Loading...
HomeMy WebLinkAbout1998-125 ., .•. . r:ar�.+�+�':'rgYv .., .,,, r sr--ecn„-'ePeFi'' T"rqas°"_'...-�w..�.wor+c�-,m. a t Apsalk(Four&Row.) 3/25/97(ENG)RES4.MA0Uup RESOLUTION NO.98. 12 5 A RESOLUTION OF INDIAN RIVER COUNTY CERTIFYING a "AS-BUILT" COSTS FOR CERTAIN PAVING AND DRAINAGE IMPROVEMENTS TO 1013T AVENUE FROM 79TH STREET TO 871*1 STREET, DESIGNATED AS PROJECT NO. 9309, AND OTHER CONSTRUCTION NECESSITATED BY SUCH PROJECT, PROVIDING FOR FORMAL COMPLETION DATE, AND DATE FOR PAYMENT WITHOUT PENALTY AND INTEREST. WHEREAS, the Board of County Commissioners of Indian River County determined that the improvements described herein specially benefitted the property located within the boundaries as described in this title,designated as Project No. 9309, are in the public interest and promote the public welfare of the county;and WHEREAS, on April 15, 1997, the Board held a public hearing in the Commission Chambers at which time the owners of the property to be assessed were afforded an opportunity to appear before the Board to be heard as to the propriety and advisability of making such improvements;and —._. . ... WHEREAS,after such public hearing was held the County Commission adopted Resolution No.97-56,which confirmed the special assessment cost of the project to the property specially benefitted by the project in the amounts listed in an attachment to that resolution;and WHEREAS,the Director of Public Works has certified the actual "as-built"cost now that the project has been completed is$2.00 per parcel,which is the same$2.00 per parcel in the confirming Resolution No. 97-56, NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF INDIAN RIVER COUNTY,FLORIDA,that: L Resolution No. 97-56 is modified as follows: The completion date for Project No. 9309 is declared to be September 23, 1998, and the last day that payment may be made avoiding interest and penalty charges is ninety(90)days after passage of this resolution. 2. Payments bearing interest at the rate of 81/:% per annum may be made in two equal installments, the first to be made twelve (12) months from the due date and the subsequent payments to be due yearly from the due date. The due date is ninety(90)days after the passage of this resolution. C:1Caror0MmNdition PsvinsW309 Ad3uili Rawmjiumpd 1 W. RESOLUTION NO. 98- 12 5 3. The assessment roll for said project listed in Resolution No.97-56 shall be as at forth y in attached Exhibit"A"to this resolution. 4. The assessments as shown in attached Exhibit "A" shall stand confirmed and remain legal, valid, and binding first liens against the property against which such assessments are made until paid. f S. The assessments shown in Exhibit "A", attached to Resolution No.97-56 were ` recorded by the County on the public records of Indian River County, and the lien shall constitute l f prima facie evidence of its validity. This resolution was moved for adoption by Commissioner � Eggert and the motion was seconded by Commissioner A d a in s and,upon being put to a vote,the vote was as follows: Chairman John W. Tippin Aye Vice-Chairman Kenneth R, Macht Aye Commissioner Fran B. Adams Aye Commissioner Caroline D.Ginn Aye Commissioner Carolyn K.Eggert Aye The Chairman thereupon declared the resolution duly passed and adopted this 10 dayof November , 1998. BOARD OF COUNTY COMMISSIONERS OF INDIAN RIVER COUNTY,F IDA By: W.TIPPIN, Cha' Attest: �.�.•..J ifE�Y K.BART a k• Attachment: Exhibit"A" IMan River Coutity Aptinwed Dog Ahninixtretion n M Budget it-a 8' Ride Munn Public Works /4 CXard0fAw7TPdWm PavigW309 AsHuili Reto-ntjm.%Vd 2 �€•W gyzs"` zfp,:'. s, �,,�.'7N w.s�x•.i•.ra�rs,,.�_>?`�+ iP��i:., � -�ra�,-sa •. .. to ±FINAL COST FOR: .: 101ST AVENUE,79TH STREET TO 87TH STREET DATE: October 1,1998 PROJECT NO. 9309 TOTAL F.F. 9,667.37 TOTAL L.F. 5,300.00 FDWJ COST CONMI CTION Labor $52,205.84 Equipinwt $40,049.35 As" $27,334.93 Sod $23,754.50 pipe $14,717.62 Limerock $45,011.19 Ltand611 $92.70 Testing $562.50 concrete $951.26 Equipment Rental $248.60 Catch Btewu $3,688.00 Outside Labor $482.16 Box Tractor Work I1.645.00 TOTAL CONSTRUCTION COSTS: $210,743.65 $210,743.65 EFS $700.00 $700.00 ROW ACQUISITION& N/A IM-P SEARCH FERC (Based on$2.59/L.F.) $2.59 X 5,300 L.F.= S 13.727.00 SUBTOTAL $225,170.65 Administration 3% 2%Tax Collector's Fee(2%of Property Owners Assessment) 56,755.12 Recording Fees $386.70 5175.00 TOTAL 5232,487,47 $2.00 per Front Foot to be assessed to Benefited Property Owners $19,334.74 Balance to be Paid by Other Revenue Services(MSTUD) $213,152.73 TOTAL ASSESSMENT 519�3a,� Assessment $19,33414 $2.00 9667.37 i i r 9309CO8T.WK4 10/08/98 i n� FINAL ASSESSMENT ROLL FOR PAVING AND DRAINAGE IM PROVEMEN'TS TO: 101 ST AVENUE FROM 79TH STREET TO 87TH STREET TOTAL FRONT FEET.......... 9,66737 COST TO PROPERTY OWNERS................. $19,334.74 PROJECT NO.9309 COST PER FRONT FOOT............... W-00 a. NAME&ADDRESS LEGAL DESCRIPTION FRONT FOOTAGE COST/F.F. TOTAL COST 1. Coolidge Corp. 33-31-38-00003-0070-00001.0 349.09 52.00 5698.18 Box 610727 Lots 1 to 4,Block G, N.Miami,FL 33160 Vero Lake Estates,Unit L (OR BK 467 PP 534) ,7 2. Coolidge Corp. 33-31-38-00003-0070-00005.0 300.00 $2.00 $600.00 Box 610727 Lots 5 to 8,Block G, k§ N.Miami,FL 33160 Vero Lake Estates,Unit L k (OR BK 467 PP 534) 3. Coolidge Corp. 33-31-38-00003-0070-00009.0 300.00 $2.00 $600.00 ' Box 610727 Lots 9 to 12,Block G, N.Miami,FL 33160 Vero Lake Estates,Unit L y (OR BK 467 PP 534) :a 4. Coolidge Corp. 33-31-38-00003-0070-00013.0 300.00 $2.00 $600.00 Box 610727 Lots 13 to 16,Block G, N.Miami,FL 33160 Vero Lake Estates,Unit L (OR BK 467 PP 534) :r 5. Raymond H.&Ruth Mary Burg 33-31-38-00003-0060-00017.0 75.00 $200 5150.00 15701 Minnetonka Blvd. Lot 17,Block F, - Minnetonka,MN 55343 Vero Lake Estates,Unit L 9309FIN.VNK4 loraft FINAL ASSESSMENT ROLL FOR PAVING AND DRAH4AGE MiPROVEMENTS TO: 101 ST AVENUE FROM 79TH STREET TO 87TH STREET 3: s;p TOTAL FRONT FEET.......... 9,667.37 COST TO PROPERTY OWNERS................. $19,334.74 PROJECT NO.9309 COST PER FRONT FOOT............... $200 NAME&ADDRESS LEGAL DESCRIPTION FRONT FOOTAGE COST/F.F. TOTAL COST 6. Coolidge Corp. 33-31-38-00003-0060-00018.0 225.00 62.00 $450.00 Box 610727 Lots 18, 19,20,Block F, N.Miami,FL 33160 Vero Lake Estates,Unit L (OR BK 467 PP 534) 7. Coolidge Corp. 33-31-38-00003-0060-00021.0 300.00 5200 6600.00 ` Box 610727 Lots 21 to 24,Block F, N.Miami,FL 33160 Vero Lake Estates,Unit L y (OR BK 467 PP 534) 8. Coolidge Corp. 33-31-38-00003-0060-00025.0 300.00 $2.00 $600.00 Box 610727 Lots 25 to 28,Block F, N.Miami,FL 33160 Vero Lake Estates,Unit L (OR BK 467 PP 534) 9. Coolidge Corp. 33-31-38-0000340060-00029.0 349.04 S2.00 $698.08 Box 610727 Lots 29 to 32,Block F, N.Miami,FL 33160 Vero Lake Estates,Unit L (OR BK 467 PP 534) 10. Lawrence W.&Brenda Young 33-31-39-00002-0070-00001.0 88.86 $200 $177.72 8295 101st Avenue Lot 1,Block G, Vero Beach,FL 32967 Vero Lake Estates,Unit K 9309RN.WK4 10✓22/9B V r. I FINAL ASSESSMENT ROLL FOR PAVING AND DRAINAGE EWROVEMENTS TO: 101ST AVENUE FROM 79TH STREET TO 87TH STREET TOTAL FRONT FEET.......... 9,66737 COST TO PROPERTY OWNERS................. $19,334.74 PROJECT N0.9309 COST PER FRONT FOOT............... $zpo x� NAME&ADDRESS LEGAL DESCRIPTION FRONT FOOTAGE COST/F.F. TOTAL COST 11. Timothy J.&Cynthia A Sherman 33-31-38-00002-0070-00002.0 75.00 V-00 5150.00 8165 95th Avenue Lot 2,Block G, Vero Beach,FL 32967 Vero Lake Estates,Unit K (OR BK 634 PP 2142) 12. Eric S.&Melinda W.Fisher 33-31-38-00002-0070-00003.0 75.00 $2.00 $15000 2071 Misty Meadow Rd. Lot 3,Block G, a Finksburg,MD 21048 Vero Lake Estates,Unit K 13. Bloomfield Construction Co. 33-31-38-00002-0070-00004.0 225.00 S2.00 $45000 338 Cedarville Street Lots 4,5&6,Block G, Pittsburg,PA 15224 Vero Lake Estates,Unit K 14. Kerry A.&Loraine Heider 33-31-38-00002-0070-00007.0 75.00 S2.00 515000 3902 Dowling Avenue Lot 7,Block G, Wilkins Township,PA 15221 Vero Lake Estates,Unit K (OR BK 478 PP 32) 15. Michael E.&Lynn M.Baumgartner 33-31-38-00002-0070-00008.0 150.00 $2.00 $30000 8205 101 st Avenue Lots 8&9,Block G, Vero Beach,FL 32967 Vero Lake Estates,Unit K 16. Nick&Jeanne Gazzola 33-31-38-00002-0070-00010.0 75.00 $2.00 $150.00 342 S Pacific Avenue Lot 10,Block G, Pittsburg,PA 15224 Vero Lake Estates,Unit K 9309FIN.V K4 10122/98 FINAL ASSESSMENT ROLL FOR PAVING AND DRAIN1AGE IMPROVEMENTS TO: 101 ST AVENUE FROM 79TH STREET TO 87TH STREET TOTAL FRONT FEET.......... r: 9,667_37 COST TO PROPERTY OWNERS................. $19,334.74 ;s PROJECT N0.9309 COST PER FRONT FOOT............... X00 NAME&ADDRESS LEGAL DESCREMON FRONT FOOTAGE COST/F.F. TOTAL COST 17. Michael&Linda M.Galley 33-31-38-00002-0070-00011.0 75.00 $2.00 $150.00 8165 101st Avenue Lot 11,Block G, Sebastian,FL 32967 Vero Lake Estates,Unit K 18. Ann E.Brack 33-31-38-00002-0070-00012.0 75.00 $2.00 $150.00 117 Royal Palm Street Lot 12,Block G, Sebastian,FL 32958 Vero Lake Estates,Unit K 19. Coolidge Corp. 33-31-38-00002-0070-00013.0 150.00 52.00 $300.00 Box 610727 Lots 13& 14,Block G, N.Miami,FL 33160 Vero Lake Estates,Unit K (OR BK 467 PP 534) 20. William W.&April A Moolenaar 33-31-38-00002-0070-00015.0 75.00 $2.00 $150.00 8115 101 st Avenue Lot 15,Block G, Vero Beach,FL 32967 Vero Lake Estates,Unit K 21. William W.&April A.Moolenaar 33-31-38-00002-0070-00016.0 75.00 $2.00 $150.00 8115 101st Avenue Lot 16,Block G, Vero Beach,FL 32967 Vero Lake Estates,Unit K 22. Nicholas&Gilda Addesa 33-31-38-00002-0060-00017.0 150.00 $2.00 5300.00 370 S Waverly Place,Apt 4-C Lots 17& 18,Block F, Vero Beach,FL 32960 Vero Lake Estates,Unit K 9309FIN.WK4 IOr~zm --- - -- -- ----- S Y FINAL ASSESSMENT ROLL FOR PAVING AND DRAINAGE EWROVEMENTS �. TO: 101ST AVENUE FROM 79TH STREET TO 87TH STkEET TOTAL FRONT FEET.......... 9,667-37 COST TO PROPERTY OWNERS................. $19,334.74 PROJECT NO.93M COST PER FRONT FOOT............... W-00 .:a NAME&ADDRESS LEGAL DESCRIPTION FRONT FOOTAGE COST)F.F. TOTAL COST 23. Sanaa Lynn Key 33-31-38-00002-0060-00019.0 75.00 52.00 5150.00 8136 101 st Avenue Lot 19,Block F, Vero Beach,FL 32967 Vero Lake Estates,Unit K 24. Harry&Lillian Greenberg 33-31-38-0000240060-00020.0 75.00 $2.00 $150.00 11734 Folkstone Lane Lot 20,Block F, Los Angeles,CA 90077 Vero Lake Estates,Unit K 25. Coolidge Corp. 33-31-38-0000240060-00021.0 300.00 $2.00 $600.00 Box 610727 Lots 21 to 24,Block F, N.Miami,FL 33160 Vero Lake Estates,Unit K 26. Coolidge Corp. 33-31-38-00002-0060-00025.0 300.00 $2.00 $61.00 Box 610727 Lots 25 to 28,Block F, N.Miami,FL 33160 Vero Lake Estates,Unit K 27. Joseph&Julia D.Kosich 33-31-38-0000240060-00029.0 75.00 $2.00 $150.00 6715 Tuxedo Road Lot 29,Block F, San Diego,CA 92119 Vero Lake Estates,Unit K 28. Glenn E.&Dorothy L.Ferrall 33-31-38-0000240060-00030.0 75.00 $2.1 $150.1 2509 Bordeaux way Lot 30,Block F, Lutz,FL 33549 Vero Lake Estates,Unit K 9309F1N.%W4 1022M FINAL ASSESSMENT ROLL FOR PAVING AND DRA 14AGE IMPROVEMENTS ` <_ TO: 101 ST AVENUE FROM 79TH STREET TO 87TH S'M. ET TOTAL FRONT FEET-......... 9,667.37 COST TO PROPERTY OwNERs----------------- $19,334.74 PROJECT N0.9309 COST PER FRONT FOOT............... Z2 00 ' NAME&ADDRESS LEGAL DESCRIPTION FRONT FOOTAGE COST/F.F. TOTAL,COST 29. Mary Ann Rannou 33-31-38-00002-0060-00031.0 163.93 $2,00 $327.96 8276 101 st Avenue Lots 31 &32,Block F, Vero Beach,FL 32967 Vero Lake Estates,Unit K Plat Book 5,Page 83 30. Coolidge Corp. 33-31-38-00001-0140-00001.0 75.00 $2.00 $150.00 Box 610727 Lot 1,Block N, N.Miami,FL 33160 Vero Lake Estates,Unit J (OR BK 467 PP 534) 31. Ann Vignovich 33-31-38-00001-0140-00002.0 150.00 $2.00 530000 2311 West Wade Street Lots 2&3,Block N, Aliquippa,PA 15001 Vero Lake Estates,Unit J 32. Bertie Dibble 33-31-38-00001-0140-00004.0 75.00 52.00 $150.00 RR I Box 1059 Lot 4,Block N, Three Springs,PA 17264 Vero Lake Estates,Unit J 33. Regis H-&Margaret E.Ryan 33-31-38-00001-0140-00005.0 150.00 $2.00 $30000 P.O.Box 614 Lots 5&6,Block N, Rockledge,FL 32956-0 Vero Lake Estates,Unit J 34. Paul K.Solt 33-31-38400001-0140-00007.0 150.00 $2_00 530000 2299 Hoffer Avenue Lots 7&8,Block N, Laureldlae,PA 19605 Vero Lake Estates,Unit J 9309FIN.WK4 1Q/2?J98 I 0. FINAL ASSESSMENT ROLL FOR PAVING AND DRAINAGE IMPROVEMENTS TO: 101 ST AVENUE FROM 79TH STREET TO 87TH S'T'REET TOTAL FRONT FEET.......... 9,66737 COST TO PROPERTY OWNERS................. $19}34.74 PROJECT NO.9309 - COST PIER FRONT FOOT............... $2.00 NAME&ADDRESS LEGAL DESCRIPTION FRONT FOOTAGE COST/F.F. TOTAL COST 4 35. Collidge Corp. 33-31-38-00001-0130-00001.0 131.74 W-00 X3.49 Box 610727 Lot 1,Block M, N.Miami,FL 33160 Vero Lake Estates,Unit J (OR BK 467 PP 534) 36. W.Ray&Anne G.Laseter 33-31-38-00001-0130-00002.0 75.00 $2.00 $150.00 1038 Ray Wyatt Road Lot 2,Block M, Ashville,AL 35953 Vero Lake Estates,Unit J a 37. Charlotte A_&John D_Cole,Jr. 33-31-38-00001-0130-00003.0 75.00 $2.00 $150.00 8455 101st Avenue Lot 3,Block M, Vero Beach,FL 32967 Vero Lake Estates,Unit J 38. Joseph Sortino 33-31-38-00001-0130-00004.0 75.00 $2.00 $150.00 clo Florence Wolfling Lot 4,Block M, 475 Center Street Vero Lake Estates,Unit J East Aurora,NY 14052 39. Raymond C.&Julia C.Raub 33-31-38-00001-0130-00005.0 75.00 $2.00 Si 50.00 1501 SW Edinburg Drive Lot 5,Block M, Pt.St Lucie,FL 34953 Vero Lake Estates,Unit J (OR BK 153 PP 384) 9309FIN.WK4 10R?J4B FINAL ASSESSMENT ROLL FOR PAVING AND DRAINAGE mpROVEMENTS r TO: 101 ST AVENUE FROM 79TH STREET TO 87TH STREET TOTAL FRONT FEET.......... 9,66737 COST TO PROPERTY OWNERS................. 219,334.74 PROJECT'N0.9309 COST PER FRONT FOOT............... X00 a i NAME&ADDRESS LEGAL DESCRIPTION FRONT FOOTAGE COST/F.F. TOTAL,COST 40. Madeline Nistico 33-31-38-00001-0130-00006.0 150.00 �� 552 Third Street Lots 6&7,Block M, Clairton,PA 15025 Vero Lake Estates,Unit J 41. Coolidge Corp. 33-31-38-00001-0110-00009.0 150.00 Box 610727 Lots 9&12,Block K, 52.00 5300.00 N.Miami,FL 33160 Vero Lake Estates,Unit J (OK BK 467 PP 534) ) 42. George E.Petticrew,Jr. 33-31-38-00001-0110-00010.0 75.00 62.00 $i50.00 8326 101st Avenue Lot 10,Block K, Vero Beach,FL 32967 Vero Lake Estates,Unit K 43. Mary Agnes Martin(Dec.) 33-31-38-00001-01 1 0-0001 1.0 75.00 $2 00 c% Eleanor Schachern,Executor Lot 11,Block K, $150.00 2421 Front Street Vero Lake Estates,Unit J Monica,PA 15061 44. Rita Hudmon 33-31-38-00001-0110-00013.0 75.00 $200 8360 101st Avenue Lot 13,Block K, 5150.00 Vero Beach,FL 32967 Vero Lake Estates,Unit J 9309FIN.WK4 loci 98 i FINAL ASSESSMENT ROLL FOR PAVING AND DRAINAGE IlVIPROVEMENTS � . .s TO: 101 ST AVENUE FROM 79TH STREET TO 87TH STREET TOTAL FRONT FEET.......... 9,667.37 PROJECT'N0.9309 COST TO PROPERTY OWNERS................. 119,334.74 - COST PER FRONT FOOT............... 12.00 NAME&ADDRESS LEGAL DESCRIPTION FRONT FOOTAGE COST/F.F. Tp'p,+j,COST' 000 45. Rita F.Hudmon 33-31-38- 01-0110-00014.0 75.00 X00 8360 101st Avenue Lot 14La,Block K, 1150.00 Vero Beach,FL 32967 Vero ke Estates,Unit J a 46. Collidge Corp. 33-31-38-00001-0110-00015.0 150.00 Box 610727 Lots 15& 16,Block K, M'00 $300•0 j N.Miami,FL 33160 Vero Lake Estates,Unit J (OK BK 467 PP 534) 47. Collidge Corp. 33-31-38-00001-0120-00008.0 22500 Box 610727 Lots 8 to 10,Block L, $2.00 $450.00 N.Miami,FL 33160 Vero Lake Estates,Unit J (OK BK 467 PP 53) 48. Marvin&Gayle Reaume 33-31-38-00001-0130-00011.0 75.00 Lot 11,Block L 13520 NW 4th Manor $2.00 $150.00 , Plantation,FL 33325 Vero Lake Estates,Unit J 49. Tommy J.&Jean Runion 33-31-38-00001-0120-00012.0 75.00 1713 Linwood Avenue Lot 12,Block L, $2.00 1150.00 Ft.Pierce,FL 34982 Vero Lake Estates,Unit J 50. Tommy J.&Jean Runion 33-31-38-00001-0120-00013.0 75.00 1713 Linwood Avenue Lot 13,Block L, 12.00 $150.00 Ft.Pierce,FL 34982 Vero Lake Estates,Unit J 9309FIN.WK4 10✓22/M 3f«% FINAL ASSESSMENT ROLL FOR PAVING AND DRAINAGE B PROVEMENTS TO: 101 ST AVENUE FROM 79TH STREET TO 87TH STREET TOTAL.FRONT FEET.......... 9,667.37 COST TO PROPERTY OWNERS................. $19,334.74 PROJECT'NO.9309 COST PER FRONT FOOT............... $zoo , NAME&ADDRESS LEGAL DESCRIPTION FRONT FOOTAGE COST/F.F. TOTAL COST 51. Michael K.&Nina E.Neady 33-31-38-00001-0120-00014.0 131.56 12.00 5263.12 3902 74th Avenue Lot 14,Block 1., Hyattsville,MD 20784 Vero Lake Esates,Unit J 52. Kathleen L.Craig 28-31-38-00006-0140-00001.0 71.00 $2.00 514200 4250 Sardis Road Lot 1,Block N, Murrysville,PA 15668 Vero Lake Estates,Unit I 53. Ernest G.&Christin Gerber,m 28-31-38-00006-0140-00002.0 75.00 $2.00 5150.00 8575 101st Avenue Lots 2,Block N Vero Beach,FL 32967 Vero Lake Estates,Unit 1 54. John Lloyd 28-31-38-00006-0140-00006.0 75.00 $2.00 5150.00 9432 U.S.Highway 1 Lots 3,Block N Sebastian,FL 32958 Vero Lake Estates,Unit I 55. Fred Anderson 28-31-38-00006-0140-00004.0 75.00 $2.00 $150.00 1001 Foster Road Lot 4,Block N, Sebastian,FL 32958 Vero Lake Estates,Unit 1 56. Joseph&Gertrude Blood 28-31-38400006-0140-00005.0 75.00 $2.00 $150.00 8545 101st Avenue Lot 5,Block N, Vero Beach,FL 32967 Vero Lake Estates,Unit 1 9309FIN.WK4 lOiR?/9t FINAL ASSESSMENT ROLL FOR PAVING AND DRAINAGE IMPROVES 7771 TO: 101 ST AVENUE FROM 79TH STREET TO 87TH STREET . TOTAL FRONT FEET.......... 9,667.37 COST TO PROPERTY OWNERS................. $19,334.74 PROJECT NO.9309 COST PER FRONT FOOT............... noo NAME&ADDRESS LEGAL DESCRIPTION FRONT FOOTAGE COST/F.F. TOTAL COST 57. Southern Bell T&T Co. 28-31-38-00006-0140-00006.0 75.00 $2.00 $15000 cto Bellsouth Room 5E03 Campanile Lot 6,Block N, 1155 Peachtree Street NE Vero Lake Estates,Unit I Atlanta,FL 30367-6 (OR BK 721 PP 1444) 58. David W.&Delia Badders 28-31-38400006-0140-00007.0 146.00 52.00 5292.00 11146 Del Rio Road Lots 7&8,Block N, Spring Valley,CA 91978 Vero Lake Estates,Unit I (OR BK 495 PP 747) i 59. Stuart E.&Lucille Glover 28-31-38-00006-0130-00001.0 77.07 $2.00 $154.14 10101 87th Street Lot 1,Block M, Vero Beach,FL 32967 Vero Lake Estates,Unit I 60. Patricia L.Carey 28-31-38-00006-0130-00002.0 75.00 $2.00 5150.00 8675 101 st Avenue Lot 2,Block 7, Vero Beach,FL 32967 Vero Lake Estates,Unit I (OR BK 484 PP 706) 61. Virginia&Raymond Taylor,Jr. 28-31-38400006-0130-00003.0 150.00 $2.00 $300.00 1076 Great Road Lots 3&4,Block M, Lincoln,RI 02865 Vero Lake Estates,Unit I 9309FIN.WK4 10f12/9a3 i FINAL ASSESSMENT ROLL FOR PAVING ANDD RAII4AGE IlVIPROVENCENTS TO: 101 ST AVENUE FROM 79TH STREET TO 87TH STREET TOTAL.FRONT FEET.......... 9,66737 " COST TO PROPERTY OWNERS................. $19,334.74 PROJECT N0.9309 COST PER FRONT FOOT............... 52.00 =�: f NAME&ADDRESS LEGAL DESCRIPTION FRONT FOOTAGE COST/F.F. TOTAL COST 62. Edmund N.Ansin,Trustee 28-31-38-0006-130-00005.0 225,00 $2.00 $4500 1401 79th Street Causeway Lots 5 to 7,Block M, Miami,FL 33141 Vero Lake Estates,Unit I (OR BK 467 PP 485) ' 63. Alexandra A.&Anasta Alexander 28-31-38-00006-0130-00008.0 70.00 $2.00 $140.00 328 Granada Parkway Lots 8&9,Block M, Lindenhurst,NY 11757 Vero Lake Estates,Unit I 64. Donald Paul&Maria Ricc Zappa 28-31-38-00006-0110-00009.0 71.00 $2.00 $142.00 224 S Evaline Street Lot 9,Block K, Pittsburg,PA 15224 Vero Lake Estates,Unit I 65. Frank S.&Susan Ernst 28-31-38-00006-0110-00010.0 75.00 $2.00 $150.00 15713 Davis Cup Lane Lot 10,Block K, Ramona,CA 92065 Vero Lake Estates,Unit I 66. Karol Poderski 28-31-38-00006-0110-00011.0 75.00 $2.00 $150.00 1625 Martin Hwy.#714 Lot 11,Block K, Palm City,FL 34990 Vero Lake Estates,Unit I 67. Edmund N.Ansin,Trustee 28-31-38-00006-0110-00012.0 75.00 52.00 $150.00 1401 79th Street Causeway Lot 12,Block K, Miami,FL 33141 Vero Lake Estates,Unit I (OR BK 467 PP 485) 9309M.WK4 10i2?J9B FINAL ASSESSMENT ROLL FOR PAVING AND DRAINAGE EMPROVEM[ENTS TO: 101 ST AVENUE FROM 79TH STREET TO 87TH STREET TOTAL FRONT RMT.......... 9 667.37 COST TO PROPERTY OWNERS................. S19,334 74 PROJECT NO.9309 COST PER FRONT FOOT............... $2.00 NAME&ADDRESS LEGAL DESCRWnON FRONT FOOTAGE COST/F.F. TOTAL COST 68. Harold&Rose Borrelli 28-31-38-00006-0110-00013.0 150.00 $2.00 $300.00 66 Parsonage Hill Road Lots 13& 14,Block K, Northford,CT 06472 Vero Lake Estates,Unit I 3 69. John H.Francisco 28-31-3&00006-0110-00015.0 75.00 $2.00 $150.00 Houston Paving Co. Lot 15,Block K, 80 Houston Road Vero Lake Estates,Unit I 3 Little Falls,NJ 07424 t :s i 70. Wanda Lepien 28-31-384)0006-0110-00016.0 71.00 $2.00 $142.00 107 McGregor Street Lot 16,Block K, Harligen,TX 78550 Vero Lake Estates,Unit I (OR BK 414 PP 240) 71. George Lins 28-31-38-00006-0120-00009.0 145.00 $2.00 $290.00 P.O.Box 266 Lots 9& 10,Block L, Brielle,NJ 08730 Vero Lake Estates,Unit I 72. Ronald&Joan Ciccozzi 28-31-38-00006-0120-00011.0 75.00 $2.00 $150.00 120 Heather Drive Lot 11,Block L, Monaca,PA 15061 Vero Lake Estates,Unit I i s 9309FIN.WK4 lor2219t3 f i F. FINAL ASSESSMENT ROLL FOR PAVING ANDD AGE HvIPROVEMENTS TO: 101 ST AVENUE FROM 79TH STREET TO 87TH STREET s' TOTAL FRONT FEET.......... 9,66737 COST TO PROPERTY OWNERS................. $19,334.74 PROJECT NO.9309 COST PER FRONT FOOT............... $2.00 NAME&ADDRESS LEGAL DESCRIPTION FRONT FOOTAGE COST/F.F_ TOTAL COST 73. Orval B.&Marjorie O.Archer 28-31-38-00006-0120-00012.0 75.00 $2.00 $150.00 2799 Wright Avenue SE Lot 12,Block L, Palm Bay,FL 32909 Vero Lake Estates,Unit I 74. Maggie L.McDaniel 28-31-38-00006-0120-00013.0 150.00 52.00 5300.00 8666 101st Avenue Lots 13& 14,Block L, Vero Beach,FL 32967 Vero Lake Estates,Unit I (OK BK 440 PP 913) 75. Thomas H.&Donna S.Sherrod 28-31-38-00006-0120-000]5.0 152.08 $2.00 $304.16 Rt. 1 Box 107-N Lots 15& 16,Block L, Lake City,FL 32055 Vero Lake Estates,Unit 1 TOTAL 9,667.37 $2.00 $19,334.74 FRONT FOOTAGE COST PER F.F. TOTAL COS71 9309FIN.WK4 i 10/22A8 i