RESOLUTION NO. 99-34
A, RESOLUTION OF INDIAN RIVER COUNTY CERTIFYING
"AS -BUILT" COSTS FOR CERTAIN PAVING AND DRAINAGE
IMPROVEMENTS TO Airport Drive adjacent to Collier
Club in Sebastian, Florida in Roseland Gardens
Subdivision. DESIGNATED AS PROJECT NO. 9811, AND
OTHER CONSTRUCTION NECESSITATED BY SUCH PROJECT;
PROVIDING FOR FORMAL COMPLETION DATE, AND DATE FOR
PAYMENT WITHOUT PENALTY AND INTEREST.
WHEREAS, the Board of County Commissioners of Indian
River County determined that the improvements described herein
specially benefited the property located within the boundaries as
described in this title, designated as Project No. 9811, are in
the public interest and promote the public welfare of the county;
and
WHEREAS, on December 1, 1998, the Board held a public
hearing in the Commission Chambers at which time the owners of
the property to be assessed were afforded an opportunity to
appear before the Board to be heard as to the propriety and
advisability of making such improvements; and
WHEREAS, after such public hearing was held the County
Commission adopted Resolution No. 98-134, which confirmed the
specianassessment cost of the project to the property specially
benefited by the project in the amounts listed in an attachment
to that resolution; and
WHEREAS, the Director of Public Works has certified the
actual "as -built" cost now that the project has been completed is
$14.37 per front foot, which is less than $14.62 per front foot
in the confirming Resolution No. 98-134,
NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY
COMMISSIONERS OF INDIAN RIVER COUNTY, FLORIDA, that:
1. Resolution No. 98-134 is modified as follows: The
completion date for Project No. 9811 is declared to be March 4,
1999, and the last day that payment may be made avoiding interest
and penalty charges is ninety (90) days after passage of this
resolution.
2. Payments bearing interest at the rate of 73/4% per
annum may be made in two equal installments, the first to be made
twelve (12) months from the
1
ii
I.
0
1
ii
u
No. 99- 34
due date and the subsequent payments to be due yearly from the
due date. The due date is the date of passage of this
resolution.
3. The assessment roll for said project listed in
Resolution No. 98-138 shall be as set forth in attached Exhibit
"A" to this resolution.
4. The assessments as shown in attached Exhibit "A" shall
stand confirmed and remain legal, valid, and binding first liens
against the property against which such assessments are made
until paid.
5. The assessments shown in Exhibit "A", attached to
Resolution No.98-138 were recorded by the County on the public
records of Indian River County, and the lien shall constitute
prima facie evidence of its validity.
This resolution was moved for adoption by Commissioner
Adams and the motion was seconded by
Commissioner Ginn and, upon being put
to a vote, the vote was as follows:
Chairman Kenneth R. Macht
Vice -Chairman Fran B. Adams
Commissioner_1 John W. Tippin
Commissioner Caroline D. Ginn
Commissioner Ruth Stanbridge
Aye
Aye
Aye
Aye
Aye
The Chairman thereupon declared the resolution duly
passed and adopted this 6
1999.
Attest:
b
day of April
BOARD O COUNTY COMMISSIONERS
OF IAN RV R .CRUNTY, FLORIDA
By 44.411
enneth R. 'Nlaclit
Chairman
JEFFREYK. B1jRTON,
Clerk ,
Attabhinent: Exhibi
asbuilt.res
2
rl,nii9rr,•FilMer.Counr'
/tow ok._of
_"S
lOald
LAQ trabon r
':Ris.�--.-....wc ..T .,-recut r
�,,
gij
�h ./
..
49
-99
0
0)
0)
FINAL COST FOR:
AIRPORT DRIVE ADJACENT TO COLLIER CLUB IN SEBASTIAN, FL
DATE: March 4, 1999
PROJECT NO. 9811
TOTAL R.F.
TOTAL L.F.
1,427.97
1,484.00
FINAL COST
CONSTRUCTION
Grading $7,791.00
Coquina $13,152.21
Asphalt $7,576.65
Driveway Restoration $567.20
Sod $131.19
Clearing $1734.00
TOTAL CONSTRUCTION COSTS: $32,452.25 $32,452.25
PERMIT FEES $350.00
ROW ACQUISITION & N/A N/A
TITLE SEARCH FEES
ENGINEERING & SURVEYING; 5.900,00
TOTAL $38,702.25
50% Developer Assessment
50% Property Owner's Assessment
Recording Foes
Collection Fee 2.006446%
Administration Fee 3%
•
TOTAL ASSESSMENT
ASSESSMENT _ $20,519,93 = $14.37
1,427.97 IT
$19,351.12
$19,351.13
$200.00
$388.27
$580.53
520,519.93
9811 FIN. WK4 03/29/99
l
wcp
Co
111
P O E- g t" g
P � 4. n R.
�.
WS N p N a P
ft. so
N O
8 8
0
0 O
NJ o rn -Z-]
En tig VI
A A A
w w w
J J J
F» vs
4-4
N N
A A
A A
O O
V)
to) EA b9 n1 N
cA O
y�
'0 N N n CSI —to) V. A
9' A A lTT]] N
A sD v
NJ O O -'I --3 -4 W J
H
Q
z z , y a
v)
tv 7t 4
• <
tmi
HH z
r
y®>
~ tea
RD
n~
dry
to 0
• 4
o c�
0
0
01
0)
O
0.00 N0.gt 7
tJ .- _
Z
,Z
t,/O t
• —
O —
n w
0. W
N
gw
tn
nO
ao
co 8
00_
0
y.A
tJ
n
g 00
oo
Gyc')+
o3 8
Q
a�
O
cob
8
tJ
O
o 0
o 00 00
-n
0
O 'T1
>• 0
rn
EA En EA En
A A A A A A
W W w w w
-4 J J -4 J J
n
0
w
M
n-�
00
CAO
-o0
roy
rn
"tl
m
0
7 �-yy
•
o
zrrJ^D
V/
• M
z
• pzj
O ).-1
tl21
• o
(ewe r
• l l
Utcn
z
an d
• 0�
a
z��
A� l+J
n• ri
ray
W 0
azo
b • t
O ci,
ttil "3
(")
yz
(A En EA EA EA EA
In A ?
00 Co CO
9 J J
O O O O
O O
W
00
9
O
1
(fi fA En En 6+9
A
w w
O O
0 0 0
D
En
En
ril(/3 EA
(n N
En c
n En CA A
0 41) w >0 -4
'-3 -3 J W -4