HomeMy WebLinkAbout2016-004 WORK ORDER NUMBER s
Membrane Replacement for Hobart RO Skids #5 & #S
This Work Order Number S is entered into as of this 1-?t-4ay of 207 , pursuant to that
certain Continuing Contract Agreement for Professional Services, dated November 15, 2011,and that certain
Extension and Amendment of Continuing Contract Agreement for Professional Services entered into as of
this 4th day of November, 2014 (collectively referred to as the "Agreement"), by and between INDIAN RIVER
COUNTY, a political subdivision of the State of Florida ("COUNTY") and Kimley-Horn and Associates, Inc.
("Consultant").
The COUNTY has selected the Consultant to perform the professional services set forth on Exhibit A
(Scope of Work), attached to this Work Order and made part hereof by this reference. The professional
services will be performed by the Consultant for the fee schedule set forth in Exhibit B (Fee Schedule),
attached to this Work Order and made a part hereof by this reference. The Consultant will perform the
professional services within the timeframe more particularly set forth in Exhibit A(Time Schedule),attached
to this Work Order and made a part hereof by this reference all in accordance with the terms and provisions
set forth in the Agreement. Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work
Order shall conflict with the terms of the Agreement and the terms of the Agreement shall be deemed to be
incorporated in each individual Work Order as if fully set forth herein.
IN WITNESS WHEREOF,the parties hereto have executed this Work Order as of the date first written
above.
CONSULTANT: BOARD OF COUNTY COMMISSIONERS •........••
Kimley-Horn and Associates, Inc. OF INDIAN RIVER COUNTY ..•y G�r1MISSj'
By: By: -Qa�.�, j
David R. Bardt, P.E. Bob Solari , Ch�irpnan
Title: 'y •����
o'••• r ,I, �;
Principal BCC Approved Date: January 12, 2016 '•9�'ERcouN�!.•''•
Attest:Jeffrey R. Smith, of Court ap roller
By:
Is Sp
ep y Clerk
i)
Approved:
)000�sepjh . aird, County Administrator
i
Approved as to form and legal sufficiency:
D T. Reingold, County Attorney
i
i
I
EXHIIBIT#A
Work Order Number 5
Membrane Replacement for RO Skids #5,#8 and
Installation of Membranes in RO Skid #7 l
North (Hobart)RO Water Treatment Plant
PROJECT UNDERSTANDING
i
The existing membranes in stage 2 of skids#5 and#8 at the Hobart water treatment plant have
degraded rapidly,due to impacts from the scale inhibitor use. Replacement of the 2°d stage of
each of these RO skids is necessary and will consist of removal and disposal of the existing
elements,swabbing/cleaning of the existing pressure_vessel s,disinfection of RO skid product
piping, installing new membrane elements, flushing, and startup and testing of new membranes in
the existing skids.
Specifications and drawings have been prepared under PO#71787-00 for membrane replacement
of RO skids#1 and#2. Removal of RO skids#l. and#2 elements under the previous purchase
order will be used in skid#7,which is currently empty. Placing skid#7 into service with used
membrane elements from RO skid#1 and#2 will be included under this work order.
Replacement of penneate hoses on the RO skids#I and#2 will be included under this scope of
work. The work will be perfonned by an original equipment►manufacturer(OElvf) who has
bonding capacity and a general contractors' license; experienced in performing this type of work.
The work will be publicly advertised for bidding through Indian River County(IRC)purchasing
department.
SCOPE OF SERVICES
The following scope consists of engineering support for membrane replacement of skids#5 and
#8, permeate hose replacement on RO skids#1 and#2, Florida Department of Environmental
Protection permitting,and startup set-vices for RO skid#7 at the North Hobart water treatment
plant.
Task 1—Update Specifications and Drawings
Consultant will update the technical specifications to include membrane replacement with new in
stage 2 of RO skids 45 and#8.
Consultant will update the drawings and specifications to include penneate hose replacement with
hard-piping on RO skids#I and#2 only.
Task 2—Permitting
Consultant will prepare a FDEP permit application FDEP Folin 62-555.900(1),Application for a
Specific Permit to Construct PWS Components for a minor modification to the RO water plant
without an increase in rated plant capacity.
KAW1PB_Civil10�t572035-Hobart Membrane ReplacementtScopelHobart Membrane Replacement 5&8 Additional Services
rev l.docx
Page 1 of 3
Consultant will prepare supporting documents, consisting of drawings. specifications,projections;
and calculations supporting the permit application.
Consultant will prepare four(4) signed and sealed copies of permit application package and
submit to FDEP Southeast District.
Consultant will respond to one round of reasonable requests for additional information from
FDEP permitting agency requests for clarification.
Task 3—Observations and Startup
I l
Consultant will review additional submittals on membrane elements for stage 2 of RO skids#5
and#8, permeate piping replacement,and respond to OEM and IRCU staff questions.
Consultant will review performance of RQ train#1 and #2 membranes and provide a suggested
membrane loading scheme of used membrane elements into RO skid#7. Consultant will provide
coordination with OEM on the loading of these elements.
Consultant will provide an additional four(4)days of on-site observations of membrane
installation in an effort to track and monitor loading of the membrane elements for RO trains#5,
#8, and V.
Consultant will provide up to four(4)days of startup observations, consisting of review of profile
data, membrane system performance,water quality test results;and operational testing of RO skid
#7 components.
Consultant will attend and witness startup and operational testing of R.0 skids#5,#8, and V. RO
skids 95 and#8 will only consist of operational testing with.stage 2 membrane elements and
review of water quality testing performed by OEM. Operational testing of RO skid#7 will
consist of review and coordination with SCADA programmer the loop scaling and operation,
instrument ranges,and tuning of pre-treatment, steady-state, and post-flushing of the RO skid.
Consultant will develop a pupch-list of incomplete items based on our on-site observations and
startup testing. Consultant will issue a written punch-list to Owner and contractor. Consultant
will provide one(1)site visit to review follow up work on punchlist items.
Consultant will provide certification of completion and request for approval to place PWS
Components into operation, in accordance with DEP form 62-555.900(9) if work is found to be in
general conformance with the plans and specifications. It is assumed that a partial release to
place the R.0 skid 47 into operation and one final clearance for the completed project will be
prepared and requested. Consultant will submit forms in duplicate to the Department for a
request to release the RO plant.
Task 4--SCADA.Implementation of RO Skid 47
The existing RO skid#7 appears to have programming and code installed for the operation of the
membrane skid,however,it does not appear that it has been loop checked,or tested for
integration with the oilier system components. This task consists of implementing the operational
testing of RO skid#7 and placing it into service with the used membrane elements.
KAWPB_CiN4A"t572035-Hobart Membrane Rep1aceinent4Scope\Hobart Membrane.Replacement s&&Additional Services
rev l.doca
Page 2of3
1
Consultant will utilize the services of Control Systems Design, who is familiar with the PLC and
HMI programming.
Consultant will review the completeness of existing code for all interfaces and control logic being
in place and operational to support train#7 addition. Perform modifications to complete the
programming to provide functionality presently available for the other trains.
Consultant will provide onsite checkout and verification of instrumentation and equipment
configuration and current existing train#7 operation, including input/output(UO)and
fiuictionality prior to operational startup.
Consultant will perform modifications necessary to implement the configuration.
Consultant will provide up to one-day of offsite remote assistance for startup and operational
testing.
TIME SCREDULE
Consultant will complete these tasks in a timely and mutually agreed upon schedule,and
concurrently with the other related purchase order PO#71787-00.
FEESCHEDULE
We will provide these services in accordance with our Continuing Services Contract Agreement
for Professional Services dated November 41,2014,with Indian River County.
The Consultant will provide professional services for Task 1 through Task 3 on a lump sum fee
basis as follows:
Task.No. 'Task Task Fee
Task 1 U date Drawin s& Specifications $ 4,100
Task 2 Permitting S 5,700
Task 3 Observation and Startup $14,780
Task 4 SCADA Implementation S 7 800
Total Lump Sum Fee= $32 380
ADDITIONAL SERVICES
The following services are not included in the Scope of Services for this project, but may be
required depending on circumstances that may arise during the execution of this project.
Additional services include, but may not be limited to the following:
e Design drawings of any modification to the RO skids
ii
KAWPB Civi11044572035-Hobart Membrane Repiacement\SeopelHobars Membrane Replacement 5&8 Additional services
rcv l.docx
Pap 3of3
i
i
a
EXTiMBTT B-FEE SCHEDULE
PROIECI'.Membrane Replacement-Hobart Trains 45 and 08 WWI` I OF 1
CLIENT,Indian River County Utilities PRE NO.
ESTIMATOR.MDM DATE:10/24/15
DESCRIPTION: DIRECT LAS OR I MAX-HOURS)
Membrane Rcpineement,permitting REG Dir Exp UNE
Startup obscrvation3 SE-14 PROF DES/ i CLK FXP ENP TOTAL
PRINC PROF JWH P2 TS/AB P) SUB SUB
NOJ TASK
1 UPDATE DWCS&SPECS
Revise dwas 4 $1 2 5150 $87 $2.133
Updated 9 4 61 4 $89 51,967
$4,100
2 PERMITTIXG
Prepare nication 2 8 $59 SI,331
Supporting docs 6 4 '429 St 043
Submit Pamit pa&auc&cooMination 41 6 2 578 51,764
Rn ondtoR I 4 6 S69 S1,563
SSi00
3 Obsarvation and Starve
Additional subminalsreview 21 4 5'.17 5621
Loidin scheme for RO omin#7 2 6 $103 S1,111
Membiono replacement(q ) 4 32 5194 54,418
SmTobsenmtions(4 days) 121 30 1 $264 S6,DD6
Ponchlist 2 8 S39 SI.331
Crnifint an 2 4 4 S37 Sl 293
514,73
4 SCADA Im lementat)an
Control Sstems Design S73501 550 57.800 57.800
TOTAL HOURS 0 40 ol 116 267900 SI1G4 $31.3810S3'.380
LABOR 5/HOUR1 225 216 148 105 96 25 So SO
SUBTOTAL a xwt o t2tso 2avc o 79yj V1,216 SO