HomeMy WebLinkAbout2015-227 SECTION 00942 - Change Order Form No 2 DATE OF ISSUANCE: December 1, 2015 EFFECTIVE DATE- December 1, 2015 OWNER. Indian River County CONTRACTOR Sunshine Land Design. Inc. Project: Gifford Neighborhood 45th Street Beautification Project OWNER's Project No 1506 OWNER'S Bid No 2015040 You are directed to make the following changes in the Contract Documents, it Description- Replace existing asbestos concrete(ACJ wotermain along 451h Street from east of 40th Avenue to east of 40"Avenue to east of 32"d Avenue. Reason for Change Order- Given that the asbestos concrete(AC)main installed in 1968 will be under the new pavement and in conflict with the proposed landscape, it is pragmatic to have the existing AC main replaced with PVC/HDPE away from the new roadway and landscape at this time and minimize further interruption of service to our customers in this area. Attachments: (List documents supporting change) Sunshine Land Design, Inc., Proposal for IRC 45th Street AC Water main Replacement along with I aerial exhibits(5 sheets) CHANGE IN CONTRACT CHANGE IN CONTRACT TIMES u PRICE Description Amount Description Time U t Original Contract Price $1,306.877.14 Original Contract Time. (days or dates) o I� Substantial Completion ! 120 ro Final Completion. ( 150 Net Increase (Decrease) $313.783.32 Net change from previous Change from previous Change Orders No 1 . (days) �I Orders No 1 Substantial Completion. 65 ),� Final Completion 65 0 U' Contract Price prior to this $1.620.660.46 Contract Time prior to this Change Change Order: Order (days or dates) Substantial Completion 185 U Final Com letion. 215 Net increase(decrease)of $266,301.92 Net increase (decrease) this -P r' this Change Order Change Order d tes) Substantial Complet�;*iq���� �. Final Com le Contract Price with all $1,886,962.38 Contract Time with all approved* :p`; o approved Change Orders. Change Orders ;o: ( tesq' a Substantial CompleAtpq. 4-4., Final Comletl>k. ACE TED: RECO �/I DED: APPROVED: By: By: By. CONTRA TQR ( ign-fur- ENGIN (Signa ure) OWNER Bob Solari (J Chairman Date. �� Z3 1�S Date: �� `r . Date. l 00942-Change Order Form REV 04-07 docx 00942-1 F:Utilities\UTILITY-EngineeringlProiects-Utility Construction PemitsURC-45th Street AC WM Replacement 33rd Av.to 40th Av\AdminW942-Change Order Form REV 04- 07.docx Rev.05109 PROPOSAL LAND DESIGN 3291 SE Lionel Terrace, Stuart, FL 34997 Phone: 772 283 2648/ Fax: 772 283 8944 www.SunshineLandDesign.com I� r i+ Ij l TO: Arjuna Weragoda PROPOSAL DATE: 11/14/2015 Indian River County Utilities Mobile: (772) 226-1821 SUBMITTED BY: TIM TAYLOR E-mail: aweragoda@ircgov.com ttaylor sunshinelanddesign.com ENGINEER: PLAN DATE: )OB DESCRIPTION: IRC 45th Street AC Water Main Replacement ]OB AS OUTLINED BELOW QTY UNITS ITEM ITEM COST 1 MOBILIZATION/CONSTRUCTION BOND COST 1 LS $ 19,800.00 $ 19,800.00 2 MAINTENANCE OF TRAFFIC(SHOULDER/SIDEWALK CLOSURES) 1 LS $ 11,550.00 $ 11,550.00 3 SIDEWALK REMOVAL AND REPLACEMENT 3,720 SF $ 6.60 $ 24,552.00 4 SOFT DIG (POT HOLE/ LOCATE/VACUUM TRUCK) 1 LS $ 6,600.00 $ 6,600.00 ' 5 INSTALLATION OF : MAIN LINE/VALVES/CONNECTIONS/SEVICES/ ETC a) MATERIALS INCLUDING A 10%CONTINGENCY 1 LS $ 51,417.19 $ 51,417.19 b) MATERIAL SALES TAX 1 LS $ 3,085.03 $ 3,085.03 b) LABOR AND EQUIPMENT COSTS 1 LS $ 49,500.00 $ 49,500.00 6 DIRECTIONAL BORE 977 LF $ 33.00 $ 32,241.00 7 OPEN ROAD CUTS AND REPAIRS(SIDE STREET CONNECTIONS) 5 EA $ 3,850.00 $ 19,250.00 8 TESTING/BACTEES/ACCEPTANCE 1 LS $ 11,110.00 $ 11,110.00 9 ABANDON/GROUT EXISTING LINES AND VALVES 1 LS $ 19,618.70 $ 19,618.70 10 SURVEY/DATA COLLECTION/ RECORD DRAWINGS 1 LS $ 8,250.00 $ 8,250.00 it AC LINE STOP (IF REQUIRED) 2 EA $ 4,664.00 $ 9,328.00 45 DAY EXTENSION PER CONTRACT TOTAL: $ 266,301.92 ATTACHMENT N0. 2 CGC1518885/CUC1.223792 Watermain relocation 11/15/2015 I