HomeMy WebLinkAbout2000-128r- As -Built (Fourth Reso.)
/r-/4- 01
3/25/97(ENG)RES4.MAG\gk
RESOLUTION NO. 2000- 128
A RESOLUTION OF INDIAN RIVER COUNTY CERTIFYING
"AS -BUILT" COSTS FOR CERTAIN PAVING AND
DRAINAGE IMPROVEMENTS TO 1ST STREET BETWEEN
16TH AVENUE AND 18TH AVENUE, DESIGNATED AS
PROJECT NO. 9721, AND OTHER CONSTRUCTION
NECESSITATED BY SUCH PROJECT; PROVIDING FOR
FORMAL COMPLETION DATE, AND DATE FOR PAYMENT
WITHOUT PENALTY AND INTEREST.
WHEREAS, the Board of County Commissioners of Indian River County
determined that the improvements described herein specially benefitted the property located
within the boundaries as described in this title, designated as Project No. 9721, are in the public
interest and promote the public welfare of the county; and
WHEREAS, on April 6, 1999, the Board held a public hearing in the
Commission Chambers at which time the owners of the property to be assessed were afforded an
opportunity to appear before the Board to be heard as to the propriety and advisability of making
such improvements; and
WHEREAS, after such public hearing was held the County Commission adopted
Resolution No. 99-32 which confirmed the special assessment cost of the project to the property
specially benefitted by the project in the amounts listed in an attachment to that resolution; and
WHEREAS, the Director of Public Works has certified the actual "as -built" cost
now that the project has been completed is $21.91 per front foot, which is less than $22.27 per
front foot in the confirming Resolution No. 99-32.
1
��fUrr�v
_
RESOLUTION NO. 2000-128
a
NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY
COMMISSIONERS OF INDIAN RIVER COUNTY, FLORIDA, that:
1. Resolution No. 99-32is modified as follows: The completion date for Project
No. 9721 is declared to be August 30, 2000, and the last day that payment may be made avoiding
interest and penalty charges is ninety (90) days after passage of this resolution.
2. Payments bearing interest at the rate of 8.5% per annum may be made in
two equal installments, the first to be made twelve (12) months from the due date and the
subsequent payments to be due yearly from the due date. The due date is ninety (90) days after
the passage of this resolution.
3. The assessment roll for said project listed in Resolution No. 99-32 shall be as set forth
in attached Exhibit "A" to this resolution.
4. The assessments as shown in attached Exhibit "A" shall stand confirmed and remain
legal, valid, and binding first liens against the property against which such assessments are made
until paid.
5. The assessments shown in Exhibit "A", attached to Resolution No.99-32 were
recorded by the County on the public records of Indian River County, and the lien shall
constitute prima facie evidence of its validity.
2
RESOLUTION NO. 2000-__1115
This resolution was moved for adoption by Commissioner
Stanbri dae , and the motion was seconded by Commissioner
Gi nn and, upon being put to a vote, the vote was as follows:
Chairman Fran B. Adams
Vice -Chairman Caroline D. Ginn
Commissioner Kenneth R. Macht
Commissioner Ruth Stanbridge
Commissioner John W. Tippin
Aye
Aye
Aye
Aye
Aye
The Chairman thereupon declared the resolution duly passed and adopted this
10th day of October ,2000.
9721 Resolution As-Built-mag.wpd
BOARD OF COUNTY COMMISSIONERS
OF INDIAN RIVER COUNTY, FLORIDA
aA C c
Fran B. Adams, Chairman
Indian River County
Administration
Budget
Legal
Risk Management
Public Works
Engineering
Approved
Date
l®
/0
�o VA)-
Mfr.-let)
3
1
FINAL COST FOR:
1ST STREET BETWEEN 16TH AVENUE AND 18TH AVENUE
DATE: August 15, 2000 TOTAL F.F.
PROJECT NO. 9721 TOTAL L.F.
FINAL COST
919.10
506.71
CONSTRUCTION
Labor $8,545.95
Outside Labor $161.04
Equipment $6,428.64
Equipment Rental $91.83
Asphalt $2,746.61
Concrete $104.04
Sod $2,540.46
Pipe/Culverts $1,118.05
Stabilizer& Limerock $1,996.64
Engineering Tests $68.45
Miscellaneous $7.86
TOTAL CONSTRUCTION COSTS: $23,809.57 $23,809.57
PERMIT FEES $350.00 $350.00
ENGINEERING
($2.59 /L.F.) $2.59 x 506.71 $1,312.38 $1,312.38
Sub -Total $25,471.95
Administration 2.999613% $764.06
Recording Fees $87.50
25% County's Cost
75% Property Owner's Assessment
2% Collection Fee (75% Figure)
TOTAL COST TO PROPERTY OWNERS:
Assessment =
$20,137.49
919.1 FF
TOTAL $26,323.51
$6,580.88
$19,742.63
$394.85
$20,137.49
$21.91
$20,137.49
9721 FCST.WK4 09/29/2000
0
0
0
a; v o E" S vCi v 0 0 §
- evl N o O, 00 0~0 O'N O� to
.. 69 V .-. O .-+ .-t N
EACA EA EA EA EA 0
F
O
Ma
IMO
o 0 0 a,-. c-
cel tel
EA N
EA Er27
OO0 CM
GA
w U Fromm
M WW1=
p 0 0 0 0
0 a F GW7 0 °�.° v 0 0 is
F F L.14 C) ihtegmze
0
w
raZarli
oe oe oe oe oe
og 9 9 9g 9g
V'1 7). 0 2 try N
O O 0 0 0 0 0 O 0 0
c uo uo ▪ uo 14 N. A
OOvpv ▪ O ov O v oo
M M M M M Vt
[� 00 O� N
Su
csi el2
NCI it M �ytv
IdG n • 4 My
N M V M V 'C .
Ce
O 0 t' "" i 1 j r3 ; 41 6
0 13
u 00's 131 g -g oo8a r:4• N M • •
•
O
$1.]
Pa
C;)4
p CA
0�
Cek pcH
VI
W Op O
c;
A
914
42,
C7 �
O
W
Yom'
954
W
PA 1.4
V,
d
on 7, a�
or G P `� Pp eD 'Ar,
r .d 4 y., `' 'fl G
d
aq�� �y"Q.N-43a%
p ca ,r5 °
V 3 w °
°a 0,•,(3,.,p0.6—A.-6
o n ''3
d
ob 0� $e -n-- N ° 3 0 o °'� �.
oho r-�u'.a° o;:°a�K v
pON
• ` p pQ 'o•0AbD''',3',/,')e% -tO'�e;al1)Y W % M O ,A Q'a.+a, r
cr,
l .6r 4 w Q' F
d a
r)
A
O
Ssa
OA
It
41
.60
•
N