of dune minor structures that of Beaches and Shores There will be no reduction in the critical habitat of endangered or—threatenecl--plant and—anima species occurring in Iridian diver County, and the county shall conserve, appropriately use and protect non -threatened, non -endangered fisheries, wildlife, wildlife habitat and marine habitat (i.e. seagrass beds) through the implementation of land development regulations and policies. For the purpose of this objective, "critical habitat" is defined as the minimum required sum of environmental conditions in a specific area necessary to sustain a given species. The protection of critical habitat shall be measured and evaluated on a site development basis, in addition .to county land acquisition efforts as described in Policy 5.5 and the policies of Objective of this element. L� 85 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:45 - OffcialDocuments:672, Attachment Id 0, Page 115 CONSERVATION' Policy rte: The -county shancon ta-ct—heFlorida a�and Freshwater Fish Commission {GFC)—,the V". ish and-Wi-J.ti11fe :::f� Service (USFWS) and the Treasure Coast Regional Planning Council .to establish an inventory of known ranges of ndangered orthreatene species, or w erh asuch species are expected to-.occtrr-i-n Indian River County based -upon -Mbita suitability, _iMe inventory -shall- then be utilized to-al-ert the county. in the review of development. proposals of poten- -ti-a cave opl mentimpacts to endangered or threatened species. The-tount"ha33 make the inventory avail -ab -le -to -the -public. Policy 7,2: For developments on property known to support endangered or threatened species of plants or animals, or on property -expected—tosignificantly contribute to such species!_ habitat -needs_, the developer. -shall be-requlr- tv notify the GFC and the USFWS and provide proper protection to the extent feasible, to the satisfaction of the county and the -wild -life agencies. Policy 7.3: The county shall take measures, as set forth in the policies of Objective 5 and Objective 6 of this element, to protect- significant upland, wetland —and—deepwater communities that provide -habitat for -threatened -or -endangered species, as well as non -threatened, non -endangered -species. otrc-y 7 4. Tfterounty shah regula Viand developmen , as set -for -thin -the objectives and---ps3ic-ies of -the Future -Land—(_ Use Element, to protect natural features, resources and ecological systems. Policy -7 -.5 --The county-sha117L-suppor-t-the Florida-Departmeirt of Natural Resources Proposal to establish slow speed z -one regulations in .certain areas of the St. Sebastian River and the Indian River Lagoon, to enhance the protection of West Indian manatees and to prevent boating accidents. Policy 7.6: The county shall support state and federal land acquisition proposals along the St. Sehastian..River and on north Orchid -Island in -the- interest of protectingthr-eate and endangered species and critical habitat. Policy LJ; The_ county shall -continue to restrict beach -front artificial lighting through the implementation and enforce- ment of the county sea turtle protection ordinance. Policy 7.8: The county shall establish regulations pertaining to water -dependent and water -related uses, in satisfaction of the objectives -anipolicies o -f -the Coasta! management Elemen and the_ Indian -River Lagoon SW -IM -Plan to ensure appropr-iate protection of marine species and marine habitats, including: 86 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:46 - OfficialDocuments:672, Attachment Id 0, Page 116 a. The requirements that piers, docks, boat shelters, or other- waterfront --structures located to -av id (if feasible) or minimize negative impacts on native shoreline vegetation and marine grassbeds, based on an environmental survey to be provided to the county by an applicant; and b. The required .use of silt screens or other appropriate sediment control methods during the construction of water -dependent or water -related uses, as applicable. QBJECTIVE.8 Recreational Uses of Natural Resources Sufficient resource-based parks and outdoor recreational oppor- tunities will be provided for public use; viable communities of flora and fauna on public recreational and open space lands will be preserved; and adverse impacts on natural resources from recreational activities will be minimize "Sufficiency" shall e measured based on population ratio/supply standards as specified and set forth in the Recreation and Open Space Element. PoUcy 8_.l_ -__The countyah-all take measures to.provide fi- cient resouTz-e aseditks access, and outdoor recreational opportunities for the residents of Indian River County, as set forth in the objectives and policies of the Recreation and Open Space Element. Policy 8,2: The county shall preserve native vegetative communities on county owned recreational and open' space land in conjunction with development design, to the extent feasi- ble. Policy .8.3: The county shall coordinate with the U.S. Fish and— Wildl— Service, the ori a Game and Fre�ter Fid Commission, and other appropriate agencies to ensure that rare, threatened, or endangered plant or animal species identified or expected to occur on county recreational and open space lands shall be protected from adverse development impacts: Policy 8.4: The county shall establish regulations pertaining to water -dependent and water -related recreation uses, to ensure appropriate protection of marine species and marine habitat, as set forth in the objectives and policies of the 'Coastal Management Element. Policy 8.5: By 1991, the county shall establish land use regulations, whereby the use of off-road recreational vehi- cles.in wetland or upland habitats shall be limited to areas designated and shall e regulated to ensure adverse impacts to natural resources do not occur. 87 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:46 - OffcialDocuments:672, Attachment Id 0, Page 117 CONSERVATION Policy 8.6: The county shall coordinate with the St. Johns River water Management District, via participation in the SJRWMD Upper St. Johns River Basin Recreation Advisory Committee, and support the establishment of recreational access sites and improvements in the Upper St. Johns River Basin in Indian River County. OBJECTIVE 9 Commercial Uses of Natural Resources Sufficient opportunities will be provided for the commercial use of natu-r-al resources in Indian River County, while adverse impacts '—orinatural--resources from commercialresource-based activities will be minimized. Policy 9.1: The county shall continue to regulate excavation and -mining activities through- the -count excavati-on- and mining ordinance, to ensure adverse impacts on natural resources are minimized, including the following require- ments: a, water management standards waterbodies are enhanced and maintained to maximize habitat -value and surface water quality; y; b. mining operation setbacks of 150 feet from property lines; (" tial districts; d. land surface reclamation standards; e. the protection of public and private roads from impacts from the hauling of mined materials; and f, the posting of compliance bonds to ensure site develop- ment, operation, and restoration in conformance with the approved mining site plan. Policy 9.2: By 1991, the county shall obtain certification to administer state reclamation requirements in conjunction'with local sand mine regulations. Policy 9:3: The county shall review its mining and -excavation regulations for the Atlantic Coastal Sand Ridge and the Ten Mile Ridge to ensure that the natural features of these areas are preserved. Policy 9.4: The county shall coordinate with the Indian River Soll and water Conservation District to encourage agricul- tural operations to implement conservation plans and best management practices. 88 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:46 - OffcialDocuments:672, Attachment Id 0, Page 118 CONSERVATION Policy 9.5: The county shall take measures to increase the productivity of fisheries habitat, by improving estuarine water quality and by protecting estuarine ecological systems, especially emergent and submergent aquatic vegetation, as set forth_ in the policies of Objective 2 and Objective 5 o this element. - Policy 9.6: The county shall direct land development in a manner to promote commercial resource-based uses, while ensuring the protection of natural resources, as set forth in the objectives and policies -of the Future Land Use Element. OBJECTIVE 10 Soil Erosion Wind and water soil erosion associated with land development activities willbereduced,-and areas of shoreline erosionwill be stabilized, with adverse impacts to property and natural resources minimized. Policy 10.1: The county shall coordinate with River Soil and Water Conservation District to agricultural operations to implement conservation best it, nagement -Pr ac t ices, to ensure thatos through wind and water erosion is minimized. the Indian plans and Policy 10.2 -:,The county shall enforce its tree protection ordinance to -ensure -that wind -and -water -gal -erosion associ- a orl with urhao �^�1 anri� onl earing ae ivibes is min_m3zed, through the use of erosion control •techniques -suct .as -.tempo- rary as.tempo- rary seeding and mulching, sodding, diversion berms, interceptor ditches, sediment barriers, sediment basins, and related appurtenances or devices. Policy 10.3: By 1992, the county shall implement beach shoreline stabilization measures as recommended in the Indian River County Beach Preservation Plan (Cubit Engineering, 1988), including: a. a beach -erosion ring program; b. coordination and cooperation with the Sebastian Inlet Tax District and City of Vero Beach on beach restoration projects; C. the establishment of dune maintenance districts; and d. a beach preservation and restoration committee to implement programs and make recommendations pertaining to beach preservation and restoration activities. 89 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:47 - OffcialDocuments:672, Attachment Id 0, Page 119 CONSERVATION Policy 10.4: To protect existing dune communities and reduce shoreline soi erosion, the county shall continue to prohibit development encroachment oceanward of the county dune stabi- lization setback line, with the exception of dune walkovers and other similar minor structures subject to FDNR Division of Beaches and Shores approval. _Policy 10.5: No rigid beach shore protection structures shall be permitted, except when used as part of a comprehensive plan for beach restoration and when nonstructural alternatives are not acceptable. -Policy 10.6: The county shall establish land development regulations to promote shoreline stabilization along the St. Sebastian River and the Indian River .Lagoon, as set forth in Policy-2--l-of-this element, -Additionally,-the _establishment of bulkheads or other rigid shore protection structures along the St. Sebastian River or the Indian River Lagoon shall be prohibited, except when such bulkheads or rigid structures connect two adjacent pre-existing bulkheads or rigid structures on properties adjacent to the project site. Policy 120.7a The county shall take the as bet fort hill the policies of Objective 7 of the Drainage Sub -Element, consistent with the Indian River Lagoon SWIM Plan, to reduce sediment transport and nutrient loading to the Indian River Lagoon. OBJECTIVE 11 Hazardous and Nonhazardous Wastes The _number of -cases _of_ improperly_ managedandillegally disposed of hazardous waste in the county will be decreased. Policy 11.1: The county shall take measures, as designated in the policies of Objective 2 of the Solid Waste Sub -Element, to decrease the number of cases of improperly managed and illegally disposed of hazardous wastes in the county by 50%. Policy 11.2: The county shall take measures, including a recycling program, as designated in the policies of Objective 4 of the Solid Waste Sub -Element, to reduce by 30% the volume of solid waste to be buried in the county landfill. 90 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:47 - OffcialDocuments:672, Attachment Id 0, Page 120 COASTAL MANAGEMENT ELEMENT GOALS, OBJECTIVES AND POLICIES GOAL To protect, maintain and enhance coastal resources and provide for the enjoyment of the social, economic and natural benefits of these L" -dour , otentiai loss of life, and public and private expenditures in the coastal zone. OBJECTIVE 1 Natural Resource Protection The County recogniz-es-theexisting natural resources And habitats of the coastal area, and by September 1990 will have a comprehen- _sive management program to protect, conserve and/or enhance coastal wetlands, living marine resources (e.g. manatees, sea turtles, -etc.)--,--wild!i fe -habitat (e.g. seag_rass beds, etc.)- and undeveloped coastal barriers. Policy 1.1: By September 1990, the County shall adopt ordinances limiting the development of environmentally sensitive and environmentally important areas, with ;incentives to encourage preservation or environmentally compatible development in these areas. Policy 1.2: The county shall deem as environmentally sensitive all wetlands, and as environmentally important all significari Aacts of xeric scrub grid c6as-tal/tropical hammocks, as set forth and further tescribed in Polic; ps 5 - a and 6.11 of the Conservation Element. Policy 1.3: The designation of "environmentally sensitive or environmentalIT important"- shall not preclude development -in these areas, but shall require particular specific considerations, to be listed in local ordinances pertaining to natural resources. Policy The county shall require environmental surveys prior to submittal of applications for development in en- vironmentally sensitive and envirorriiientally important areas The focus of these surveys should identify existing natural vegetation, drainage, elevations and significant resources such as wetlands, mosquito impoundments, sand ridges, and historic sites, as applicable. Policy 1.5: The county shall recognize federal, state and local regulations concerning endangered and threatened species as well as species of special concern, including all plant and animal species and their habitats and communities 'Which exist in Indian River County. The county shall discourage activities which threaten these species by adopting Tec ive 7 and its associated policies of the Conservation Element. ( Persons who knowingly damage or destroy endangered species or their habitats as regulated, shall be. subject to local, as well as federal and state penalties. SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:47 - OffcialDocuments:672, Attachment Id 0, Page 121 COASTAL MANAGEMENT ELEMENT Policy 1.6: The county shall provide protection to sea turtles and their nesting habitats by implementing t o following measures: a. the county shall continue to restrict beachfront artificial lightingthrough the implementation and --enforcement ordinance-;- b, the county shall not permit restoration, alteration or maintenance projects east of the existing dune vegetation line during Ge turtle nesting season, from May 1 to .October 31 of each.. year, except for projects .necessary to mitigate natural disaster occurrences or .FDNR permitted and monitored projects; C. the county shall acquire and/or assist state and federal agencies in the acquisition of coastal strand vegetative communities east of S.R. A -1-A and north of Wabasso Beach on Orchid Island, in conjunction with the proposed CARL Wabasso Beach/Sea Turtle National Wildlife Refuge project ref. Policy 6.4 of the Conservation Element); d. the county shall continue to prohibit the operation of motorized vehicles on the primary dune and beach system except -i-n- cases—of—emergency or as approved —by the Florida Department--0f--Natures l sourncc Policy 1,7: The county shall contact and meet with local boating interests and boating regulatory agencies to develop a- manatee_ awareness_ program—by-1992. The- program- should include, but not be limited. to, public education, coordinated siting .reports and necessary rescue efforts, preservation of manatee habitats, and the reduction of threats to the con- tinued existence of this species. Policy 1.8: The county shall support the Florida Department of—Natural Resources proposal—to—establish slow speed zone regulations in certain areas of the St. Sebastian River and the Indian River Lagoon, to enhance the protection of West Indian manatee populations. Policy 1.9: The county shall protect the natural functions of wetlands and deepwater habitats in Indian River County by implementing the policies of Objective 5 of the Conservation Element, including: a. the adoption of a comprehensive wetland and deepwater habitat protection ordinance;. b. the requirement of a buffer zone of native upland edge vegetation around wetland and deepwater habitats construe a or preserved on new development sites; . -76- SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:48 - OffcialDocuments:672, Attachment Id 0, Page 122 COASTAL MANAGEMENT ELEMENT ( c. the encouragement of the restoration and improved management of -impounded ; d. the continued implementation of county mangrove protection regulations, as set forth in the county tree protection ordinance; and e. the continued implementation of a mechanism for trans- ferring development density rights from environmentally �sehsitive wetlands to uplands, in conjunction with planned residential development. Policy 1.10: The county ..shall take measures to protect _ significant upland vegetative communities, wildlife, and marine habitats in the coastal zone and overall county, as set forth in theop licies of Objectives 6 and 7 of the Conservation Element. Policy 1.11: The county shall support all federal and state efforts to expand or establish new preservation areas or wildlife sanctuaries, where the establishment of such areas does con lict-vith county interests, an oes not require the dedication of local funds. The county shall evaluate for support all federal, state and local preservation efforts which require local funding. Policy 1L -1 -2: -Indian River -County shalL-coordinate with-feder- al, State and local public and private orQanizat-ions to establish update -to -date and accurate seagrass community maps and seagrass management techniques and strategies. Policy -1 13 The county shall-re_%ula.te applicable structures or a t v ties to minimize adverse impacts to existing seagrass beds or the future expansion of t embeds. The county shall immediately adopt and implement the objectives and policies of the Comprehensive Plan to afford protection to existing or potential seagrass areas. In addition, the county shall continue to support the Habitat and Restoration Program of the SW -I -M (Surf -ace Water --Improvement aad Management) plan, including provisions for seagrass protection. Policy 1.14: Indian -River County shall continue to promote both commercial and private fishing activities within the county through the proper management of marine habitats and permitting of fishing resources. Policy 1,15: By 1992, the county shall develop and implement regulations for aquaculture use in accordance with feddral, localstate dnd regu a ions governing such activities. Local criteria shall include, but not be limited to, the following: -7 7- SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:48 - OffcialDocuments:672, Attachment Id 0, Page 123 COASTAL MANAGEMENT ELEMENT a. The county shall require local aquaculture permits '7. for all projects not within federal or state regulation, and coordinate for review all projects under federal or state regulation, b. The county shall permit the leasing or sale of privately landsowned bottom for aquaculture purposes provided that :-- --- 1. There is no creation of new or expansion of existing bottom lands. 2 The area and water quality is state approved for shellfish harvesting and/or propogation or meets or exceeds state regulations, 3. These activities do not interfere with waterway rights or boating activities, or reduce circulation patterns, impact existing vegetation or aquatic habitats or degrade existing water quality_. . Upland activities associated with aquaculture or mariculture operations shall not adversely impact the upland areas, neighboring areas or adjoining waters. This shall include dis- charges, odors, or other pollution. Policy 1.16: By 1992, the county shall evaluate the need to establish a natural resources management department to assist and advise the county on environmental matters. This depart- ment -would be -established by the- Board tof—County -Commis- sioners, at which time the duties and responsibilities of the department would be determined. OBJECTIVE 2 Estuarine Water Quality By 1995 --,,Indian River County will improve overall estuarine water quality to the' Florida Department of Environmental Regulation guidelines of Class II waters - shellfish propagation and harvest- ing. Policy 2.1: The county shall immediately adopt the state classification of Class II as the minimum acceptable standard for existing water conditions, and shall target improvement efforts to those areas failing to meet this standard. Policy 2.2: The county shall not permit any new point -source dishes into estuarine surface water. SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:48 - OffcialDocuments:672, Attachment Id 0, Page 124 COASTAL MANAGEMENT ELEMENT Policy .2.3: To reduce existing point source and non -point source' discharges into the Indian River Lagoon waters, the county shall coordinate with the Water and Sediment Quality Program of the Surface Water Improvement and Management (SWIM) plan and shall adopt the goals, objectives and policies of -the Drainage Sub -Element of the Indian River County pre -- . Policy 2.-4:' The county shall coordinate and cooperate with the -municipalities in the county to eliminate existing, and -prohibit future, point and non -point water pollution sources. Policy 25: By September, 1990, the County shall establish a periodic water quality monitoring program for the Indian River Lagoon, and a Surface Water Management Plan which will include the -following actions. a. Coordinate with existing water quality monitoring programs to promote permanent water quality monitoring stations at Sebastian Creek, tha North Relief Canal, the Main Relief Canal and the South Relief Canal. Pursue 'state and federal,tunding for programs to improve the water quality of the Indian River Lagoon. Special emphasis and consideration should be awarded to the SWIM (Surface Water Improvement and Management) plan.- C. lan: c, Be S=gnate the responsibilities of sampling and collection, d. Establish a local pollution response network to mitigate spills and accidents. Policv 2.6: Indian River County shall improve the quality and reduce the overall amount of freshwater inflow to the Indian River Lagoon. It shall be county policy to: a. not permit the utilization of drainage systems which allow new discharges directly into natural surface water bodies without treatment or mitigation of these dis- charges; b. require all new development in the coastal—zone—to utilize on-site retention and detention methods of storm water management consistent with the provisions of. the Drainage Sub -Element; _ C. require new development to utilize_ existing, -natural drainage features, such as wetlands and swales for stormwater management, as available and feasible, in compliance with the provisions of Section 17-25.042 F.A,C., (FDER requirements for wetlands stormwater discharge facilities), -79- SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:49 - OffcialDocuments:672, Attachment Id 0, Page 125 COASTAL MANAGEMENT ELEMENT e, continue to require a117-neww development o retain, at - minim m, the First one inch of pr ipitation runaff. - addition, the county will require retrofitting to achieve compliance with existing stormwater requirements where renovations or additions of greater than 50% to .existing structures occur; and f. initiate a program to periodically monitor and/or inspect stormwater facilities to ensure proper operation and ---maintenance, and invoke penalties for malfunc- tioning, altered, abused or neglected systems. POLICY : All marinas, docks,boat moorings, erosion control projects and other similar structures constructed in, over or directly affecting the surface waters of Indian River County, shall be located and designed in order to allow the maximum Physical avan�for water circulation and the least ad -verse rin resources. Policy 2.8: The county shall require all dredge and fill operations to utilize proper mitigation techniques and devices, i-nadditionto= obtaining all suitably federal, sae and local permits. These could include b1 not he limited to silt screens and curtains. Policy 2.9: The county shall prohibit the discharge of any waste and/or_ pollutant material—into surface waters,—by commercial, public or private vessel, when such activity is under county jurisdiction. Policy 2.10: The county shall implement the policies of Objective 2 of the Conservation Element, to improve water quality within the Indian River Lagoon, the St. Sebastian d others-urface waters in Indi-an River County. OBJECTIVE 3 Wat-,.—vependenL/l-iater nelaLed Uses By 1993, Indian River County shall adopt and implement .performance guidelines which give shoreline priority to water -dependent uses while decreasing the adverse ecological impacts of these uses. Policy 3.1: The county shall establish criteria to categorize wa1.C1-uejJe11ue11L/water-relarcea uses In order or significance and maximum benefit to the community. This order shall consider public, economic and private considerations and the uses shall be ranked as follows: o:uo SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:49 - OffcialDocuments:672, Attachment Id 0, Page 126 COASTAL MANAGEMENT ELEMENT a, water -dependent public interest%use; b. water -related public interest/use; C. water -dependent private interest/use; and d_ water -related private interest/use.- Policy .3.2: Water -dependent facilities shall be located and designed in order to minimize environmental impacts. All projects and activities shall be required to obtain all applicable federal, state and local permits and shall be reviewed by the county and all other permitting agencies.. The following criteria shall be considered on review: a, location, type and abundance of shoreI3ne and aquatic b, circulation and/or flushing patterns of the associated water body; cs ex;ct;ng water quality and physical dimensions of the water body; and d, size, composition, number and sources of construction material, physical dimensions of projects_ and_ con- struction techniques utilized, scope, duration and potential impact of construction. Policy 3.3: Water -related uses not requiring direct waterbody access'shall be reauired to locate in upland areas. o-licy-3—.4 s—ihe county shad rccognize—and regulate accord— ingly, the differences between "commercial marinas," private multi -slip facilities, and public/private multi -slip facilities. a. Commercial -marinas shall include all dock facilities and appurtenances providing services such as fuel and oil products, marine equipment and supplies, terminal or transfer facilities, commercial and charter fishing operations, fish or other resources material processing and/or shipping and receiving, warehousing, storage and distribution .tacilities of marine or marina relatea products, boat building and/or repairs. b. Private multi -slip dock. facilities shall include all facilities having three or more boat launching, docking or storage facilities, which provide fueling, r or other commercial services normally associated with a marina, and do not rent or lease berthing slips to the general public, -81- SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:50 - OffcialDocuments:672, Attachment Id 0, Page 127 COASTAL MANAGEMENT ELEMENT Q. ubiic/privateHIUlti-slip duck facilities shall include --- all facilities having three or more boat launching, docking or storage facilities, which do not provide fueling, or other commercial services normally associated_ with a marina, except that berthing slips maybe rented or leased tothethe_ 7ener 1. 7 -MM i r _ wi th the ratio of public to private berthing slips to be - consistent with State Department of Natural Resources - ` ^ standards for such facilities. Policy 3.5: Commercial marinas shall be, permitted only in commercially zoned areas and shall be required to obtain all appropriate federal, state and local permits. By 1991, the county shall establish marina siting and performance regulations to include, but not be limited to the following criteria: a. Marinas must demonstrate a working pollution mitigation plan which addresses, at minimum, fuel storage/spill management, contaminated runoff collection and water pollution clean-up/contro proce ures, and appropriate b. Point or nonpoint discharge from upland activities associated with marinas shall not be permitted to enter -dnt-0-the applicable waterway. C. Commercial marinas shall be sited in order to. minimize degradation of existing aquatic habitats and its wildlife, and shall not be located in class 1 or 2 resource protection areas included in the _FDNB aquatic preserves program. d. Marinas will only be allowed in areas with greater than four (4) feet average water depth below mean low water. All marina access shall be through existing channels connected to the intra -coastal waterway. Where maintenance dredginq---is required-,- it shall be—the minimum necessary to allow access to .marina facilities; dredging activities shall not exceed 8 feet in channel depths. Dredging activities shall be prohibited in FDNR recognized seagrass or shellfish areas. e. Commercial marinas must possess sufficient upland areas able to accommodate all needed utilities and marina support facilities, including all required parking, setbacks, lighting, open space, public facilities, drainage and pollution mitigation criteria. f. Commercial marinas shall contribute and participate in manatee awareness programs. t g. A1-1 marinas and multi�ip facilities shall -be required to display and maintain all applicable navigation, warning and manatee awareness markings. -82- SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:50 - OffcialDocuments:672, Attachment Id 0, Page 128 COASTAL MANAGEMENT ELEMENT h. Commercial marinas s all be prohib-ite-c-rom locating in FDNB Aquatic- Preserves, tees, or other federal, t-h - fede'ral, state or locally recognized environmentally sensitive areas, in cases where the location, construction and/or operation of these facilities would decrease existing water quality , and/or natural circulation patterns; or threaten endangered wildlife, bird rookeries or marine habitats. Policy 3.6: Private and public/private multi -slip dock facilities shall be—allowed within Indian River County provided that: a. Such facilities shall meet or exceed the minimum cri- teria set forth by applicable federal, state and local agencies including securing, all pertinent permits prior to construction. b. Such facilities shall be associated with existing or planned residential developments, including commercial development, multi -family and single-family residential development o— park areas. C. No dredging of new channels shall be permitted for new multi -slip facilities, and maintenance dredging for all existing facilities shall require appropriate federal, State -and local--approval,,.fin addition—,dredging-shall be prohibited in FDNR recognized seagrass-or shellfish areas. d. All new facilities having 10 or more slips for vessels 25' or greater shall be required to install and maintain pump -out facilities meeting all local criteria. These acili-ties s -ha l -5e permitted and inspected—by--tYre HRS -Indian River County Environmental Health Department, which shall have power to penalize facilities in non- compliance. Criteria pertaining to pump -out facilities should include but not be limited to: 1. pump -out facilities shall incorporate marina -wide systems, portable/mobile systems, slipside systems or a combination of these types; and 2. effluent shall be collected for forwarding to approved public facilities, or directly deposited to approved public or private facilities. With county approval; properly treated effluent may be utilized for landscape irrigation, provided this use does not endanger the health, safety or welfare of the population or the environment and its wildlife. SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:50 - OffcialDocuments:672, Attachment Id 0, Page 129 COASTAL MANAGEMENT ELEMENT e. In,areas not within state regulatorv� jurisdiction but within local regulatory jurisdiction, the area of submerged and pre-empted by the multi -slip dock facility shall not --exceed rules of the Board of Trustees of the Internal Improvement Trust Fund, Chapter 18 -201, -Florida Aquatic Preserves..(as amended).. These criteria as regulated by NR, shall be utilized by the .county for regulatory purposes. Private and public/private multi -slip dock facilities shall be regulated by the county to ensure adverse impacts esources are minimized. Policy 3.7: By 1991, the County shall develop and implement regulations governing vessels utilized for "live aboard" purposes.—Criteria to be incorporated-im--the-regu1ations shall include, but not be limited to the following: a. The county shall cooperate with the Florida Marine Patrol to recognize "live-aboards" and enforce regu- lations pertaining to -them. b. Buoyant vessels with no operative means of propulsion inhabited thirty (30) consectutive days or more shall be defined as "live-aboards vessels. Motorized buoyant vessels occupied for greater than seven 7 consecutive days shall be considered "live -aboard" vessels. C. The county shall develop and implement regulations which pertain to the availability and utilization of pump -out facilities for live aboards. d. Non=motQriz-e-dessels c_1_ass-f-ied---as----!�live-aboard" vessels shall be required to moor within marinas or privately owned riparian property, and shall be connected to county approved pump -out facilities or a municipal or county sewer facility. e. ve-abo�-s—rd-al-1 be required to have adequate upland facilities, such as parking, trash removal and landscaping, fences, signs and outbuildings, as necessary. Policy 3.$: All non -water -related -an -;ion-water-dependent uses shall be subject to setbacks from the St. Sebastian River and the Indian River Lagoon Aquatic Preserves in order to afford a shoreline protection buffer as described and set forth in Policy 2.1 of the Conservation Elellent. OBJECTIVE 4 Beaches and Dunes Indian River County will have an established comprehensive beach and dune mana ementregulatory_ program -by. -September_ 1990_, which protects, maintains and enhances a naturally functioning beach and dune system, while ensuring that no unnatural disturbances of the primary dune system occur. -84- SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:51 - OffcialDocuments:672, Attachment Id 0, Page 130 COASTAL MANAGEMENT ELEMENT Policy 4.1: The county hereby des construction Setback Line construction line, -,except control Line as the (DSSL)" and shall related activities for the following: ignates the 1981 DNR Coastal "County Dune Stabilization prohibit construction and eastward of the established a. federal, state—and locally permitted erosion con- trol/dune stabilization projects, dune walkovers, lifeguard towers or boardwalks or temporary dune irrigation projects. b. public navigational—pxaj-ects, marker --s— or—ther con+rnl structures and the maintenance of these structures; C. maintenance and/or restoration not requiring greater than 50% located east of the DSSL, sub: relevant permits and approvals; of existing structures reconstru-ct-ion which—are ;equent to obtaining all and d. emergency vehicles and/or activities to protect life and/or loss of upland property (including fire, police rescue, emergency construction.) Policy 4.2: Indian River County shall review all proposed beach and dune projects in the unincorporated area of the county to ensure appropriate beach and dune protection, and shalom review —and submitcmments regarding permit appli-cations of all apprepri4te federal, state an' IocaI agencies governing beach and dune management, in addition to pursuing available federal and state funding for beach and dune management projects. Policy 4.3: The county shall require dune walkover structures for all new public and private development desiring beach access. The county shall not approve plans which do not include walkover structures at beach access points. Policy 4.4: Indian River County shall devise a dune walkover construction and maintenance plan to be implemented through the Parks and Recreation Division of the county. Criteria shall include: a. elevated structures 'at---al-1 designated public access points designed to minimize environmental- impacts and withstand adverse climatic conditions; b. public structures a minimum of six feet wide which utilize approach ramp facilities for the handicapped; and C. the planting of native and acclimated plant species in conjunction with the construction of new walkover structures to discourage engroachment onto the neighboring sensitive dune area. -85- SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:51 - OffcialDocuments:672, Attachment Id 0, Page 131 COASTAL MANAGEMENT ELEMENT Policy 4.5:-T.o maintain and/or re-establish the natural dune syst ins, indiarr _,— Cm-ty shall adopt and implementa dune preservation ordinance, which shall address, at minimum, the following: a. all permitted beach access shall occur at designated aCCv�,s points which include dune walkover structures; v b. all. beach. and dune restoration projects shall be required to utilize native and adaptive species; c. the disturbance or removal of dune vegetation shall be prohibited, except when. associated with permitted dune projects and dune restoration; d, activities which would adversely impact the nearshQre_ . .reef community shall be prohibited; e, all federal, state and local regulations concerning . beach management shall be satisfied; f, continued supper for, andcoordination with, the existing h -each rpt ra ierleommrbtee to implement programs and make recommendations pertaining to beach preservation and restoration activities, and g. coordination—with the appropriate-municipaities--of- Indian River County and ithe Sebastian Inlet Tax District concerning beach restoration/preservation. Polis 4.6: The countyshall continue to—prohibit-motor'ized vehicles on the beach/dune area, except for vehicles engaged n emergency activities, ted in vehicles and permitted vehicles associated with approved construction, restoration and/or scientific projects. Policy 4.i: The county shall continue to impose fines or other—penalties_ and,/or require mitigation or- re-stor-ation €-or the violation of beach and dune regulations. Poli 4.8: The county shall coordinate with Brevard County and the Sebastian Inlet Tax District to -study and evaluate Projects concerning the Sebastian Inlet, in addition to pursuing alternatives for funding and management of inlet activities. POLICY 4.9: In the interm period between comprehensive plan adoption and development of the beach and 'dune management planes the count I will continue to enforce existing coastal regulations and shall adopt the Cubit Beach Preservation Plan and its provisions and/or amendments as the,county beach and dune preservation plan. SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:52 - OffcialDocuments:672, Attachment Id 0, Page 132 COASTAL MANAGEMENT ELEMENT OBJECTIVE 5 Limiting Public,Expenditure in tfFe-Coastal High -Hazard Zone By September 1990, the county will eliminate public expenditure and subsidy in the Coastal High -Hazard Zone, with the exception of natural :resource management. Policy 5.,1: The county hereby,., designates as a the "Coastal High -Hazard Zone" (CHHZ) that area located east of the Department of Natural Resources Coastal Construction Control - "--Line,, or designated FEMA V -Zones, whichever is further west. Policy', -a5.2: In.. the -Coastal High:Hazard Zone, the county shall not subsidize public facilities which are not directly related to public access or resource management, and the .county shall adopt Objective 2 and its associated policies of thetCapital Improvement Element. Policy 5.3: The Public Works Department shall assess all county facilities damaged from storm activity in the CHHZ, and shall make recommendations to reduce future expenditures and•., potential -damage risks,. In addition-, �the Pu-bric Works Department shall evaluate with a cost -to -benefit analysis, the relocation of all storm damaged infrastructure or infrastructure which is repeatly threatened by potential storm damage. Policy 5,4: The county shall pursue actions and: policies necessary to ensure its continued participation in the Federal Flood Insurance Program. :Policy 5.5: The county shall continue to review and adopt ,revisions of the Standard Building Code concerning the construction or ouildinq-s—l-ocatecrin t -he coastal zone. OBJECTIVE 6 Reduction of Hurricane Evacuation Times to Reduce Public Risk, By 1995, Indian River County. will have reduced estimated evac- uation time for a category 3 storm event to 12 hours or less. Policy 6.1: The county hereby designates as the "Hurricane Vulnerability Zone" the area described in the 1988 Hurricane Evacuation Study update as inundatey a Category hurricane. Policy 6.2: The county shall pursue the construction of a four-laned, fixed -span bridge to replace the Merrill -Barber draw bridge in order to provide --increased hurricane evacua tion capacity to reduce evacuation times. .. Policy 6.3: The county shall coordinate with all federal, state and local agencies witfi jurisd-idt=on in -the- county, -o ensure their cooperation in fulfilling the dir�rtivea of the local Peacetime Emergency Plan. SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:52 - OffcialDocuments:672, Attachment Id 0, Page 133 —87— COASTAL MANAGEMENT ELEMENT Policy 6.4: The county shall increase the number of and capacity of public shelters avai a e to evacuees in order to maintain the present shelter capacity/population ratio. Policy 6.5: Indian River County shall evaluate and pursue recommendations by the Director of Emergency Management concerning public projects or modif-rca ns to projects which could reduce potential evacuation problems in the county; Policy 6:6: Indian River County shall continue to coordinate -,---With;, Brevard and St. Lucie Counties concerning evacuation routes and populations involved, and to assess the impacts of .-these neighboring counties' growth on local evacuation times. Policy 6.7: The county shall not permit increased zoning densities in the- Hurricane -Vulnerability- Zone- which—reduce evacuation clearance times or increase public expenditure or loss of property and/or human life. Policy 6.8: The county shall coordinate with the Florida East Coast Railroad and other concerned agencies to ensure that train movements will_156stopped during hurricane evacuations. OBJECTIVE 7 Post -Disaster Redevelopment By 1993, the county will have a post -disaster recovery and re -development -plan which minimizes -or eliminates the future risk to humanlife and public and. private prop6tty from natural disasters. Policy 7.1: The county shall immediately adopt the following policies , as guidelines for post -disaster recoverya redevelopment. Policy 7.2: The Operations Group, as specified in the local Peacetime Emergency Plan, shall designate and organize the members of a Recovery Task Force to develop a recovery and re -development outline and identify the data and personnel needed—tom—reduce post -disaster recovery time and future risk from severe disasters. The Recovery Task Force should address to the following criteria: a. Increasing coordination and-ceoperatior----between the county, the municipalities within the county and the federal and state agencies involved in disaster relief. b. Identifying post -disaster federal. sources and allocating available recovery funds, including local-, state and SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:53 - OffcialDocuments:672, Attachment Id 0, Page 134 COASTAL MANAGEMENT ELEMENT c, Establishing the criteria for review and permitting of emergency rmits, anauthorization of immediate clean-up. and repairs necessary to protect the health, safety and welfare of the affected population. d. Recommending actions -for future hurricane mitigation procedures/projects, which would reduce potential �- e. Recommending amendments/changes to local plans, policies or procedures regarding hurricane mitigation. The local Peacetime :Emergency Plan and the associated recommendations of the hazard mitigation annex shall be adopted by the county. Policy 7.4:1 Structures and uses eastward of -..the DSSL which sustain greater an 50� o.(Member. of Appraisal Institute) assessed current market value damage from a naturally occurring storm shall be required to relocate upland of their location and, when possible, westward of the DSSL. Prior to reconsrt uction, struc ures east—o-f-the FDN C.C.C.L. exhibiting damage from -a: naturally occ-dring storm event, greater than 500 of MAI assessed market value shall be required to obtain all applicable permits and comply with all applicable building codes concerning coastal construction. Policy 7,5:. All non -emergency post -disaster reconstruction shall be evaluated by the appropriate agencies for reducing future disaster effects. These agencies shall approve or ,disapprove plans, based on current state and local laws, ordinances and criteria_pertainingto coastal construction, including the objectives and policies of this plan. POLICY 7.6: The county shall implement the provisions of the local code of laws and ordinances pertaining to coastal construction and natural resource protection, in addition to the applicable goals, objectives and policies of the Indian River County Comprehensive Plan-,—tc�- reduce —the e-x-posure of human life and property to natural hazards. Such provisions shall include but not be limited to: a) The regulation of coastal development in accordance with the coastal building code of Indian River County; b) Preservation of flood storage capacity in the 100 year flood plain, in accordance with Objective 5 of the Drainage Sub -Element; c) The protection of beaches and dunes from -disturbance, in accordance with the policies of Objective 4 of this element; -89- SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:53 - OffcialDocuments:672, Attachment Id 0, Page 135 COASTAL MANAGEMENT ELEMENT d) The management of stormwater, runoff and the regulation of sewerage systems and septic tanks, as per the policies of the Drainage and Sanitary Sewer Sub -elements; and e). The provision of- the Future Land Use Element and the Coital- manaqem pertaining to coastal an :use designations. OBJECTIVE 8 Beach.Access Environmentallysafe access will be provided to Indian River County beaches and shorelines. The county shall have no net loss of existing public access facilities. Polis 8._1_:_._Indian Riv-eCounty shal"-squire additions waterfront property through its Land Acquisition Pro gram, in order to increase shoreline access. The county will place the greatest emphasis on acquisitions which offer both preservation of naturalhabitats and potential increased public access to beaches and shorelines. Policy !E2. Indian River County shall accept donations' of shoreline lands suitable to increase public coastal access, provided this acceptance is in the best interest of the county. r P li Indian Rive� - . �� ��ail- imp Oslo Road boat ramp facility to allow greater river access for the, south county, and develop the treasure shores park facility to provide greater public beach access. Policy 8.4: The county shall prohibit the net.loss of public access and facilities by: a) Requiring any displaced or removed public access to be replaced at a minimum of a one-to-one ratio; Requiring- pr-ivate property owners—to pro- e pubic access to beaches which are renourished or enhanced with public funds. This requirement may include provisions for establishment, relocation or enhancement of public accesses provided all remedies are approved under adopted Indian River County regulations_; C) Providing public vehicular parking at more than 50% of all new public beach accesses. OBJECTIVE 9 Historic Resources The county will provide for the preservation and protection of historically and archaeologically significant sites and structures. SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:53 - OffcialDocuments:672, Attachment Id 0, Page 136 COASTAL MANAGEMENT ELEMENT POLICY 9.1: By September 1990, - n ianRiver County shall adopt --an Historices -Pre servat on—Drd nan , which identifies and provides for the preservation of significant historic and cultural artifacts and sites. Policy -9..2: The county shall pursue funds- for conducting a - survey of archaeological or other—si tes--which—ma-y exist— pres'ently undiscovered in the county; once identified, these sites :shall be evaluated and included in the Historic Resources Management Plan. -:Polic 9.3: The county shall pursue state and federal funding _ to - acquire -and/or to preserve cultural and historic sites recognized as important and/or significant. Policy 9.4:. The county shall provide developers with incen- tives, such as transfer of development rights, tax incentives and others, in-return,fqr preserving historic resources; Policy 9.5: Development which includes historical resources sites shall be required to construct and submit archaeological -surveys -prior to commencing or recommencing construction activities Development shall be required (through land development regulations) to preserve these resources while maintaining a reasonable use of the land. Polite-- 9:6: T -he cou-nty- shall recogni-ze and properly manage its -historical resources by implementing Objective 8 and its ;associated policies of the Future Land Use Element'. OBJECTIVE 10 Infrastructure in the Coastal Zone Infrastructure in the coastal zone.shall be adequate to provide the—lL-si-gn-ated iev -ls 6f service indicated: in tTie respective Indian River County Comprehensive Plan elements and sub -elements, including future service areas and phases of implementation. Policy 10,1: The county shall prohibit the location of wastewater treatment package plants in—the Hurricane Vul- nerability Zone. Policy 10.2: The county shall require infrastructure located in the Coastal High -Hazard Zone and exhibiting severe or repeated storm damage to undergo evaluation for abandonment ,or relocation up an . Policy 10.3 The county shall coordinate with all state and federal agencies in the funding and implementation of beach renourishment projects. Policy 10.4: Indian River County shall permit the utilization of local funds only for beach renourishment projects which, at minimum, address the following criteria: SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:54 - OffcialDocuments:672, Attachment Id 0, Page 137 COASTAL MANAGEMENT ELEMENT a, an economic impact analysis, which shows that the 1 nig-te c /benefit ratio o pre the exceeds the cost/benefit ratio of alternative projects; b. a compatibility and performance standards analysis which shows that impacts to --the existing, surrounding beach, dune and nearshore sys t__s are minimized, C.. an environmental analysis which shows that impacts to the offshore reef community, and the nearshore, beach and dune ecological communities are minimized and a design and capacity analysis which shows that benefits to upland life and property, public access enhancements, and the projected life of the proposed project are equal to or greater than those-Qfalternate projects, Priority shall e given to those projects which display the greatest potential for upland life and property protection, with the least adverse environmental impacts, for the best cost ratio. 'Policy 10.5. The county shall not allow new underground storage tanks or septic facilities oceanward of the County Dune Stabilization Setback Line. �o1icy 1L 6-: The county shall maintain- the -standards, phasing and funding of infrastructure in the coastal zone, as set forth in the Traffic Circulation and Drainage Elements, and the Aauifer Recharge, Sanitary Sewer and Potable Water Sub -Elements of the Indian River County Comprehensive Plan. Policy 10.7: The county shall support the utilization of periodiccsand bypassing of the Sebastian Inlet through continued and/or expanded efforts of maintenance dredging. OBJECTIVE 11 Limit Densities in the Coastal High -Hazard Zone Indian River County shall—Iiitvpresidential densities in ---the coastal high hazard zone of the unincorporated barrier island to less than 3 units per acre, and direct development and population concentrations away from known or predicted coastal high -hazard areas. Policy 11.1: The county shall protect loss of life and property in coastal high -hazard areas by implementing policies 5.2, 5.5, 6.7, 7.3 and 7.4 of the Coastal Management Element. The county shall support a program of land acquisition in the Hurricane Vulnerability Zone, This land may be used for either natural resource preservation, i. recreation or both. county shall continue to support such as transfer -of -development rights to reduce densities in the coastal high -hazard areas. SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:54 - OffcialDocuments:672, Attachment Id 0, Page 138 —qn 9— COASTAL MANAGEMENT ELEMENT ( Policy 11.4: The county shall not allow zoning densities in the CHHZ greater than RS-3ng e- ami y Residential District (up to 3 units/acre). Policy 11.5: The county shall utilize the provisions of the local Code.. of Laws and Ordinances, all applicable state and -federal- relations, and the "ppiaP=tate objectives and policies of the Indian River County Comprehensive Plan, to limit development in the Coastal High Hazard Zone, and provide for the relocating or replacement of infrastructure away -from this area. SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:54 - OffcialDocuments:672, Attachment Id 0, Page 139 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:55 - OfficialDocuments:672, Attachment Id 0, Page 140 RECREATION AND OPEN SPACE ELEMENT l GOALS, OBJECTIVES & POLICIES As with all elements of the comprehensive plan, goals, objectives and policies are the basis of the Recreation Open Space Element. Not only do they establish the county's direction for recreation and open space; but goals, objectives and policies also set community expectaLions for recreation ana open space ana courses of action which the county will pursue to meet those expectations. GOAL:— It is the goal --of Indian River County to prow a residents of the county, is accessible to' all residents of the county, and maximizes the county's physical, cultural and historical resources. OBJECTIVE 1 Adequate Parklands The county will at all times during the planning period have a sufficient supply of parklands to—accommodate--the county residents at the accepted service levels. POLICY 1.1: The county hereby adopts recreation levels -of -service as follows: ° Urban district parks; specialty parks (beach), and specialty parka (river) a ed . countywide parks. The following levels -of -service are applicable. countywide, Park Type A�r�s— per lOflPopui�t3�n Urban District 5 Specialty (Beach) 1.5 Specialty (River) 1.5 ° Community park levels -of -service are hereby set separa ely—fo�he north and south districts. For the south district, two levels -of -service are set, one for the period from 1989 to 1995 and the other from 1996-2010. Digtri Acres per --1000 Population North Community South Community South Community 3 1.25(1989-1995) 3 (1996-2010) POLICY 1,2: For level-bf-service purposes; the county will measure area per 1000 population by summing the total county owned acreage by park type and dividing by the current estimate of county functional population, excluding municipalities, 58 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:55 - OffcialDocuments:672, Attachment Id 0, Page 141 RECREATION AND OPEN SPACE ELEMENT POLICY 1.3: The county shall incorporate these levels of service in its land development regulations and ensure that no development will be permitted if the impact of that development would be a lowering of the recreation service levels below the minimum standards. POLICY,1.4: The county hereby adopts the facility standards identified in Table 10.12 as guidelines to be used in developing parklands, ,---OBJECTIVE 2 By 1995, the county will have 177 acres of community park in the south district. POLICY 2�By-1991—,—the—county—shall—develop Phase I—of tILLU recently acquired park in the south county. POLICY 2.2: The county shall, by 1992, assess the feasibility of converting former landfill sites and wastewater reuse . sites to county parks..pecific consideration will be .given to the Oslo transfer station site and the old stump dump. Those sites identified as feasible for conversion shall be developed for park use. POLICY 2.3: The county shall include active recreation facilities suclias baseb—allfieTds, basketball courts, tennis courts,jogging trails, and others in its future south county parks. OBJECTIVE 3 By 2000, the county will have developed at- least 60 percent af_ its currently undeveloped existing park acreage. POLICY 3.1: The county will, by 1993, develop the north beach complex (Treasure Shores Park) by providing parking, dune walkovers, restroom facilities, picnic areas, and other amenities POLICY 3.2; The county will provide for the improvement of the existing fairgrounds facilities by providing parking, permanent facilities, and necessary structures. POLICY 3.3: The county will explore the feasibility of expanding the current county golf course by nine holes. POLICY. -3 4s The county will add facilities to exist parks having undeveloped area. The facilities to be added will be consistent with the recreation facility guidelines in Table 10.12 and the recreation capital improvements program, 59 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:56 - OffcialDocuments:672, Attachment Id 0, Page 142 RECREATION AND OPEN SPACE ELEMENT OBJECTIVE 4 By 1995, the county's recreation system will meet demand through the coordination of public and private resources. POLICY 4.1: The county will not duplicate recreation .facilities if recreation facilities are provided y the private sector, are available to the public and are adequate"to serve the target population. POLICY 4.2: a. The county shall encourage private groups to provide rencreation services and. facilities—to residents by taking the following actions: By September 1990, revise land development regulations -to-require-that-recreation-facilities -ie-provided within certain planned residential developments: and 0 Incorporate within the proposed recreation impact fee ordinance, a provision for reducing' fees for residential developments which -provide -recreation facilities. b, Where private services and facilities are available, the county will coordinate its recreation activities, services, and facilities so that recreation demands are met efficiently and economically. Such coordination will require the county o; 0 Maintain statistics on user demand; 0 Provide recreation 'assistance, such as program development and—taff n -g if -needed -to make-faoii-itis available to the publio-; and - 0 Incorporate private recreation services into a county -wide program. OBJECTIVE -5 Access By 1995, the county will have increased accessability throughout its park system, and will have eliminated any existing constraints in the county's parks. POLICY 5.1: The county will by 1991 undertake a detailed study of all of its park facilities and identify all access constraints. POLICY 5.2: The county will design all new parks and recreation facilities and retrofit all 'existing parks and recreation facilities to provide barrier -free access. This will include wheelchair ramps, wide doors, lowered fixtures, �- and other appropr-iate measures. 60 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:56 - OffcialDocuments:672, Attachment Id 0, Page 143 RECREATION AND OPEN SPACE ELEMENT POLICY 5.3: The county will locate new park facilities in close proximity to the population to be served based upon service.radius for different park types. POLICY 5.4: The county will provide vehicular, pedestrian, and.,bicycle,access.consis:tent with the Bikeway%Sidewal Plan, to all Cou . nty . owned parks in conjunction with park development: OBJECTIVE'6 By 1995, the county will have increased access to the county's major natural resources, including the Atlantic Ocean, Indian River, Sebastian River, and freshwater lakes. POLICY 6.1 The.`county shall provide parking facilities and dune crossovers in developing the Treasure Shores Park. POLICY'6..2:, The county shall provide at least two additional boat ramps and parking for access_to navigable waters in the County by 1995. The `county will also'maintain water access to e.xistipg boat, ramps by maintenance dredging existing channels as necessary. POLICY 6.3:' To increase river access, the county shall. support thetat"epartinenff ofrtlatuxal -Resou es (DNR) in their acquisition -of areas around the St. Sebastian River. This support will include, but not be limited to: 0, compiling ownership information; 0 conducting site analvses; 0 contacting landowners;. and ° Providinq staff assistance. POLICY 6.4o The county shal velop on ach access on the south barrier island by 1995. This access will be improved with a dune crossover, parking, and other necessary.facilities by 1996. OBJECTIVE 7 Recreation Programs By 1995., 'the county will have a recreation program with a recreation staff which adequately serves all geographic areas of the county with a ranee of programs. The .county shall provide supervised recreation .activities at all community park sites. b SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:56 - OfficialDocuments:672, Attachment Id 0, Page 144 RECREATION A PES-gAC-E EIFE-ME-NT POLICY 7,2: The county shall provide recreation programs and services-�ch complement—those provided—by�-the municipali- ties and avoid unnecessary duplication of programs. POLICY 7.3: The county shall allow private groups to use park areas and preclude use of those areas for recreation programs and activities provided that the ollowing conditions are -met: ° The area of the park to be used must not currently be in use by the general public. lease specifying duration of use, characteristics of use, insurance requirements and other applicable conditions must be executed by the Board of County Commissioners. ° A site pian -o `em proved by the planning department. Any improvements made to the leased site must be done and pai"-or-by-the leasee. OBJECTIVE 8 Open Space By 1995, the coue nty will have at least 10 percent ,more _ publiclyowned or publicdy�controlled open space than it—has i;,--- 1989.. POLICY 8.1: The county shall acquire those environmentally sensitive areas programmed for acquisition in the conservation element.of this plan. These areas will be used .as open space,. passive recreation areas, and historical sites, as appropr-iat . POLICY 8.2: The county hereby designates the following roadways as scenic/historic roads: Jungle Trail Fellsmere Grade Quay Dock Road Old Winter Beach Road Gifford Dock Road POL e hco_ shall.. y develop management plans for. each of the scenic/historic roads. These management plans shall provide for the protection of open space resources adjacent to these roads and shall designate areas suitable for open space aquisition. These roads will be used as anness ways, I open space, and corridors incorporating passive and active recreational activities while maintaining their primary historical importance. 62 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:57 - OffcialDocuments:672, Attachment Id 0, Page 145 RECREATION AND OPEN SPACE ELEMENT POLICY 8.4: Consistent with the Traffic Circulation Element, e county shall acquire sufficient right-of-way for future roads to provide additional green (open space) areas by: ° Using rural crossections including grassed swales unless precluded by physical constraints; ° Providing for grassed medians on divided roadways where conditions allow; and Designing roadways to provide for grassed roadway -recovery areas_ POLICY 8.5: The county shall incorporate the open space definitions and standards reflected in this element into its lend development regulations. OBJECTIVE 9 By 1995, the county will have increased the amount of green area/open space within development°projects. POLICY 9.1: The county shall require all development projects to incorporate a minimum amount of green space or open area. The county's land development regulations shall specify specific -amounts o open area by lari use ype, Wut Y1P e amounts ha it not be less than 15 percent of the site for industrial areas; 20 percent of the site for commercial areas; and 30 percent of the'site for residential areas. POLICY 9 -r2 -:--he county shat -1 throug"ts l -and devolopmen± regulations, require that all environmentally sensitive areas from which density is transferred and other such areas as are appropriate to be maintained as open space in perpetuity and that this be accomplished through recordation of conservation easements. OBJECTIVE 10 Intergovernmental Coordination By 1992, the county will have a countywide recreation system. POLICY 10.1: The count will work with the m- nu icip lities in the county through meetings and workshops to study the feasibility of consolidating all recreation activities into a countywide system.by 1992. POLICY 10.2: The county will enter into interlocal agreements with each of -the municipalities to coordinate recreation planning; POLICY 10.3: In order to provide recreation sites in the St. Johns Marsh and to provide for hunting, fishing, boating, and bird watching opportunities, the.county the St, Johns River Water Management District by: 63 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:57 - OffcialDocuments:672, Attachment Id 0, Page 146 r RECREATION—AND OPEN SPACE—E HENT ° Providing access road maintenance; 0 Providing recreation site design alternatives; and 0 Designating acceptable site locations. POLICY 10.4: To enhance recreation opportunities, the county '_ will coordinate with and support state and federal agencies in their land acquisition programs by: 0 Compiling informationq Conducting site analyses; tacting owners;—and Providing staff assistance. POLICY 10.5: The county will enter into an interlocal agreement with the school board and private school operators LU obtain use of school facilities for recreation purposes during non -school hours and to establish coordination between the county and the school system. CR QR,TRCTTVR 11 By 1995, the county will have a source of funds adequate to meet the needs identified in this element earmarked for recreation. POLICY 11.1: The county will consider the adoption of a recreation impact fee applicable to new development in the county. POLICY 11.2: The county will set up user fees for those facilities and programs for which user fees are appropriate. Appropriate includes those programs where—the—benefi is quantifiable and where the fee can be effectively implemented. POLICY 11.3: The county will; as part of—its user fee program, develop a method_ to subsidize rec-reatior —user fees for low income residents so that there will be minimal effects of user fees on participation at sites or programs. POLICY 11.4: The count_ will analyze the feasibility of establishing a countywide recreation district having the ability to evy ad valorem taxes for recreation purposes. 63.1 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:58 - OffcialDocuments:672, Attachment Id 0, Page 147 RECREATION AND OPEN SPACE ELEMENT POLICY 11.5: The county shall identify state recreation grant programs. When applicable, shall apply for available grant funds, for facility or program funding. OBJECTIVE 12 Arts and` -Cultural Programs and federal the county recreation By 1991, the county willhavea program to facilitate the provision of--.t-he arts and cultural activities in the county. POLICY 12.1: The county shall support cultural activities by: ° Using the county's grant eligibility requirements to acquire funds for cultural events; ° D oviding staff a-ssistance—f rr cultural --events; ° Co -sponsoring cultural events; ° Promoting private arts organizations; and ° Continuing financial support through tourist tax revenue or private arts and cultural groups. 63.2 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:58 - OffcialDocuments:672, Attachment Id 0, Page 148 au a ••„ _. GOAL, OBJECTIVES & POLICIES Goals, objectives and policies are the basis of the Economic Development Element. They establish the county's overall direction for economic development and set the community's expectations for economic development and courses of action the county will undertake to meet those expectations. GOAL It is the -goal -'6f Indian River County to have balanced and orderly economic growth. OBJECTIVE 1 LOW UNEMPLOYMENT RATE Subsequent to plan adoption, the county will have a reduction in its unemployment rate of- one percentage pont by 1992. POLICY 1.1: The county shall encourage the expansion of existing businesses and attraction of new industries and businesses, including clean "high tech" industries. POLICY 1.2: The county shall seek businesses whose seasons supplement the seasons of the citrus industry, such as agri-business and research and development corporations. POLICY 1.3: The county_shall encourage new and—existing businesses to participate in summer youth programs. POLICY 1.4: The county shall promote the growth of businesses which provide skilled and semi -skilled jobs with salaries higher than minimum wages. POLICY -i- 5 --'the county�ahal-1 focusit-s indu-str-ial—expans-io efforts on attracting and expanding clean, small-scale light manufacturing and assembly concerns. POLICY 1,6: The county shall provide adequate infrastructure to areas designated for commercial and industrial development in the Future Land Use Element and according to the Capital Improvement Element. POLICY 1.7: The county shall provide for the issuance of Industrial Development Bonds for new industries as allowed by I ___ POLICY 1.8: By 1992, the county shall prepare a study assessing the feasibility of rebating capital costs to firms which pay initial utility line extension charges. POLICY 1.9: The county shall coordinate with the Florida Job Service and the Treasure Coast Job Training Center to provide better notification of available jobs. 22 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:58 - OffcialDocuments:672, Attachment Id 0, Page 149 ECONOMIC DEVELOPMENT ELEMENT POLICY 1.10: The county shall utilize existing industries a magnet LU aLLL Wt, 11CW UVcty riucii., iaav+..+..7 —r -r— businesses for industries located in Indian River and surrounding counties. POLICY 1.11: The county as an-employer—sha3- use—its loe al —empinyment pool_ cervices and contractors whenever possible. OBJECTIVE 2` BALANCED ECONOMIC GROWTH The county will have a more diversified economy by increasing the number of employees of the non top three major industrial sectors in the county by 1% each year beginning in 1992. POLICY 2.1: The county shall by. 1993 prepare an Economic Base Study. POLICY 2.2: Upon completion of 1993, the county shall adopt conclusions reached in the study. OBJECTIVE 3 the Economic Base Study in policies subject to the IMPROVED EDUCATIONAL OPPORTUNITIES By 1995, the county will have increased its overall classroom facilities. &Iso, past -secondary educational opportunit-ies—will have increased by 1995. POLICY 3.1: The county shall promote the development of post -secondary educational and research facilities in the county. _POLICY- 3.2: The county shall determine the type of vocational training that is needed to support the needs of new and existing businesses and industries. POLICY 3.3: The county shall inform existing and potential businesses of avai-lab-le employment training assistance, POLICY 3.4: The county shall provide training opportunities for unskilled and semi -skilled workers in the county. POLICY 3.5: The county shall maximize the educational opportunities available to county citizens. POLICY 3.6: The county shall encourage the expansion of the local branch of Indian River Community College and attract a branch of a four-year college or university to the county. POLICY 3.7: The county shall survey local industries to determine what type of training and assistance is needed on a annual basis, beginning at plan adoption. 23 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:59 - OffcialDocuments:672, Attachment Id 0, Page 150 ECONOMIC DEVELOPMENT ELEMENT POLICY 3.8: The county shall promote expansion -of -vocational education programs in the county, POLICY 3.9: The county shall promote the conduction of job seminars on a regular -basis throughout the county, OBJECTIVE4- ADEQUATE TRANSPORTATION SYSTEM The county will maintain adopted level of service standards for roadways. Level of service "C" shall be maintained for rural principal arterials and rural freeways during peak hour, peak se-ason—,-dnd-pedk direction conditions,.uring peak hour, pea season and, peak direction conditions, level of service "D" or better shall be maintained on all other freeway, arterial and collector roadways. Also, the county will have a coordinated system -of sidewal-cs-and bikeways -lythe year 2010. POLICY 4.1: The county shall continue to charge equitable impact fees on all new development to ensure that resources will be available to expand.the transportation system to meet the demands ofnew development-in-the-county,- POLICY evelopmen-in-the-county: POLICY 4.2:: The county shall implement the Bikeway and Sidewalk 5 - Year Capital Improvement Program and its subsequent amendments. POLICY 4.3: By 1995, the county shall conduct a feasibility study of o provision ot alternate orms of transportation. POLICY 4.4: The county shall support the expansion and development of the two adjacent coastal counties' regional airports. POLICY 4.5: The county shall support the Vero Beach and Sebastian Municipal Airports' Master Plans. OBJECTIVE 5 IMPROVED PERCEPTION By 1991, the county will have improved the community's perception of economic development programs. POLICY 5.1: The county shall support the Indian River County Co h Vero Beach -Indian River County Chamber of Commerce, and the. county Economic Development Council, POLICY 5.2: The county shall promote press and other media cooperation - 24 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:59 - OffcialDocuments:672, Attachment Id 0, Page 151 ----ECON`OMIC-D`EVELOPMENT ELEMENT POLICY 5.3: The county shall assure the community that economic development x" --am-wi'z�re lec community goals and preserve the,present quality of life. POLICY 5.4: The county shall provide information to businesses and industries interested in locating in Indian POLICY 5.5: The county shall support the development and implementation of economic development programs. POLICY 5.6: The county shall provide speakers to educate private citizens, service organizations, and special interest groups .about the county's economic development positions and strategies. POLICY 5.7: The county shall support the Indian River Community . POLICY 5:8: The county shall maintain and update the Commercial/Industrial Data Source information base as conditions change.— POLICY 5.9: hange.—POLICY.5.9: The county shall update the 1985 adopted Overall Economic Development Plan (OEDP) every five years and continue to prepare an annual report of the plan. f OBJECTIVE 6 ENCOURAGE DEVELOPMENT By 1991, the county will have adopted land development regulations that encourage economic development activity.- POLICY ctivity, POLICY 6.1: By l-rl-,-the county all review and evacuate the county's land development regulations. These regulations shall be reviewed each subsequent year thereafter. POLICY 6.2: Each year following plan adoption, the county shall re-evaluate the commercial and industrial nodes in the Future Land Use Element to ensure that they are large enough and are properly located to provide for future growth. POLICY 6.3: The county shall ensure that impact fees are reasonable and equitable compared to the impact that new commercial development will have on the county's roadways and water and wastewater systems by reassessing impact fee rates every two years after plan adoption. POLICY,6.4:, By 1992, the county shall complete a feasibility st am which will allow the spreading of payment of impact fees over several years. 25 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:00 - OffcialDocuments:672, Attachment Id 0, Page 152 ECONOMIC DEVELOPMENT ELEMENT OBJECTIVES ADEQUATE WATEP-ANDLSANITARY-SEWER FACILITIES 1 By 1995, the county will upgrade its potable water and sanitary sewer-facilities-,--al-lowing—for adequate—capacity—for- future economic growth: POLICY 7.1: The county shall implement the plan's potable water acrd _ sanitary sewer sub-e-iems itel impraveme s programs. POLICY 7.2: The county shall continue to provide for water _and sanitary sewer impactfees. POLICY 7.3: The county shall explore possible federal or state funding assistance programs for capital improvements to its water a-nd wstew-at-er-facilities. OBJECTIVE 8 ADEQUATE AND AFFORDABLE HOUSING The county shall a-nsu-r the-prov-ia on of adequate and affordable housing for its residents. _. POLICY -8.1: The county shall crea i1__ _le _rr_ _' . . . ves to encourage POLICY 8.2: The county shall conduct an assessment to determine the number ohousing developments in the county subject -to- restric-tions Ee:g—.age-,-children—,income. POLICY 8.3: The county shall tunding or low-cost ousing. sue federal and state POLICY 8.4: The county shall designate land for higher density housing as per the county's Housing and Future Land Use elements. POLICY 8,5; The county shall dir_eet-higher residential densities to areas with necessary utilities to reduce costs per uni an thereby provi3e morefor act e h uo sing. POLICY 8.6: The county shall maintain a eurr_en_t-inventory of the types of housing available, including rental units and mobile home parks, andmoist the restrictions which are imposed POLICY 8.7: The county shall encourage local lending nst-itutionsto sponsor affoor able mortgage programs. OBJECTIVE 9 INTERGOVERNMENTAL COORDINATION_ The county will facilitate coordination and cooperation among governmental j-uriadictions an--other-public/private agencies. - SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:00 - OfficialDocuments:672, Attachment Id 0, Page 153 POLICY 9.1: The county—shall involve i-nterested—par ties .r- 1,�4- X11 Inti l i cc properly represented. POLICY 9.2: The county shall disseminate any new information to those groups who-are_mos-t responsible_ for imp-Lementinq the various economic development projects. 26.1 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:01 - OfficialDocuments:672, Attachment Id 0, Page 154 CIE ELEMENT GOAL; OKECTI-VES— & POLICIES GOAL Indian River County will have a Capital Improvements Program which manages the provision of services and facilities as identified in each element of the Comprehensive Plan in a fiscally pr dent manner, and ensures that the levels of service set in each element are maintained, facilities and infrastructure improvements are provided --concurrent with development, existing infrastructure is maintained, and balanced growth is attained. OBJECTI E 1 Construction of CapitalFacilities By, 1990, the County shall have Capital Improvement systems which identify all existing and future needs and ensure the provision of aci is es and services which hese needs. POLICY 1.1: The county shall maintain a five year capital improvement. program which is evaluated and updated annually. No capital improvements shall be undertaken by the county unless -that -improvement is—included..within this- element's adopted five vear capital impr-avemen. n��ro9=R i. The CaPitMl Improvements Element will be, reviewed annually. If any transportation facility identified in the Schedule of Capital C Improvements is delayed in construction and this delay will cause the-level--af serv-ice to deteriorate-below—tN —adopted minimum level of service standard for the roadway, a Comprehensive Plan Amendment will be required to adjust the Schedule of Capital Improvements. POLICY 1.2: The. county shall evaluate and prioritize capital improvement projects based on following criteria. Those—criteria--are ranked—i"rder-of—importance. its Preservation of the health and safety of the public by eliminating public hazards; ° Compliance with all mandates and prior commitments; ° Elimination of existing deficiencies; ° Maintenance of adopted level of service standards; Provision of infrastructure concurrent with the impact of new development; Protection of prior infrastructure investments; Consistency with the county plan .1aas of other agencies; ° Accommodation of new development and redevelopment fay demands; 55 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:01 - OffcialDocuments:672, Attachment Id 0, Page 155 CIE ELEME-NT ° Consistency with plans of state agencies and water management ublie fne414t�e-s within the local government's jurisdiction. Promotion of compact development by discouraging growth outside of urban service areas; Demonstration of linkages between projected growth and facility location; ° Utilization of the economies of wale—and timing of other improvements; Reduction of operating costs; Adjustment disaster -s—. or unseen opportuni POLICY 1.3: The county shall implement the Potable Water, Sanitary Sewer, and Solid Waste Sub -Element recommendations as outlinedn the appropriate sub -elements oftheComprehen- sive -Plan. Sinc- these are enterprise accountfu^dL-a elements, capital expenditures identified in these elements shall be funded principally from revenues derived from the applicable systems. POLICY 1.4: The county shall prioritize and implement the programs identified in the Traffic Circulation, Recreation and Open Space, Drainage, Aquifer Recharge, Conservation, and Future Land Use Elements of the Comprehensive Plan. POLICY 1.5: The county shall not eliminate or reallocate bu(gete�appropriations- for road imp ovement-- projects required to meet the adopted level of service standards unless the applicable projects will be constructed concurrently by other means. POLICSLl_._-:- The county shall continue—to urge the State of Florida Department of Transportation to reallocate budgeted appropriations for state funded road improvements for over -capacity roads, and other traffic facilities. POLICY 1.7: The county shi the replacement and the amount which will minimize structure and maximize the 11 continue to allocate funds for renewal of infrastructure in an the operating costs of the infra - life of the infrastructure. POLICY 1.8: The county shall upon the recommendation of the sheCounty—Finance—Advisory Committee explore various sources. of revenue for funding capital improvement projects. 56 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:02 - OffcialDocuments:672, Attachment Id 0, Page 156 CIE ELEMENT C POLICY 1.9: The county shall manage its long term general obligation debt in such a manner that the ratio of the debt service millage to the countywide milia a does not exceed 20 percent. POLICY 1.10: The county shall include ali capital oXnanrli- tures identified in elements of the Comprehensive Plan in excess of $25,000 in its 5 -year schedule of improvements. POLICY 1.11: The 5 -year schedule of improvements shall contain a mix of capital expenditures, including projects to eliminate existing deficiencies, upgrade and'replace existing facilities and construct new facilities. POLICY 1.12: The county shall establish a procedure in its annual budget review for a capital improvements program, which requires each county department to include in its annual budget request applicable expenditures as identified in----the—capital improvements program of the appropriate element of the Comprehensive Plan. POLICY 1:1-3-: The county -shalomurge -the State of Florida to provide new revenue sources and enhancements of existing revenue sources for mandates and capital projects. OBJECTIVE, -2 Development in High Hazard Coastal Areas_ By 1990, the county will have eliminated all public expenditures that subsidize development–In high hazard coastal areas. POLICY 2.1: The county shall make appropriations for infrastructure in coastal high hazard areas only to maintain . existing infrastructure. POLICY 2.2: The county shall require that all developments and all single family units in high hazard coastal areas fully pay for the required infrastructure improvements through impact fees, developer dedications, assessments, and contributions. POLICY 2.3: The county shall not use public funds to subsi- dize increased density or intensity of urban development in high hazard coastal areas. However, public beach, shoreline access, resources restoration, or similar projects may be constructed. POLICY 2.4: The county shall ensure that replacement of infrastructure in high hazard coastal areas is at or below existing service capacity, except where such replacement will improve hurricane evacuation time, mitigate storm damage, or meet regulatory requirements. Recreation and open space improvements are exempt. 57 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:02 - OffcialDocuments:672, Attachment Id 0, Page 157 CIE ELEMENT POLICY 2.5: High hazard coastal areas are defined as land which is seaward of the Coastal Construction Control Line as defined in Chapter 161 F.S,, and land within the Federal Emergency Management Administration "V" Zone as displayed on National ooinsurance Program Maps, Revised, November, 1987, or as may be subsequently revised. OBJECTIVE 3 Maintenance of Established Levels -of -Service By -199-0, the county w3ll--have land—leve-lopment regulati-ons which ensure that development permits are issued only if infrastructure is available to maintain adopted levels of service. POLICY 3.1: By 1990, the county shall revise its land development regulations to provide the basis for evaluating' proposed developments and assessing whether the planned and existing in ras rt acture is sufficient to serve tie proposed development. The basis for these regulations will be the concurrency management plan incorporated within this element. Besides revising development regulations, the county will prepare the computer tiles and take the actions identified in the c-oncurrency management -pram section. POLICY 3.2: The county shall use general obligation Bonds and other sources to raise the funding required to provide those public facilities which cannot be constructed with user feub, revenue bonds, impact fees or —other dedicated—revenue sources. POLICY 3.3: The county shall approve development only in accordance with the connection matrix identified in the Sanitary Sewer sub -element, Table 3.A.16, Pg. 71.1. POLICY 3.4: The county shall, concurrent with the impact of new development, provide the infrastructure necessary to maintain the level of service standards identified in the various elements or the uomprenensive Pian, wnere development is proposed and is consistent with all applicable regulations but one or more public facilities is/are operating at an inadequate service level, the applicant may at his expense make facility improvements to increase facility capacity when such improvements are consistent with county plans and receive county approval. POLICY 3.5: The county hereby adopts the level of service standards for public facilities which are established in the other elements of the comprehensive plan and which are stated below; Drainage: The county hereby adopts the following level -of -service standard for all new drainage unincorporated countT: New development requiring major 58 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:02 - OfficialDocuments:672, Attachment Id 0, Page 158 CIE ELEMENT site plan approval or subdivision platting shall construct a complete drainage system to mitigate the impacts of a 25 year/24 hour design rainfall event using the Soil Cons ervat in- n Service Type 2 modified -rainfall, curves. Post development runoff shall not exceed pre -development runoff unless maximum discharge rate has been adopted for applicable drainage basin and the discharge does not exceed that rate. If the maximum discharge rate has not been adopted for the applicable basin, post development discharge may not exceed pre -development discharge. All new roads constructed in Indian River County after September, 1990, shall meet the following design criteria. Local Road -Protection -Level -of -Ser -vice 3 year storm/24 hour duration - no flood encroachment outside existing easement and right-of 10 year storm/24 hour duration - limited encroachment of stormwaters in front and rear yards; 25 year storm/24 hour duration - greater encroachment of stcrmwaters in front and rear yards with no minor street flooding (2" maximum); 100 year storm/3 day duration - some street flooding Uut no f -food -ng of -exist- nq or proposed residences. By 2010, all existing roadways in the county shall be improv the following level -of -service standard: 1. Minimum road crown elevation for existing roads shall be raised during resurfacing/ rebuilding to the flood elevation resulting from the 2 year/24 hour storm event on local streets. 2. The center two lanes of rebuilt roads must be at or above flood levels resulting from a 10 year/24 hour storm event on Arterial and Collector roads. All drainage basins will meet the following level of service standards: By 1995 2-Year/24 Hour Storm Event Rv 2000 5-Yearl2� Hours Event By 2010 10-year/24 Hour Storm Event 59 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:03 - OfficialDocuments:672, Attachment Id 0, Page 159 CIE ELEMENT ° The county hereby adopts the following water quality level -of -service standard; as a minimum, retention of the first 1" of rainfall is required prior to offsite discharge. An additional 50% treatment is required for all direct discharge into the Indian River Lagoon due to its designation as an outstanding Florida water, as required by Ch. 17-25.025(9), F.A.C. Potable Water: ° The level of service standards for the county's potable water facilities of 250 gallons per day (GPD) per equivalent residential unit (ERU), based on county Ordinance No. 84-18, are hereby adopted and shall be utilized for determining the availability of facility capacity and the demand generated by a development. Solid Waste: ° The following level of service standards are hereby adopted for solid waste facilities in the county, and shall be used as the basis for determining the availability of facility capacity and the demand generated by a development: Service Area Average Solid Waste Generation Rate County -wide 6.5 pound per capita per day or 2.37 cubic yards per capita per year Sanitary Sewer: ° The level of service standards for the county's sanitary sewer facilities of 250 gallons per day (GPD) per equivalent residential unit (ERU), based on county ordinance 84-18, with a peak monthly flow factor of 1.25 are hereby adopted and shall be utilized for determining the availability of facility capacity and the demand generated by a development. Recreation & Open Space: The county hereby adopts recreation levels -of -service as follows: * Urban district parks, specialty parks (beach), and specialty parks (river) are considered countywide parks. The following levels -of -service are �..,. applicable countywide. 60 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:03 - OfficialDocuments:672, Attachment Id 0, Page 160 CIE ELEMENT Park Type-- Urban ypesUrban District Specialty (Beach) Specialty (River) Acres per 1000 Population 5 1.5 1.5 Community park levels -of -service are hereby set separately for the north and south districts. For the south district, two levels -of -service are set, one for the period from 1989 to 1995 and the other from 1996-2010. District Park Type Acres per 1000 Population North Community 3 South Community 1.25(1989-1995) South Community 3 (1996-2010) Traffic Circulation: ° The county hereby adopts traffic circulation level of service standards. These standards—are as follows. Level of service "C" shall be maintained for rural principal arterials and rural freeways during peak hour, peak season, peak—direction cons ions.Durinpeak hour, peak season, peak direction conditions, level of service "D" or better shall be maintained on all other freeway, arterial and collector roadways. OBJECT—IAT"- Futur�"evelcpment's Sha-r-eo-f—Capit-&I Casts The county will have a Capital Improvements program which ensures that future developments bear a proportionate share of the cost of providing the infrastructure required to maintain adopted levels of service standards. POLICY 4.1: The county shall pay for infrastructure improvements and services needed to satisfy future needs while maintaining adopted levels of service through impact fees, development dedication, and developer contribution. POLICY 4.2: The county shall upon the recommendation of the established Indian River County Finance Advisory Committee explore various sources of revenue for funding capital improvement projects. POLICY 4.3: The county shall study and, if feasible, implement new funding mechanisms such as the establishment of a stormwater utility district, creation of count'y'wide recreation district, development of a recreation impact fee, and establishment of other appropriate funding sources as identified in the various elements of the Comprehensive Plan. SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:04 - OffcialDocuments:672, Attachment Id 0, Page 161 CIE ELEMENT POLICY 4.4: The county will continue to implement the existing roadway, water and sewer impact fee ordinances. OBJECTIVE 5 Local Government's Ability to Provide Required Services and Facilities The county will have a capacity monitoring system for all improvements and facilities identified in the various elements of the Comprehensive Plan in order to ensure that the county can adequately plan for necessary facility improvements. POLICY 5.1: Land use decisions in the county shall be made based on the planned availability of facilities to maintain adopted levels of service. POLICY 5.2: The county shall not approve land use change requests unless adequate infrastructure to support the area exists or is programmed. POLICY 5.3: In the event that the planned capacity of public facilities is insufficient to serve all applicants for development orders, the county shall schedule capital improvements to serve developments in the following order of priority. 0 Development orders approved prior to adoption of this plan 0 Single-family units in existing platted subdivisions or in existing legal, buildable parcels 0 New orders permitting redevelopment 0 New orders permitting new developments where the applicant funds the infrastructure expansion in exchange for future reimbursement New orders permitting new developments without developer participation POLICY 5.4: The county shall utilize the following priority for extension of facilities and services: 0 To serve areas within the existing Urban Service Areas 0 To serve and support the staged development of Urban Service Areas POLICY 5.5: The county shall coordinate with other local, state, and federal agencies as well as private entities to create an efficient capital improvements schedule which provides the following general benefits while minimizing the financial burden of providing facilities and services. 61.1 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:04 - OfficialDocuments:672, Attachment Id 0, Page 162 CIE ELEMENT C0 Reduction of overall capital and operating expenditures by the development of multi -use facilities; more effi- cient land use patterns and phasing; Reduction of overlapping, duplicating services and administrative procedures; 0 Implementation of adopted physical, social and economic goals and policies in a least -cost manner; 0 Better coordination of public capital investment with private capital expenditures. POLICY 5.6: The county shall continue utilizing enterprise funds for the provision of the Sanitary Sewer, Potable Water, and Solid Waste facilities. The debt for enterprise funds is to be paid by user fees and other appropriate sources. POLICY 5.7: The county shall finance the capital cost of non -enterprise fund supported public facilities (ie., roads stormwater management, and parks) from current revenue, equity or debt, bond issues, impact fees, assessments and other appropriate sources. POLICY 5.8: All development orders issued by the county which require public facilities that will be financed by debt shall C be conditioned on the issuance of the debt or the substi- tution of a comparable amount of non -debt revenue. POLICY 5.9: Pursuant to section 163.3187, Florida Statutes, the schedule of Capital Improvements may be amended two times during any calendar year and as necessary for emergencies, developments of regional impacts, and certain small scale development activities. POLICY 5.10: The mandatory semi-annual report to the Depart- ment of Community Affairs concerning amendments to the Comprehensive Plan due to emergencies, developments of regional impact, and selected small developments shall identify any changes to adopted goals, objectives, or policies in the Capital Improvements Element. POLICY 5.11: Pursuant to Section 163.3177, Florida Statues, the Schedule of Capital Improvements may be adjusted by ordinance and not deemed to be amendments to the Compre- hensive. Plan when such amendments relate to corrections, updates, and modifications concerning costs; revenue sources; acceptance of facilities pursuant to dedications which are consistent with the plan; or the date of construction of any facility except transportation facilities enumerated in the Schedule of Capital Improvements; for transportation facilities a delay in construction of the facility which causes the level of service standard to deteriorate below the adopted minimum level of service for the roadway will require a comprehensive plan amendment. 61.2 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:05 - OfficialDocuments:672, Attachment Id 0, Page 163 CIE ELEMENT POLICY 5.12: The county shall ensure that all capital improvements programs identified in various elements of the Comprehensive Plan are completed according to schedule. The only acceptable delays will be those which are subject to one of the following: Projects providing capacity equal to, or greater than, the delayed project are accelerated within, or added to the Schedule of Capital Improvements, in order to provide capacity of public facilities in the fiscal year at least equal to the capacity scheduled prior to the act which delayed the subject project. Modification of development orders issued conditionally or subject to the concurrent availability of public facility capacity provided by the delayed project. Such modification shall restrict the allowable amount and schedule of development to that which can be served by the capacity of public facilities according to the revised schedule. ° Amendment of the plan to reduce the—adopted standard for the Level of Service for public facilities until the fiscal year in which the delayed project is scheduled to `e—completed. 61.3 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:05 - OffcialDocuments:672, Attachment Id 0, Page 164 INTERGOVERNMENTAL COORDINATION ELEMENT GOAL, OBJECTIVES AND POLICIES GOAL It is the goal of Indian River County to have an effective, accessible, and continuous system of intergovernmental coordina- tion to ensure consistency among local, regional, state and federal plans and policies, to identify and resolve conflicts, and to promote cooperation regarding implementation of growth manage- ment plans within Indian River County. OBJECTIVE I Coordination Among All Local Plans Thecounty will continue to utilize exi-sting coordination mecha- nisms or modify them, as needed, to ensure that the adopted county comprehensive plan remains compatible with the school board, other local governments' plans, and adjacent counties' plans. POLICY 1.1: --The—county shall.-fully—utilize the Treasure Coast Regional Planning Council's review and comment process for the Comprehensive Plan and plan amendment proposals of other ocal governments in order o ensure consistency between the County Comprehensive Plan and the local compre- hensive plans of municipalities, and Brevard, St, Lucie, Okeechobee, and Osceola counties. POLICY 1.-2: The county shall continue to utilize the Comprehensive Plan Technical Advisory Committee and the Quad -County Council of Governments to provide coordination between Indian River County planning activities and the planning activities of the municipalities within the county and St. Lucie County. POLICY 1.3: The county shall study the feasibility of establishing a computer network link between the county and its municipalities in order to ensure a quick and efficient response to any land use ordinance changes. POLICY 1.4: The county shall establish an interlocal agreement with all municipalities, requiring that applica- tions for changes in land use or zoning for areas located within 500 feet of corporate boundaries be referred to the affected agency (city or county) for staff review and comment before any action is taken. POLICY 1.5: the county shall use the mred.L t_.L ^, procedures of the Treasure Coast Regional Planning Council and the appropriate regional agencies when interjurisdictional incompatibilities are identified. POLICY 1,6 -.—Coordination -of__pla-n elements with lans of other governmental entities shall be enhanced by implementing �- the objective and policies of the subject comprehensive plan elemlents as -follows: 39 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:05 - OffcialDocuments:672, Attachment Id 0, Page 165 INTERGOVERNMENTAL COORDINATION ELEMENT ° Future Land Use Element - Policies 2.11, 2.13, 7.1, 7.2, 7.7, 7.8, 7.9, Objective 11, 11.1, 11.4, Objective 12, Policies 12.1, 12.2, 12.3, 12.4, and 16,3. ° Traffic Circulation Element - Policy 6.2, Objective 8, policies 8.1, 8.2, 8.3, 8.4, 8.5. °- Mass Transit Element - Policy 1.4, Objectives 2, Policies 2.1, and 2.2. ° Port and Aviation Element - Policies, 1.1, 2.3, Objective 4, Policies 4.1 and 4.2. ° Housing Element - Policies 1.2, 1.3, 1.5, 2.4, 4.1, 4.5, 4.6, 5.3, 6,1, 6,2, 7,1, 8.1, Objective 9, policies 9.1 9,2, 10.1 and 10.2. ° Sanitary Sewer Sub -Element - Policies 1.2, 4.2, 5.7, 6.2, 6.3, 6.5, Objective 7, Policies 7.1, 7,2, 7.3, 7.4, 7.5, and 7.6. ° Potable Water Sub -Element - Policies 1.2, 4.2, 4.5, 4.6, 4.7, 5.7, 6.2, 6.3, Objective 7, policies 7.1, 7.2, 7.3, 7.4, and 7.5. Solid Waste Sub -Element - Policies 2.3, 2.4, 3.5, 4.1, 4.3, 4.6, Objective 5, policies 5.1, 5.2, and 5.3. ° Aquifer Recharge Sub -Element - Policies 1.2, 1.3, 1.7, 3.4, Objective 4, policies 4.1, 4,2, 4.3, 4.4, 5.3, and 5.4. ° Drainage Sub -Element - Policies 1.1, 1.6, 1,8, Objective 4, Policies 4.1, 4.2, 4.3, 4.4, 4.5, 4.6, 6.2 7.1, and 7.6. ° Coastal Management Element - Policies 1.5, 1.6, 1,7, 1.8, 1,11, 1.12, 1.13, 1.15, 2.3, 2.4, 2.5, 2.8, 3.2, 3.5, 3.6, 3.7, 4.1, 4.2, 4.5, 4.8, 5.3, 6.2, 6.3, 6.5, 6,6, 6.8, 7.2, 7,5, 9.2, 9.3, and 10.3, 10.7, 11.5. ° Conservation Element - Policies - 1.1, 1.3, 1.4, 1.6, 2.4, 2.7, 2.10, 3.7, 5.1, 5.2, 5.8, 6,1, 6.2, 6.3, 6.4, 6.13, 7.1, 7.2, 7,5, 7.6, 8.3, 8.6, 9.2, 9.4, 10.1, and 10.4. ° Recreation and Open Space Element - Policy 1.1 Objective 4, policy 6.3, Objective 10, policies 10.1, 10.2, 10.3, 10,4, 10.5, 11.4, 11,5, and 12.1. ° Capital Improvements - Policies 1.2, 1.6, 4.3, and 5.5, ° Economic Development - Policies 4.5, 5.1, 5.7, Objective 9, Policies 9.1, 9.2. POLICY 1.7: The county shall participate in the local government review and adoption proceedings for municipalities 40 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:06 - OfficialDocuments:672, Attachment Id 0, Page 166 INTERGOVERNMENTAL COORDINATION ELEMENT within its boundaries and adjacent counties. POLICY 1.8: The county shall file a written request with each adjacent county to receive copies of proposed comprehensive plans or plan amendments for review. POLICY 1.9: The county shall ensure that all of its intergovernmental responsibilities are clearly defined. POLICY 1.10: To ensure coordinated management of the Indian River Lagoon, the county shall continue active participation with the Marine Resources Council by: Participating- irr- the Marine Resources Council's Sebastian Watershed Action Committee and _the Indian River Lagoon Narrows Watershed Action Committee; Providing information to the council on environmental issues related tote land development; Participating in quarterly meetings of the council. The county will continue coordination with the SJRWMD on the SWIM plan and with other agencies that regulate the Indian River Lagoon. The county coordinates with the SJRWMD on the SWIMPlanby: ° Applying for the utilization of the SWIM funds for impeiementation of programs designed to meet the goals, objectives, and policies of the SWIM plan for .improvement of surface water quality; ° Submitting regular report to the SJRWMD on progress of the programs. The county will continue to coordinate with the municipalities in the county and the 293 drainage districts by implementing policies 4.1, 4.3 and 4.6 of the drainage sub -element. POLICY 1.11: The county shall coordinate with the municipalities to eliminate existing enclave areas. POLICY 1.12: The county shall encourage municipalities to identify the potential areas for annexation, set up criteria for annexation decision, and execute interlocal agreement with the county to codify this criteria. POLICY 1.13: The county, through coordination with munic- ipalities shall ensure that future annexation will not create enclave areas. POLI-CY-1.14-:the—county sha-l—tudy--and-,--if feasible, initiate action on becoming a charter county in order to better coordinate and address countywide issues. 41 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:06 - OffcialDocuments:672, Attachment Id 0, Page 167 INTERGOVERNMENTAL COORDINATION ELEMENT Policy 1.15: The county shall coordinate with the school board to enact a formal interlocal agreement, specifying county review and approval criteria for new and expanded school facilities and specifying responsibility for providing off-site facilities and services. OBJECTIVE 2 Coordination of Level of Service Standards By 1990, the county will have an adopted formal coordination mechanism with existing planning groups and agencies to exchange information and coordinate adopted level -of -service standards in the comprehensive plan with municipalities, adjacent counties, the region, and the state. POLICY 2.1: The county shall ensure that the Indian River County Comprehensive Plan remains consistent with the State Comprehensive Plan and the Regional Comprehensive Policy Plan. POLICY 2.2: -The county shal7 work it-h--tume nicipali ies in the county to establish county -wide level -of -service standards for services that are not affected -by local -varia- tion. POLICY 2,3; The county—shal-1---not-i-fy tete Treasure Coast Regional Planning Council of development proposals likely to affect other local governments in the region. POLICY 2.4: The county shall maintain the level of service set in various elements of the comprehensive plan and notify other local governments of the level -of -service standards. POLICY 2.5: The county shall utilize the existing review and permitting process to coordinate level -of -service stan- dards for public facilities and services with any state, regional and local entity having operational and maintenance responsibilities for such facilities and services within the county. Policy 2.6: The county shall encourage the state to enact legislation requiring proposed state facilities to comply with local plans, adhere to local land development and local impact fees. OBJECTIVE 3 Impact of Development in Other Jurisdictions BT911r-t e oc 1`911r -the will establish a coordination mechanism with municipalities, and adjacent counties to ensure that development in one jurisdiction does not adverSely affect the adequacy of public facilities and services in other jurisdictions. 42 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:06 - OffcialDocuments:672, Attachment Id 0, Page 168 INTERGOVERNMENTAL COORDINATION ELEMENT POLICY 3.1: The county shall establish a review mechanism to ensure that the availability of public facilities and services to support development concurrent with the impact of such development in the unincorporated areas which are not adversely affected by the development in municipalities and adjacent counties. POLICY 3.2: By 1990, the county shall identify all facil- ities and services which can be affected by the plans and developments in other jurisdictions and monitor facility and service capacity through multi -jurisdictional coordination. POLICY 3.3: By 1991, the county shall study the feasibil- ity of establishing a countywide concurrency management system which ensures the availability of necessary facilities and services concurrent with the impact of development on a countywide basis. POLICY 3.4: The county shall study the feasibility of the establishing a joint facilities coordinating committee to ensure that the municipalities' land use intensities are not 'increased beyond the capacity of the county's public facil- ities. POLICY 3.5: The county, through interlocal agreements with C the municipalities, shall coordinate the timing, location, and capacity of public facilities to ensure that required services will be available when needed and are economically feasible. 43 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:07 - OfficialDocuments:672, Attachment Id 0, Page 169 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:07 - OfficialDocuments:672, Attachment Id 0, Page 170 COMPREHENSIVE PLAN %.%;A , .IMPROVEMENT N NO NOO -♦00 N J�p(-OO=N =W�OD OD(D N� A w w(A " (0 sok (0 -00 co rnCO rn `0 cam} O SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:07 - OfficialDocuments:672, Attachment Id 0, Page 171 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:08 - OfficialDocuments:672, Attachment Id 0, Page 172 C TABLE OF CONTENTS PAGE INTRODUCTION 1 DEFINITIONS 1 EXISTING CONDITIONS 3 Financial Resources 4 Local Sources 4 State Sources 10 Federal Sources 13 Overall Revenue Sources 13 Earmarked Revenue Sources 16 Expenditures 19 Overall General Expenditures 20 Existing Outstanding Debt 23 Local Policies & Practices 24 ANALYSIS 28 Analysis of Timing and Location of 28 Capital Improvements Needs Assessment 29 Fiscal Assessment 30 Projected Revenues 30 Tax Base, Assessment Ratio, Millage Rate 33 Projected Expenditures 35 Projected Debt Capacity 38 Debt Service Obligations 39 Fiscal Assessment Summary 40 CONCURRENCY MANAGEMENT PLAN 46 GOAL, OBJECTIVES & POLICIES 55 PLAN IMPLEMENTATION 62 EVALUATION & MONITORING PROCEDURES 62 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:08 - OfficialDocuments:672, Attachment Id 0, Page 173 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:08 - OfficialDocuments:672, Attachment Id 0, Page 174 LIST OF TABLES TABLE PAGE 13.1 Sources of Funds 5 13.1.1 FY 1987-88 Revenue Summary 5.1 13.2 Historic Overall Revenue Summary 14 13.3 Historic Revenue Earmarked for Traffic 17 Circulation 13.4 Historic Revenue Earmarked for Water, 19 Sewer, Solid Waste 13.5 Historic Overall General Expenditure 22 Summary 13.6 Historic Expenditures Water, Sewer, 23 Solid Waste 13.7 Existing Long Term Debt 23.1 13.8 5 -year Capital Improvements Expenditures 29 13.9 Projected Overall Revenue Summary 31 13.10 Projected Revenue Sources Earmarked 32 for Traffic Circulation 13.11 Projected Revenue Sources Earmarked for 33 Water, Sewer, Solid Waste 13.12 Tax Base Projections 34 13.13 Projected Overall Expenditure Summary 36 13.14 Projected Expenditures for Water, Sewer, 37 Solid Waste 13.15 Overall Operating Cost Projections 38 13.16 Bonding Capacity Without Public Vote 39 13.17 Bond Schedule 39.1 13.18 Revenue & Expenditure Projections by Element 43 for Capital Improvements 13.19 Service Level Measures 53 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:08 - OfficialDocuments:672, Attachment Id 0, Page 174 TABLE PAGE 13.20 Monitoring 13.21 Implementation Matrix 13.22 Evaluation Matrix 13.23 5 - Year Schedule of Improvements SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:09 - OfficialDocuments:672, Attachment Id 0, Page 175 54 64 67 68 LIST OF FIGURES PAGE 13.1 Public Education & Health Facilities 4.1 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:09 - OfficialDocuments:672, Attachment Id 0, Page 176 CAPITAL IMPROVEMENTS ELEMENT CAPITAL IMPROVEMENTS ELEMENT INTRODUCTION— An important part of Indian River County's Comprehensive Plan is the Capital Improvements Element (CIE), The CIE summarizes the needed capital facilities identified in the other comprehensive plan- elements—and descr-ibL-s--the financi-a-1 means by which these facilities are to be funded. In other words, the CIE demonstrates the economic feasibility of the entire comprehensive plan. The CIE also prioritizes the funding of all the public facilities identified in the other comprehensive plan elements based on the level of needs and the availability of funds. Th purpose o -f the-- CIE is to evaluate the need for public facilities in support of the Future Land Use Element, to estimate the costs of improvements for which local government has fiscal responsibility, to analyze the fiscal capability of the local government o finance and construct improvements, and to adopt f-inanci-a-1 pol-ic-i-es to gui-l€—the—fund ing—and- construction of improvements. For purposes of this element, a capital improvement is a substantial facilityland, building or major equipment) that costs at least $25,000 and which is required to meet adopted level of service standards. The CIE consists of five major components. These components are the inventory, analysis, concurrency management, goals, objectives and policies and implementation sections. The inventory section identifies financial resources ani existing locai—policies end practices. The analysis section discusses the fiscal assessment of both the county -comprehensiveplanas well as other issues concerning the CIE. The concurrency management section sets the administrative framework for maintaining public facility service levels. The goals, objectives and policies section provides the guidelines and general direction of the CIE. The implementation section includes a 5-vear schedule of capital improvements as well as monitoring and evaluation programs. DEFINITIONS Capital Improvement - an item which is differentiated from an operating item by two criteria, cost and frequency. 1 item has- major - costs (ice 2,000- -0r--more)-- and o=urS infrequently, usually in intervals greater than three years, Capital Improvement Element (CIE) - meets the requirements in F.S.9i-5. This is the plan element --which guides the provision of the needed capital improvements identified in the other plan elements. SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:09 - OfficialDocuments:672, Attachment Id 0, Page 177 CAPITAL IMPROVEMENTS ELEMENT Capital Improvement Programs (CIP) - a multi-year schedule of r capital improvements which not only reflects those improvements 1. identified in the plan but also those other capital improvements which are desired by a community (e.g. police, fire, jails, etc.). Level of SerylCe (L•OS) Standards - indiratnrs of the extent or degree of service provided by, or proposed to be provided by, a facility based on and related to the operational characteristics of the facility. LOS indicates the capacity per unit of demand of each public facility. Bonds - indebtness represented by certificates of outstanding debt. Capital Budget - a plan of proposed capital outlay appropriations and means of financing them. Debt - an obligation resulting from the borrowing of money or from the purchase of goods and services. Debts of governments include trends, time warrants, and notes. Debt Service - payments --0f principal, interest and other required contributions to an amortization or sinking fund resulting from debt obligations. Earmarked Revenue - is a source of funds which is mandated by law, bond requirements, or policy to be used for a specific purpose. Enterprise Fund - a fund established to account for operations financed and operated in a manner similar to private business enterprises. In a Enterprise Fund the costs of procuring goods or services to the general public on a continuing basis is financed or recovered primarily through user charges. Fiscal Year a twelve month period of time which the annual operating budget applies and at the end of which a government determines its financial position and the results of its operation. Fund - a fiscal and accounting entity with a self -balancing set of accounts in which cash and other financial resources, all related liabilities, and residual equities, or balances, and changes therein, are recorded and segregated to carry on specific activities or attain certain objectives in accordance with special regulations, restrictions or limitations. General Obligation Bonds - are bonds backed by a pledge of the general taxing power or "full faith and credit" of the issuing government. Grants - are contributions or gifts of cash or other assets from another government to be used or expended for a specific purpose, activity, or facility. SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:10 - OffcialDocuments:672, Attachment Id 0, Page 178 CAPITAL IMPROVEMENTS ELEMENT C Impact Fees - are fees charged to developers to cover, in whole or in part, the anticipated cost of improvements that will be necessary as a result of the development. The county currently collects impact fees for roads, water and sewer. Infrastructure - consists of public domain assets such as roads, bridges, curbs, streets, sidewalks, drainage systems, lighting systems, and similar assets that are immorable and of value only to the government unit. Revenue Bonds - are bonds payable from a specific source of revenue and which do not pledge the full faith and credit of the issuer. Revenue bonds are payable from identified sources of revenue, and do not permit the landholders to compel taxation or legislative appropriation of funds not pledged for payment of debt service. Revenues - increases in the net current assets of a governmental fund type from other than expenditure refunds and residual equity transfers. Also, general long-term debt proceeds and operating transfers in are classified as "other financing sources" rather than as revenues. Examples of revenues are taxes, fees, charges, special assessments, grants and interest income. Special Assessments - are a compulsory charge made against certain C properties to defray part or all of the cost of a specific improvement or service deemed to primarily benefit those properties. User Charge - a revenue source to recover all or part of the cost of goods`or services from those directly benefiting from them. Interest Income - is revenue earned on invested cash. EXISTING CONDITIONS The existing conditions section describes the county's revenues and expenditures from an historical as well as from a current. perspective. As shown in Table 13.1, sources of funds are first described by categories such as local, state and federal revenues. Then the revenues are described in the overall general format that the county's financial reports are prepared, which is shown in Table 13.2. Tables 13.3 and 13.4 provide further breakdowns of revenue sources which are specifically earmarked for traffic circulation, potable water, sanitary sewer and solid waste related expenditures. Also, a historical and current description of the county's overall general expenditures is provided. As shown in Table 13.5, these expenditures are described in categories according to the 3 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:10 - OfficialDocuments:672, Attachment Id 0, Page 179 CAPITAL IMPROVEMENTS ELEMENT financial reporting method mandated by the state. Table 13.6 provides a further breakdown of expenditures which are categorized as enterprise funds and are related to the potable water, sanitary sewer and solid waste sub -elements. The last part of the existing conditions section describes the county's existing debt as shown in Table 13.7. Both the public education district and health systems are countywide; however, the county does not have jurisdiction over (hese systems. The Indian Rive' r—County �hool---Board has jurisdiction over the public education system and the Florida Department of Health and Rehabilitation has jurisdiction over the county's public health system. There are two hospitals located in the county. One is owned and operated by a private corporation die otherzs a pub] c—hospital--governed-by- the established Mian River County Hospital District. The geographc service area and location of the major system components for the public education and public health systems are identified in Figure 13.1 of this element. Also, these public facilities are discussed in further detail in the Land Use Element of this Alan. Financial Resources One of the most important functions of the Capital Improvements Element is the development of an inventory of the major sources of revenue available to the county. These revenue sources the c unty s—capabil4ty--to fund- needed -capital improvements .—l►e revenue sources are categorized into three main areas. They are local, state and federal revenue sources. Table 13.1 lists the county's local, ,, stati� e and federal revenue sources by the three main categorie. �Also, Table 13.1.1 the Wn„vunt of revenue and the percentage of total revenue for FY 1987-88 for each revenue source. Also the financial resources of the county are categorized according to the county's Comprehensive Annual Financial Reports which are mandated by State Statute. These categories include taxes, licenses and permits, intergovernmental, charges for services, fines and forfeitures, interest and miscellaneous and enterprise funds. Table 13.2 indicates the total amount of historic revenue generated from these sources for fiscal years 1903-84 through 1907-00. Local, State, Federal Sources Local Local sources are comprised of revenue sources which are levied, coIeced andeisbu sr a at the low—level solely at t e discretion of Indian River County. These local sources are ad valorem taxes, public utility charges, user fees, special assessments, other miscellaneous revenue and borrowing. SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:11 - OfficialDocuments:672, Attachment Id 0, Page 180 mmv �n � N d nn`n FnY Y nv 0 s a r- 7 � C>4 Men : y „0 m m • N �� oJ: � • on 2 � n •o 0 J SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:11 - OfficialDocuments:672, Attachment Id 0, Page 181 - ...I....... 2O 9pP-P.a-►��i�Y S--��� «� .^,.«n« YYnnn aJ assYi a -<en<te JJvn Pr «r.r ag ,U Pn nPIM««•aaP m rM q�s ««Bieaa�'n' Yr n on°gpnr $ .0c. wrZ h6• a'`ia; 7 C r 1 I p M Y AZ F" Z `D ° z Z < 0 a �n N M 0 I r C -T{ Z = I�r m < N ...I....... 2O 9pP-P.a-►��i�Y S--��� «� .^,.«n« YYnnn aJ assYi a -<en<te JJvn Pr «r.r ag ,U Pn nPIM««•aaP m rM q�s ««Bieaa�'n' Yr n on°gpnr $ .0c. wrZ h6• a'`ia; 7 CAPITAL IMPROVEMENTS ELEMENT TABLE 13.1 INDIAN RIVER COUNTY \ SOURCES OF FUNDS (Local, State, Federal) LOCAL SOURCES ° Ad Valorem Taxes ° Public Utility Charqes User Fees and Charges ° Special Assessments ° Other Miscellaneous ° Interest Income ° Impact Fees ° Other Borrowing STATE -SOURCES ° Local Government Half -Cent Sales Tax Local Option Sales Tax Levies (1G) ° state Revenue Sharing. ° Local Option Gas Tax Levies ° Constitutional Gas Tax ° County Gas Tax ° One -Cent Voted Gas Tax (Inactive) ° Optional Tourist Ta ° Alcoholic Beverage License Tax ° Pari -Mutual Tax ° Mobile Home License Tax ° Various Grants FEDERAL SOURCES Various Grants Source: Indian River County Planning Department 5 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:11 - OfficialDocuments:672, Attachment Id 0, Page 182 CAPITAL IMPROVEMENTS ELEMENT TABLE 13.1.1 INDIAN RIVER COUNTY REVENUE SUMMARY FY 1987-88 REVENUE SOURCE AMOUNT % OF TOTAL (FIGURES in $1,000) LOCAL SOURCES ° Ad Valorem Taxes $27,354 35.09% ° Public Utility Charges 5,286 6.78 ° User Fees and Charges 4,359 5.59 °—Special Assessments 1,107 1.42 ° Franchise Tax 2,565 3.29 ° Other Miscellaneous ° Interest Income 3,415 4.38 ° Impact Fees 4,069 5.22 ° Other 2,416 3.09 ° Borrowing 17,440 22.37 STATE SOURCES ° Local Government Half -Cent Sales Tax 2,736 3.51 ° Local Option Sales Tax Levies (1�) -0- -0- 0 State Revenue Sharing 1,534 1.96 ° Local Option Gas Tax Levies 11860 2.38 ° Constitutional Gas Tax 919 1.17 ° County Gas Tax 410 .52 ° One -Cent Voted Gas Tax (Inactive) -0- -0- Opti on-ai-Touri stoma 8 $ . 6 ° Alcoholic Beverage License Tax 26 .03 ° Pari -Mutual Tax 446 .57 ° Mobile Home License Tax 142 .18 , ° Various Grants 675 ,86 FEDERAL SOURCES ° Various Grants 898 1.15 Source: Indian River County Office of Management & Budget, Finance Department 5.1 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:12 - OfficialDocuments:672, Attachment Id 0, Page 183 CAPITAL IMPROVEMENTS ELEMENT Ad Valorem Taxes (Property Taxes) Ad Valorem taxes are taxes based on the appraised value of property, especially real property. Everyone who owns real property pays ad valorem taxes. Ad valorem taxes are generally assess � ed mi11es, that is, thousandths of a dollar of assessed 'n value. The state mandated millage cap is 10 mills per local government, excluding voted millages, The Board of County .Commi- ssioners' policies allow revenue from ad valorem taxes to be used for both operating and capital project expenditures. Ad valorem tax revenue is the major source of revenue for Indian River County. In fiscal year 1987-88, it accounted for 35% of the county revenue. The millage rate is currently set at 4.87 mills, with a level of assessment of 100. Public Utility Charges Within government entities there often exists a set of departments who provide goods and services to the general public in a manner similar to the private sector. Such departments, classed under the genera-1—ti#le "enterprise funds" mus -fraise revenues from outside the government sector. Public utilities are those enterprise funds dedicated to providing water, sewer, electric, garbage or of er s milar servicesto the generate community. Public utility charges are the fees assessed by the public utility to the customer using the services. Revenue received from utility C, charges in FY 87-88 was approximately 6 percent of all county revenues. User Fees and Charges Because taxes alone cannot totally keep up with the increasing costs of services, governments have turned to user charges as an alternate revenue source. User charges are only assessed against those who directly benefit from a good or service that the government provides (taxes, by contrast, are compulsory charges levied by the government on the general public to finance service performed for a common benefit), Public utility charges are an example of users fees, as well as those fees imposed at recreation, site plan revenue, golf courses and for building permits. Special Assessments Special assessments are compulsory payments levied on real property for specific benefits generated by public investments or services; the assessment levied must fairly reflect the actual costs of the improvements. County revenues which fall under the general category of special assessments are street paving assessments, street lighting districts, county fire districts, municipal service taxing units, water and sewer improvements, drainage improvements and solid waste charges, 6 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:12 - OffcialDocuments:672, Attachment Id 0, Page 184 CAPITAL IMPROVEMENTS ELEMENT Expenditures of special assessment revenues are restricted to public improvement projects which directly benefit the property owner or payee. For example, street paving assessment revenues must be spent on paving streets which directly benefit the payer of the assessment. In fiscal year 1987-88 the special assessment revenues listed above accounted for approximately 1.0 percent of the county's overall revenue. Franchise Fee/Tax A franchise fee or tax is a reimbursement fee to local government for the use of right of way, cost of regulation and opportunity costs. The county receives franchise revenue from electric, water, sewer, garbage and cable T.V. franchises. There is a direct relationship between franchise fee revenue and utility revenue; as franchise fee revenue increases so does utility revenue and vice versa. In the fiscal year 1987/88 the county collected over $2.5 million of which the majority of revenue was from Florida Power & Light (FPL). The franchise fee is classified as a tax under the state chart of accounts. Other Miscellaneous Revenue Included, in this category are road, water & sewer impact fees, various administrative fees, licenses and permits, fines, income received as interest from various county funds, rental income, private contributions, and other miscellaneous revenues. These sources generated approximately 12.0 percent of the county's revenues in FY 1987-88. Impact fees are fees charged in advance of new development which provide for the replacement of the capacity of existing infrastructure facilities which will be used by the new development. These fees are designed to pay for new or future infrastructure needs and cannot be used to pay for operating expenses. Like utility charges and user fees, impact fees must be spent on infrastructure needs which will directly benefit the specific group(s) which paid the impact fee. Borrowing The county uses borrowing as a financing vehicle to raise money for public purposes which are beyond the realm of current cash reserves, operating revenue and reasonable taxation. Borrowing money to pay for capital improvements can be done through either short-term or long-term financing. Short term financing is usually accomplished by the use of bond pools, issuance of notes, private placements with banks and the public placement of Voted General Obligation debt. Long term financing is usually achieved through the issuance of bonds issued on the public market. The county may sell lands for capital improvements without a referendum of the voters if the pledge used for the bond is a non -ad valorem revenue source. Conversely, any bond issue pledging ad valorem taxes requires approval by a voter referendum. 7 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:12 - OfficialDocuments:672, Attachment Id 0, Page 185 CAPITAL IMPROVEMENTS ELEMENT General Obligation Bonds General Obligation Bonds are bonds which are secured by the full faith and credit of the county. General obligation bonds issued by county governments are secured by a pledge of the issuer's ad valorem taxing power. The amount of ad valorem taxes necessary to pay the debt service are not subject to the constitutional property tax millage limits. Such bonds constitute debts of the issuer and require approval by election prior to issuance. Since the maturation of the 1983 Beach Bonds in 1988 the county has issued another general obligation bond issue which is the 1989 Library Bond Issue. Revenue Bonds Revenue bonds are bonds payable from a specific source of revenue and which do not pledge the full faith and credit of the issuer. Revenue bonds are payable from identified sources of revenue, and do not permit the bond holders to compel taxation or legislative appropriation of funds not pledged for payment of debt service. Pledged revenues may be derived from operation of financed projects, grants and excise or other specified non -ad valorem taxes. A public election is not required prior to issuance or validation of such obligations. The county has issued revenue bonds to finance improvements to its sanitary sewer, solid waste, potable water and golf course facili- ties. Revenue bonds have been issued by the Housing Authority to help finance the provision of more low-income housing units in the county. Also, revenue bonds have been issued to finance the cost of construction of various capital improvement projects. Deposits from bond revenues are put into the respective bond fund accounts for these projects whereby funds are specifically designated for a particular project, and user charges are used to pay-off the debt. Industrial Revenue Bonds These bonds are issued by the county and are assumed by companies or industries which use the revenue for construction of plants or facilities. Industries find these bonds attractive since they are tax-exempt bonds which have comparatively low interest rates. The county's advantage in issuing these bonds is that the private sector is responsible for repayment of the debt and that new employment opportunities are created in the community. 8 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:13 - OfficialDocuments:672, Attachment Id 0, Page 186 C CAPITAL IMPROVEMENTS ELEMENT Special Assessment Bonds Special assessment bonds are bonds issued to pay for capital improvements which impact specific areas or groups of property owners. Proceeds from the assessments levied against benefiting property owners are used to pay-off the bond debt. The issuance of these bonds does not need to be approved by voter referendum. Revenue bonds and special assessment bonds are similar in nature, except special assessment bond debt is paid -off by assessments levied against benefiting property owners and not from on-going user charges. The county has issued—three special assessment bonds. The first two bonds were used to extend the water and sewer distribution systems along S.R. 60 in the county. The third bond will be used for the solid waste disposal facility (landfill) expansion, Anticipation Notes theissua� anticipation notes is an example o€ a short-term (less than 5 years) method of financing. Notes usually have higher interest rates than bonds and _ha_-veshorter maturity dates than bonds. Anticipation notes are issued in anticipation of the receipt by the county of proceeds from the sale of corresponding €uturt—bond issues. The county has two outstanding anticipation notes which were issued in 1988. One is to be used for capital improvements in the Gifford,:area, and the other is for recreational improvements in the North Beach area, Additional Optional Local Revenue Sources Besides those local revenue sources identified above, there are other optional local revenue sources available to the County. Use of additional revenue sources may be necessary, depending on priorities mandated by the Board of County Commissioners and the availability of existing revenue sources. One option available to the county is to increase and/or implement additional user fees; this could involve implementing a countywide public user fee ordinance. Another option is to increase the county's existing road impact fees and/or implement additional impact fees to fund capital expenses associated with public services such as public safety and parks. The county—ate—also- generate additional existing sources of revenue and issuing obligation bonds. Another option is to raise property in the county. 9 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:13 - OffcialDocuments:672, Attachment Id 0, Page 187 revenueby pledging additional general ad valorem taxes on CAPITAL IMPROVEMENTS ELEMENT State Sources The second main category of revenue sources is state sources. In fiscal year 1987-88, the county received approximately $10 million in state revenues. Revenue classified as state sources may be generated locally but collected by the state and returned to the county; state sources may be adopted by the county as a local option tax or fee but collected and returned by the state; or these sources may origi- nate from state general revenues and shared by the state according to state revenue allocation formulas. State revenue sources include tht—local government half -cent sales tax, local option sales tax levies, state revenue sharing, local option gas tax levies, constitutional gas tax, county gas tax, one -cent voted gas tax, optional tourist tax, alcoholic beverage license tax, pari -mutual tax and mobile home license tax. These sources are described in further detail below. Local Government Half -Cent Sales Tax The Local Government Half Cent Sales Tax Program allocates 9.888% of sales tax proceeds remitted by a sales tax dealer to a special account administered b—y—theDepart of Revenue, the—Local Government Half Cent Sales Tax clearing trust fund. These funds ' arie then earmarked for distribution to the governing body of that . county an each municipality within the county. Distribution of these monies to the counties is determined by a formula that first, uses a weighting factor based on the population of the incorporated and unincorporated areas and second, multiplied by 9.888% of the sales tax proceeds received from the county. Occasionally governments can receive supplemental distributions by meeting special eligibility criteria, however in no case can the total amount of supplemental and ordinary distribution exceed the maximum per capita amount allowed by law. Governments are allowed wide latitude in using the half cent sales tax. For counties, the law provides only that it be used for countywide tax relief or countywide programs. In Fiscal year. 1987-88, the county received approximately $2.7 million in half -cent sales tax revenue. Local Option Sales Tax Levies A governing body of a county so authorized, can levy a discretionary surtax on most transactions ender $5000 and except long distance telephone service subject to state sales tax. The extra tax is remitted to the department of revenue where the process, less administrative costs, are placed in a separate trust fund for each county. Proceeds are than distributed monthly to the counties. 10 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:13 - OffcialDocuments:672, Attachment Id 0, Page 188 CAPITAL IMPROVEMENTS ELEMENT The Local Government Infrastructure Surtax is a local option sales tax which may be imposed by counties for a period up to 15 years from date of levy, at a percentage of either .5% or 1% (Indian River County's tax, voted in last spring, is for 1%). This tax is used for one purpose only, to pay for capital projects as designated by referendum. It is estimated that the tax will generate $5.3 million yearly, with a 5% to 6% rate of growth each year. The tax is distributed based either on the specifics of an interlocal agreement or through a formula based on population, similar to the half cent sales tax. Indian River County uses the latter arrangement to determine its distribution. State Revenue Sharing State Revenue Sharing consists of taxes collected by counties for cigarettes, road and intangible personal property. They are deposited by the state into a special account titled "Revenue Sharing Trust Fund for Counties". Counties are eligible to share in these proceeds provided they meet the following criteria: - That law officers and firefighters are certified and meet state requirements; - That certification of taxable value for property tax levy is made in a timely and correct manner to the Department of Revenue; That the county's most recent financial reports have been sent to the Department of Banking and Finance, and post audits of these statements and accounts have been provided. Distribution of these collected revenues is based on several factors, including a weighting of county unincorporated population to incorporated population, the sales tax revenues remitted by the county and the county's guaranteed entitlement of proceeds by law. The Department of Revenue is required to make such distributions on a monthly basis. Counties are allowed much discretion in using these funds for public service needs. However, if a county received more than the guaranteed entitlement, certain restrictions apply to the use of excess monies. In fiscal year 1987-88, the county received approximately $1.5 million from this source of revenue. For the five year projection period, this revenue source is expected to generate approximately $8.2 million of revenue. 10.1 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:14 - OfficialDocuments:672, Attachment Id 0, Page 189 CAPITAL IMPROVEMENTS ELEMENT oca"ption-Gas� x Local Option Gas Tax is a tax varying from one to six cents on every gallon of motor fuel and special fuel sold at retail in the county. The tax may be levied for a period not to exceed 30 years, Upon expiration, the tax can be reimposed provided that a new determination of how funds are distributed to the county is made. The funds collected may only be utilized by a county or municipality for transportation expenditures. Transportation expenditures are state shared revenue monies used by local government for such programs as streetlighting, traffic signs, engineering and pavement marking, bridge maintenance and operation, public transportation and operations, the funds may— also be used to issue bonds through the State Division of Bond Finance Department of General Services. The revenues received from the tax are pledged to secure payment of the bonds. The tax remitted to the department of revenue by the retailer is placed in a Local Option Gas Tax Trust Fund. The proceeds of the tax, less any administrative changes are distributed from the fund used—ori each eligible governments local transportation expenditure of the past 5 years, as a proportion of the total of such expenditures for the county an all municipalities within the county. This proportion is recalculated every 10 years. To qualify for eligibility a county must meet the standards as set forth in parts II and VI of Chapter 218, some of these rules are mentioned under the definition for Revenue Sharing. The county currently utilizes the revenue collected from the six -cent million per year. Constitutional Gas Tax local option gas tax. The tax is approximately $1.9 Constitutional Gas Tax is defined as an excise or license tax of two cents per gallon imposed upon the first sale or first removal from storage (after importation into Florida) of motor fuel. Revenues from this levy become state funds at the time of collection by the refiner, importer or wholesaler. Generally, the constitutional gas tax is distributed to the counties based on a consumption factor (determined by the state) times the total number of gallons statewide upon which a tax was paid on retail sales. The distribution determination must adhere to the revised state constitution of 1968. SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:14 - OffcialDocuments:672, Attachment Id 0, Page 190 CAPITAL IMPROVEMENTS ELEMENT Once the distribution is determined, the State Board of Administrative uses 80% of the proceeds to meet the debt service on county bond issues to which it was pledged: When the service portion is met the remainder is sent to the county. The 20% portion is sent directly to the Board of County Commissioners unless it is felt that additional funds are needed to meet the debt service requirement. The county receives approximately $919,000 per year of Constitutional Gas Tax revenues. County Gas Tax County Gas Tax is similar in form to the Constitutional Gas Tax. This is an additional one cent tax levied on the first sale or first removal from storage, after importation into the state, of motor fuel. The tax proceeds are remitted to the Department of Revenue, who distributes the monies based on similar factors used for the constitutional gas tax.. -A "consumption factor" determined -by 1 w is multiplied by the number of gallons of fuel statewide upon which tax was paid on retail sales. With this tax, however, an additional factor considered is a ratio based on the cer i-fie assessment of the level of county gas tax distributed to the local government to the .statewide distribution. The counties are required to use the county gas tax solely for such projects as acquisition of right-of-way; construction, operation and maintenance of transportation facilities, roads and bridges; reduction of bonded indebtedness of the county or its road and bridge special district; and other transportation purposes. The county currently receives revenue from the county gas tax in the amount of approximately $411,000 per year. One -Cent Voted Gas -Tax- Any county in the state can, subject to referendum, impose a one cent voted gas tax on every gallon of motor fuel and special fuel sold at retail in the county. The proceeds from this tax are sent by the seller to the Department of Revenue where they are deposited in an account called the Voted Gas Tax Trust Fund. The department is then responsible for distributing these monies back to the counties. The funds must be used for the costs of establishing, operating and maintaining a transportation system and for the construction, reconstruction and maintenance of roads and streets. The county does not presently utilize this tax. An estimate of the possible revenue generated from this tax if it were imple- mented is approximately $450,000 per year. SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:15 - OffcialDocuments:672, Attachment Id 0, Page 191 CAPITAL IMPROVEMENTS ELEMENT Optiona Any county in the state may, subject to a vote of the citizenry, impose a tourist development tax on the leasing or renting or any living quarters in a hotel, motel, apartment, roominghouse, mobile home or RV park, or condominium for a term of 6 months or less. The county may elect to impose the tax on subcounty special districts but is responsible for aiding the Department of Revenue in identifying these rental units subject to tax in each district. The tax levied is generally one or two percent. Counties may set an additional one percent above the 2% rate through an extraordinary vote or the governing board or by referendum, provided that the original tax has been in place at least 3 years prior to date of levy of the new tax. The person receiving consideration for the rental—or—lease remits the tax to the Department of Revenue. These collections, less costs of administration, are returned monthly to the county which imposed the tax, to be used for the following purposes: * Acquire, construct, operate and promote one -ate more publicly owned and operated convention centers, such as sports stadiums, coliseums or auditoriums within the district that the—tax—is imposed; * Promote and advertise tourism in the State of Florida and nationally and internationally; * To fund convention bureaus, and information bureaus as county agencies with the Chamber of Commerce and similar the county; other tourist or by contract associations in * To finance beach development, and restoration as well as shoreline protection and restoration of inland lakes and rivers to which there is no public access; * Those counties with less than 500,000 population may also use the funds to construct, improve, maintain and promote museums, zoos, fishing piers or native centers which are publicly owned and operated either by the county or not for profit organizations who open to the public; * The revenues may also be pledged to secure and liquidate revenue bonds issued by the county subject to certain limitations. The county has adopted a tourist tax rate of 2%, which went into effect April 1987. Revenue collections received—from the tax for fiscal year 1987-88 were estimated to be $228,000. r2 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:15 - OffcialDocuments:672, Attachment Id 0, Page 192 CAPITAL IMPROVEMENTS ELEMENT ( . . Alcoholic Beverage License Tax "Alcoholic Beverages" refers to distilled spirits and all beverages containing one half of one percent or more of alcohol by volume. Within the Department of Business Regulation there is a division of alcoholic beverages and tobacco. Their job is to both oversee the manufacture and sale of all alcoholic beverages in Florida, and enforce the provisions of the tobacco law and beverage law. Importers, manufacturers, wholesale distributors, brokers and retail vendors of alcoholic beverages are all subject to licensing rules and regulations, and their accompanying fees. All revenues collected by the Division of Alcoholic Beverages and Tobacco is place-cl--iz�^ azt; n e state treasury-_c-nedthe— A-kcohol c Beverage and Tobacco Trust Fund. Twenty-four percent of the license taxes imposed on the sale of beer, wine and liquor collected within a county is returned to the county Tax Collector. The remaining funds are used to operate the division .and contribute to the operation of the Office of the Secretary -ot- Busines-s--Re—qula ion�f Atter au , any remaining monies left in excess of the needs of the division are transferred to ..the General Revenue Fund. The county currently receives approximately $27,000 per year of Alcoholic Beverage License Tax Pari -Mutual Tax Th P. nivision of Pari -Mutual Wagering of the Department of Rusin3eSS Regulation is responsible for the rules and regulations regarding race tracks, race meets and races held in Florida as well as Jai -Alai and other pari -mutual exhibitions. A number of taxes are collected from those engaged in pari -mutual events. Depending on the type of event these can include: a daily license fee to -operate * an admission tax * a tax on total monies contributed to the betting pool during daily performances (the handle) * a "breaks" tax on that portion of tree pool not redistributed to contributors or withheld by the license permit holder as commission * various surtaxes on the excess funds mentioned above * occupational licenses for each specified job performed. The various taxes are paid by the permit holder to the Division of Pari -Mutual wagering. F lf—of the—fun s are deposited into a Pari -Mutual Tax Collection Fund; the other half are credited to the General Revenue Fund. Surtaxes are paid directly to the General Revenue Fund. 12.1 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:15 - OfficialDocuments:672, Attachment Id 0, Page 193 CAPITAL IMPROVEMENTS ELEMENT Of the monies deposited and credited to the pari -mutual tax collection trust fund, $29,915,500 of the balance is divided equally among the number of counties in the state (at this time 67). Monies in this fund are also used to operate the Division of Pari -Mutual Wagering, the Florida Pari -Mutual Commission and to provide a proportionate share of the operation of the Secretary of Business Regulation. After audit, any funds remaining in excess of the needs of the division are transferred to the General Revenue Fund. The state legislature has placed a ceiling of $446,500 on the amount of pari -mutual tax revenues distributed annually to the county. Mobile Hbme License Tax The recreational type vehicles and mobile homes are subject to one of two kinds of license tax depending on their mobility. Recreational vehicles and mobile homes that are considered permanently affixed to the land are subject only to a small annual sticker fee, as in many cases they may be taxed as real property as well. In the 1987 edition of the Florida Statues, Chapter 320.0815, the annual cost of $3 is divided by the government in three ways: $2,50 to the county's tax collector, $.25 to the county's property appraiser and $.25 to the State Department of Transportation, to defray the cost of manufacture and handling of the stickers. Recreational and mobile home vehicles that are mobile are required to pay an annual license tax depending on the size of the unit. These funds are collected by the county tax collector and remitted to the Department of Transportation. Of the amount remitted, $1.50 is paid into the general fund, the remaining goes to a state treasury fund called License Tax Collection Trust Fund. These monies are distributed to the counties; one half to the District School Board, the remaining half to the Board of County Commissioners (for those units located in unincorporated areas) and to the cities within the county (for those units located within corporate limits). The county receives approximately $142,000 per year of mobile home license tax revenue. Additional Optional State Revenue Sources There are other available state revenues which could generate additional revenue for the county. One revenue source which is not already in existence is the One -Cent Voted Gas Tax, As explained in more detail earlier in the text, this tax is a local option tax that can be levied for every gallon of motor fuel sold in the county. The projected revenue from this tax is $450,000 per year, 13 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:16 - OfficialDocuments:672, Attachment Id 0, Page 194 t CAPITAL IMPROVEMENTS ELEMENT Federal Sources Federal funds dispursed to the county have been decreasing in recent years--and---are projected to continue to decline with shrinking federal budget revenues: Federal funds are either granted directly to local governments or passed through state agencies for administration and monitoring. These grants are usually distributed on a competitive basis rather than by formula allocations; thereby making projections of future revenues -diff -i -- cult. Therefore, for the purpose of revenue projections, these sources will be assumed to remain constant. The county received approximately $898,000 in federal funds during fiscal year 1987-88. Grantors included the U.S. Department of Housing and Urban Development, Section 8 Rental Assistance Program -.—The county also received--rarious human services--grants-- and ervice grantsand a grant ibr the county landfill. Overall Reve Indian River County depends upon a number of revenue sources for funding its operations. A summary of these sources is provided with',' historical revenue amounts for fiscal years (FY) 1983-84 through 1987-88 in Table 13.2. These sources were jextracted from the county's annual financial reports, which are prepared E.. according to Sate Statute requirements. The figurel do not include various state and federal grants and borrowing revenues. As indicated in Table 13.2, for the FY 1983-84 through FY 1987-88 time =period, a county had a total revenue of approximately $208 million. Specific information related to eacho-f- these funding sources listed in Table 13.2 is provided below. SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:16 - OfficialDocuments:672, Attachment Id 0, Page 195 CAPITAL IMPROVEMENTS ELEMENT 1 011=40* I i ri . •- • • •: a . •• �• • • Taxes The majority -of�-therevenue—collected under—tire 'taxes' category is generated from ad valorem taxes. Ad valorem taxes are taxes on the assessed value of real property. Everyone who owns real property pays ad valorem taxes. They are based on a millage rate in which one mill is equal to $1 per $1,000 of assessed value or .1 percent. During FY 1987-88, the county collected over $27 million in ad valorem taxes. The millage rate was set at 4.87 mills, in FY 1987-88, with a level of assessment of 100. Besides ad valorem taxes, the county collects local option resort taxes, local option gas taxes, electric franchise fees and other miscellaneous revenue under the 'taxes' category. In FY 1987-88, the county collected over $4.7 million of these non -ad valorem taxes. The total revenue received from the "Taxes" category was over $32 million in FY 1987-88, as indicated in Table 13.2. License and Permits The license and permit—fees which produce—thelard volume o revenue are the fees and permits charged for new construction. In FY 1987-88, the county received $122,233 from this revenue source. The county also receives funds from professional and occupational licenses collected by the Tax Collector. The total revenue received from the 'Licenses and Permitscategory was FY 1987-88, as indicated in Table 13.2. SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:16 - OffcialDocuments:672, Attachment Id 0, Page 196 U= 13.2 WYN RM MKIY 1 I= a1F KL MdE & MM M+M FISM YWS 1983-84 USI 1987-88 Tn2tT Rrrb* Licaises Maws Intrest QEcges smi and Int Er— EX Fines aryl and fXa Oa>er Or Tis pa nits av n Tetal Services Pa-feitures Misc. Servicers Sarces Totals 63-84 $13,353,327 $194,327 $5,689,734 $1,408,167 $476,938 $2,086,291 $2,942,391 $494,070 $ 26,645,245 84-85 17,201,279 202,571 5,710,196 1,576,409 504,874 2,688,656 3,463,000 464,993 31,811,978 85-86 21,181,476 219,821 6,365,280 2,191,524 558,281 4,601,704 4,497,474 471,197 40,086,757 86-87 24,8071101 219,902 9,252,713 3,675,834 474,244 5,974,689 6,108;824 618,474 51,131,781 87-88 32,069,112 243,975 7,912,270 3,478,601 509,082 5,474,720 7,546,672 969,740 58,204,172 $207,879,933 (Grand Total) 1 011=40* I i ri . •- • • •: a . •• �• • • Taxes The majority -of�-therevenue—collected under—tire 'taxes' category is generated from ad valorem taxes. Ad valorem taxes are taxes on the assessed value of real property. Everyone who owns real property pays ad valorem taxes. They are based on a millage rate in which one mill is equal to $1 per $1,000 of assessed value or .1 percent. During FY 1987-88, the county collected over $27 million in ad valorem taxes. The millage rate was set at 4.87 mills, in FY 1987-88, with a level of assessment of 100. Besides ad valorem taxes, the county collects local option resort taxes, local option gas taxes, electric franchise fees and other miscellaneous revenue under the 'taxes' category. In FY 1987-88, the county collected over $4.7 million of these non -ad valorem taxes. The total revenue received from the "Taxes" category was over $32 million in FY 1987-88, as indicated in Table 13.2. License and Permits The license and permit—fees which produce—thelard volume o revenue are the fees and permits charged for new construction. In FY 1987-88, the county received $122,233 from this revenue source. The county also receives funds from professional and occupational licenses collected by the Tax Collector. The total revenue received from the 'Licenses and Permitscategory was FY 1987-88, as indicated in Table 13.2. SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:16 - OffcialDocuments:672, Attachment Id 0, Page 196 CAPITAL IMPROVEMENTS ELEMENT Intergovernmental As indicated in Table 13.2, the 'Intergovernmental' revenue category is the second largest source of revenue for the county, excluding the 'Enterprise Funds' category. The two largest sources are the Local Government One -Half Cent Sales Tax and State Revenue Sharing. In fiscal year 1987-88, the One -Cent Sales Tax accounted for 34.6% of the total revenue collected from the 'Intergovernmental' category. State Revenue Sharing accounted for 19.4% of the revenue. The balance of the- revenue received consistsof Insurance Agent Fees, Race Track Taxes, Constitutional Gas Taxes, County Gas Taxes and other miscellaneous revenues. Charges for Services This revenue is derived mainly from court fees, property appraiser fees, or recording of legal instruments, sale of maps and publications, library related fees and other miscellaneous fees or charges. As shown in Table 13-2, this category generated a total / revenue.of $3,478,601 in fiscal year 1987-88. Fines and Forfeitures This revenue consists of court fines, confiscated property, police education fines, library fines and fines for violations of local county ordinances. Collection of court fines was the largest revenue generator in this category for fiscal year 1987-88. The court fines comprised 67.4% of the total revenue collected in this category in -fiscal year 1987-88. interest and Miscellaneous Revenue from this category is derived mostly from interest earned. In fiscal year 1987-88, 47,5% of the revenue in this category came from earned interest. The remainder of the revenue generated from this category consists of county rents and royalties, special assessments, contributions, reimbursements and other miscellaneous revenue. In fiscal year 1987-88, the county received a total of $5,474,720 of revenue from this category as indicated in Table 13.2 15 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:17 - OffcialDocuments:672, Attachment Id 0, Page 197 CAPITAL IMPROVEMENTS ELEMENT Enterprise Funds Enterprise funds are funds which pay for the cost of their operations and capital improvements from user fees/charges and do not receive funding from general county revenues. In other words, these funds are self-supporting and operate similar to a private enterprise, rather than a public entity. Therefore, enterprise funds are categorized separately for budget and accounting purposes. Currently the county has a total of five enterprise funds. These five consist of Building, Golf Course, Housing Authority, Water and Sewer and Solid Waste enterprise funds. Enterprise fund revenues are also shown in Table 13.2 for fiscal years 1983-84 through 1987-88. The majority of the revenue generated in the 'Enterprise Funds' category is collected from charges for services. In fiscal year 1987-88, charges for services comprised 88.6% of the total revenue collected from enterprise fund revenue. Earmarked Revenue Sources Besides the overall summary of the county's revenue sources which is provided above, revenues which are earmarked for specific expenditures relating to individual comprehensive plan elements C are identified. Earmarked revenues are sources of funds which are mandated by law or policy to be used for a specific purpose. These sources are gas taxes, traffic impact fees and enterprise fund revenues. The comprehensive plan elements which have these earmarked revenue sources are the Traffic Circulation Element and the three Enterprise Fund Sub- Elements (i.e. Potable Water, Sanitary Sewer, Solid Waste Sub- Elements). Tables 13.3 and 13.4 summarize these earmarked revenues collected from fiscal years 1983-84 through 1987-88 and are described below. Gas Taxes and Impact Fees (Traffic) Roadway improvements identified in the Traffic Circulation and Capital Improvements Elements are infrastructure investments to be made by the county. There are a number of revenues derived from motor fuel (gas) taxes, as well as impact fees, that are directly earmarked for traffic circulation system improvements. Table 13.3 shows these revenue sources for fiscal years 1983-84 through 1987-88. As indicated in Table 13,3, for the above mentioned time period, the county collected a total gas tax and impact fee revenue of approximately $14 million. Specific information related to each 16 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:17 - OfficialDocuments:672, Attachment Id 0, Page 198 CAPITAL IMPROVEMENTS ELEMENT of these funding sources listed and in the preceding section Revenue Sources'. Local Option Gas Tax in Table .13.4 is provided below entitled 'Local, State, Federal The Local Option Gas Tax is a tax on motor fuel sales of six cents per gallon. The State gives the authority to the county to levy the gas tax. However, implementing the tax levy is the county's option. The proceeds of the tax are distributed to the other municipalities and the county, based on a formula agreed upon in an interlocal agreement. These funds are used only for county transportation related expenditures. TABLE 13.3 HISTORIC REVENUE SOURCES EARMARKED FOR TRAFFIC CIRCULATION FISCAL YEARS 1983-84 THROUGH 1987-88 FISCAL LOCAL CONSTIT- COUNTY TRAFFIC TOTAL YEAR OPTION GAS UTIONAL GAS IMPACT TAX GAS TAX TAX FEES 1983-84 $ -0- $816,076 $457,988 $ -0- $ 1,274,064 1984-85 -0- 871,928 403,219 -0- 1,275,147 1985-86 602,105 897,610 406,614 352,728 2,259,057 1986-87 1,745,750 958,315 439,783 1,798,106 4,941,954 1987-88 1,860,398 919,175 410,571 1,293,754 4,483,898 $14,234,120 (Grand Total) Source: Indian River County Finance Department, May 1989 Table 13.3 indicates that in fiscal year 1987-88, the county collected over 1.8 million in local option gas tax revenue. Constitutional Gas Tax The Constitutional Gas Tax is a two cent tax per gallon of motor fuel sold in the state. The state allocates the county's portion by using a distribution formula multiplied by the state's monthly motor fuel collections. According to Table 13.3, the county received $919,175 of revenue in fiscal year 1987-88 from this gas tax. Twenty percent of the revenue received must be used for maintenance of roadways. The remaining eighty percent must be used for acquisition and/or construction of roadways in the county. 17 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:17 - OfficialDocuments:672, Attachment Id 0, Page 199 CAPITAL IMPROVEMENTS ELEMENT County Gas The County Gas Tax is a one cent tax per gallon of motor fuel sold in the state. The tax revenue is distributed to the county by the State Department of Revenue based on the same formula used to distribute the Constitutional Gas Tax, In fiscal year 1987-88, the county received $410,571 from this tax. This revenue must be used for county transportation related expenditures. Traffic Impact Fees Unlike the gas taxes, traffic impact fee revenue is a local source of revenue. The Board of County Commissioners in 1986 adopted traffic or road impact fees on all new development in the county. As stated in Table 13.3, the county collected approximately $1.3 million in traffic impact fee revenues in fiscal year 1987-88. This revenue must be used only for new roadway improvements in the county. These fees a-re—designed�-to pay�-for—new—or future infrastructure needs and cannot be used to pay for operating expenses. Enterprise Funds (Water, Sewer, Solid Waste) Capital improvements identified in the Potable Water, Sanitary Sewer and Solid Waste Sub -Elements and the Capital Improvements. Element are infrastructure investments to be made by the County. There are revenues derived from charges for services and other miscellaneous revenue that are directly earmarked for potable water, sanitary sewer and solid waste improvements. These revenues are categorized as enterprise funds. As discussed in previous sections of this element, enterprise funds are funds which pay for the post of their operations and capital improvements from user fees/charges and do not receive funding from general county revenues. Therefore, they are self-supporting and operate much like a private enterprise. Table 13.4 provides a summary of the revenues received from the potable water, sanitary sewer and solid waste enterprise funds for fiscal years 1983-84 through 1987-88. As indicated in Table 13,4, the charges for services revenue category has consistently in- creased through the five year period. SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:18 - OffcialDocuments:672, Attachment Id 0, Page 200 CAPITAL IMPROVEMENTS ELEMENT 1983-84 $ 723,848 TABLE 13.4 $-813,213 1984-85 HISTORIC REVENUE SOURCES EARMARKED FOR \, 1985_-96____17,_29_9 WATER, SEWER, SOLID WASTE 1,380,763 1986-87 FISCAL YEARS -8-4-THR UGH 1987-88 1,827,027 1987-88 (ENTERPRISE FUNDS) 2,300,858 POTABLE WATER AND SANITARY SEWER: Fiscal Charges Other Total Year For Services 1983-84 $1,749,795 $ 391,088 $ 2,140,883 1984-85 1,937,618 2,441,906 4,379,524 1 5-86 2,525,0408,561,106 11,086,146 1986-87 3,11-8,005 2;959,076 6-,-0-77,081 1987-88 3,530,826 4,199,670 7,730,496 SOLID WASTE: Fiscal'-.'.- Charges Other Total Year For Services 1983-84 $ 723,848 $ 89-3_,____5 $-813,213 1984-85 883,811 931895 977,706 \, 1985_-96____17,_29_9 , 4B1 81,282 1,380,763 1986-87 1,717,193 109,834 1,827,027 1987-88 1,957,590 343,268 2,300,858 Source: end. n River County Finance Department, -Mayr; 1-989 As referenced in Table 13.4, in fiscal year 1987-88, a total of over $7.7 m=eson of revenues- was -collected - n the otable water and sanitary sewer enterprise funds. In the same year, over $2.3 million was collected in the solid waste enterprise fund. These revenues are used only for the operation and expansion of these public facility services. Expenditures The previous section reviewed the various funding or income sources currently utilized by Indian River County. This section ident-ities--how those monies --are allocated to meet the county's needs.— The eeds The county's overall general expenditures are identified for fiscal years 1983-84 through 1987-88. Table 13.5 shows the breakdown the overall expenditures . in f�year 1987-48, the county's total expenditures were approximately 50,990,065. SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:18 - OfficialDocuments:672, Attachment Id 0, Page 201 CAPITAL IMPROVEMENTS ELEMENT Table 13.6 indicates the specific expenditures for the potable water, sanitary sewer and solid waste enterprise funds. These expenditures were extracted from the county's annual financial reports, which are prepared according to State Statute requirements. Overall General Expenditures The overall expenditures for the county are summarized in Table 13.5 for fiscal years 1983-84 through 1987-88. Each category generally includes expenses for capital outlay which represent the cost of equipment replacement and additions, minor expansion of facilities and furnishing for buildings. A brief discussion of each expenditure category mentioned in Table 13.5 is provided below. General Government The expenses accumulated in the general government services category in Table 13.5 are for the legislative, administrative, legal, finanei&l,comprehensiu-e pl-anning and general maintenance functions of the county. In fiscal year 1987-88, approximately $8.6 million were spent on these general government services. Public Safety The majority of the public safety expenses in this category are for law enforcement and fire protection for the county's residents. In fiscal year 1987-88, the county spent over $16.7 million for public safety services. Physical Environment The physical environment category expenses encompass mostly water utility services, garbage /solid waste services and conservation/ resource preservation. A total of $727,949 was spent on these services in the county in fiscal year 1987-88, as stated in Table 1.3.5. Transportation Indian River County is responsible for transportation facilities such as roads. This category includes the personnel and general maintenance costs of providing roadways, but not the cost of construction and expansion of these facilities. In fiscal year 1987-88, the county spent over $7.5 million providing this service. 20 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:18 - OffcialDocuments:672, Attachment Id 0, Page 202 CAPITAL IMPROVEMENTS ELEMENT Economic Environment This category includes veterans services and housing/urban development services. The county spent $81,902 in fiscal year 1987-88 providing these economic environment services. Human Services The county provides funds for general health care, including mental health services and welfare services. These services among others encompass the Human Services category. Table 13.5 indicates that over $2.1 million were spent on these services in fiscal year 1987-88. Culture/Recreation Indian River County operates and maintains a number of beach accesses, recreation areas and library facilities. These expenses are for personal services, operating expenditures and capital outlay. The county spent approximately $2.2 million in fiscal year 1H7-88 on providing cultural/recreational services for its residents. Debt Service Debt service is interest and payments made by the county on its debt, As Table 13.5 indicates, in fiscal year 1987-88 the county total debt service was over $4.4 million. This figure includes principal retirement, interest and other miscellaneous debt service. Enterprise Funds Table 13.5 identifies historic expenditures for the potable water, sanitary sewer, solid waste and other miscellaneous enterprise funds for fiscal years 1983-84 through 1987-88. Table 13.5 identifies the expenditures by operating expenses and other miscellaneous expenses. In fiscal year 1987-88, the county's enterprise funds combined had a total expenditure of approximately $8,4 million. 21 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:19 - OfficialDocuments:672, Attachment Id 0, Page 203 .. PON OOJJOIV� ERnE aw -4 w Ln Ob H W pTWT( Nor 4A ' r r ' -- oou+aww 22w�i"3t`R QQ� SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:19 - OfficialDocuments:672, Attachment Id 0, Page 204 CIE ELEMENT Existing Outstanding Debt In order to provide needed capital facilities, the county in the past has utilized bonded indebtedness as a funding mechanism. Table 13.7 summarizes the various existing long-term debt of the county as of December, 1988. Table 13.7 lists the debt by issue, the initial amount, the amount remaining, the average interest rate, the final maturity, the bond life remaining, the bond rating and the security pledge. According to Table 13.7, the county has issued revenue supported bonds such as water and sewer revenue bonds, water and sewer assessment bonds, solid waste assessment bonds, recreation revenue bonds, Gifford bond anticipation notes and North Beach bond anticipation notes. These bonds were issued for a total of $40,940,000 of revenue. Also, as stated in Table 13. 7, the county issued two capital improvement bonds which were non -ad valorem tax supported. The total tax for these bonds was $13,510,000. Local Policies and Practices As part of the capital improvements planning process, it is important to do an inventory of current Indian River County policies and practices which guide the timing, location, expansion, or increase in capacity of capital facilities. These policies and practices relate to the county's existing level of service standards, impact fee programs, the existing comprehensive plan and enterprise fund accounts. Existing Level of Service'(LOS) Standards Level of service (LOS) standards are indicators of the extent or degree of service provided by, or proposed to be provided by, a facility based on and related to the operational characteristics of the facility. LOS indicates the capacity per unit of demand of. each public facility. LOS standards.can affect the timing and location of development by guiding development to areas where facilities may have excess capacity. 23 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:20 - OfficialDocuments:672, Attachment Id 0, Page 205 k ti 1. M11 17J 11 111 b� COC 00 °COli Ln CO CO PtM ° xxxxx a H rt r�" Coa V ' Co03 Lnw�w (n H a \ \ tl (D N G (ID ((D (GD (D (DD 7 H 0 (D H. OD COft H. � < a �7 rt W rt W l0 O W N 10 z N 00 UI N N UI U10 OO tOt0 N J N NO AJOONA ft H UI UI A O Op N A Ot UI UI UI N W O (G O In In O O O O N O O In O O O UI O\ N r 000 00 E O O O 00 OJt00(n rtw 0 000 00 O O O 00 00000 0 000 00 O O O 00 00000 c+ N W 1.4 W W 0 Q\ W t0 N CO N N UI O 00%w Qt 1p N J N N W M 4UI03N0 O N A t0 W UI10�N0, �.� MH. OUIUI UIO O O O J%O %O%WNNO 000030 O. O O MID OJOOV 000 JO O O O JO 00000 N 000 lnO O O O lnO 00000. N N 0 N z P J W Ot 01 J OO O UI Ut UI UI UI rt tQ p ow da ow Ow df fD f � A IW l0 A O W A 10 A A IU UI 0\0 dP J J J UI Ot J J dP daUI t ow dP OP 0 rt o a Ct N N N N N N NN N N N N 00 t0 0 O O 00 00000 91 OO t0 10 N O W0 NNNNN rS www � z UI UI N O In N VI UI JANOOW rtf' rd d H uq rt ra N N A W W W W O 4 W N J A JJ OA UI WF- �, KK K K K K l< ft ft ~ ft rt m 23.1 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:20 - OfficialDocuments:672, Attachment Id 0, Page 206 CIE ELEMENT Currently, the county has existing LOS standards for the following capital facilities: Traffic Circulat3-0n (Roadways-} LOS C for non -peak season LOS D for peak season * Solid Waste 6.5 pounds per capita per day * Sanitary Sewer City of Vero beach Service Area - 130 gpc County Ser-vic-e Area ----10G- gpcd-- (gpcd = gallons per capita per day) (gpd/unit = gallons per dwelling unit per day) * Drainage l0 - year, 24 ---hour design storm * Recreation (acres per population) Neighborhood Parks Acreage - ,072 Dev. Acreage - .054 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:20 - OfficialDocuments:672, Attachment Id 0, Page 207 * Potable Water (Single Family) (Multi -Family) North County 211 gpd/unit 170 South County 200 1 100 (gpd/unit = gallons per dwelling unit per day) * Drainage l0 - year, 24 ---hour design storm * Recreation (acres per population) Neighborhood Parks Acreage - ,072 Dev. Acreage - .054 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:20 - OfficialDocuments:672, Attachment Id 0, Page 207 CIE ELEMENT Urban District Parks Acreage - 11.05 Dev. Acreage - 7.56 Specialty Parks (river) Acreage - 2.75 Community Parks Acreage 1.62 Dev. Acreage - 1.49 Specialty Parks (beach) Acreage 3.45 Dev. Acreage - .475 Existing as well as proposed LOS standards are discussed in further detail in each individual comprehensive plan element. Capital Improvement Programs A capital improvement program (CIP) is a plan for capital expenditures to be incurred each year over a fixed period of years to meet anticipated capital needs. This program identifies projects which the county plans to undertake and presents esti- mates of the costs and the full resources needed to finance the projects. The county currently does not have an overall capital improvement program. However, each element of the Comprehensive Plan will have its own individual 5 -year Capital Improvement Schedule identifying the needs, costs and timeframes for capital project implementation. Also, the Capital Improvement Element (CIE) itself will consolidate all of the elements capital improvement needs and develop an overall 5 -year Capital Improvement Schedule. The overall program will list the needs, costs, timeframes, priorities and the necessary financial resources to implement the identified capital improvement projects in the elements for the county in the next 5 years. Impact Fees Impact fees are charges to developers for off-site improvements that must be provided by the local government to serve the new development. This financing technique is one strategy the county can use for implementing the Capital Improvements Element (CIE). 25 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:21 - OfficialDocuments:672, Attachment Id 0, Page 208 t CIE ELEMENT Currently, the county place. These fees applicable elements. - has traffic, water and sewer impact fees in are discussed in further detail in their Impact fees may indirectly affect the timing and location of development. For example, a development may choose to locate in an area having lower traffic impact fees, since these fees vary in costs depending on the location in the county. Also, impact fee costs may postpone or prohibit development from occurring due to the potential economic hardship. The Existing Comprehensive Plan The Indian River County Comprehensive Plan adopted in September 1982 and subsequently amended, has served as a guide for capital improvement programming through active community and planning staff input on various elements such as land use, traffic cir- culation—and others which directly affect capital improvemen needs. The comprehensive plan has also provided a framework for evaluating the capability of infrastructure to support zoning changes and development proposals. Enterprise Funds Enterprise funds are used to account for operations that are financed and operated in a manner similar to private business enterprises, when the intent of the governing Board is that the full costs of providing the service to the general public on a continuing basis be financed or recovered primarily through user charges Enterprise funds have been used to ensure that the true cost of a facility or service is born by the user or recipient through collection of user charges. Currently, the county operates its solid waste services, golf course facility, building department services and utility services as enterprise funds. 26 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:21 - OffcialDocuments:672, Attachment Id 0, Page 209 CIE ELEMENT As a tool for affecting the timing and location of development, user charges may be designated to vary with the quantity and location of the service provided. Thus, charges could be greater for providing services further from urban areas, and the reverse for distances closer to urban areas. In this way user charges could affect the economics of development locating further away from urban areas, 27 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:21 - OfficialDocuments:672, Attachment Id 0, Page 210 l CIE ELEMENT ANALYSIS The analysis section of the element analyzes the county's fiscal ability to provide adequate capital improvements, based on historic and projected revenue and expenditure patterns. The analyses prepared in the other applicable comprehensive plan elements have identified capital improvements needed to meet the demands of existing and future development. The needs of other public facilities such as jails, libraries and public education and health systems are also discussed. Revenue and expenditure projections are identified, and analyzed and a fiscal assessment of the needs (costs) versus the projected available revenue is included. Analysis of the Timing and Location of Capital Improvements The Future Land Use and Traffic Circulation Elements are directly related to the timing and location of capital improvements. The provision of land use density guidelines and intensities of land uses stated in the Future Land Use Element are based upon several criteria. These criteria are environmental constraints, land use compatibility, the existing character of specific geographic areas, hurricane evacuation capabilities, availability of public facilities and services and other policies and criteria of the Comprehensive Plan, Using the Future Land Use Element to plan for the provision of public facilities and services promotes compact development by emphasizing infill development in urban areas and maximizes the efficiency of existing facilities and services in under-utilized areas. Utilizing the Future Land Use Element also controls premature "leap -frog" development and ensures that adequate facilities will be present consistent with the Future Land Use Element, Maximizing the use of existing facilities and controlling "leap -frog" development will contribute to a cost-effective and efficient service delivery system. Using the Future Land Use Map in the Future Land Use Element and Future Thoroughfare Plan Map in the Traffic Circulation Element in planning for future locations of facilities will provide for efficient and orderly expansion of public facilities, provide for efficient growth in desired areas, discourage growth in undesirable areas, and protect environmentally sensitive lands. Development orders will be based upon the availability of adequate public facilities and services which will provide additional support for the Future Land Use and Traffic Circulation Elements. The objectives of the Future Land Use and Traffic Circulation Elements will be furthered by the extension of facilities and services in a logical and efficient manner. This will be accomplished by implementing and enforcing the adopted Capital Improvements Element and its corresponding 5 -Year Schedule of Capital Improvements. This ensures that facilities and services will be in place concurrent with future land use development. In 28 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:22 - OfficialDocuments:672, Attachment Id 0, Page 211 CIE ELEMENT the case of transportation facilities, as long as these facilities are scheduled within three of the five years of the Schedule of Capital Improvements, these facilities are considered concurrent. Therefore, if a capital improvement project is not on the adopted 5 -Year Schedule of Capital Improvements Pian and the improvement is required to maintain adopted level of service standards, future development will be prohibited until the necessary facilities are in place. This in effect indirectly controls the timing and location of future land use development and in turn furthers the implementation of the Future Land Use and Traffic Circulation Element's objectives. Specifically, the suture Land Use Element of—the plan de 'nea es existing and future year 2010 urban service areas and the location of public facilities, referenced in Figure 2.33. The proposed Land Use Map, Figure 2.34 a/b/c, in the Future Land Use Element, directly relates to the location of public facilities and the urban service areas. The Land Use Map graphically portrays the maximum land use densities/intensities for the county by y : T the ear 201Qhe residential land use densities in some areas are as high as 10 units to the acre in the urban service areas and as low as 1 unit per M acres outside the urban service areas. The commercial/industrial land use areas are located along the US#1 Corridor and nodal areas located along-mC]-or—trarspor-t-ation-rout and intersections. The use of a schedule of capital improvements is important in the timing and provision of improvements to existing facilities or services and construction of new facilities. The prioritization of projects and scheduling of projects based on projected need and available revenue will ensure that existing resources are properly allocated. This scheduling effort will also ensure that the appropriate areas will be served by needed facilities, thus maintaining adopted levels of service. The county coordinates with the S District and the various state Department of Transportation, when or service improvements within continuation of this coordination state agencies and St. Johns will Comprehensive Plan with regard to improvements. SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:22 - OffcialDocuments:672, Attachment Id 0, Page 212 t. Johns River Water Management agencies, such as the Florida these agencies program facility Indian River County. The will ensure that the plans of be consistent with the county timing and location of capital 28.1 r CIE ELEMENT Needs Assessment The main purpose of the needs assessment is to identify the capital improvements required to provide sufficient infrastructure to meet proposed levels of service for existing and new develop- ment. The needs are based on the public facility requirements as identified in the other applicable individual comprehensive plan elements and the Future Land Use element. For purposes of this element, a capital improvement is a substantial facility (land, building or major equipment) that costs at least $25,000 and which may be paid for in phases. Capital improvement needs through fiscal year 1995 are identified for drainage, recreation, traffic circulation (roadways), conservation/aquifer recharge, sanitary sewer, potable water, solid waste and other public facilities. Table 13.8 summarizes these needs for fiscal years 1990-91 through 1994-95. Public facilities such as public education and health systems are provided countywide; however, the county itself does not have fiscal responsibility for these systems. However, the county is required by State Statutes to provide some funds and health care facilities for the Indian River County Health Department (IRCHD). The Florida Department of Health and Rehabilitation appoints the management of the IRCHD, maintains the financial records and prepares its own financial report separate from the county. An analysis and description of public schools and health centers is provided in the Future Land Use and Introductory Elements of this plan. Based on general locational criteria for public schools and health centers, it is assumed that any new facilities which may be constructed in the county by 1995 will be located in existing infrastructure service areas or designated expansion areas. Therefore, these systems may be considered to be adequately served by appropriate infrastructure. Table 13.8 summarizes the county's capital improvement expenditure needs for fiscal years 1990-91 through 1994-95. Detailed capital improvements schedules, which list each improvement project, are provided in each applicable comprehensive plan element. The capital improvement needs in Table 13.8 are identified by element name or category, along with estimated costs per fiscal year. The total estimated costs for capital improvement expenditures for the five year period is approximately $131.5 million. 29 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:23 - OfficialDocuments:672, Attachment Id 0, Page 213 CIE ELEMENT The cost estimates in Table 13,8 were based on various sources. The traffic circulation costs were derived from the Florida Department of Transportation unit costs per lane mile of road construction. Land acquisition costs were based on recent sale prices of similar properties in the county and on a cost per acre basis. Facility construction costs were based on the county's past experiences in constructing similar facilities and empirical cost estimates. TABLE 13.8 INDIAN RIVER COUNTY 5 -YEAR CAPITAL IlmpROvIImENTS EXPENDITURES FISCAL YEAR 1990-91 THROUGH 1994-95 Element or 3ategory 1990-91 1991-92 1992-93 1993-94 1994-95 Total Recreation and Dpen Space $ 1,020,000 $ 130,000 $ 132,000 $ 555,000 $ 230,000 $2,067,000 ?rainage 1,220,000 1,645,000 1,195,000 795,000 595,000 5,450,000 Praffic ;irculation 3,597,000 4,481,000 4,828,000 3,970,000 8,600,000 25,476,000` :onservation/ aquifer Recharge 2,000,000 2,000,000 1,000,000 1,000,000 1,000,000 7,000,000 sanitary Sewer 9,081,918 6,611,918 1,891,918 1,891,918 1,891,918 21,369,590 btable Water 27,825,000 2,056,000 1,773,000 7,838,000 -0- 39,492,000 solid Waste 680,000 500,000 3,380,000 2,375,500 500,000 7,436,500 ether Public 'acilities: Jail Phase III 13,410,000 1,806,000 4,674,000 2,730,000 650,000 23,270,000 County Library (main & north branch) GRAND TOTAL-- $131,561,090 Court Facilities Fire Stations Health Care 29.1 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:23 - OfficialDocuments:672, Attachment Id 0, Page 214 CIE.ELEMENT Fiscal Assessment This section examines the county's ability to fund the capital improvements listed in Table 13.8. The purpose of this section is to determine whether sufficient revenue will be available within the existing budgeting framework utilized by the countyo fund the needed improvements at the time they will be required. The assessment process consists of estimating future receipts of revenues and balancing these receipts against anticipated expenditures. Using this process, it is possible to quantify annual revenue surpluses and shortfalls, providing a basis for examining opportunities for financing the needed capital improvements. The expenditure estimates include the operating- costs peratingcosts associated with operations of the county. Projected Revenues Th county's revenues are projected for fiscal year 1958-8-9 through 1994-95. The projected revenues are first analyzed in this section in general overall terms. Afterwards, earmarked projected revenuesare di.scusse as well a he county's tax base and millage rate projections. Overall Projected Revenues Table 13.9 summarizes the county's projected overall revenues for fiscal years 1988-89 through 1994-95. These revenues include the county's general governmental funds and enterprise funds. As Table 13.9 indicates, in fiscal year 1994-95 the county is expected to collect overA1_ll million in total revenue. Of the total projected revenue in fiscal year 1994-95, over $21.8 million is expected to be from Enterprise Fund revenue, which is approximately 18% of the total revenue projected. A discussion of Enterprise Fund revenue and its composition is provided in the Existing Conditions section of this element. Ad valorem taxes are projected to be over $56.4 million in fiscal year 1994-95. These taxes are part of the 'Taxes' category in Table 13.9. Ad valorem taxes are the county's largest individual revenue source and account for approximately 50 percent of the county's total revenue in fiscal year 1994-95. For the five year time period, beginning in fiscal year 1990-91 and ending in fiscal year 1994-95, the county is projected to receive a total of over $479 million in revenues. 30 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:23 - OffcialDocuments:672, Attachment Id 0, Page 215 If .1111�1 l�'J�P♦tNpNOtW W 00 J�J Ch 0) 01 wwwwww 12 n H i N C1 Ot Ot 01 U1 Ut ♦QQt ♦(Qj1 (Q1 • �QJ ♦�jQ1 •pQ ♦Qp ♦QQ ♦pQ ♦pQ ♦pQ •pQ Q� r. 31 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:24 - OfficialDocuments:672, Attachment Id 0, Page 216 CIE ELEMENT Earmarked Projected Revenues Earmarked revenues are revenues which are restricted in their use. For purposes of this element, evenues are --categorized by applicable comprehensive plan elements. These elements include Traffic Circulation, Sanitary Sewer, Potable Water and Solid Waste, The remaining elements do not have earmarked revenue sources. Tables 13.10 and 13.11 provide a summary of earmarked revenue projections by applicable comprehensive plan elements for fiscal years 1988-89 through 1994-95. Table 13.10 identifies projected revenues for traffic circulation expenditures. These revenues include as taxes and traffic impact fees. It is estimated that in fiscal year 1994-95 the total revenue available for traffic circulation expenditures will be over-$11.3mil-lion. For the five year period the total projected traffic circulation revenue is over $31.9 million. Projected revenue available waste expenditures is- shown iz--Ta-bl<e- 13_11, These revenue figures do not include impact fees. TABLE 13.10 PROJE= RUMM ,Sn11RCES r EARMARKED FOR TRAFFIC CIRCULATION ( FISCAL YEAR 1988-89 THROUGH 1994-95 Fiscal Local Option Constitutional County Traffic Total Year Gas Tax Gas Tax Gas Tax Impact Fees 1988-89 $1,827,492 $ 935,336 954,043 $ 436,206 444,930 $1,147,255 1,147,255 $ 4,346,289 4,410,270 1989-90 1990-91 1,864,042 1,901,323 982,664 453,829 1,147,255 4,485,071 1991-92 1,939,350 1,012,143 462,905 1,147,255 4,561,653 1992-93 1993-94 1,978,136— 2,017,699 1,032,389 1,053,035 472,164 481,607 1,147,255 1,147,255 4.699-944 4,699,596 1994-95 2,058,053 1,074,096 491,239 1,147,255 4,770,643 NOTE: * Assumes a constant grwth of $1,147,255 million per year. _%uT.R E- Indian River County Office of Management & Budget, June, 1989. SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:24 - OfficialDocuments:672, Attachment Id 0, Page 217 CIE ELEMENT TABLE 13.11 PROTECTED REVENUE SOURCES EARM= FOR WATER & SEWER, SOLID WASTE FISCAL YEARS 1988-89 THROUGH 1994-95 (ENTERPRISE FUNDS) POTABLE WATER & SANITARY SEWER: SOLID WASTE: Fiscal Fiscal Year—Total* Year Total 1988-89 $5,030,192 1988-89 $3,874,322 1989-90 6,070,690 1989-90 6,990,784 1990-91 6,059,359 1990-91 8,441,372 X991-0,) 6,739,188 1991-92 °441,372 1992-93 7,619,801 19.9.2-93 8,863,-4.41 1993-94 8,579,177 1993-94 9,306,613 1994-95 9,516,678 1994-95 9,771,943 NOTE: *Figures do not include impact fee revenue. SOURCE: Indian River County Office of Management * Budget, June, 1989 As indicated in Table 13.11, in fiscal ear 1994-95, the projected revenue for water and sewer expenditure is over 59.5 million. In thame-yeas, the avai-lab-le- revenue pr-ojec-tecl---for so -id waste expenditures is over $9.7 million. For the five year projection period, beginning in fiscal year 1990-91 and ending in -fiscal year1Q04-95 the county is expected to receive over $38 million of revenue from Potable Water and Sanitary Sewer revenue sources and over $43 million from Solid Waste revenue sources. Tax Base, Assessment Ratio, Millage_.Rate Table 13.12 summarizes the county's tax base projections through fiscal year 1994-95. The county's tax base projections are categorized by fund groups. The ad valorem tax base is the same as the general fund category identified in Table 13.12. The ad valorem tax base of the county is projected to increase, assuming a 6 percent rate of growth. The county's assessment ratio is projected to remain stable at 100 percent. The county has a Municipal Service Taxing Unit (MSTU) and three separate fire districts which have their own millage. Their ind v' -di ual tax base proj�ions for years 1989- W-tivr—ough 1994-95 and shown in Table 13.12. 33 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:24 - OfficialDocuments:672, Attachment Id 0, Page 218 n�� a art ll a Nein mm CD 0 H H N 4Aw oworno�oG� ppp 4oM11.1a 00 0 f'h lO H. 00HHH000 p N rP W O U1 l0 lJl 0 otno�o�wo rh r OOrrNlJ1O WWOOOD UI 0 O 0to J r �O H tD rt H OOHHN6I�O k . . I w w o o w w H lnlno�Ooo�� � N rt H {\/ OOHrNO��O 4 wwo0trl'wN o00o O 0 0 "C w H r w O O H H N J IO 1O • • W N W O lJI llt .P � l!I U1 O to O In �D .A r 10 OrrNOOIO .P O W O O M O1 l U1 O 1O W Ul lD SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:25 - OfficialDocuments:672, Attachment Id 0, Page 219 n H [=J C9 H N m a I rt n 8 ro Ln I H N CO ko r• rta W Q N N �rt Ln FJ Fl Fj � � a ro G 0 Vt a' rOrCO rm W I,• � l9 • r am N H �p N . . VI aIT iii t7� �i 0 N C N• M W N 110 N n a %O (D J Ln m £ 0 � tt rt w w .0 (N1 N (D W N 1H0 ,Np %0 p� OOj 0 �pjNpp pNN� j1 w W H Ln Ln O � O 8 34 n H [=J C9 H N m a I rt n 8 ro Ln I H N CO ko CIE ELEMENT Projected Expenditures The county's expenditures are projected for fiscal years 1988-89 through 1994-95. The total projected expenditures are identified in general in Table 13.13. Expenditures are also analyzed by earmarked Enterprise Fund expenditures in Table 13.14 and operating costs are summarized in Table 13.15. Overall Projected Expenditures Table 13.13 provides a summary of the county's overall projected expenditures through fiscal year 1994-95. The categories used in the table are the same as the ones used in the Existing Conditions Section of this element. By fiscal year 1994-95, the county is projected to have expenditures totaling over $103.5 million. The category which is projected to have the largest expenditures -is the -'Public S-&fet ' category. This category includes law enforcement, fire, corrections, emergency services and others. For the five year time period, beginning in fiscal year 1990-91 and ending --n- fiscal year 199-4-951_ the county's expenditures are projected to be over $453 million. Earmarked-11rojected Expenditures Table 13.14 indicates the projected expenditures for the water, sewer, and solid waste enterprise funds for fiscal years 1988-89 through 1994-95. The expenditures are identified by operating expenses and other expenses -for each y -ear_. In fiscal year 1994-95, potable water and sanitary sewer enterprise funds are projected to have over $7.4 million in total expenditures. Operating expenses are projected to be 44.5 percent of the total expenditures in fiscal year 1994-95. The solid waste enterprise fund is projected to have total expenditures of over $4.9 million in the same time period. Operating expenses are projected to be 37.5 percent of the total expenditures in fiscal year 1994-95. For the five year time period, beginning in fiscal year 1990-91 and ending in fiscal year 1994-95, the total sanitary sewer and potable water projected expenditures are anticipated to be over $32 million. Also, solid waste expenditures are expected to be over $21 million in the same time period. 35 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:25 - OffcialDocuments:672, Attachment Id 0, Page 220 36 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:25 - OfficialDocuments:672, Attachment Id 0, Page 221 Nrrrrr.A1 n H C9 C+1 r m rD I rt n 0 T i lP N In OD %0 MONr I'• rrrOOw00 ,OJN�i �N N (mN� (1,01 �JW +OOp�) 1D F' tD OD W 171 O N PI-�W 14 0�0 W WNF-+�1� {L F+ pV-)) CO -4 ' OA NN INNII OJ ,�p NJ t1�0 J� �p�p Nrrrrr.A1 n H C9 C+1 r m rD I rt n 0 T i lP N In OD %0 CIE ELEMENT TABLE 13.14 C . PROJECTED EXPENDITURES FOR WATER & SEWER, SOLID WASTE FISCAL YEARS 1988-89 THROUGH 1994-95 (ENTERPRISE FUNDS) POTABLE WATER & SANITARY. SEWER: Fiscal Year Operating Expenses Other Expenses Total 1988-89 $2,082,620 $2,232,423 $4,315,043 1989-90 2,363,221 2,944,503 5,307,724 1990-91 2,528,647 3,150,619 5,679,266 1991-92 2,705,653 3,371,163 6,076,816 1992-93 2,895,049 3,607,145 6,503,194 1993-94 3,097,703 3,859,646 6,957,349 1994-95 3,314,543 4,129,822 7,444,365 SOLID WASTE: Fiscal Operating Other Year Expenses Expenses Total 1988-89 $ 746,953 $1,721,148 $2,468,101 \.. 1989-90 1,336,137 2,222,504 3,558,641 1990-91 1,429,667 2,378,080 3,807,747 1991-92 1,529,744 2,544,546 4,074,290 1992-93 1,636,826 2,722,665 4,359,491 1993-94 1,751,404 2,913,252 4,664,656 1994-95 1,874,003 3,117,180 4,991,183 SOURCE: Indian River County Office of Management & Budget, June 1989. 37 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:26 - OfficialDocuments:672, Attachment Id 0, Page 222 CIE ELEMENT Operating Cost Projections Table 13.15 provides projections of overall operating costs for the county for fiscal years 1988-89 through 1994-95. In fiscal year 1994-95, the county is projected to spend approximately $31.5 million in operating costs. Based on the figures stated in Table 13.15, the county's operating costs are projected to increase approximately 2 percentage points per year. TABLE 13.15 INDIAN RIVER COUNTY OVERALL OPERATING COST PROJECTIONS FISCAL YEARS 1988-89 THROUGH 1994-95 Fiscal Year Total Operating Costs* 19- "- 1989-90 1989-90 --20-.1-- 1990-91 23.3 1991-92 25.8 1992-93 1993 994 27.6 9945 29.5 31,5 NOTE: *Figures are in millions SOURCE: Indian River County Office of Management & Budget, June, 1989 Projected Debt Capacity Debt financing is one way the county has provided for its capital facility needs. Debt financing is basically borrowing money using the county's assets as collateral. The primary rationale for becoming obligated for providing the capital facilities through indebtedness is that it spreads the cost of the facility over its useful life and thus is paid for by those who will use the facility. Table 13.16 provides a summary of the county's estimated available bonding capacity without public vote. The county's bonding capacity is identified for 10, 20 and 30 years. As Table 13.16 indicates, the county's available bonding capacity for the next 10 years is $27,560,000, with an additiona potentia. ot ,375,000. SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:26 - OfficialDocuments:672, Attachment Id 0, Page 223 CIE ELEMENT POSSIBLE/MAYBE - PLEDGE SOURCES Race Track & Jai -Ali Fronton TABLE 13.16 1,590,000 1,815,000 Franchise Fees INDIAN RIVER COUNTY 7,940,000 9,050,000 ESTIMATED AVAILABLE BONDING CAPACITY 3,705,000 5,295,000 WITHOUT PUBLIC VOTE Total 37,935,000 54,235,000 10 years 20 Years 30 Years PLEDGE SOURCES 7.25% 7.85% 7.95% Half Cent Sales Tax 8,275,000 11,835,000 13,480,000 First Guaranteed Entitlement 1,145,000 1,635,000 1,860,000 Second Guaranteed Entitlement 2,365.000 3,385,000 3,850,000 Gas Taxes 14,875,000 21,275,000 24,235,000 Tourist Tax 900,000 1,285,000 1,465,000 Sub -Total 27,560,000 39,410,000 44,890,000 POSSIBLE/MAYBE - PLEDGE SOURCES Race Track & Jai -Ali Fronton 1,115,000 1,590,000 1,815,000 Franchise Fees 5,555,000 7,940,000 9,050,000 Road Impact Fees 3,705,000 5,295,000 6,030,000 Total 37,935,000 54,235,000 61,785,000 SOURCE: Indian River County Office of Management & Budget, December, 1988. (' Debt Service Obligations The county debt service obligations for current and anticipated bond issues are summarized in Table 13.16. Debt service are payments of principal and interest on obligations resulting from the issuance of bonds. The total anticipated debt service for the county through fiscal year 1994-95 is estimated to be over $25,1 million. As Table 13.17 indicates, the county's major anticipated outstanding debts are for water and sewer revenue bonds, water and sewer assessments, bond anticipation notes, solid waste revenue bonds and assessments, three general revenue bonds and general obligation debt for library bonds. 39 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:26 - OfficialDocuments:672, Attachment Id 0, Page 224 39.1 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:27 - OfficialDocuments:672, Attachment Id 0, Page 225 W N 1 K 0. g \ � r n T i r s~ � IA1I r T M N 9 Ns ■t 'I L1 Si >} F~ n � F r O O T I y 'O y N yid VV y N l I�Sbt N *UQ O O O OLO y 8 111 O N O O i ONO O y ,Q �1 V 'y0 y�1 �I rp pOI 4 P N P N p I N P YI ,, ;♦ V �p 1y C V' yN� y p y I v; y A N N N T .. H Q N! N P N; 0!Pi V I W P ; P ; y♦ i O A P I O8 U081 ; .PFpi p rMp yoV1 l — yl W G OOp O8 P S8 i 8 H yPp1 aN r O O O 1 O O D 1 O O O O; O Ol --•— --^ W 1 \ 30 W � �pNI1 ypI N r V P �y1 N Ppp O8' yp y yNI �W My 18n p i Irl � � I)��1 O8 S' ; r8r' $ !E N8 V 8O V eNp S 8N yNOI 8N A ppN � Pg )A M QI�' gN Y�,,II g $ g Oop g 1 6 8 py, ga —--- yp1 gG SO r' O O- O— O-- --- N; 1♦ ' N 1 N O" iN � � N A N �♦ u W Nq N�;� W Mii NN OQ Y7 V to I N T SQ DQQ V Q 2S o Q QN QQ QO I RO iN gO _ ; W C P O @Q�j 71 ppppO ppN ppNp pm S 8 S 8 .pp 8 ap 8N 8N QO 8 N � O O O O � O 39.1 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:27 - OfficialDocuments:672, Attachment Id 0, Page 225 S i l'n o $ i " o � i a � i i � 9 li ' e ■ ■ i y � _ s----- ----7 ---- ---- -- [[ A �1 T Q y T ■ N O V e M 9yr ss X81 8N O 8I N 8$ 8$ V 88a 1: "s 1py 8G 1p2y SO 1sE -S. 11 q O W O M i 0 Id O Yl i 0 O O O p< O 1 w P 14 O 00 0 O Do 0 O 09 o6aR I 1 i • i 1 i 1 i W M �r i N O O O O 1 0 O O O O O O O ■ • � � � + N 111 r � 6 N 88 N.1� 8 • N �■ '.1 O O O D! O O O O 1 a a 0 0 O O O O ------------- ------ ------ ------ Q � N {sN1I yerl yrP1 p+ pPp pp+ R �pVy pp+ b �1 � N , � � iC� V N � Ign yO 8� ry � 8O y�Wi 8O yyN1 i 8O W 8N " . 8N �lyp8N �yp1 , 8M O � C� � ■ I —OV O—O— — OO,n — nO �1Npy pp,, ./ ypN b �Ny b N b N N a O V 7 apM + V. p 88O O 1 - SS .O11 8O Ny 8Sp 4yy1 8�p l8� 8N .p4p 8N yN 8O yN� O O �. r O O 0 0 0 O 0 0 0 O O O D O O O• O O O O, PPP " V N' — — — — — — — — — — — — — — ------ ---------------- — — — — -- — — — — — — — — — ------ 0 -----O C - C O O C. 39.2 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:27 - OffcialDocuments:672, Attachment Id 0, Page 226 CIE ELEMENT Fiscal Assessment Summar This section provides an analysis of the county's revenues and expenditures for its capital improvement needs for the five year period beginning in fiscal year (FY) 1990-91 and ending in FY 1994-95. The estimated costs of the county's capital improvement needs for this five year projection period are derived from each applicable comprehensive plan element's capital improvement schedule or program and other identified facility needs. The estimated costs of these capital improvements are summarized by individual element and year in Table 13.18. Also, Table 13.23 summarizes each individual element's capital improvement needs, along with their cost, timeframe, and revenue source(s). The estimated revenues to be used to pay for the projected capital improvements needs consist of existing revenue sources and proposed revenue sources. For purposes of this analysis, proposed revenues are assumed to have been approved and implemented as required in order to balance anticipated revenues and expenditures. Table 13.18 provides a summary of the projected revenues and expenditures by element category for capital improvements needs for fiscal years 1990-91 through 1994-95. This table identifies each revenue by source and amount of revenue for each year by element. The table also identifies the amount of estimated expenditure costs for each element by year. The resulting balance of each element's costs versus its revenues is also provided in Table 13.18. The projected revenue from the adopted One -Cent Local Option Sales Tax identified in Table 13,18 is carried over from year to year. The tax became effective June 1, 1989. The county anticipated revenue from the tax is approximately $5.3 million per year for a maximum of 15 years. It is projected that the tax will have a %5 to 6% growth factor per year beginning in fiscal year 1989-90. For the Traffic Circulation element, estimated revenues consist of gas taxes, traffic impact fees and a portion of the adopted One Cent Local Option Sales Tax. As indicated in Table 13.18, the revenues are expected to fund the anticipated costs of the identified traffic circulation capital improvement needs for the five year period. The estimated revenue from gas taxes is not exclusively for capital improvement financing. These revenues are also used to fund other transportation related expenditures such as operating costs. However, maintenance costs have been removed from the revenue estimates, The Drainage element's revenue sources consist of the use of funds from the road and bridge, transportation improvement and park improvement funds. Also, revenues are proposed from the adoption of a stormwater utility charge and special assessments through 40 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:28 - OffcialDocuments:672, Attachment Id 0, Page 227 CIE ELEMENT municipal servicing taxing units (MSTU). These revenue sources and their proposed uses are further discussed in the Drainage Element. As Table 13.18 indicates, these revenues are expected to fund the needed drainage capital improvements. The Conservation /Aquifer Recharge Element revenue consists of the adoption of a general obligation bond using ad valorem tax debt as a pledge source. The issuance of this bond would require voter approval. There is a possibility that one cent local option sales tax monies may be used to fund a portion of the expenditures beginning in 1992-93. The Recreation and Open Space Element revenues consist of a combination of one cent local option sales tax revenues and an ad valorem tax contribution. Also, implementation of a parks and recreation user fee and impact fee are optional_ revenue sources. This user fee would be based on the information provided in the IRC Parks & Recreation User Fee and Revenue Study, November 1987. As Table 13.18 indicates, the Housing Element's revenue sources consist of a one time contribution in fiscal year 1993-94 from the county's ad valorem tax revenues. Included—In the_ county capital_ improvement fiscal assessment analysis are the needed revenues and anticipated costs for financing additional or other facilities for the five year period. These other facilities include a new health care facility, a new main library and north county branch library, new fire stations, new courthouse facilities and a expansion of jail facilities. As indicated in Table 13.18, the anticipated revenues for these facilities are monies received from the adopted One -Cent Local Option Sales Tax and an increase in the millage rates for the Fire Districts. Also, revenues for the library facilities are derived from a grant, a contribution from the general fund and revenues from a voted general obligation bond issue. These revenues are anticipated to completely fund the other facility needs. An analysis of the needs and cost for the Sanitary Sewer, Potable Water and Solid Waste enterprise funds are provided in Table 13.18. The Enterprise Funds are self-supporting and operate much like a private enterprise. Their expenditures cannot exceed their revenues; therefore, their revenues and expenditures balance. The projected revenues for financing the capital improvement needs for the Sanitary Sewer and Potable Water Elements are identified in Table 13.18. These revenues include impact fees and revenues from the issuance of revenue, bonds. 41 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:28 - OffcialDocuments:672, Attachment Id 0, Page 228 CIE ELEMENT G- _ The Solid Waste Element's capital improvement needs and the revenues earmarked for financing these needs are also identified in Table 13.18 under the Enterprise Fund category. The anticipated revenue sources for so id waste capital improvement expenditures are—user charges/assessments for -the—five—year period. The county's total projected revenue for capital improvement financing for fiscal -years 1990-91 through 1994=95 i -s $168.2 million, The total estimated costs for capital improvement expenditures for the same five year period is approximately $131.5 million. These figures are based on the summation of revenue and expenditure amounts listed in Table 13.18. Through the balancing of revenue and expenditures the county's capital improvements are compe y financedusing various funding resources. Therefore, the county's Capital Improvements Element is financially feasible for the five year period encompassing fiscal years 1990-91 through 1994-95. Specifieal-ly, the Future Land Use Element of the plan delineates existing and future year 2010 urban service areas and the location of public facilities, referenced in Figure 2,33. The proposed land use map, Figure 2.34 a/b/c, in the Future Land Use Element, directly relates to the location of public facilities and the urban service areas. The land use map graphically portrays the maximum land use densities/ intensities for the county by the year 2010. The residential land use densities in some areas are in the urban service areas and as low as 1 unit per 40 acres outside the urban service areas. The commercial/industrial land use areas are located along the US #1 corridor and nodal areas located along major transportation routes and intersections. SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:28 - OfficialDocuments:672, Attachment Id 0, Page 229 CIE ELEMENT TUE 13.18 IMUN RNM GM aM40 CF IUMI&'S & E*DMM PFQJF= BY E[EAM GOM FCR CPIM DEF004M FML'AM 1990-91 MM 1994-95 IIF 1990-91 1991-92 1992-93 1993-94 1994-95 �1FFIC CUU= ftvmn C� �1 2.687 2.749 2.804 2.86 2.917 DpLt Fps 1.147 1.147 1.147 1.147 1.147 1 cat Local q tim .870 .870 1.368 3.136 6.448 Sales Tax 3.597 4.481 4.828 3.970 8.600 gig 1.107 ,285 .491 3.173 1.912 DRAIIiu Stber Utility .132 .132 .132 .132 .132 qmcial P6sesmmtsAm .120 .120 .120 .120 .120 Pak kgmw3 t .014 .014 .014 .014 .014 lbad & Pricy DEpt./NBlU •048 .048 .048 .048 .048 aaWmtatim IT[afrts .906 1.331 .881 .481 .281 Bpendit-res 1.220 1.645 1.195 .795 .595 B31mre 0 0 0 0 0 OuWNIN/ ;Qjffm MUG Femw cevral Wicptirn 2.000 2.000 1.000 1,000 1.000 Bads W %icrw TZ: DEbt) F tomes 2.000 2.000 1.000 1.000 1.000 Blame 0 0 0 0 0 FEaUM & CPFN SOM Ftvmle Pel Valc ran .400 0 0 0 0 Tax artd tim 1 gait Ic cal Opti .620 .130 .132 .555 .230 Sales Tit `. F items 1.020 .130 .132 .555 .230 Fine 0 0 0 0 0 43 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:28 - OfficialDocuments:672, Attachment Id 0, Page 230 CIE ELEMENT SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:29 - OfficialDocuments:672, Attachment Id 0, Page 231 FaE 13.18 (QN'T) IDDIPN I= OaM aM4W OF I vam & EKPN= PR)]B= BY HEM Nr (P01I3)8}f FOR Dim DFRMN 1I5 FT3AL Y9TS 1990-91 TRUJ1 1994-95 990-91 1991-92 1992-93 1993-94 1994-95 H= E[EMM F� Ad Valan 0 0 0 .0 0 Tax Cmt lbi Em F itru�s 0 0 0 ,0 0 Baler 0 0 0 0 0 COM FP 2I= Ftigue 1 oast Local Ceti 6.110 1.806 4.674 2.730 0 Sales Tax (;tet .400 0 0 0 0 O mt lbitim 1.000 0 0 0 0 anesal mhgat;rn 5.900 0 0 0 0 Bari (Pd Val= Tax Dist) Fire District MiLla3e kite 0 hnBase 0 0 0 .650 — 1ha Fb` i] ity 2.051 0 0 0 Jail Pb. III 2.039 0 0 0 0 Ont Rdlities 2.020 1.806 4.674 2.730 0 Libxies-Nk & awch 7.300 0 0 0 0 Fire Sttias 0 0 0 0 .650 Bayne 0 0 0 0 0 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:29 - OfficialDocuments:672, Attachment Id 0, Page 231 CIE ELEMENT U E 13.18 (CCN'T) IN)UN MM OM SIMM CF MUFIM & EmTnm Prol= BY E[EWU G= FOR GAFFE DEFOAHIIS FLVL)M1990-91 TrOU13i 1994-95 alleu 1990-91 1991-92 1992-93 1993-94 1994-95 INMTRO FINS: SN= MO & PC= VAR fbvffw kpec,�t Fes; 1,000 1.000 1.000 1.000 1.000 Tb em B3 -ds 35.907 7.668 2.665 8.730 ,892 Bpmhbires smr 9.082 6.612 1.892 1.892 1.892 Water 27.825 2.056 1.773 7.838 0 ByalcTm 0 0 0 0 0 9�ID 4�1SIE (.. fiber Ctrs/ 6.983 6.983 7.287 7.659 8.050 5pnLbzes ,680 .500 3.383 2.375 .500 B31ane 6.303 6.483 3.907 5.284 7.550 quue: h1im River Coaity Planing Dept., Office of Nit & a4t, Utilities Dept., July 1989. Nis: All figures are in millias of collars. (1) Ftvffm figzes Maude remlrzs earnark3d fr:r cminta�ix cots. 45 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:29 - OfficialDocuments:672, Attachment Id 0, Page 232 C C CIE ELEMENT CONCURRENCY MANAGEMENT PLAN To ensure that level -of -service standards are maintained, it is necessary to have a system in place which provides the criteria for measuring facility capacity, assessing development demand on applicable facilities, and monitoring service levels for applicable facilities. This system will set the parameters for issuing development orders consistent with level -of -service standards. While this concurrency management plan sets policy and establishes a process, the specific application of this system will be through the county's land development regulations. When updated in conformance with state requirements, these regulations will define the details of the concurrency management system and establish its administrative requirements. The major purpose of the concurrency management system is to detail the specifics of implementing the county's level -of -service standards. For that reason, the concurrency management system must apply to all development activity in the county. The system must then identify the applicable standards for each facility, the geographic scope of the concurrency requirement, and the method of monitoring facility capacity changes. Most importantly, this system must specify when facilities are considered available, Project Applicability All development orders issued by the county must comply with the concurrency management plan and meet level -of -service standards. Development orders are county approvals for initiating construction and/or land development activity. Specifically, development orders consist of the following: comprehensive plan amendments, rezonings, site plan approval, preliminary plat approval, development of regional impact (DRI) development order approval, planned development preliminary approval, and building permit approval for single-family- homes. For purposes of concurrency imanagement, rezonings and comprehensive plan amendments are not considered development orders. Service Standards Level -of -service standards are established in this plan for the following facilities: sanitary sewer, potable water, solid waste, drainage, recreation, and transportation. These are explained in detail in the applicable comprehensive plan elements. No level -of -service has been set for mass transit; justification for this is included in the mass transit element. For each facility, level -of -service is a measure of the relation- ship between demand for the service and the capacity of the facility. Capacity, however, is measured differently for each �.. type of facility. Table 13.19, Service Level Measures, identifies 46 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:29 - OfficialDocuments:672, Attachment Id 0, Page 233 CIE ELEMENT both the capacity and demand These measures are addressed identified in the applicable measures for each public facility. in detail and existing capacities are elements of the comprehensive plan. Concurrency requires that the specific facility within the geographic scope of a proposed project have sufficient capacity to accommodate the project's demand. If that capacity is not available, the project cannot be approved. The principal function of the concurrency management system then is to provide a mechanism whereby demand and capacity measures can be compared on a project by project basis. Table 13,19, Service Level Measures, provides the criteria for establishing a demand to capacity comparison for a proposed project. While most ofthecharacters tics a-s€l-f--ex pLar1at , one needs -clarification;—.his is the geographic scope for the traffic public facility category. For concurrency purposes, affected roadways will be those roadways impacted by a project's traffic. All projects, regardless of size, are deemed to impact the roadway on Whichthe PrnJect—fr-onts or to which the project directs trips. Level of service standards are to apply to all requests for development orders and permits. Level of service standards are measurements based on peak -hour trips and based on volume ranges or average travel speed for the peak hour. Demand Demand is an important component of the concurrency management system. Essentially, demand is a measure of facility use. When compared to facility capacity, demand can indicate the level -of - service for the facility. As depicted in Table 13.19, Service Level Measures, demand can be measured quantitatively for each public facility category. While the demand function for each facility consists of applying a rate to the number—of—facilityestimation of total demand is more complex. For concurrency management purposes, demand can be divided into three types: existing, committed, and projected. Each must be considered separately for purposes of concurrency management. °Existing Demand Existing demand is simply the current level of use for a facility. For a roadway, it is the peak hour trips; for water and wastewater treatment plants, it is the existing flow volume measured in �a11-0ns- perms . Theses- figures ar Jnc1uded--aithinapplicable plan elements. 47 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:30 - OfficialDocuments:672, Attachment Id 0, Page 234 CIE ELEMENT Existing demand then reflects the use of a facility by the current population. When compared to capacity, existing demand can show if the facility has unused capacity or if it is functioning over capacity. Existing demand, however, is not static. As population increases and dwelling units come on-line, existing demand increases. These increases in existing demand can be identified through facility u -se measurementS. ample, regul-a-rtraffic counts tone on roads or treatment plant flow records are examples of facility use measurements indicating existing demand levels. As existing demand levels for facilities are updated, committed demand levels must be reduced if projects representing committed demand have Come on-line— °Committed Demand Committed demand is a measure of the impact that approved development projects will have on facilities. When added to existing demand for a facility, the committed demand for that facility-wi-i produc" snore -accurate- estimate of unused -capacity - This estimate of unused capacity represents the amount of capacity that can realistically be allocated to new projects. Committed em determined for -which_ development -orders—have been approver and which ar_e still valid. Then the specific facilities which will be impacted by these projects must be determined; these facilities will be roadways and the landfill, and they may be treatment plants, drainage conveyances, and recreation facilities. Finally, the amount of demand on each facility attributable to committed demand must be estimated. Applicable elements of the plan identify the rates to be applied to each project to determine facility demand. Traffic volumes, for example, can be derived by applying a trip rate to the size of the project. Sanitary sewer and potable water both have rates of 250 gallons per day per equivalent residental unit. Other public facility rates are discussed fully in the applicable comprehensive plan element. Like existing demand, committed demand must be determined on a facility by facility basis. For example, both existing demand and committed demand must be determined for each major roadway, each treatment plant, each major drainage conveyance, each park category by district, and the active cell in the landfill. Also, like existing demand, committed demand estimates must be modified as projects are completed and the -impacts are -measured by existing demand; committed demand estimates must also be modified as new development orders are approved and old development orders are terminated. 4E SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:30 - OfficialDocuments:672, Attachment Id 0, Page 235 CIE ELEMENT 'Projected Demand (� The third type of demand is projected demand. This consists of two -types. is non—committed sin.gl-e-family lat demand, while the other is new project demand. Non -committed, single-family lot projected demand relates to the facility impacts associated with construction on single-family lots in old subdivisions and construction on single-family unplatted lots and acreage. Since this type of construction will impact facilities, the demand anticipated from this type of activity must be considered in facility expansion plans. For this reason it is necessary to maintain an accurate inventory of unbuilt, platted lots and consider the impacts of construction on these lots. The second type of projected demand is new project demand. For each new project, demand estimates must be made on a facility by facility basis. Only if sufficient available capacity exists for each facility to be impacted --can the project be approved_ and a d-evelopment order issued. Upon issuance of a development order, the estimated impacts on each facility would be considered as committed demand. Availability of Capacity Facility capacity can b-e---a-ssessed--�-two different ways. First, facility capacity can be determined by facilities that are existing and available; examples would be existing treatment plants and existing roadways with a set number of lanes. The second manner for assessing facility capacity is to consider bot existing, in -the -ground facilities as well as facility expansions or new facilities which are programmed but not yet existing. For purposes of assessing facility capacity, the capacity of existing,in-the-g= ouncefacilities will be considered in all cases. Programmed facilities will be considered in assessing capacity for each public facility category when the following conditions are met: °For sanitary sewer, potable water, solid waste and drainage facilities: - facility expansion is a condition of a development order*; or - facility is currently under construction; or {a llty- is- guar-ateed by an ^for--ceable develop- ment aqreement. 49 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:30 - OfficialDocuments:672, Attachment Id 0, Page 236 CIE ELEMENT 'For recreation facilities: ° - facility expansion is the subject of a binding executed contract providing for commencement of construction or property acquisition within one year of development order issuance; or - facility expansion or property acquisition is guaranteed in an enforceab-l- development agreement providing for facility expansion/property acquisition within one year of development order issuance. - raciiity expansion meets any or the cr referenced above; or facility expansion must be included in the county's Five -Year Schedule of Capital Improvements; and ° the facility must be included within the urban service area; ° the facility must have an estimated date for construction to begin and be completed; ° the- facility -must—he scheduled to start construction by the third year of the 5 -Year Schedule of Capital Improvements; and ° a delay in construction of the facility will require a comprehensive plan -amendment. ° the capital improvements element and the Five -Year Schedule of Capital Improvements must be financially feasible; ° the Five -Year Schedule of Capital Improvements must maintain adopted level of service standards, must serve new velopment and eliminate existing deficiencies- as prioritized; ° a realistic, financially feasible funding system based on currently available revenue sources must be used; ° development regulations that ensure the issuance of development orders and permits only when facilities and services will be available to accommodate development must be adopted; ° a monitoring system capable of determining —whether --the adopted -level-of service -standards are met and the schedule of capital improvements is followed must be adopted; and ° areas where public facilities and services \�W111 De p. designated * only applicable for consideration for the project to which the development order does or will apply, 50 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:31 - OfficialDocuments:672, Attachment Id 0, Page 237 CIE ELEMENT Regulation No development order shall be issued for any project where the project's demand in conjunction with existing demand and committed demand will exceed the capacity of a facility at the service level established in this plan. Level of service analysis will be undertaken by the planning staff during the review of each project for which development order approval is required. Monitoring System To effectively implement the concurrency requirement, it is necessary to maintain an estimate of available capacity for each public facility subject to level -of -service requirements. By maintaining an accurate and current available capacity estimate for each facility, projected demand from development applications can be compared to the available capacity for the facility to determine if the project can be approved. The purpose of the monitoring program is to maintain a current estimate of available capacity for each facility. The monitoring system portion of the concurrency management plan will be maintained by the planning department. Using personal computers and data base management software, records will be developed and maintained for each specific facility. The staff will identify the total capacity of each applicable facility based upon information in the specific element of the comprehensive plan. These data will then be entered into separate records in the total capacity field for data base files estab- lished for each public facility category. Capacity figures will be modified as facilities are expanded or as criteria specified in the availability of capacity section are met, thereby allowing a programmed expansion to be considered for capacity determination purposes. Through contact and interaction with line departments, the planning staff will ensure that capacity estimates are modi- fied as soon as facility characteristics are changed. 50.1 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:31 - OfficialDocuments:672, Attachment Id 0, Page 238 C CIE ELEMENT Table 13.20, Monitoring System Design, depicts the general struc- ture of the monitoring system data base file for each public facility category. This table shows that available capacity for each specific facility is a function of total capacity less existing demand and less committed demand. The demand section of this concurrency management plan identifies the methodology for assessing demand. To implement the monitoring system, the following actions will be necessary: Action .Identify all uncompleted pro- jects with valid development orders ,Estimate committed demand by specific facility for each project referenced above .Do quarterly traffic counts for thoroughfare plan roads to determine existing demand .Identify existing flows for each water & sewer treatment plant .Estimate landfill (active cell) volume used .Estimate population and apply park standard to determine park existing demand Responsibility Planning Dept. Planning Dept, Engineering Utilities Dept, Utilities Dept. 51 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:32 - OfficialDocuments:672, Attachment Id 0, Page 239 Planning Dept. Timing 1990 1990 Quarterly Quarterly Quarterly Quarterly CIE ELEMENT Action Responsibility Timing .Estimate existing flows for drainage conveyances Engineering Quarterly .Enter data received from other departments into computer Planning Dept. Ongoing .Add estimated demand for new projects to committed demand total upon issuance of D.O. Planning Dept. Ongoing ,Maintain records of units/ projects receiving CO's, maintain demand estimates from those units/projects, subtract estimated demand for those units/projects from committed demand once existing demand is updated Planning Dept. Ongoing Applicability The concurrency management plan monitoring system has applic- ability to more than just level -of -service measurement. It also provides the basis for assessing facility expansion needs and therefore capital improvements programming. By maintaining an accurate and up-to-date estimate of available capacity, the need for facility expansion can be recognized before all capacity is used and development must be restricted. By incorporating the monitoring system into the capital improvements programming process, capital budgets can be prepared based on reliable information.and valid estimates of need. 52 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:32 - OfficialDocuments:672, Attachment Id 0, Page 240 CIE ELEMENT TABLE 13.19 SERVICE LEVEL MEASURES Public Facility Specific Capacity Demand Geographic Category Facility Measure Measure Scope Traffic Roadway Volume of cars Peak Hour Affected accamodated Trips/Day roadways over time Sanitary Sewer Treatment Treatment design Generation Service Plant Capacity (GPD) Rate (GPD) Area Potable Water Treatment Treatment design Generation Service Plant Capacity (GPD) Rate (GPD) Area Solid Waste Landfill Volume in active Generation Entire cell (cubic yards) Rate(cubic County yards per person per year) Recreation Parks Acres of park land Acres of District ,parks per thousand population Drainage Drainage Volume of water Volume of Basin conveyances stormwater outfalling for design storm SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:32 - OfficialDocuments:672, Attachment Id 0, Page 241 53 CIE ELEMENT ItMy194 11"s Wit Rbl1c F�dLty `Ictal a sting Ondtbed AVaiLiblP cab3gay Facilities 4wity Daralrl Dail City naffic 4 'ly Oarlty volare Total c pdty- Peak hear/ ( cage) estimted (adsting dmra- pEak SMSOn- amtierly C= t fmn at}avW (oomutbed dena4 ICS Ox D (mak Saaqcn) DD's Sanitary %jer amtreYt plants Design flus 5dsting Plants %lure esti- metal cqmdty- nEexd fmn (edsting daTEnJ) - DD's (oauCatb-:d daituu I�+�le Tt natt plots 1 ign flus E�nstsrrg flLvs \bhm testi Zbtal C�tY- mted fmn (wstlr>g dsca�- ap n7ad DO's (armdtted did) Solid W3ste Actiw cell ktive cell Volare esti Total apedty- design city wlure til imted fmn (edstirrg del)- agrojed M's (armlitfidi c'fa7di z�+ P P8rk A=exe Aaps_p this- Acres per Zbtal ty- and pqulatim x tumid (adsting dffe4- E�ds! pqai-- pTilatim x (=imtted &a -d) pal for TXa>ad W's L�dinsge Dr-air�ge �b]ure Ikisti ng flags Volure of Total c,Epaity- crTTRy3ms sb3MOtpr (e dstirg dnET4- alla-Ed to (amiitbad dmiard) mall fix a1'L-oad DO's 54 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:33 - OffcialDocuments:672, Attachment Id 0, Page 242 CIE ELEMENT GOAL, OBJECTIVES S POLICIES GOAL Indian River County will have a Capital Improvements Program which manages the provision of services and facilities as identified in each element of the Comprehensive Plan in a fiscally prudent manner, and ensures that the levels of service set in each element are maintained, facilities and infrastructure improvements are provided concurrent with development, existing infrastructure is maintained, and balanced growth is attained. OBJECTIVE 1 Construction of Capital Facilities By 1990, the County shall have Capital Improvement systems which identify all existing and future needs and ensure the provision of facilities and services which meet these needs. POLICY 1.1: The county shall maintain a five year capital improvement program which is evaluated and updated annually. Nocapital improvements shall be undertaken by the county unless that improvement is included within this element's adopted five year capital improvements program. The Capital Improvements, Element will be reviewed annually. If any transportation facility identified in the Schedule of Capital Improvements is delayed in construction and this delay will cause the level of service to deteriorate below the adopted minimum level of service standard for the roadway, a Comprehensive Plan Amendment will be required to adjust the Schedule of Capital Improvements. POLICY 1.2: The county shall evaluate and prioritize its capital improvement projects based on following criteria. Those criteria are ranked in order of importance. 0 Preservation of the health and safety- of the public by eliminating public hazards; 0 Compliance with all mandates and prior commitments; 0 Elimination of existing deficiencies; 0 Maintenance of adopted level of service standards; 0 Provision of infrastructure concurrent with the impact of new development; Protection of prior infrastructure investments; Consistency with the county plan and plans of other agencies; 0 Accommodation of new development and redevelopment facility demands; 55 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:33 - OfficialDocuments:672, Attachment Id 0, Page 243 CIE ELEMENT ° Consistency with plans of state agencies and water management districts that provide public facilities within the local government's jurisdiction. Promotion of compact development by discouraging growth outside of urban service areas; 0 Demonstration of linkages between projected growth and facility location; ° Utilization of the economies of scale and timing of other improvements; ° Reduction of operating costs; ° Adjustment for unseen opportunities, ies, si uations, ani disasters. POLICY 1.3: The county shall implement the Potable Water, Sanitary Sewer, and Solid Waste Sub -Element recommendations as outlined-in-tfie appropriate sub -elements -of the -Comprehen- sive Plan. Since these are enterprise account funded elements, capital expenditures identified in these elements shall be funded principally from revenues derive from tie applicable systems. POLICY 1,4: The county shall prioritize and implement the programs identified in the Traffic Circulation, Recreation and Open Space, Drainage, Aquifer Recharge, Conservation, and Future Land Use Elements of the Comprehensive Plan. POLICY 1.5 The county shall not eliminate or reallocate budgeted appropriations for road improvement projects required to meet the adopted level of service standards unless the applicable projects will be constructed concurrently by other means. POLICY 1.6: The county shall continue to urge the State of Florida Department of Transportation to reallocate budgeted appropriations for state funded road improvements for over -capacity roads, and other traffic facilities. POLICY 1.7: The county shall continue to allocate funds for the replacement and the renewal of infrastructure in an amount which will minimize the operating costs of the infra- structure and maximize the life of the infrastructure. POLICY 1.8: The county shall upon the recommend atioTr-af-the established Indian River County Finance Advisory Committee explore various sources of revenue for funding capital improvement projects. 56 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:33 - OffcialDocuments:672, Attachment Id 0, Page 244 C CIE ELEMENT POLICY 1.9: The obligation debt service millage percent. county shall manage its in such a manner that the to the countywide millage long term general ratio of the debt does not exceed 20 POLICY 1.10: The county shall include all capital expendi- tures identified in elements of the Comprehensive Plan in excess of $25,000 in its 5 -year schedule of improvements. POLICY 1.11: The 5 -year schedule of improvements shall contain a mix of capital expenditures, including projects to eliminate existing deficiencies, upgrade and replace existing facilities and construct new facilities. .POLICY 1.12: The county shall establish- in its annual budget review for a capital improvements program, which requires each county department to include in its annual budget request applicable expenditures as identified in the capital improvements program of the appropriate Plan. .. el'-- __ the Comprehensivea POLICY 1.13: The county shall urge the State of Florida to provide new revenue sourced en revenue revenue sources for mandates and capital projects. OBJECTIVE 2 Development in High Hazard Coastal Areas BY 1990, the county will have eliminated all public expenditures that subsidize development in high hazard coastal areas. POLICY 2.1: The county shall make appropriations for infrastructure in coastal high hazard eas only to maintain existing infrastructure. POLICY 2.2: The county shall require that all developments and all single family units in high hazard coastal areas fully pay for the required infrastructure improvements through impact fees, developer dedications, assessments, and contributions. POLICY 2.3: The county shall not use public funds to subsi- dize increased density or intensity of urban development in high hazard coastal areas. However, public beach; shoreline access, resources restoration, or similar projects may be constructed. POLICY 2.4: The county shall ensure that replacement of infrastructure in high hazard coastal areas is at or below existing service capacity, except where such replacement will improve hurricane evacuation time, mitigate storm damage, or meet regulatory requirements. Recreation and open space improvements are exempt. SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:34 - OffcialDocuments:672, Attachment Id 0, Page 245 CIE ELEMENT POLICY 2.5: High hazard coastal areas are defined as land which is seaward of the Coastal Construction Control Line as. defined in Chapter 161 F.S., and land within the Federal Emergency Management Administration "V" Zone as displayed on National Flood Insurance Program Maps, Revised, November, 1987, or as may be subsequently revised. OBJECTIVE 3 Maintenance of Established Levels -of -Service By 1990, the county will have land development regulations which ensure that development permits are issued only if infrastructure is available to maintain adopted levels of service. POLICY 3.1: By 1990, the county shall revise its land development regulations to provide the basis for evaluating proposed developments and assessing whether the planned and existing infrastructure is sufficient to serve the proposed development. The basis for these regulations will be the concurrency management plan incorporated within this element. Besides—revising development_ regulations the- county will prepare the computer files and take the actions identified in the concurrency management plan section. POLICY 3.2: The county shall use general obligation Bonds and other sources to raise the funding required to provide those public facilities which cannot be constructed with user fees, revenue bonds, impact fees or other dedicated revenue sources. POLICY 3.3: The county shall approve development only in accordance with the connection matrix identified -in—thy Sanitary Sewer sub -element, Table 3.A.16, Pg. 71.1. POLICY 3.4: The county shall, concurrent with the impact of new development, provide the infrastructure necessary to maintain the level of service standards identified in the various elements of the Comprehensive Plan. Where development is proposed and is consistent with all applicable regulations but one or more public facilities is/are operating at an inadequate service level, the applicant may at his expense make facility improvements to increase facility capacity when such improvements are consistent with county plans and receive county approval. POLICY 3.5: The county hereby adopts the level of service standards for public facilities which are established in the other elements of the comprehensive pian and which are stated below: Drainage: The county hereby adopts standard for all new unincorporated county: SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:34 - OffcialDocuments:672, Attachment Id 0, Page 246 the following 1evel--o-f-service drainage systems within the New development requiring major CIE ELEMENT site plan approval or subdivision platting shall construct a complete drainage system to mitigate the impacts of a 25 year/24 hour design rainfall event using the Soil Conservation Service Type 2 modified rainfall curves. Post development runoff shall not exceed pre -development runoff unless maximum discharge rate has been adopted for applicable drainage basin and the discharge does not exceed that rate. If the maximum discharge rate has not been adopted for the applicable basin, post development discharge may not exceed pre -development discharge. ° All new roads constructed ink-nd-i-an—River County after September, 1990, shall meet the following design criteria. Local Road Protection Level of Service 3 year storm/24 hour duration - no flood encroachment outside existing easement and right-of-way limits; 10 year storm/24 hour duration - limited encroachment of stormwaters in front and rear yards; 25 year storm/24 hour duration - greater encroachmen of stormwaters in front and rear yards with no minor street flooding (21' maximum); 100 year storm/3 day duration - some street flooding, but no flooding of existing or proposed residences. ° By 2010, all existing roadways in the county shall be improved to meet the following level -of -service standard: 1. Minimum road crown elevation for existing roads shall be raised during resurfacing/rebuilding to the flood elevation resulting from the 2 year/24 hour storm event on local streets. 2. The center two lanes of rebuilt roads must be at or above flood levels resulting from a 10 year/24 hour storm event on Arterial and Collector roads, All drainage basins will meet the following level of service standards: By 1995 2-Year/24 Hour Storm Event By 2000 5-Year/24 Hour Storm Event By 2010 10-year/24 Hour Storm Event SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:34 - OffcialDocuments:672, Attachment Id 0, Page 247 CIF ELEMFNT The county hereby adopts the following water quality level -of -service standard; as a minimum, retention of the first 1" of rainfall is required prior to offsite discharge. An additional 50% treatment is required for all direct discharge into the Indian River Lagoon due to its designation as an outstanding Florida water, as required by Ch. 17-25.025(9), F.A.C. Potable Water: The level of service standards for the county's potable water facilities of 250 gallons per day (GPD) per equivalent residential unit (ERU), based on county Ordinance No. 84-18, are hereby adopted and shall be utilized for determining the availability of facility capacity and the demand generated by a development. Solid Waste: 0 The following level of service standards are hereby adopted for solid waste facilities in the county, and sha be usedas he basis—for~determining --- the availability of facility capacity and the demand generatey a development: Service Area Average Solid Waste Generation Rate s County -wide 6.5 pound per capita per day or - 2.37 cubicay rds per capita per year Sanitary Sewer: The level of service standards for the county's sanitary sewer facilities of 250 gallons per day (GPD) per equivalent residential unit (ERU), based on county ordinance 84-18, with a peak monthly flow factor of 1.25 are hereby adopted and shall be utilized for determining the availability of facility capacity and the demand generated by a development. Recreation & Open Space: The county hereby adopts recreation levels -of -service as follows: Urban district parks, specialty parks (beach), and specialty parks (river) are considered countywide parks. The following levels -of -service are applicable countywide. SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:35 - OffcialDocuments:672, Attachment Id 0, Page 248 CIE ELEMENT p Acres per _1.000 Population Urban District 5 Specialty (Beach) 1.5 Specialty (River) 1,5 * Community park levels -of -service are hereby set separately for the north and south districts. For the south district, two levels -of -service are set, one for the period from 1989 to 1995 and the other from 1996-2010. District Park Type Acres per 1000 Population North Community 3 South Community 1.25(1989-1995) South Community 3 (_1996-2010) Traffic Circulation: The county hereby adopts traffic circulation level of service standards, These standards are .as follows. Level of service "C" shall be maintained .for rural principal arterials and rural freeways during peak hour, peak season, peak—d-irection conditions— During peak hour, peak season, peak direction conditions, level of service "D" or better shall be maintained on all other freeway, arterial and coroadways. OBJECTIVE 4 Future Development's Share of Capital Costs The county will have a Capital Improvements program which ensures that future developments bear a proportionate share of the cost of providing the infrastructure required to maintain adopted levels of service standards. POLICY 4.1: The county shall pay for infrastructure improvements and services needed to satisfy future needs while maintaining adopted levels of service through impact fees, development dedication, and developer contribution. POLICY 4.2: The county shall upon the recommendation of the established Indian River County Finance Advisory Committee explore various sources of revenue for funding capital improvement projects. POLICY 4.3: The county shall study if feasible, implement new funding mechanisms such as the establishment of a stormwater utility district, creation of countywide recreation district, development of a recreation impact fee, and establishment of other appropriate funding sources as identified in the various elements of the Comprehensive Plan= SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:35 - OffcialDocuments:672, Attachment Id 0, Page 249 CIE ELEMENT POLICY 4.4: The county will continue to impleme existing roadway, water and sewer impact fee ordinance OBJECTIVE 5 Local Government's Ability to Provide Required Services and Facilities The county will have a capacity monitoring system for all improvements and facilities identified in the various elements of the Comprehensive Plan in order to ensure that the county can adequately plan for necessary facility improvements. POLICY 5;1: Land use decisions in the county shall be made based on the planned availability of facilities to maintain adopted levels of service. POLICY 5.2: The county shall not approve land use change requests unless adequate infrastructure to support the area exists or is programmed. POLICY 5.3:—In—the—event that the planned capacity of public facilities is insufficient to serve all applicants for development orders, the county shall schedule capital improvements to serve developments 3n the—following ord€�-"f--- priority. °Development orders approved prior toa onion of ttrzS plan orSingle-family units in existing Platted subdivisions in existing legal, buildable parceld ° New orders permitting redevelopment ° New orders permitting new developments where the applicant funds the infrastructure expansion in exchange for flif-Iira reimbursement New orders permitting new developments without developer participation POLICY 5.4: The county shall utilize the following priority for extension of facilities and services: To serve areas within the existing Urban Service Areas To serve and support the staged development of Urban Service Areas POLICY 5.5: The county shall coordinate with other local, state, and federal agencies as well as private entities to create an efficient capital improvements schedule which provides the following general benefits while minimizing the financial burden of providing facilities and services. 61.1 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:36 - OffcialDocuments:672, Attachment Id 0, Page 250 CIE ELEMENT Reduction of overall capital and operating expenditures by the development of multi -use facilities; more effi- cient land use patterns and phasing; 0 Reduction of overlapping, duplicating services and administrative procedures; Implementation of adopted physical, social and economic goals and policies in a least -cost manner; 0 Better coordination of public capital investment with private capital expenditures. POLICY 5.6: The county shall continue utilizing enterprise funds for the provision of the Sanitary Sewer, Potable Water, and Solid Waste facilities. The debt for enterprise funds is to be paid by user fees and other appropriate sources. POLICY 5.7: The county shall finance the capital cost of non -emprise fund --supported public- faci-lrties—die-goads stormwater management, and parks) from current revenue, equity or debt_, bond issues, impact fees, assessments and other appropriate sources. pLI J--". :-Prll development orders issued by-thie county which require public facilities that will be financed by debt shall be conditioned on the issuance of the debt or the substi- tution of a comparable amount of non -debt revenue. POLICY 5.9: Pursuant to section 163.3187, Florida Statutes, the schedule of Capital Improvements may be amended two times during any calendar year and as necessary for emergencies, developments of regional impacts_, and certain small scale development activities. POLICY 5.10: The mandatory semi-annual report to the Depart- ment of Community Affairs concerning amendments to the Comprehensive Plan due to emergencies, developments of regional impact, and selected small developments shall identify any changes to adopted goals, objectives, or policies in the Capital Improvements Element. POLICY 5.11: Pursuant to Section 163.3177, Florida Statues, the Schedule of Capital Improvements may be adjusted by ordinance and not deemed to be amendments to the compre- hensive Plan when such amendments relate to corrections, updates, and modifications concerning costs; revenue sources; acceptance of facilities pursuant to dedications which are consistent with the plan;. or the date of construction of any facility except transportation facilities enumerated in the Schedule of Capital Improvements; for transportation facilities a delay in construction of --,the facility which causes the level of service standard to deteriorate below the �.. adopted minimum level of service for the roadway will require a comprehensive plan amendment. SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:36 - OffcialDocuments:672, Attachment Id 0, Page 251 CIE ELEMENT POLICY 5.12: The county shall ensure that all capital improvements programs identified in various elements of the Comprehensive Plan are completed according to schedule. The only acceptable delays will be those which are subject to one of the following: Projects providing capacity equal to, or greater than, the delayed project are accelerated within, or added to the Schedule of Capital Improvements, in order to provide capacity of public facilities in the fiscal year at least equal to the capacity scheduled prior to the act which delayed the subject project. Modification of development orders issued conditionally or subject to the concurrent availability of public facility capacity provided by the delayed project. Such modification shall restrict the allowable amount and schedule of development to that which can be served by the capacity of public facilities according to the revised schedule. 0 Amendment of the plan to reduce the adopted standard for the Level of Service for public facilities until the fiscal year in which the delayed project is scheduled to be completed. 61.3 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:36 - OfficialDocuments:672, Attachment Id 0, Page 252 CIE ELEMENT PLAN IMPLEMENTATION An an important art of plan is its implementation, P P Y Implementation involves execution of the plan's policies. It involves taking actions and achieving results. For the Capital Improvements Element, implementation involves various activities. While some of these actions will be ongoing, others are activities that will be taken by certain points in time. For each policy in this element, Table 13.21 identifies the type of action required, the responsible entity for taking the action, the timing, and whether or not the policy necessitates a capital expenditure. To implement the Capital Improvements Element, several different types of actions must be taken. These include: development of mechanisms for funding new facilities, adoption of land development regulations and ordinances, execution of interlocal agreements, coordination, and preparation of studies and evaluation and monitoring reports, Overall Capital Improvements Element implementation responsibility will rest with the Office of Management and Budget. Besides its responsibilities as identified in Table 13.21, the planning department has the additional responsibility of ensuring that other entities discharge their responsibilities. This will entail notifying other applicable departments of capital expenditures to be included in their budgets, notifying other departments and groups of actions that must be taken, and assisting other departments and agencies in their plan implementation responsibilities. As part of the Capital Improvements Element, the county has developed a Concurrency Management Plan which ensures the main- tenance of the adopted level -of -service standards. Through the Concurrency Management Plan, the County will measure facility capacity, assess development demand, and maintain a Capital Improvements Program which ensures that the level -of -service standards are maintained. EVALUATION & MONITORING PROCEDURES To be effective, a plan must not only provide a means for implementation; it must also provide a mechanism for assessing the plan's effectiveness. Generally, a plan's effectiveness can be judged by the degree to which the plan's objectives have been met. Since objectives are structured, as much as possible, to be measurable and to have specific timeframes, the plan's objectives are the benchmarks used as a basis to evaluate the plan. Table 13.22 identifies each of the objectives of the Capital Improvements Element. It also identifies the measures to be used to evaluate progress in achieving these objectives. Most of these measures .are quantitative, such as adopting land development 62 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:37 - OfficialDocuments:672, Attachment Id 0, Page 253 CIE ELEMENT requirements which ensure the maintenance of the level -of -service standards, adopting a capacity monitoring system and others. Besides the measures, Table 13.22 also identifies timeframes associated with meeting the objectives. The Planning Department staff will be responsible for monitoring and evaluating the Capital Improvement Element. This will involve collection of data and compilation of information regarding facility capacity, expansion, and new development permitted. This will be done on a regular basis. As part of the county's Concurrency Management System, the Planning Department will continually monitor the facility capacity to ensure that level -of -service standards will be maintained. While monitoring will occur on -a continual basis, formal evaluation of the Capital Improvements Element will occur annually. The formal evaluation and appraisal of the entire Comprehensive Plan will occur every five years. Besides assessing progress, the evaluation and appraisal process will also be used to determine whethertTie Capital—Improvements Element—objectives should be modified or expanded. In this way, the monitoring and evaluation o -f the_ Capital.�ovem_ents Element will not only provide a means of determining the degree of success of the plan's implementation; it will also provide a mechanism for evaluating needed changes to--the-plan, element. 0 Procedures for Monitoring & Evaluation of the Entire Indian River County Plan As discussed in the above paragraphs, the evaluation and monitoring procedures identified for the capital improvements element are basically the same for the entire comprehensive plan. These procedures will be used by the county to prepare the formal Five -Year Evaluation and Appraisal Reports. Included in those procedures are all the format requirements listed in 9J -5.005- (1)(a) -(f), F.A.C. The monitoring and evaluation of this plan is critical to ensure that the policies are effective in achieving the plan's goals and objectives. Each individual element of the plan contains provisions and measures to be used in the review of the element. Each element contains an Implementation and Evaluation Matrix and Monitoring Procedures which will be used to prepare the Five -Year Evaluation and Appraisal Reports. In addition, a great portion of the plan monitoring will be in conjunction with the concurrency management system which is designed to ensure that approved levels of service are maintained and that sufficient capacity exists in the various services and facilities. Other evaluation of the plan or plan elements is likely to occur in the day to day application of the mandated regulations, which will result in plan amendments. i SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:37 - OffcialDocuments:672, Attachment Id 0, Page 254 CIE ELEMENT The formal Evaluation and Appraisal report required by law will provide a complete review of the plan and be conducted in compliance with the public participation procedures adopted for the development of this plan. As part of the monitoring system, all appropriate baseline data will be updated. Besides assessing progress, the evaluation and appraisal process will also be used to determine whether the objectives should be. modified or expanded. In this way the monitoring and evaluation of the elements of the plan will not only provide a means of determining the degree of success of the plan's implementation; it will also provide a mechanism for evlauating needed changes to the plan element. SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:38 - OffcialDocuments:672, Attachment Id 0, Page 255 CIE ELEMENT TABLE 13.21 CAPITAL IMPPRO00T ELEMENT IMPLIIMENTATION MATRIX POLICY # TYPE OF ACTION RESPONSIBILITY TIMING CAPITAL EXPEND. 1.1 Maintenance of CIP Office of Management and 1990-1995 No Budget (OMB)/Planning Dept. 1.2 Prioritization Planning Dept./OMB Ongoing No 1.3 Facility or Service Appropriate County 1990-1995 Yes Provision Departments 1.4 Facility or Service Appropriate County 1990-1995 Yes Provision Departments 1.5 Maintenance of BCC/Public Works Dept. Ongoing No Previous Commitments 1.6 Coordination BCC/FDOT Ongoing No 1.7 Replacement and Appropriate County Ongoing Yes Renewal of Infra- Departments structure 1.8 Utilizing Bond BCC/Appropriate County Ongoing No Funding Departments 1.9 Budget Management BCC/OMB Ongoing No 1.10 Capital Budget BCC/OMB Ongoing No Management 1.11 Capital Budget BCC/OMB Ongoing No Management 1.12 Capital Improvements BCC/OMB Ongoing No Management 1.13 Encourage Implement- BOC/State Ongoing No - ation 2,1 Budget Management Appropriate County Ongoing No Departments 2.2 Funding Mechanism BCC/Private Developers Ongoing No 2.3 Budget Management BCC/Appropriate County Ongoing No Departments 2.4 Infrastructure BCC/Appropriate County Ongoing No Replacement Strategy Departments 64 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:38 - OfficialDocuments:672, Attachment Id 0, Page 256 CIE ELEMENT TABLE 13.21 cont... POLICY # TYPE OF ACTION RESPONSIBILITY TIMING CAPITAL EXPEND. 2.5 Coastal Areas Appropriate County, State, Ongoing No Identification and Federal Agencies 3.1 Land Development BCC/Planning Dept. 1991 No Regulation 3.2 Funding Mechanism BCC/OMB Ongoing 3.3 Land Development BCC/Planning Dept. 1991 Regulations 3.4 Concurrency Management BCC/Appropriate County Ongoing Departments 3.5 Concurrency Mangenent BCC/Appropriate County Ongoing Departments 4.1 Funding Mechanism BCC/OMB Ongoing 4.2 Funding Mechanism BCC/OMB Ongoing 4.3 Feasibility Study BCC/Appropriate County 1992 Departments 4.4 Continued Enforcement BCC/Utilities/Planning Ongoing 5.1 —Concurrency Management Appropriate County Ongoing Departments 5.2 Concurrency Management BCC/Planning Dept. Ongoing 5-3 Prioritization Planning Dept./OMB ongoing 5.4 Prioritization Planning Dept./OMB Ongoing 5.5 Coordination BCC/Local, State, and Ongoing Federal Agencies 5.6 Funding Mechanism BCC/Utilities Dept. Ongoing 5.7 Funding Mechanism BCC/Appropriate County Ongoing Departments 5.8 Permitting BCC/OMB/Appropriate Ongoing Requirements County Departments 5.9 CIP Amendment BCC/OMB Ongoing Pequirements SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:38 - OffcialDocuments:672, Attachment Id 0, Page 257 No No No No No No No No No No No No No NO No CIE ELEMENT TABLE 13.21 cont... POLICY # TYPE OF ACTION RESPONSIBILITY TIMING CAPITAL. EXPEND. 5.10 Plan Amenckent BCC/Planning Dept./ Ongoing No Requirements DCA 5.11 CIP Amendment Requirements 5.12 CIP Amendment Requirements SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:39 - OfficialDocuments:672, Attachment I( BOC/OMB Ongoing No BOC/Appropriate County Ongoing No Depar ents CIE ELEMENT TABLE 13.22 CAPITAL IMPROVEMENT ELEMENT EVALUATION MATRIX OBJECTIVE # MEASURE TIMEFRAME 1 Existence of Adopted Capital- 1990 Improvements Program 2 Existence of Adopted CIP 1990 3 Existence of Adopted Land Development 1991 Regulations 4 Existence of Adopted Land Development 1991 Regulations 5 Existence of Adopted Monitoring System 1991 67 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:39 - OfficialDocuments:672, Attachment Id 0, Page 259 CIE ELEMENT TABLE 13.23 ff INDIAN RIVER COUNTY (l 5 -YEAR SCHEDULE OF IMPROVEMENTS FISCAL YEARS 1990-91 to 1994-95 ($ Millions) PROJECT DESCRIPTION FISCAL PRQTE('TED REVENUE EXISTING CONSISTENCY YEAR COST SOURCE DEFICIENCY WITH OTHER 6. Roseland Watershed 1990-91 ($ MILLION) (% SHARE) ELEMENTS DRAINAGE FACILITIES 1990-91 1, Drainage Improvements 1990-91 .150 (T) Yes to SR AlA/17th St. 1990-91 .150 2. Drainage Improvements 1990-91 .100 (T) Yes to CR 510/SR AlA inter- 1990-91 .160 section 1991-92 .160 3. Channel "H" construction; 1990-91 .050 (R=80% Yes 4th St. & 8th St, drainage ,160 U=20a) culverts deteriorate improvments .160 (T=25% Yes 4. Indian River Blvd. Ph III; 1990-91 .150 �.. Purchase impoundment #22; 1991-92 .150 (T) Yes Stormwater Treatment .060 improvements - 15" to 36" 5. Indian River Blvd. 1990-91 .250 drainage pipes to serve Drainage Swales 1991-92 .250 existing development 68 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:39 - OfficialDocuments:672, Attachment Id 0, Page 260 1992-93 .250 1993-94 .250 (T) Yes 6. Roseland Watershed 1990-91 .150 (U) Yes Improvements -Swale betterment 7. Vero Lake Estates 1990-91 .150 drainage improvements 1991-92 .150 (A) Yes 8. Upgrade to recommended 1990-91 .160 sizes all bridges & 1991-92 .160 culverts within the IPYvCD 1992-93 .160 Canal system as existing 1993-94 ,160 culverts deteriorate 1994-95 .160 (T=25% Yes R=25% U=50%) 9. Secondary drainage 1990-91 .060 improvements - 15" to 36" 1991-92 .060 drainage pipes to serve 1992-93 .060 existing development 1993-94 .060 (U=33% 1994-95 .060 A=67%) Yes 68 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:39 - OfficialDocuments:672, Attachment Id 0, Page 260 CIE ELEMENT TABLE 13.23 (CON'T) INDIAN RIVER COUNTY' 5 -YEAR SCHEDULE OF IMPROVEMENTS FISCAL YEARS 1990-91 to 1994-95 ($ Millions) PRaTEC'T DESCRIPTION FISCAL PRO3ECTED REVENUE EXISTING CONSISTENCY YEAR COST SOURCE DEFICIENCY WITH OTHER ($ MILLION) (% SHARE) ELEMENTS SANITARY SEWER FACILITIES CON'T... 4. 1,0 MGD expansion of 1991-92 2.470 (I=5% Yes north sub -regional B=95%) facility 5. 1.0 MGD of percolation 1991-92 .750 (I=16% Yes pond at north sub -reg- B--84%) ional facility 6. 1.8 MGD of reuse at cen- 1991-92 1.500 (I=8% Yes tral sub -regional facility B=92%) TOTAL SANITARY SEWER $21.370 SOLID WASTE FACILITIES 1. Purchase of 'Segment V 1990-91 .680 (C=50% Yes S=50%) 2. Land & Equipnent Pur- 1991-92 .500 chases 1994-95 .500 (C=50% Yes S=50%) 3. Construction of Segment 1992-93 3.380 (C=50% Yes III includes .500 S=50%) 4. Closure of Segment II 1993-94 2.376 (C=50% Yes S=50%) TOTAL SOLID WASTE $7.436 POTABLE WATER FACILITIES 1. Pipe replacement & fire 1990-91 .800 (I=20% Yes hydrant installation B=80%) 2. Distribution system im- 1990-91 9.354 (I=2% Yes provements B=98%) 3. Construct Ph.I-Hobart 1990-91 17.671 (I=0.93% Yes RO Plant & Wellfield B=99.07%) 70 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:40 - OfficialDocuments:672, Attachment Id 0, Page 261 CIE ELEMENT TABLE 13.23 (CON'T) INDIAN RIVER COUNTY 5 -YEAR SCHEDULE OF IMPROMENTS FISCAL YEARS 1990-91 to 1994-95 ($ Millions) PRQ7DCT DESCRIPTION FISCAL YEAR PROTECTED COST ($ MILLION) REVENUE SOURCE (% SHARE) EXISTING CONSISTENCY DEFICIENCY WITH OTHER ELEMENTS DRAINAGE FACILITIES CON'T... 1994-95 .325 (T) Yes 10. Drainage Improvements 1991-92 .050 (A) Yes to Treasure Shores Park/ 1994-95 .050 (P=70% Yes AlA $5.450 T=30%) 11. 41st St, drainage im- 1991-92 .100 provements 1992-93 .100 (T) Yes 12. 45th St, drainage im- 1991-92 .150 provements 1992-93 .150 (T) Yes 13. 53rd St, drainage 1991-92 .150 (I=7% Yes improvements 1992-93 .150 (T) Yes 14. C.R. 512 drainage im- 1991-92 .325 provements 1992-93 .325 69 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:40 - OfficialDocuments:672, Attachment Id 0, Page 262 1993-94 .325 1994-95 .325 (T) Yes 15. Ditch "D" Channel im- 1991-92 .100 (A) Yes provements TOTAL DRAINAGE $5.450 SANITARY SEWER FACILITIES 1. 1.3 mgd purchase of 1990-91 4.940 (I=3% Yes south sub -regional fac- ility 2. 1.3 mgd of percolation 1990-91 2.250 (I=7% Yes pond at south sub -reg- B=93%) ional facility 3. Wastewater force mains & 1990-91 1.892 wastewater pumping stat- 1991-92 1.892 ions 1992-93 1.892 1993-94 1.892 1994-95 1.892 (I=18% Yes B=82%) 69 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:40 - OfficialDocuments:672, Attachment Id 0, Page 262 CIE ELEMENT TABLE 13.23 (CON'T) INDIAN RIVER COUNTY 5 -YEAR SCHEDULE OF IMPROVDMS FISCAL YEARS 1990-91 to 1994-95 ($ Millions) PROJECT DESCRIPTION FISCAL PROJECTED REVENUE EXISTING CONSISTENCY .750 YEAR COST SOURCE DEFICIENCY WITH CIPHER V=53%) 2. North Beach Complex Ph.I- ($ MILLION) (% SHARE) ELEMENTS POTABLE WATER FACILITIES CON'T... 4. Pipe in Indian River 1991-92 2.056 (I=24% Yes Blvd. B=76o) 1990-91 5. Pipe in Kings Hwy. from 1992-93 1.773 (I=28% Yes Hobart WTP to Giford area ball field, etc.) B=72$) 6. Pipe in U.S. #1 from 1993-94 6.528 (I=3% Yes Hobart WTP to Roseland 8=97%) area 7. Construct 0.75 MG Rose- 1993-94 .650 (I=25% Yes land elevated tank B=75%) 8. Convert permeators to low 1993-94 .660 (I=25% Yes pressure - South Co. R.0 B=75%) plant TOTAL POTABLE WATER $39.492 RECREATION & OPEN SPACE FACILITIES 1. South county park ac- 1990-91 .750 (L=47% Yes quisition V=53%) 2. North Beach Complex Ph.I- 1990-91 .050 (L) Yes park development (parking, restrooms, dune walkover, etc.) 3. South county park Ph.I 1990-91 .220 (L) Yes (softball fields, foot- ball field, etc.) 4. Jungle Trail site acqu- 1991-92 .090 (L) Yes isition & Development (parking) 71 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:40 - OfficialDocuments:672, Attachment Id 0, Page 263 CIE ELEMENT 72 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:40 - OfficialDocuments:672, Attachment Id 0, Page 264 TABLE 13.23 (CON'T) INDIAN RIVER COUNTY 5 -YEAR SCHEDULE OF IMPRWIIENTS FISCAL YEARS 1990-91 to 1994-95 ($ Millions) EXISTING CONSISTENCY PROTECT DESCRIPTION FISCAL PROJECTED REVENUE YEAR COST SOURCE DEFICIENCY WITH OTHER ($ MILLION) (% SHARE) ELEMENTS RECREATION & OPEN SPACE CON'T... 5. Jungle Trail Site 1991-92 .040 (L) Yes Requisition (river access) 6. Kiwanis-Hobart Park Ph.I 1992-93 .105 (L) Yes (tennis courts, lighted ballfield, parking, bleachers) 7. Gifford Park Ph. I (ten- 1992-93 .027 (L) Yes nis court improvements, press box, etc.) ' 6. Number II corporation 1993-94 .020 (L) Yes property (parking, dune walkover) 9. West Wabasso Park Ph. I 1993-94 .035 (L) Yes (Ball field, restroans, playground equipment) 10. Dale Wimbrow/Donald 1994-95 .200 (L) Yes McDonald Park Ph. I (parking lot, con- cession building, landscaping) 11. Oslo Landfill site 1994-95 .030 (L) Yes (jogging path, ball field, parking, etc.) 12. S. Barrier Is. Beach Acc. 1993-94 .500 (L) Yes TOTAL RECREATION $2.067 72 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:40 - OfficialDocuments:672, Attachment Id 0, Page 264 CIE ELEMENT C TABLE 13.23 (CON'T) INDIAN RIVER COUNTY 5 -YEAR SCHEDULE OF FISCAL YEARS 1990-91 to 1994-95 ($ Millions) PROTECT DESCRIPTION FISCAL PROTECTED REVENUE EXISTING CONSISTENCY YEAR COST SOURCE DEFICIENCY WITH OTHER ($ MILLION) ($ SHARE) ELEMEN'T'S OONSERVATION/AQUIFER 00N'T... CONSERVATION/AQUIFER RECHARGE FACILITIES 1. Land purchase of Xeric 1990-91 2.000 Scrub (Sandpine) 1991-92 1.000 (G) Yes vegetative camtunity 2. Land purchase coastal/ 1991-92 1.000 tropical ha =ks 1993-94 1.000 (G) Yes 3. Land purchase of coastal 1992-93 1.000 (G) Yes strand vegetative camiunities 4. Purchase of additional 1994-95 1.000 (G) Yes land (i.e. mitigation banking site(s)) TOTAL CONSERVATION $7.000 OTHER PUBLIC FACILITIES 1. Health Care Facility 1990-91 2.051 2. Jail Phase III 1990-91 2.039 3. Court Facilities 1990-91 2.020 1991-92 1.806 1992-93 4.674 1993-94 2.730 4. Library (main & N. Branch) 1990-91 7.300 Fire Stations TOTAL O'T'HER 1994-95 .650 $23.270 73 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:41 - OfficialDocuments:672, Attachment Id, 0, Page 265 (L) (G=80% V=14% N=6%) (F) Yes Yes Yes Yes Yes CIE ELEMENT TABLE 13.23 (CON'T) INDIAN RIVER COUNTY 5 -YEAR SCHEDULE OF IM1TOVETEM FISCAL YEARS 1990-91 to 1994-95 ($ Millions) PROJD(,T DESCRIPTION FISCAL PROTECTED REVENUE EXISTING CONSISTENCY YEAR COST SOURCE DEFICIENCY WITH OTHER ($ MILLION) (% SHARE) ELEMDM TRAFFIC CIRCULATION FACILITIES 1. C.R. 512 (Roseland Rd. 1994-95 6.000 (L=64% to U.S. #1) widening to D=26% 4lanes J=10%) No Yes 2. Indian River Blvd. (S.R. 1992-93 10.000 (L=55% No Yes 60 to 53rd St.) widening D=25% 4 lanes J=10%) 3. Oslo Road (Old Dixie 1993-94 .792 (L=50% No Yes Hwy. to U.S. #1) widening D=40% j to 4 lanes J=10%) \.. 4. Old Dixie Hwy. 1993-94 3.267 (L=50% No Yes (SR 60 to 4th St.) D=40% widening to 4 lanes J=10%) 5. 66th Avenue (N. of C.R. 1990-91 .040 (D) No Yes 510-1/2 mile) sidewalks 6. Old Dixie Hwy. (sidewalks) (S. of 17th St.-S.W. 1/4 1990-91 .074 mile) (17th St. S.W. to 1st St. 1992-93 .703 S.W.) (1st St. S.W. to S.R. 60) 1993-94 .703 (D) No Yes 7. 4th St. (bikepath) (Old 1991-92 .298 (D) No Yes Dixie to 43rd Ave) 8. Highland Dr. (23rd St. SW) .075 (L) No Yes at U.S. #1 intersection improvement 9. Highland Dr. (23rd St. SW) .075 (L) No Yes at Old Dixie Hwy intersection improvement 74 SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:41 - OfficialDocuments:672, Attachment Id 0, Page 266 CIE ELEMENT TABLE 13,23 (CON'T) INDIAN RIVER COUNTY 5 -YEAR SCHEDULE OF IMPRWEMaM FISCAL YEARS 1990-91 to 1994-95 ($ Millions) pgp= DESCRIPTION FISCAL pRQTFX'I'ED REVENUE EXISTING CONSISTENCY YEAR COST SOURCE DEFICIENCY WITH OTHER ($ MILLION) (% SHARE) EIEKDTTS TRAFFIC CIRCULATION CCN'T... 10. 66th Ave. (57th St. 1992-93 .850 (L=5O% No Yes to 8th St.) Right -of- J=50%) Way Acquisition 11. 26th St. (43rd Ave to 1994- 1.000 (L) No Yes 82nd Ave..) Right -of -Way 1995 Acquisition 12. 41st St. (IRB to 58th 1994- 1.000 (L) No Yes Ave.) Right -of -Way 1995 Acquisition No Yes 13. 45th St. (IRB to 58th 1994- .600 (L) Ave.) Right -of -Way 1995 Acquisition 14. S.R. 60 (ICWW to I.R.B.) 1992- 13.000 State(100%) Yes Yes Merrill Barber Bridge 1993 1993- 1994 I5. S.R. 60 (IRB to 20th 1992- 3.243 State (10O%) No Yes Ave.) I-way pairs 1993 15. S.R. A -1-A (S.R. 60 1994- .500 (VB = 100% No Yes to 17th St.) 1995 State ?) 17. S.R. A -1-A (17th St. to 1994- 1.500 (VB = 97% No Yes S. VB line) 1995 = 3% State = ?) TOTAL TRAFFIC $25.477 (County only) SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:42 - OfficialDocuments:672, Attachment Id 0, Page 267 EP':ENT Notes for revenue sources: (A) Special Assessments/MSTU (T) Transportation T,prLoveie;,t Revenue (P) Park Improvement Revenue (R) Road & Bridge Dept. Funds/MSTU (U) Stormwater Utility Charges (I) Tact Fees (B) Revenue Bonds (C) User Charges (S) Assessments (V) Ad Valorem Tax (L) 1C Local option Sales Tax (G),General obligation Bonds (N) Grant (F) Fire District Millage Increase (D) Gas Taxes (J) Traffic Impact Fees (VB) City of Vero Beach �r SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:23:44 - OffcialDocuments:672, Attachment Id 0, Page 268